Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
H-1b. Chanhassen Specialty Retail Subdivision Site Plan and PUD Amendment
CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952 227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.2271110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.2271130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.2271125 Fax: 952.227.1110 Website www.d.chanhassen.rnn.us -J. 8 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Sharmeen Al-Jaff, Senior Planner DATE: July 27, 2015 a, SUBJ: Chanhassen Specialty Retail / Villages on the Ponds 1 l `h Addition Planning Case #2015-17 PROPOSED MOTION "The Chanhassen City Council approves the Preliminary and Final Plat for Villages on the Ponds 11"' Addition; Site Plan for Chanhassen Specialty Retail, and Planned Unit Development Amendment to the sign criteria subject to the conditions of the staff report; and adopts the Findings of Fact." City Council approval requires a majority vote. EXECUTIVE SUMMARY The developer is requesting Subdivision approval to create one lot and one outlot, Site Plan Review for a 19,909 square -foot, one-story specialty liquor store (Total Wine & More), and Planned Unit Development Amendment to the sign criteria. PLANNING COMMISSION SUMMARY The Planning Commission held a public hearing on July 7, 2015 to review the proposed development. The Planning Commission voted 6 — 0 recommending approval of the development as proposed subject to the conditions of the staff report. As part of the discussion, some issues were raised. These issues are as follows: Slaves The applicant is requesting approval to locate signs along all four building facades. Signs facing the east and south elevations are proposed to be 30 inches in height while signs facing west and north will be 42 inches. The smallest wall area is 3,359 square feet. The city code would permit a sign with an area not to exceed 5% of the total wall area which translates to 168 square feet with no restrictions on the size of the letters nor how high it can be located on a building wall. The dashed red line on the building elevations below reflect the 5% sign area. Chanhassen is a Community for Life - Providing for Today and Planning lorTomorrow Todd Gerhardt Chanhassen Specialty Retail / Villages on the Ponds 116 Addition July 27, 2015 Page 2 of 4 Staff was asked to compare the sizes of other liquor store signs in the city (see table on next page). s bD w L w d d O c N d L 3 O w 0 O m 7 L .... > O A d Z d X d Ln y O C ti Ln C d C m 'n d �' "0 M c d Y `� m cD -p V e -I c f0 v d wN v d O c O N a O Ln Ln N w 0 Y C c G1 s O m 3 C f6 YO p Oc0 O Z p p C 6 .to d> c W " i+ m a+ m a M 0U d c N 0D N ry OA = d d N O a .F, `m d d 0 u O y N a d L+ d b0 d tYn 'O L Lo d Ln C0 rbD L v 'O y oA y 7 'Vf VI N bD i� C c @ tO C C c m a O coO Gi CLd .c O O aj 6 N C d L V O O p a � UD 00 2 N 7 O N 7 O N Y L o aj z p 3 6 z °' m o LO N N� m cG I- N m N V LL m o = u a F 3 Qj E a Y Q U U a rr 0 J a UD � o 0) a d r L m a) Lf) Ln 00 00 m N Ln .O O m N 00 of - N N M n p « Q' 00 00 m LD n N Ol 3 L u N a N F p, TT cu a N L J O V 10�� d of mad, txoA 0 `,°3 v, m a tko o Lp a a E� Go L d' ti d' •N Ln LOO 00 M O w o 3 ti =p r i c-1 e --I e -I LA L Lan N 41 d m CL c m V c N M K C m 2 0 o Z 00 °0 m a °° a a a Lo w H O W N e 3 C* H N m a U C C U Off = . n !� s bD w L c d W O rq O N Z d X d 0 d u c N m V C O a G1 s _ a aM L O @ i 3 3 N 00 O W " a OA = `m d L+ L Lo d Ln o m y mLT O r, 7 E a CLd .c 00 O a a a io Y N h G m N C CZ NCZ a m o = u a F Qj E a Y Q U U a Todd Gerhardt Chanhassen Specialty Retail / Villages on the Ponds I ld Addition July 27, 2015 Page 4 of 4 Traffic At the Planning Commission meeting for Chanhassen Specialty Retail on July 13, 2015, questions were raised about how traffic in and nearby the Villages on the Ponds development would be impacted if this proposal is approved. A traffic analysis was completed by BRW, Inc. as part of the Environmental Assessment Worksheet (EAW) for Villages on the Ponds. The original development with its traffic analysis was approved by the City Council on August 12, 1996. The current proposal for Chanhassen Specialty Retail is expected to generate less traffic than what was approved by Council in 1996. The original proposal in the EAW for Villages on the Ponds expected three buildings on the site with a combined total of 36,300 square feet. Both the original and the current proposal would fall under Specialty Retail Category (LUC 814) in the ITE Trip Generation Manual 6' Ed. The current proposal would generate 44% fewer weekday trips and 45% less PM peak hour trips than the original proposal that the traffic study was based on. This site has already been approved for a larger traffic user than what is proposed for Chanhassen Specialty Retail. Adjusted to use 1'1'>✓ 'Trip Generation Manual 6' Ed. LUC 814 RECOMMENDATION "The Chanhassen City Council approves the Preliminary and Final Plat for Villages on the Ponds 11`h Addition; Site Plan for Chanhassen Specialty Retail, and Planned Unit Development Amendment to the sign criteria subject to the conditions of the staff report; and adopts the Findings of Fact." ATTACHMENTS 1. Reduced Copy Final Plat, Villages on the Ponds 116' Addition. 2. Planning Commission Staff Report Dated July 7, 2015. gAplan\2015 planning cases\2015-17 chanhassen specialty relaMezecutive summary.doc Chanhassen Specialty Retail Proposal from the EAW Traffic Study* Size 19,900 sf 36,300 sf Weekday Tris 820 tris 1450 trips PM Peak Hour 98.6 trips 179.0 trips Adjusted to use 1'1'>✓ 'Trip Generation Manual 6' Ed. LUC 814 RECOMMENDATION "The Chanhassen City Council approves the Preliminary and Final Plat for Villages on the Ponds 11`h Addition; Site Plan for Chanhassen Specialty Retail, and Planned Unit Development Amendment to the sign criteria subject to the conditions of the staff report; and adopts the Findings of Fact." ATTACHMENTS 1. Reduced Copy Final Plat, Villages on the Ponds 116' Addition. 2. Planning Commission Staff Report Dated July 7, 2015. gAplan\2015 planning cases\2015-17 chanhassen specialty relaMezecutive summary.doc 31BP , I City of Chanhassen Planning Commission Chair & Members 7700 Market Blvd. PO Box 147 Chanhassen, MN. 55317 Re: Proposed Total Wine Liquor Store Chanhassen Dear Honorable Chair & Comrnission Members, 560 Market Street - Suite 12 PO Boa 580 Chanhassen, MN 55317 Phone 952.474.5243 - Fax 952.474.5244 - burdickproperties.com SENT VIA EMAIL ONLY I am writing to all of you regarding the proposed new Total Wine Liquor store to be located on the south side of Highway 5 in Chanhassen. I feel that there are several good reasons why the City Of Chanhassen should not allow a big box liquor store. The two (2) main reasons I feel this proposal should be denied are as follows: 1. Chanhassen currently has more than enough liquor stores. The City Of Chanhassen should show their support for these long time small business owners as they are a valuable asset for all of Chanhassen and an important part of the community. 2. It would be wrong to allow such a large big box liquor store to be located in such close proximity to the Saint Hubert's Church and School. This huge liquor store would be located very close to the church and contribute a lot of additional traffic in an already very congested area. In closing, I am respectfully asking for your support in denying the proposal for a Total Wine Liquor Store in Chanhassen. It might be appropriate for the city to place a moratorium on additional liquor stores in the city. Thank you for your consideration. Please feel free to contact me at the above address and telephone number with any questions. Most cordially yours, BURDICK PROPERTIES. INC. BRAN H. BURDICK PRESIDENT BHB/su� ! OWNERS, DEVELOPERS, AND PROPERTY MANAGERS OF FINE COMMERCIAL PROPERTIES. CITY OF CHANHASSEN PROPOSED MOTION: PC DATE: July 7, 2015 CC DATE: July 27, 2015 •--�� REVIEW DEADLINE: August 4, 2015 CASE #: 2015-17 BY: SJ, AF, TH, TJ, ML, JM, JS "The Chanhassen Planning Commission recommends that City Council approve the preliminary plat for Villages on the Ponds 11th Addition; site plan for Chanhassen Specialty Retail, and Planned Unit Development Amendment to the sign criteria subject to the conditions of the staff report, and adopts the Findings of Fact and Recommendation." SUMMARY OF REQUEST: The developer is requesting preliminary plat approval to create one lot and one outlot (Villages on the Ponds 11`h Addition), and Site Plan Review for a 19,909 square -foot, one-story specialty liquor store (Total Wine & More), and Planned Unit Development Amendment to the sign criteria. Notice of this public hearing has been mailed to all property owners within the required 500 feet. Staff is recommending approval of the request with conditions. LOCATION: Northwest Corner of Lake Drive and Main Street Outlot B, Villages on the Ponds 4' Addition (PID 25-8460030) APPLICANT: Venture Pass Partners, LLC Owner: Northcott Company 19620 Waterford Court 250 Lake Drive East Shorewood, MN 55331 Chanhassen, MN 55317 (612) 801-4313 (952) 294-5215 rrauwerdink(a)venturenass.net bschwenna,northeotthospitalitv.com PRESENT ZONING: Planned Unit Development (PUD) — Villages on the Ponds 2020 LAND USE PLAN: Mixed Use ACREAGE: 2.71 acres DENSITY: NA LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision. The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. SCANNED Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 2 of 23 The City has a relatively high level of discretion in approving amendments to PUDs because the City is acting in its legislative or policy-making capacity. A PUD amendment must be consistent with the City's Comprehensive Plan. PROPOSAL/SUMMARY The site is located at the northwest corner of Lake Drive and Main Street, within Villages on the Ponds, a mixed-use development. The site was rough graded as part of the overall development. The property is located within Sector I of the Villages on the Ponds development (there are four sectors within the development which will be discussed in further detail later in the report). The following is a summary of the proposal: 1. Subdivision: Replat an outlot into one lot and one outlot to house a specialty retail building. 2. Site Plan: Construction of a 19,909 square -foot retail building (Total Wine & More). 3. Planned Unit Development Amendment: Changing the Signage Criteria to allow wall signs to be placed higher than 20 feet from floor elevation along the north and west building facades, and increase the height of the individual letters not to exceed 48 inches. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 3 of 23 The primary parking for the project is located within the westerly portion of the site. Some on - street parking is also available along Lake Drive, Main Street and Pond Promenade, which are all private streets. Within Villages on the Ponds there are existing cross -access and cross -parking agreements that permit a portion of the parking to be located off site. Parking requirements in excess of those specifically provided on site are through shared parking. The building materials consist of rock face block, accent block and concrete utility brick. Black awnings are proposed over individual windows. An E.I.F.S. band is incorporated at the top of the walls and is used as a sign band. Staff has been working with the applicant for several months to improve the design and layout of the site and building. The applicant has implemented all staff's recommendations into the design. The product is attractive and will complement the design of surrounding buildings. The proposed development is consistent with the comprehensive plan and the project's development design standards. Staff is recommending approval of the project subject to the conditions of this report. APPLICABLE REGULATIONS Chapter 18, Subdivision Chapter 20, Article II, Division 6, Site Plan Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial and Office - Institutional Development Villages on the Ponds Development Design Standards Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 4 of 23 On September 23, 1996, the City Council approved PUD 95-2, Villages on the Ponds, including a Comprehensive Land Use Plan amendment from Office/Industrial, Institutional, Residential Medium Density, Residential Low Density to Mixed Use -Commercial, High Density Residential, Institutional and Office; Preliminary Planned Unit Development for up to 291,000 square feet of commercial/office buildings, 100,000 square feet of institutional buildings, and 322 dwelling units; Rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat dated "Received September 19, 1996" for two lots and ten outlets and public right-of-way. On June 28, 1999, the City Council approved PUD 95-2 granting Final Plat approval for Villages on the Ponds Fourth Addition, creating one lot and two outlets. The lot is for the Peddler Cyclery, a.k.a., Bokoo Bikes. On December 9, 2002 the Chanhassen City Council approved Site Plan #2002-9, plans prepared by Truman Howell Architects and Associates, Inc., dated October 18, 2002, for a 70,873 square - foot, three-story building consisting of street level commercial and upper level hotel rooms (not constructed); and A variance for the use of more than 15 percent EIFS on the building based upon the finding that it is consistent with other buildings approved in the area (void since not used); and A variance for signage in excess of 20 feet in height on the building based on the fact that it is consistent with the approval given to the Community Bank of Chanhassen building (void since not used). On October 27, 2014, the Chanhassen City Council approved the Preliminary and Final Plat for Villages on the Ponds I 11h Addition; Site Plan for Chanhassen Specialty Grocery with a Variance to the sign letter size on the north and west building elevations subject to the modified conditions of the Planning Commission staff report, and the Development Contract for Villages on the Ponds I Vh Addition. On February 9, 2015, the Chanhassen City Council approved the extension of the time to record the site plan agreement for Chanhassen Specialty Grocery and the final plat for Villages on the Ponds I Ph Addition to May 31, 2015. (Not constructed and plat not recorded). Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 5 of 23 SITE PLAN In order to provide a better understanding of the overall development, staff will first review the site plan component, which in turn leads to the Planned Unit Development Amendment and the Replat of the outlot. The building must comply with the Design Standards for Villages on the Ponds design criteria. The ordinance governing this site requires the development to have an attractive design and use durable materials. Site coverage may not exceed 70 percent. This is a Planned Unit Development and hard surface coverage can be averaged over the entire development including the permanent open space. When the city approved the initial development for Villages on the Ponds, it insured an open space that exceeds 30%. The actual open space exceeds 45%. The design of the building is attractive and is proposed to be constructed of high-quality materials that are complementary to surrounding buildings. They include rock face block, accent block and concrete utility brick. Black awnings are proposed over individual windows. An E.I.F.S. band is incorporated at the top of the walls and is used as a sign band. The architectural design of the building lends itself to place wall signage over the E.I.F.S. band shown in the elevations below. Staff is recommending approval of a PUD amendment to allow the requested signage if it meets the architectural integrity of the overall development. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 6 of 23 All elevations can be viewed by the public on all four sides. Staff commends the applicant on the level of detail that has been introduced to the building through the use of spandrel windows, different building materials, a green wall along the east elevation, projecting entrance and articulation along the roof line. The loading dock is buffered from views by landscaping. The majority of the parking is located along the western portion of the site. Sidewalks are extended between the subject site and the surrounding area and separates pedestrian from vehicular traffic. The trash enclosure for the building is located along the southeast corner of the building and is proposed to utilize the same materials as the building. The added landscaping and boulevard trees will provide a calming effect to a busy area. The building has a pronounced entrance, utilizes durable exterior materials, and exhibits articulation. There are no required setbacks from any of the private streets within this development. Staff regards the project as a well-designed development. The overall design is sensitive to the surrounding area. Based upon the foregoing, staff is recommending approval of the site plan with conditions as outlined in the staff report. @ ACRMWLST RRSPIG W �3. M1(Nt'nfAST FPSaEC�IVC Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 7 of 23 LIGHTING/SIGNAGE The applicant has submitted a lighting plan and a photometrics plan has been prepared for the site. Light levels for site lighting shall be no more than one-half foot candle at the project perimeter property line. This does not apply to street lighting. All fixtures must be shielded. The proposed parking lot lights are a shoebox design which is permitted in this development. The light poles may not exceed 20 feet in height. The PUD standards encourage the use of lights on the building to minimize the number of parking lot lights. The applicant is proposing to use downcast shielded fixtures. Wall signage is proposed along four sides of the building which is permitted under the Planned Unit Development ordinance governing this development. However, there is a limit on the size of the individual letters and height of the wall sign. Staff will address this issue in detail under the PUD amendment section of the report. PARKING The ordinance requires one parking space per 200 square feet of retail building, which translates to 100 spaces for this application. The applicant is providing 84 spaces on site and 74 on -street parking spaces. The entire development was created based on a shared parking concept. An overall parking study noted that the cross -parking arrangement would provide sufficient parking to accommodate users throughout the development. The parking study and the Alternative Urban Areawide Review (AUAR) anticipated a greater density and intensity of use. It was anticipated that there would be a total of 291,000 square feet of office/commercial space, 100,000 square feet of institutional space, and 322 dwelling units in the overall development. Actual development resulted in the following: Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 8 of 23 Use Anticipated Actual Net Change Institutional 100,000 square feet 134,000 square feet -34,000 square feet Residential 322 units* 323 units** -1 unit Office/Commercial 291,000 square feet 198,500 square feet +92,500 square feet *Parking study assumed independent living apartment units requiring more parking **160 of the 323 units are senior -only apartments which required substantially less parking The overall Villages on the Ponds development provides ample parking and remains consistent with the approved plan. ARCHITECTURAL COMPLIANCE Size, Portion and Placement Entries: The building has pronounced entrances. Articulation: The buildings incorporate adequate detail and has been tastefully designed to complement the surrounding area. The architectural style is unique to the buildings but will fit in with the surrounding area. The building utilizes exterior materials that are durable and of high quality. Site Furnishing The applicant is providing bicycle racks in the northwest comer of the building and an eco -mesh green wall on the east side of the building. Material and Detail High quality materials are being used on the building. Color The colors chosen for the buildings are earth tones. The selection is unique, but blends in with the surrounding buildings. Height and Roof Design The building is a one-story building. The roofline is staggered and contains pitched elements which adds articulation to the design of the buildings. All rooftop equipment must be screened from views. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 9 of 23 Facade Transparency All facades viewed by the public contain more than 50 percent windows and/or doors. Some walls are further broken by the use of landscaping. Loadim Areas, Refuse Areas, etc. The trash enclosure and loading dock are located along the southeast corner of the building. They will be screened by landscaping and a trash enclosure. SITE PLAN FINDINGS In evaluating a site plan and building plan, the City shall consider the development's compliance with the following: (1) Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; (4) Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; c. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 10 of 23 of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the city's design requirements, the comprehensive plan, the zoning ordinance, the design standards, and the site plan review requirements. Staff is recommending approval of the request with conditions. The site design is compatible with the surrounding developments. It is functional and harmonious with the area. Staff regards the project as a reasonable use of the land. The overall design is sensitive to the city's image. Based upon the foregoing, staff is recommending approval of the site plan with conditions outlined in the staff report. PLANNED UNIT DEVELOPMENT AMENDMENT The current language pertaining to wall signage that address the subject building limits the height of the wall sign to 20 feet and the size of the individual letters to 30 inches. The proposed building as well as some of the other buildings that were approved before this one have received variances. When the applicant submitted the proposal for this request, they also requested a variance from this criteria. Staff evaluated the request and recommended a minor PUD amendment that would accommodate all users within this sector of the development to allow the same treatment. Approval of the building signage will be contingent When Villages on the Ponds was being studied, discussed and analyzed, it was divided into four sectors: • Sector I: Mixed use of commercial and residential • Sector II: Highway exposure • Sector III: Institutional • Sector IV: Residential Within Sector I, the ordinance limited the wall signage to be placed no higher than 20 feet above the ground elevation, and limited the height of the individual letters to 30 inches. Sector II permits the placement of wall signs to be extended above 20 feet. This was permitted because Sector II was viewed as a highway -oriented development as it is bordered by Highay 5 to the north and Highway 101 to the west. of the PUD amendment. VILLAGES ON THE PONDS Sectors Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 11 of 23 As staff began evaluating the subject site and how it fits into the sector scenario described above, it was concluded that the north and west elevations for buildings in Sector I fall under that same rule. Based on this conclusion, staff directed the applicant to apply for a Planned Unit Development amendment rather than a variance. The amendment is simple and will involve two sections of the Wall Signs Criteria, as shown below in bold type and highlighted in yellow: Wall Signs The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and H. These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 2. If illuminated, individual dimensional letters and logos comprising each sign maybe any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign maybe permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 12 of 23 As stated earlier, this is a mior amendment and staff is recommending approval of the request. PLANNED UNIT DEVELOPMENT AMENDMENT FINDINGS The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse effects of the proposed amendment. The six (6) effects and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Fes: The site is guided mixed use. A retail building with an area of less than 20,000 square feet is a reasonable size building in that location. b) The proposed use is or will be compatible with the present and future land uses of the area. Fes: The proposed use is and will be compatible with the present and future land uses of the area through the implementation of the design standards, landscaping, architecture, etc. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance. Fm�diin : The proposed use will conform with all performance standards contained in the Zoning Ordinance such as design standards, signage, durable materials, uses, etc. d) The proposed use will not tend to or actually depreciate the area in which it is proposed. Fes: The proposed use is intended to meet the daily needs of the area. It could potentially add convenience to the homeowners in the area. e) The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Fm�d<in �: The site is located within the Municipal Urban Service Area. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f) Traffic generation by the proposed use is within capabilities of streets serving the property. Finding: Traffic generation by the proposed use is within capabilities of streets serving the property. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 13 of 23 The developer is proposing to replat the property into one lot and one outlot. The lot will house the specialty liquor store building. Outlot A is for Pond Promenade. The ordinance states, "All lots shall abut for their full required minimum frontage on a public street as required by the zoning ordinance; or be accessed by a private street; or a flag lot which shall have a minimum of thirty feet of frontage on a public street." The lot has street frontage on all four sides. V T r The subdivision request is a relatively straightforward action and staff is recommending approval with conditions. The plat includes one lot (Lot 1, Block 1) and one outlot (Outlot A). The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. The fees to be collected with the final plat are as follows: Surface Water Management fee Park Dedication fee • GIS fee: $25 (plat) + ($10/parcel x 3 parcels) = $55 City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. Staff notes that the proposal is consistent with the Comprehensive Plan and the Zoning Ordinance. SUBDIVISION FINDINGS 1. The proposed subdivision is consistent with the zoning ordinance. Findin : The subdivision meets the intent of the city code subject to the conditions of the staff report. 2. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Finding: The proposed subdivision is consistent with applicable plans. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 14 of 23 3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; Fes: The proposed site is suitable for development subject to the conditions specified in this report. 4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Findin : The proposed subdivision will be served by adequate urban infrastructure. 5. The proposed subdivision will not cause environmental damage; Fes: The proposed subdivision will not cause environmental damage subject to conditions of approval. 6. The proposed subdivision will not conflict with easements of record. FindinE: The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. 7. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate storm water drainage. b. Lack of adequate roads. c. Lack of adequate sanitary sewer systems. d. Lack of adequate off-site public improvements or support systems. Findin : The proposed subdivision is provided with adequate urban infrastructure. PARKS This property is located within the community park service area for Lake Susan Community Park and the neighborhood park service area for Rice Marsh Lake Neighborhood Park. Employees and visitors to the specialty retail store will have convenient access to these publicly -maintained park and recreation facilities. Lake Susan Park is 33 acres in size and features large playgrounds, basketball court, picnic shelter, tennis courts, archery range, public water access, fishing pier and a ball field. Ample off-street parking is available at the park. Rice Marsh Lake Neighborhood Park is four acres in size and features a playground, ball field, basketball court, volleyball court and a small picnic shelter. Off-street parking is available. No additional parkland acquisition is being recommended as a condition of this subdivision. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 15 of 23 TRAILS The subject site has convenient access to the public trails along Great Plains Boulevard, the three- mile Rice Marsh Lake trail loop, and the lakeside trail route to Lake Susan Park. No additional trail construction is being recommended as a condition of this subdivision. STREETS AND ACCESS The site lies within the Villages on the Pond Planned Unit Development located south of Trunk Highway 5 between County Road 101 and Great Plains Boulevard. The streets within the Villages development — Pond Promenade, Lake Drive and Main Street — are privately owned and maintained. The site is on the northwest corner of Lake Drive and Main Street and will be accessed from the north and west via Pond Promenade. The developer proposes improvements along the private streets north and west of the site, specifically installation of 90 -degree parking stalls that will be paved and will have curb and gutter. The developer has submitted turning movement templates illustrating how tractor -trailer units will access the site from Lake Drive and back into the loading dock on the south side of the building. Public sanitary sewer and water main are within the streets surrounding the proposed development. A drainage and utility easement is proposed over these utilities. The developer proposes to wet tap a six-inch diameter water service to the existing water main and extend a sanitary sewer service from an existing sanitary sewer manhole northwest of the building on Lot 1. These service connections will be inspected by the Building Department in conjunction with the building/plumbing permit. GRADING AND DRAINAGE The site was mass graded when the surrounding area was developed. The original plans for the site included underground parking within the southern portion of proposed Lot 1. The underground parking was sub cut with the original site grading and has since filled with surface water runoff. The developer proposes to raise the grade of Lot 1, including filling the aforementioned sub -cut area. Porous pavement is proposed to be installed, draining to an underground system comprised of sand and a drain tile outlet that connects to the existing storm sewer system. This connection will be inspected by the Building Department in conjunction with the building/plumbing permit. Based on the proposed grading on the north side of site the grading plan may require some revisions in order to maintain drainage from the existing improvements to the north. The entire site drains to Rice Marsh Lake. The majority of the site reaches Rice Marsh Lake through a conveyance that follows the 101 corridor. A small portion of the site drains to the Planning Commission Chanhassen Specialty Retail - Planning Case 2015-17 July 7, 2015 Page 16 of 23 wetland located along Highway 5 before heading south through the Hidden Valley neighborhood and then on to Rice Marsh Lake. Within the two largest drainage areas and overall drainage on the site the discharge rates are decreased under the developed conditions from existing conditions. Storrs Event SW CB Existing Maximum Rate of Runoff (ds) Area 3S Area 4S Area 58 Total Exisbng 2 -year 7.22 0.01 0.50 0.06 7.72 10 -year 13.32 0.02 0.80 0-09 1413 f00 -}sear 2521 0.04 1.32 0.16 28_59 10-daySnow 1.39 0.00 0.06 0.01 1.45 Proposed Maximum Rate of Runoff (cfs) Stone Event SW CB Area 3S Area 4S Area 5S Total Proposed 2 -year 3.14 0.29 0.50 0.14 3.94 10 -year 5.82 0.49 0.80 025 7.14 100 -year 9.58 0-87 1.32 0.47 12.00 10 -day Snow 1.02 0.04 0.06 0-02 1.12 mgure a Fre- ana post-aeveiopment runon rates Given the existing capacity within the system and the modest rate increases proposed for areas 3S (Main Street east side of building) and 5s (southeast comer of the building), staff agrees with the consulting engineer that there is little likelihood of downstream deleterious effects. SITE GRADING: EROSION PREVENTION AND SEDIMENT CONTROL The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). The applicant has prepared a Surface Water Pollution Prevention Plan (SWPPP) and submitted to the city. This SWPPP must contain all required elements as listed in Parts III and IV of the permit. The City has a checklist of required elements that can be made available to the applicant's engineer. The PCA also has a checklist available on their website. It is known that dewatering must take place on the site. A dewatering plan shall be included as part of the SWPPP and submitted to the city for review. The pervious pavement must be protected at all times throughout construction. The SWPPP and erosion plan shall indicate how stabilization of tributary disturbed areas is to occur and that it must occur such that no sediment is introduced to the areas once they have been installed, but in no case any longer than 24 hours. Staff has firsthand knowledge that failure to stabilize these areas can result in an ineffective practice. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 17 of 23 SITE CONSTRAINTS Wetland Protection There is no indication that any wetlands are present on the property. The existing pond was created incidentally when the area was excavated in anticipation of constructing an underground parking facility. Bluff Protection There are no bluffs or steep slopes on the site. Shoreland Management The property does not lie within any shoreland district. Floodplain Overlay This property does not lie with a floodplain. STORM WATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that "these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features." This site lies within the boundaries of the Riley -Purgatory -Bluff Creek Watershed District and is subject to their stormwater management requirements. These requirements are similar to Minimal Impact Design Standards and have the same required removals of total phosphorus and total suspended solids as does Chanhassen's code. Further, they are similar to Chanhassen's requirements as stipulated in our MS4 permit. To meet these requirements, the applicant is proposing to install pervious pavement in the interior parking stalls as well as three structural devices. The proposed plan appears to meet the volume control, rate control and water quality standards requirements. The applicant will need to get the approval of the Riley -Purgatory -Bluff Creek Watershed District. The following table has been extracted from the stormwater management report and shows the anticipated removals based upon the BMPs installed. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 18 of 23 Required Removal Nutrient Analysis (lbs/year) Provided Removal (lbslyear) Annual TP Load 4.39 60% Annual TP Load 2.63 Annual TP Removal 3.06 Annual TSS Load 798 90% Annual TSS Load 718 Annual TSS Removal 739 Finuro 7. Annual redurtinn in Total Phosnhnrus and Total Suspended Solid loads Operations and Maintenance Part III.D.5.a(5) of the GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS) PERMIT PROGRAM requires that "The permittee's Regulatory Mechanism(s) shall provide for the establishment of legal mechanism(s) between the permittee and owners or operators responsible for the long-term maintenance of structural stormwater BMPs not owned or operated by the permittee, that have been implemented to meet the conditions for post -construction stormwater management in Part III.D.5.a(2)." The permit continues on to discuss minimum provisions to allow for inspection of and preservation of function of the facility as well as transfer of responsibilities in the event the facility is sold. The city has developed a maintenance agreement and this shall be revised accordingly, executed and recorded against the property. In addition, the developer or their representative shall develop an operations and maintenance manual which shall specify anticipated inspection and maintenance, as well as schedule, necessary in order to ensure there is not significant decreases in the practices' efficacies. This operations and maintenance manual shall be referenced in the maintenance agreement. Storm Water Utility Connection Charges Section 4-30 of city code sets out the fees associated with surface water management. A water quality and water quantity fee are collected with a subdivision. These fees are based on land use type and are intended to reflect the fact that more intense the development type, the greater the degradation of surface water. This fee will be applied to the new lot of record being created. It is calculated as shown in the table below: Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 19 of 23 Per acre rate Size of new lot in acres Totals Water Quality $22,940.00 2.71 $62,236.22 Water Quantity $8,900.00 2.71 $24,145.70 Credit $11,470.00 2.77 acres treated ($31771.90) Total due at final plat 0 Overstory trees $54,610.02 LANDSCAPING Minimum requirements for landscaping at the proposed development include 3,436 square feet of landscaped area around the parking lot, landscape islands or peninsulas, and 13 trees for the parking lot. The applicant's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. The applicant needs to locate one additional overstory tree on the site to meet minimum requirements for trees and landscaping in the parking lot area. Bufferyard requirements: Required Proposed Vehicular use landscape area 3,436 sq. ft. >3,436 sq. ft. Trees/parking lot 13 trees 12 trees Islands orpeninsulas/parking lot 7 islands/peninsulas 8 islands/peninsulas The applicant needs to locate one additional overstory tree on the site to meet minimum requirements for trees and landscaping in the parking lot area. Bufferyard requirements: All bufferyard requirements have been met. Required plantings Proposed plantings Bufferyard A — north prop. line, Pond 0 overstory trees 2 overstory Promenade., 330' 2 Understory trees 0 Understory trees 2 Shrubs 12 Shrubs Bufferyard B — south prop. line, Lake 0 Overstory trees 4 Overstory trees Drive, 230' 1 Understory trees 0 Understory trees 1 Shrubs 29 Shrubs Bufferyard B — east prop. line, Main 0 overstory trees 1 Overstory trees Street, 210' 1 Understory trees 0 Understory trees 1 Shrubs 40 Shrubs Bufferyard A — west prop. line, Pond 0 overstory trees 2 Overstory trees Promenade, 210' 1 Understory trees 0 Understory trees 1 Shrubs 3 Shrubs All bufferyard requirements have been met. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 20 of 23 COMPLIANCE TABLE (Retail 1/200 square feet — 19,909/200 = 100 spaces (# 70 spaces on-site, 88 spaces on Main Street, Lake Drive, and Pond Promenade. Parking Setback N - 0' E - 0' N - 0' E - 142' W -0'S-0' W -0'S-0' RECOMMENDATION Staff recommends that the Planning Commission approve preliminary and final plat for Villages on the Ponds l Ph Addition and Chanhassen Specialty Retail Store as shown in Plans dated received June 18, 2015 and subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: SUBDIVISION Park Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the Ponds 1 l' Addition. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of $12,500 per acre, the total park fees would be $33,875. Engineering 1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. 2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication fee, and GIS fee ($25 for the plat + $10/parcel). PUD Chanhassen Specialtv Retail (19,909 sf) Lot Area 15,000 77,657 Building Height 3 stories 1 story 40 feet 29.5 feet Building Setback N - 0' E - 0' N - 70' E - 13 W-0' S-0' W-218' 5-90' Parking Stalls 100 stalls 158 stalls # (Retail 1/200 square feet — 19,909/200 = 100 spaces (# 70 spaces on-site, 88 spaces on Main Street, Lake Drive, and Pond Promenade. Parking Setback N - 0' E - 0' N - 0' E - 142' W -0'S-0' W -0'S-0' RECOMMENDATION Staff recommends that the Planning Commission approve preliminary and final plat for Villages on the Ponds l Ph Addition and Chanhassen Specialty Retail Store as shown in Plans dated received June 18, 2015 and subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: SUBDIVISION Park Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the Ponds 1 l' Addition. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of $12,500 per acre, the total park fees would be $33,875. Engineering 1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. 2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication fee, and GIS fee ($25 for the plat + $10/parcel). Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 21 of 23 3. City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. Water Resources 1. An estimated $54,610.02 in storm water utility connection charges shall be due at final plat. 2. The property owner shall execute and record against the property a maintenance agreement in a format provided by the city for the pervious pavement, underground filtration, sump manholes and Contech JellyfishTM Filter. 3. The applicant shall apply for and procure all other necessary permits. SITE PLAN Engineering 1. Based on the proposed grading on the north side of site the grading plan may require some revisions in order to maintain drainage from the existing improvements to the north. Building 1. The buildings are required to have automatic fire extinguishing systems. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. Detailed occupancy -related requirements will be addressed when complete building plans are submitted. 4. Provide a 1:200 scale drawing of subdivision. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Fire Marshal 1. Provide a three-foot clear space around fire hydrants. 2. Yellow -painted curb and "No Parking Fire Lane" signs will be required. Applicant shall contact Fire Marshal for specific locations. 3. No P.I.V. (post indicator valve) will be required. Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 22 of 23 Natural Resource Specialist 1. The interior width of all islands must be a minimum of 10 feet. 2. A total of 13 trees must be planted within the vehicular use area. Plannine: 1. The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. 2. The street/sidewalk lights along Main Street have to be preserved and operational when the site construction is completed. 3. Appreval of the site plan =ro-oinsssct up .;t17«. waw oFPlanning Case 201r4 29--uvvm1 Umit Development amendment and Siibdivisien. Condition - has been met. 4. The light poles may not exceed 20 feet in height. 5. All Wall Packs (WPI) shall be replaced with Wall Packs (WP2). Water Resources The Surface Water Pollution Prevention Plan with all elements required by the NPDES Construction Permit shall be prepared and supplied to the city for approval prior to any earth - disturbing activities. 2. Proof of the NPDES Construction Permit having been procured by the applicant shall be supplied to the city prior to any earth -disturbing activities. 3. A dewatering plan, specific to the existing pond, shall be prepared and submitted to the city for review and approval prior to any earth -disturbing activities. 4. Areas immediately tributary to the pervious pavement, including disturbed areas behind the back of curb, must be stabilized within 24 hours of construction of the pervious pavement areas. PLANNED UNIT DEVELOPMENT AMENDMENT "The Planning Commission recommends the City Council approve the Planned Unit Development amendment in the attached ordinance for Villages on the Ponds to allow signs to be placed higher than 20 feet within Sector I, and for the size of letters to be increased to 48 inches along the west and north elevations as shown below (amendments are shown in bold), and including the attached Findings of Fact and Recommendation: Planning Commission Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 23 of 23 Wall Signs The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and II. These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 2. If illuminated, individual dimensional letters and logos comprising each sign maybe any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. 3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited." ATTACHMENTS 1. Findings of Fact and Recommendation. 2. PUD Ordinance Amendment. 3. Development Review Application. 4. Project Narrative dated Received June 18, 2015. 5. Reduced copies of Final Plat, Civil and Architectural plans dated Received June 18, 2015. 6. Letter from Soloman Real Estate Group dated June 29, 2015. 7. Email from Ed Vigil dated July 1, 2015. 8. Email from Mika Milovancev dated June 26, 2015 9. Email from Randy Rauwerdink dated July 1, 2015. 10. Letter from Julie Roettger, Houlihan's Restaurant dated July 2, 2015 11. Email from Matt Mayben, General Manager, AmericInn Hotel & Suites 12. Public Hearing Notice and Affidavit of Mailing List. G\plan\2015 planning cases\2015-17 Chanhassen specialty retail/staff report specialty retail.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Venture Pass Partners, LLC and Northcott Company for Subdivision, Site Plan and Planned Unit Development Amendment approval. On July 7, 2015, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Venture Pass Partners, LLC and Northcott Company for preliminary plat, Planned Unit Development Amendment and site plan approval for the construction of a 19,909 square -foot specialty retail building. The Planning Commission conducted a public hearing on the proposed subdivision preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Planned Unit Development, PUD. 2. The property is guided in the Land Use Plan as Mixed Use. 3. The legal description of the property is: Outlet B, Villages on the Ponds Fourth Addition. 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance and meets the standards of the Village on the Ponds Planned Unit Development; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan since the site is guided for mixed use development which includes commercial or multi -family residential; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; e. The proposed subdivision will not cause environmental damage; f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature since adequate infrastructure is available. A subdivision is premature if any of the following exists: 1) Lack of adequate storm water drainage. 2) Lack of adequate roads. 3) Lack of adequate sanitary sewer systems. 4) Lack of adequate off-site public improvements or support systems. 5. Site Plan. In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: a) The proposed project is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; b) The proposed project is consistent with the Site Plan Review requirements of City Code; c) The proposed project preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; d) The proposed project creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; e) The proposed project creates a functional and harmonious design for structures and site features, with special attention to the following: 1. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; 2. The amount and location of open space and landscaping; 3. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 4. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. fl The proposed project protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. 6. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse effects of the proposed amendment. The six (6) effects and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Finding: The site is guided mixed use (residential and neighborhood commercial). A retail building is a reasonable use in that location. b) The proposed use is or will be compatible with the present and future land uses of the area. Finding: The proposed use is and will be compatible with the present and future land uses of the area through the implementation of the design standards, landscaping, architecture, etc. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance. Finding: The proposed use will conform with all performance standards contained in the Zoning Ordinance such as design standards, signage, durable materials, uses, etc. d) The proposed use will not tend to or actually depreciate the area in which it is proposed. Finding: The proposed use is intended to meet the daily needs of the area. It could potentially add convenience to the homeowners in the area. e) The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Finding: The site is located within the Municipal Urban Service Area. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f) Traffic generation by the proposed use is within capabilities of streets serving the property. Finding: Based upon traffic studies conducted by the applicant's traffic engineer, traffic generation by the proposed use is within capabilities of streets serving the property. 6. The planning report #2015-17 dated July 7, 2015, prepared by Sharmeen Al-Jaff, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the Preliminary Plat (Villages on the Ponds I Ph Addition) and site plan with a variance for Chanhassen Specialty Retail (Total Wine & More). ADOPTED by the Chanhassen Planning Commission this 7' day of July, 2015. CHANHASSEN PLANNING COMMISSION Its Chairman rd CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA 16190110IWCOAl2y a AN ORDINANCE AMENDING CHAPTER 20 OF THE CHANHASSEN CITY CODE, THE CITY'S ZONING ORDINANCE, BY AMENDING A PLANNED UNIT DEVELOPMENT THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS: Section 1. Chapter 20 of the Chanhassen City Code, the City's zoning ordinance, is hereby amended by amending the Villages on the Ponds Planned Unit Development Design Standards in its entirety as follows: VILLAGES ON THE PONDS DEVELOPMENT DESIGN STANDARDS a. Intent The purpose of this zone is to create a mixed use PUD consisting of commercial, institutional, office, and residential uses. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed underground. Each lot proposed for development shall proceed through site plan review based on the development standards outlined below. The Central Business District regulations shall apply except as modified by this ordinance. b. Permitted Uses The permitted uses in this zone should be limited to uses as defined below or similar uses to those as listed in the Standard Industrial Classification. If there is a question as to the whether or not a use meets the definition, the Planning Director shall make that interpretation. No single retail user shall exceed 20,000 square feet on a single level of a building. A maximum of thirty- three (33) percent of the square footage of the retail users within the development may be of a "big box" category. The intent of this requirement is to provide a variety of users, including small retail shops, service providers, coffee shops, cabarets, etc., for residents of the Villages as well as the community as a whole, rather than typical suburban type large, individual users dominating the development and detracting from the "village" character. Retail users should be those that support and compliment the residential development located within the development, providing goods and services which enhance residents of the village and the community. Office. Professional and business office, non -retail activity except for showroom type display area for products stored or manufactured on-site provided that no more than 20 percent of the floor space is used for such display and sales. bank/credit union finance, insurance and real estate health services - except nursing homes and hospitals engineering, accounting, research management and related services legal services Personal Services. Establishments primarily engaged in providing services involving the care of a person or his or her personal goods or apparel. dry cleaning beauty or barbershop shoe repair photographic studio tax return preparation laundromat health club optical goods computer services day care center copying mail stores Institutional. Establishments that are public/semi-public in nature. church library education services day care art gallery dance studio cultural facility Commercial/Retail. Establishments engaged in commercial operations including retail sales and services and hospitality industries. Apparel and Accessory Stores shoe stores electronic and music store and musical instruments restaurant — no drive through, except on Lot 1, Block 1, Villages on the Ponds 2"d Addition through a conditional use permit and compliance with the following standards - the drive through shall provide sufficient stacking to assure that traffic is not backed into the parking lot drive aisles; loud speakers used for ordering shall be shielded so that noise is not heard off-site, and the drive through shall be screened from off-site views. (amended 8/13/01) restaurant - fast food only if integrated into a building no freestanding fast food and no drive through drug store/pharmacy book/stationary jewelry store hobby/toy game gift novelty and souvenir sewing, needlework and piece good florist camera and photographic supply art and art supplies, gallery sporting goods video rental food stores including bakery and confectionery hardware store computer store hotel/motel entertainment liquor store pets and pet supplies home furnishings Residential. Residential units shall be provided as upper level units above the commercial/office uses within the village core and as stand alone units. A minimum of 50 percent of the residential units shall be rental units. Of the rental units, the city has adopted a goal of 35 percent of the units meeting the Metropolitan Council's affordable criteria. For the ownership housing, the city has adopted the goal of 50 percent of the units meeting the Metropolitan Council's affordable criteria. Prohibited Uses: Auto related including auto sales, auto repair, gas stations c. Setbacks In the PUD standards, there is the requirement for landscape buffering in addition to building and parking setbacks. The following setbacks shall apply: IE Building Parking Great Plains Blvd.: Buffer yard & Setback C, 0' 0' Market Blvd.: Buffer yard & Setback C, 50' 20' Highway 5: Buffer yard & Setback B, 50' 20' Interior Side Lot Line: Buffer yard & setback NA, 0' 0' East Perimeter Side Lot Line (adjacent to residential): Buffer yard & setback D, 50' 50' West Perimeter Side Lot Line (adjacent to industrial): Buffer yard & setback B, 50 20 Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal Ordinance, Article XXV. No fences shall be permitted between the required landscape buffer and arterial and collector roads. d. Development Site Coverage and Building Height The PUD standard for hard surface coverage is 70% for the overall development. Individual lots may exceed this threshold, but in no case shall the average exceed 70 percent. 2. More than one (1) principal structure may be placed on one (1) platted lot. The maximum building height shall be Sector I - four stories (residential with street level commercial or office)/50 ft. (retail and office buildings without residences above shall be limited to three stories/40 ft.) except for the lot on the corner of Promenade Pond and Great Plains Boulevard shall be limited to two stories and 30 feet, Sector II - three stories/40 ft., Sector III - three stories/40 ft., and Sector IV - four stories/50 feet. Building height limitations are exclusive of steeples, towers, and other architectural and roof accents. (Amended 11/26/01) 4. The maximum building footprint for any one building shall be limited to 20,000 square feet without a street level break in the continuity of the building, e.g., pedestrian passageways, except for the church and residential only buildings. VILLAGES ON THE PONDS Sectors 5. The following table shall govern the amount of building area for the different uses: Commercial/ Retail(s Office/Service (s Institutional (s Dwelling Units TOTAL sf Sector I 114,500 83,500 0 160 198,000 Sector II *60,000 14,000 0 0 74,000 Sector III 0 0 100,000 0 100,000 Sector IV 0 0 0 162 0 TOTAL 174,500 97,500 100,000 322 372,000 (amended 11/26/01) * Includes 47,200 s uare-foot, 106 -unit motel Building square footages may be reallocated between sectors and between uses subject to approval by the Planning Director. The following factors shall be used in calculating the reallocation of building square footages between uses: 1 Residential apartment unit = 3 congregate care (assisted living or dementia) unit. 1 Residential apartment unit = 2 elderly (independent) unit. 1 Residential apartment unit = 360 square feet of office/service. 1 Residential apartment unit = 90 square feet of retail. 1 Residential apartment unit = 440 square feet of institutional. 950 square feet of office/service = 1,000 square feet of institutional. 300 square feet of retail = 1,000 square feet of office/service. 290 square feet of retail = 1,000 square feet of institutional. (amended 11/26/01) In no instance shall addition institutional building square footage be reallocated without an amendment to the PUD. 6. Buildings adjacent to pedestrian sidewalks must have commercial/office on the majority of the street frontage. (amended 11/26/01) e. Building Materials and Design The PUD requires that the development demonstrate a higher quality of architectural standards and site design. The intent is to create a pedestrian friendly, "traditional" village character consistent with the European heritage of the upper midwest and the atmosphere within this development, yet with the amenities and technological tools of modern times. The village elevations shown on the PUD drawings are to be used only as a general guideline and the reflection of the overall village image including the north - midwestern architectural vocabulary, village like human scale and flavor, and variety in design and facade treatment. 2. All materials shall be of high quality and durable. Major exterior surfaces of all walls shall be face brick, stone, glass, stucco, architecturally treated concrete, cast in place panels, decorative block, cedar siding, vinyl siding in residential with support materials, or approved equivalent as determined by the city. Color shall be introduced through colored block or panels and not painted block or brick. Bright, long, continuous bands are prohibited. Bright or brilliant colors and sharply contrasting colors may be used only for accent purposes and shall not exceed 10 percent of a wall area. 3. Block shall have a weathered face or be polished, fluted, or broken face. Exposed cement ("cinder") blocks shall be prohibited. 4. Metal siding, gray concrete, curtain walls and similar materials will not be approved except as support material to one of the above materials, or as trim or as HVAC screen, and may not exceed more than 25 percent of a wall area. 5. All accessory structures shall be designed to be compatible with the primary structure. 6. All roof mounted equipment shall be screened by walls of compatible appearing material. Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials. All mechanical equipment shall be screened with material compatible to the building. The buildings shall have varied and interesting detailing. The use of large unadorned, concrete panels and concrete block, or a solid wall unrelieved by architectural detailing, such as change in materials, change in color, fenestrations, or other significant visual relief provided in a manner or at intervals in keeping with the size, mass, and scale of the wall and its views from public ways shall be prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall be given added architectural interest through building design or appropriate landscaping. 8. Space for recycling shall be provided in the interior of all principal or accessory structures. 9. There shall not be underdeveloped backsides of buildings. All elevations shall receive nearly equal treatment and visual qualities. 10. The materials and colors used for each building shall be selected in context with the adjacent building and provide for a harmonious integration with them. Extreme variations between buildings on the same street in terms of overall appearance, bulk and height, setbacks and colors shall be prohibited. 11. Slope roof elements shall be incorporated in all structures: Sector I - minimum 70 percent of roof area shall be sloped, Sector II - minimum of 70 percent of the roof area shall be sloped, Sector III - minimum of 30 percent of the roof area shall be sloped, and Sector IV - minimum of 70 percent of the roof area shall be sloped. An exception to this requirement are roof areas designed for human use such as decks, garden areas, patios, etc., which will not be counted towards flat roof area. 12. The following design elements should be incorporated into individual structures: Building Accents Towers, silos, arches, columns, bosses, tiling, cloisters, colonnades, buttresses, loggias, marquees, minarets, portals, reveals, quoins, clerestories, pilasters. Roof Types Barrow, dome, gable, hip, flat. Roof Accents Cupolas, cornices, belfries, turrets, pinnacles, look -outs, gargoyles, parapets, lanterns. Accent elements such as towers, turrets, spires, etc., shall be excluded from the sector building height limitation. Window Types Bay, single paned, multi -paned, angular, square, rectangular, half -round, round, italianate. Window Accents Plant boxes, shutters, balconies, decks, grates, canopies, awnings, recesses, embrasures, arches, lunettes. Street level windows shall be provided for a minimum of 50 percent of the ground level wall area. f. Site Landscaping and Screening All buffer landscaping, including boulevard landscaping, included in Phase I shall be installed when the grading of the phase is completed. This may well result in landscaping being required ahead of individual site plan approvals, but we believe the buffer yard and boulevard plantings, in particular, need to be established immediately. In addition, to adhere to the higher quality of development as spelled out in the PUD zone, all loading areas shall be screened. Each lot for development shall submit a separate landscaping plan as a part of the site plan review process. 2. All open spaces and non -parking lot surfaces, except for plaza areas, shall be landscaped, rockscaped, or covered with plantings and/or lawn material. Tree wells shall be included in pedestrian areas and plazas. 3. Storage of material outdoors is prohibited. 4. Undulating or angular berms T to Sin height, south of Highway 5 and along Market Boulevard shall be sodded or seeded at the conclusion of grading and utility construction. The required buffer landscaping may be installed where it is deemed necessary to screen any proposed development. All required boulevard landscaping shall be sodded. 5. Loading areas shall be screened from public right-of-ways. Wing walls may be required where deemed appropriate. 6. Native species shall be incorporated into site landscaping, whenever possible. g. Signage 1. One project identification sign shall be permitted for the development at each end of Lake Drive and at the south end of Main Street. Project identification sign(s) may also be located at the entrances to the development(s) in Sector IV. Project identification signs shall not exceed 24 square feet in sign display area nor be greater than five feet in height. One project identification sign, with a maximum height of 20 feet, which may be increased in height subject to city approval based on the design and scale of the sign, designed as a gateway to the project shall be located at the north end of Main Street. Individual lots are not permitted low profile ground business sign. Within Sector III, one sign for the church and one sign for the school may be placed on streetscape walls. The top of the signs shall not extend more than eight feet above the ground and the total sign area for the signs shall not exceed 64 square feet. Pylon signs are prohibited. The sign treatment is an element of the architecture and thus should reflect the quality of the development. The signs should be consistent in color, size, and material and height throughout the development. A common theme will be introduced at the development's entrance monument and will be used throughout. 2. All signs require a separate sign permit. 3. Wall business signs shall comply with the city's sign ordinance for the central business district for determination of maximum sign area. Wall signs may be permitted on the "street" front and primary parking lot front of each building. 4. Projecting signs are permitted along Main Street and Lake Drive and along pedestrian passageways subject to the conditions below. Signage Plan and Restrictions Wall Sians The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and Il. These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 2. If illuminated, individual dimensional letters and logos comprising each sign maybe any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited. Proiectin¢ Signs 1. The letters and logos shall be restricted to the approved building sign area. 2. All wooden signs shall be sandblasted and letters shall be an integral part of the building's architecture. 3. Signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered and such minimal messages such as date of establishment of business. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band or within the projecting sign and do not occupy more than fifteen (15) percent of the sign display area. 4. Projecting signs shall be stationary, may not be self -illuminated but maybe lighted by surface mounted fixtures located on the sign or the adjacent facade. Projecting signs shall be limited to one per tenant on street frontage and pedestrian passageway and my not exceed six square feet. Letters shall have a maximum height of 12 inches. 6. Projecting signs shall be a minimum of eight feet above the sidewalk and shall not project more than six feet from the building facade. 7. Plastic, plexi -glass, clear plex, or similar material projecting signs are prohibited unless used in conjunction with other decorative materials. M 8. Projecting signs maybe painted, prefinished, or utilize exposed metal. Any exposed metal shall be anodized aluminum, stainless steel, titanium, bronze, or other similar non -corrosive or ono -oxidizing materials. Window Signs Window signs shall not cover more than 25 percent of the window area in which they are located. 2. Window signs shall not use bright, garish, or neon paint, tape, chalk, or paper. Menu Signs 1. Shall be located at eye level adjacent to tenant entries and shall not exceed 4 feet in height. 2. Shall be used only to convey daily specials, menus and offerings and shall be wood framed chalkboard and/or electronic board with temporary handwritten lettering. No paper construction or messages will be permitted. 3. Menu signs shall be limited to one per tenant and may not exceed 8 square feet. Festive Flags/Banners 1. Flags and banners shall be permitted on approved standards attached to the building facade and on standards attached to pedestrian area lighting. 2. Plastic flags and banners are prohibited. 3. Flags and banners shall be constructed of fabric. 4. Banners shall not contain advertising for individual users, businesses, services, or products. 5. Flags and banners shall project from buildings a maximum of two feet. 6. Flags and banners shall have a maximum area of 10 square feet. 7. Flags and banners which are torn or excessively worn shall be removed at the request of the city. Building Directory In multi -tenant buildings, one building directory sign may be permitted. The directory sign shall not exceed eight square feet. 10 Pole Directory Sign 1. Pole directory signs consisting of single poles with individual nameplate type directional arrows may be located within the development. 2. Pole directory sign shall not exceed 15 feet in height. 3. Directory signs shall be a minimum of eight feet above the sidewalk. 4. A maximum of eight directory signs may be provided per pole. 5. The maximum size of an individual sign shall be 18 inches long by four inches wide. 6. Poles shall be a minimum of 10 feet behind the curb. h. Lighting 1. Lighting for the interior of the business center should be consistent throughout the development. The plans do not provide for street lighting. As with previous developments, the City has required the developer to install street lights throughout the street system. 2. A shoe box fixture (as specified by City Code) with decorative natural colored pole shall be used throughout the development parking lot area for lighting. Decorative, pedestrian scale lighting shall be used in plaza and sidewalk areas and may be used in parking lot areas. 3. Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. 4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2 candle at the project perimeter property line. This does not apply to street lighting. 5. Light poles shall be limited to a height of 20 feet. 6. Lighting for parking areas shall minimize the use of lights on pole standards in the parking area. Rather, emphasis should be placed on building lights and poles located in close proximity to buildings. i. Parking 1. Parking shall be provided based on the shared use of surface parking areas whenever possible. Cross access easements and the joint use of parking facilities shall be protected by a recorded instrument acceptable to the city. 2. A minimum of 75 percent of a building's parking shall be located to the "rear" of the structure and in underground garages. 11 3. The development shall be treated as a integrated shopping center and provide a minimum of one space per 200 square feet of commercial/retail area. The office/personal service component shall be treated as an integrated office building and provide 4.5 space per 1,000 square feet for the first 49,999 square feet, four per thousand square feet for the second 50,000 square feet, and 3.5 per thousand square feet thereafter. Residential uses shall provide 1.5 spaces per unit as underground parking with visitor spaces provided as part of the commercial/office uses. Within sector IV, visitor parking shall be provided at a rate of 0.5 stalls per unit. Hotel/motels shall comply with city ordinance. Churches/schools shall comply with city ordinance, however, a minimum of 50 percent of the parking shall be shared. 12 COMMUNITY DEVELOPMENT DEPARTMENT Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1300 / Fax: (952) 227-1110 * CITY OFCAANNASSEN APPLICATION FOR DEVELOPMENT REVIEW Date Filed(- _ l`� 60 -Day Review Deadline: L� Planner: :5A - Case #:15-1-7 Section 1: Application Type (check all that apply) ❑ Comprehensive Plan Amendment ......................... $600 ✓❑ Subdivision ❑ Minor MUSA line for failing on-site sewers..... $100 ❑ Conditional Use Permit ❑ Single -Family Residence ................................ $325 ❑ All Others......................................................... $425 ❑ Interim Use Permit ❑ In conjunction with Single -Family Residence.. $325 ❑ All Others......................................................... $425 [D Create 3 lots or less ....................................... 30 ❑ Create over 3 lots.......................$600 + $15 per lot ❑ Metes & Bounds .........................$300 + $50 per lot ❑ Consolidate Lots..............................................$150 ❑ Lot Line Adjustment.........................................$15 0 Final Plat' ............ .... 2� *Requires additions 450 crow for attorney costs. Escrow will be recluirl4tfor other applications through the development contract. ADDITIONAL REQUIRED FEES: ❑✓ Notification Sign .................... ........... I................. $ (city to install and remove) (11 x 3) = ❑✓ Property Owners' List within 500' ........ $3 per address (City to generate — fee determined at pre -application meeting) ❑✓ Escrow for Recording Documents.. $50 per documen (CUP/SPRMCNARNJAP/Metes & Bounds Subdivision) ,ter TOTAL FEES: $ 93 OL_�. t7� Received froA� `�� `T!A/i wrS U-c— Date Received: (�5 15 Check Number: '319D Project Name: Chanhassen Specialty Retail Property Address or Location: Outlot B, VILLAGES ON THE PONDS, 4th ADDITION Parcel #: 258460030 Total Acreage: 2.71 Present Zoning: PUD Legal Description: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION Wetlands Present? Present Land Use Designation: PUD/Retail Existing Use of Property: Vacant Land ❑ Yes ® No Requested Zoning: Existing, PUD Requested Land Use Designation: Retail Description of Proposal: 19,909 sf specialty retail. Platting outlot underlying the Pond Promenade private road areas. El Check box if separate narrative is attached SCANNED ❑ Vacation of Easements/Right-of-way................... $300 (Additional recording fees may apply) ❑ Rezoning ❑ Planned Unit Development (PUD) .................. $750 ❑� Variance............................................................. $200 ❑ Minor Amendment to existing PUD ................. $100 ❑ All Others......................................................... $500 ❑ Wetland Alteration Permit ❑ Single -Family Residence ............................... $150 ❑ Sign Plan Review ................................................... $150 ❑ All Others....................................................... $275 ❑✓ ite Plan Review ❑ Zoning Appeal ...................................................... $100 Administrative.................................................. $100 Commercial/Industrial Districts*.., ................. t. 506 ❑ Zoning Ordinance Amendment............................ $500 Plus $10 per 1,000 square feet of building ar cjd NOTE: When multiple applications are processed concurrently, *Include number of existing employees: the appropriate fee shall be charged for each application. and number of new employees: ❑ Residential Districts ......................................... $500 (Refer to the appropriate Application Checklist for required submittal Plus $5 per dwelling unit information that must accompany this application) ADDITIONAL REQUIRED FEES: ❑✓ Notification Sign .................... ........... I................. $ (city to install and remove) (11 x 3) = ❑✓ Property Owners' List within 500' ........ $3 per address (City to generate — fee determined at pre -application meeting) ❑✓ Escrow for Recording Documents.. $50 per documen (CUP/SPRMCNARNJAP/Metes & Bounds Subdivision) ,ter TOTAL FEES: $ 93 OL_�. t7� Received froA� `�� `T!A/i wrS U-c— Date Received: (�5 15 Check Number: '319D Project Name: Chanhassen Specialty Retail Property Address or Location: Outlot B, VILLAGES ON THE PONDS, 4th ADDITION Parcel #: 258460030 Total Acreage: 2.71 Present Zoning: PUD Legal Description: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION Wetlands Present? Present Land Use Designation: PUD/Retail Existing Use of Property: Vacant Land ❑ Yes ® No Requested Zoning: Existing, PUD Requested Land Use Designation: Retail Description of Proposal: 19,909 sf specialty retail. Platting outlot underlying the Pond Promenade private road areas. El Check box if separate narrative is attached SCANNED Section 3: Property Owner and Applicant Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink Address: 19620 Waterford Court Phone: (612) 801-4313 City/State/Zip: Shorewood, MN 55331 Cell: (612) 801-4313 Email rrauwerdink@venturepass.net Fax: Signature: Date: 6/5/15 PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Northcott Company Contact: Brian Schwan Address: 250 Lake Drive East Phone: (952) 294-5215 City/State/Zip: Chanhassen, M"317 Cell: Email: bschw horthcotth itaf m Fax: Signature: / Date: 6/5/15 This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Sambatek Address: 12800 Whitewater Drive Suite 300 City/State/Zip: Minnetonka, MN 55343 Email: MBultman@sambatek.com Contact: Mike Bultman Phone: (763) 398-0867 Cell: Fax: (763) 476-8532 SCANNED Section 4: Notification Information Who should receive copies of staff reports? *Other Contact Information: Q Property Owner Via: ❑✓ Email ❑ Mailed Paper Copy Name: Andy Krenik-Tushie Montgomery Architects ❑ Applicant Via: ❑✓ Email ❑ Mailed Paper Copy Address: ❑✓ Engineer Via: 0 Email ❑ Mailed Paper Copy City/State/Zip: ❑ Other* Via: ❑✓ Email ❑ Mailed Paper Copy Email: AndyK@1nnarchftects.com SCANNED PROPOSED DEVELOPMENT-OUTLOT B VILLAGES ON THE PONDS 4TMADDN PROJECT SUMMARY NARRATIVE Introduction Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE PONDS 4T ADDITION. We are proposing to subdivide and plat this parcel into Lot 1 retail development consisting of a 19,909 sf specialty retail store, as well as Outlot A which will contain the Pond Promenade Road improvements. Sidewalk construction and improvements are proposed along the full perimeter extents of Pond Promenade Road and Main Street as part of the improvements, enhancing the pedestrian friendly character of the project. Benches and bike racks are also being incorporated to further promote the pedestrian character. Architecture and Design The 19,909 sf single story building will be detailed with a varied pallet of warm toned materials for the building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices, standing seam metal roofing, aluminum windows, and fabric awnings. Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of sloped metal roofing at portions of all four elevations and feature corner towers rising above the sloped areas to provide a visual break in the sloped areas. The main entrance on the west elevation projects out to form a covered area over the entry and also provides a sloped metal hip roof. Additional use of projecting fabric awnings and metal awnings and sculpted EIFS cornices provide increased relief within the building facade. The 50% building fenestration requirement is accomplished with an interplay of massing, color, and material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS cornices, and fabric awnings provide a pedestrian scale and architectural detailing to each elevation. Windows at some locations, as governed by the Tenant's store layout, may be spandrel or translucent glass highlighted with awnings. The exterior of the building is further enhanced with an emphasis to natural plant materials using a green screen climbing landscape element at the east elevation (Main Street) and extensive use of plantings varied in height along the north, east, and south elevations. The outdoor trash storage and loading area is also screened by use of plant materials. Articulation of the south wall elevation is also accomplished with the natural building steps resulting from the receiving appendage and with the added layering and screening provided by the freestanding trash enclosure with an architectural trellis detail. Tenant signage will be integrally lit channel letters and will occur on all four building elevations as allowed by city ordinance, and will be compliant with all allowable area requirements. Stormwater Design One of the unique challenges of this project is meeting the stringent requirements of Riley -Purgatory Bluff -Creek Watershed District (RPBCWD), and specifically the standards which just became effective January 1, 2015. This is further complicated by the existence of primarily group type D soils that are pervasive across this site. Stormwater rate, water quality and abstraction requirements are being satisfied via the construction of an underground stormwater infiltration system. Extensive areas of the parking lot are to be surfaced with pervious pavers over a draintile and rock infiltration basin system. �Y OFCHANHASSEP RECEIVED JUN 1 ; nvf CHANHASSEN PLANNING OFP7 SCANNED elosauwW 'uaesequugO -1IH13» l ilVI03dS N3SSVHNVHO pp{{ z if n $ 2 C=) a G gF IU N qty 4 � 00 g 3p tae o za g UU ywZ� Li. z 171 axaa �7 u U Sy O p g€ sl @gri pU t 3wv4 8 s g a a �a 2 ag. �x oY a- - •9 �xm �i; €ea a ug � § a •x _ vF I� ys F— J Q U W Q z 2 U w< W J 0� 10 W Q Z 2 u W WOwo w>w cc a0= —1 Y Q '30 d 2 s z. h i gg W ���6x.�ddz$g.z�ee83a@�yv E�gg S$v�g���4o���3 �v'a §�34sE�e�Eeyy "e838tl�e000g��a"aa W Z Q V) -i -i z mWg i L -------------------------- Ell W. --------------------------- ------ I Oyu :7 .......... V) N LU - - - - - - - - - - - - 0 V) LU (D Atli �E a lY ���s °fi � g a p � 3 it,g 66, N pppppppgpy,,, wL Y/ a3 W W Z w vi ,S p N � N PF yZ O CW O 2 Q Q •f. _ oz OC Q =E Nv%e yB$$d 6'zv sR0 NW V LU N 6 66, wL Y/ a3 0_ MEvi Z w p •�d3 Cv'.� yZ O �' O 2 Ep _ oz y U =E Nv%e yB$$d 6'zv sR0 NW V LU N 6 81 Z i any Za9. e Y k % z c443 g• ' 11 11[ °a$'^. r=� Z z w WQ ; C 2dW m 2Z ri$$E 41 Edx=eY 'igei' aWg mN c u > 6 o` u Us YP: u � o f€• !(i v�id4€ Mail- vtiC 1 N V a` s . �'sy=y3 jYI x I$g is fill 93 ox, �� i 11e 1 1$- ®si. Sid g3 s`SE§ l Eg39 YyY y8G 9 pC3Y 3x Q `YI ��d�p Y.�ad I ge��1�3 � 1 0 � �x`I Yd � x�l l�s'Y° Ya'1P s trgrslI'r; = z P' ff m Hsi g Eg e ' e3gsj H11H Il.ca u9la a... 'I i I adx3 €£ .xasa.3 Y`s % _ dl: I 3 tl339 3 I aS „�¢° E 53 g a HBO x _ __ —_ __ __v� g tl y ax i X �s g�Y I ! 5 YI Y .13 ej &YYs�a i '• f Y€e YYS i 43 3x sr �x A i€� ao Y��;:1-„y-„y a e �� §3 0 e edS?i L 31 a Es 2� '+ 3 3 x�3 3'.Sy I•. l 3 e 3 11 I a EY Y=fn 5gy1 33j Ya°L54s sib 11\ l\ n [`s $snd3d�Y Yy E Q'. 1 \ ,. � 4y s4s oa3a87A13 id g�� gp 'C SyR Ee§ a �3 P 111\ l\\ ! YY gy Mi's P10 gigy HIM air Hj3 §3 dY e?�c �/ �d � e gE3 pletlx 8§lig; _g ��3e C,.Y'3 gain y3pYx 6 x S E 5 -® HIM S - Y 'SY4 .. ....§ § S a 8 n 8t3 l3�A4 f 5 _ p _y -`---'- ., °sAall s$l$Isa @ 111 ^ 1 1 Y f E d 5P N J q u 2si{:.E!,.� E,s_e �.- c�r.•'Y Rk�=' .fPs°`,�qt�`&Ed'- mE�s S;y Sa >TNZNw'Ei.j^p .a-aQ�wzCg>rg7 0 O TZi OHQf.N-v N a` 17 133ll15 NItlW � I p \ I I ! m ____�`,______�_ a ..__Y' •. I -- I - I O i N G91' s tpa i9S � V \ \ I \ � I —` �1J_< I I 71, I I EI I 17 133ll15 NItlW � I p \ I I ! m ____�`,______�_ a ..__Y' •. I -- I - I Z `E3�> ' E_� a � S = O £££ gg 3 rv' yygg iG i?9 t $f c Z z < aVia aQ— d ? Q a $ 6 V i d' V N ac V V ±'af i:ai Na<i OL z`a NV N V i 11011 £ �}/ _�15 ,a§ 1,J�< 5 !m�( 0m k \d ;g d+ )v \ � ƒ `<»2 Y �" A 7 y U Y • g f£ „FF g g Z N o gh' f y. vi Via. v„'i vu'iE3 d �8' �s 0 q•E`7 dy fprp_ a_9t6 to O YA e o ZK ? .QwQ m Q !L&3: 3Fi E32:,.... vOZa uO i W Q i� ° x a w x Z C�jE :5 �.f Ebw0 = c V Ju- n` U of C: � U 2Z V _.9 fi 3 M vii 1 hw V li'I ti z$S3r!a eeeifs'�i ga3 Z ..-El A3A BS :E3 ii4e ic9 - 2� E' ✓ a.y rt a= BF3 a�$ G S£•23. 34�tl3v a NMI agoa o Hill w 3 - o $a £g;Apa .� a H S 4:3'3 i_gao $ riga 4s .aB9` h:t$_ Fey [ PFi3 s � 3§ SH i xgg ay=sz�e§an i Hig ;-g g�aaa$ip acv aa". 'a `:= ,s z Imp's o c 9.d r33@4 d� 133NSNIVW / o w of �r t ✓ a.y rt a= t I #9«Zo 2 .— I(t �� q [ 3 Nmaer0F2e Z z `s€ 01 Q w Q m Q d Y E i § Z V Z= u� u W Q R. ° xa�i SZ 1=a§� ;i, 1 Eeg 5= m u >a E n` uN6' �° u� u11H ;F ( � Ik c$ a �tiw OV a � L% a` 5 Y9-c�c C < i7�..?�c"=' < �a dayy �ix_((;JT!I 6l� I � �} �,I�r ZHI3- f.= 34'e gm E.3' � § e NIS 5�ea 8 g M.oxs §§@s&g $aFee4 0 v o e..g =�x- z"§§x.6 0 983L?mcvt z.£@z?el'8zr. ° g-ppgg e= t l @ W aaae,; W a ilq�gl.y6� Ori 3a N��.fRiy Ea Eg`33ie z W = Q C S £ePR a:i}. C s 7 zg .. Z .. y z 3 xlip ' St m € N r_ F_ z 'VVVVVVJJJJJJ„{' Z ~a' §g 01 6 uVi €Q— m Q `3.e3a _ EaEP ;SEiy aO Z F u Ln Fu Q Rg` ° Z a W j 2 zZ ^�`€[ - ;a re3 u?4$5 sac O W s U c V i PH2 x cE •=y-3x33P Pg SRH En P 4ra9€ F€ag a R yE i;j € P ;H 3 gP€€ g i '= ' s Ps° i 'a€ E C9 g'd'4 'A @gH 5H s a3i 3 ?e4° i t ze i1" t 3�E: _ € 3 P i=g4 H -E' S` a-33 € R "sH RE £ i _ 's� R g qe 3F 3 R3 a € Ee€ p d: y8i3 ¢4S y4 ` 3 �• H a � § a 2' €' 3R3 P gi $_s p � � - B 3 �€�= g ; '� 3. � � } ; i�d3 =3 °'- 3g -i 3 F" z A ` 34 egX4s € gP n a" : ygsy §= F£H 11 I a H�e21 5alg 3grgHH °Pag, '$13j i 5$ alga§° $= ee 3s 3p s$ �a'R 4;g4tl :€ i s�8. W aF s AN . d• °SRH 3g as ' `.e si '_ ; a R 1n € , § gi• s @ ee `H €FSH @ FFeE $R a3 _ _ a _ 3 4 gi• € g 8a t g, i° € H 9'-z.. Re }a4= g€ y £ a=i5P SRR 4 aS =3Fe P i agH 3Hg€a p 5: �s- 55�' s3 �5 ,g a 14 33g . HIM 81 gP § R g '§ 3R ;a s : R :S €€ °sae H s H` ty ° -i Ta$i =}€ i'_:i �` He i9 a o€] 9`H 4- i t= i 15 € H pg ; F-; P� _ ,R a a °.. zP F- H - r Si • i 4H H°, g R,a. 's€ H € §4 :a i3E a a BHA g} ` $ .t izs a 6 " !` e3S ga it 1 g'R d= a a z= R $ `: 5 a4a l' gP 3 H4 r. F€sa .. He essj 3 }: e H Pi 3 €_° 6g a P sH ggR s 4,F 9R 4 e=§•_ R CC p �3pP,"H ➢ z S} € i f4'y z a P 3 W abGi y HE €s 33 r2. q§ pp !y Hsi a Pp"4!F 6S 6 is Q}a g3' 4 1 a�= ON HR a g ER €€€y 43k°} 36F Hc" 3E? bk4P 43!} Q i2 }5{ gF€ I. 39 d(P9SS Rs a is y$Hy3 2 a'H 2$ ev e} p } i }e < UP 3 1Ea HIM }4P 3§}4 °a e: 35 � Hai "_- ?a H5 ''-i3� °2$ to SRi3 eH.-a a Re !3 sv Hi i 3d4$. 'a Rsss ia9 3x ePYe 55 a'e s3- x-§ a4 33 F Ste' 3e s`e Hi€aa �ve F2iE c Al Tliii� n 9 eg" � ?4$9a85Y1H38FM RP LY as Qi. T I i — r W a£ " Jz -___.. ......... .............. ...-.-.-. C 0 o- tl 0. P: �gx t d ,tom rY �g� 3 2 " N g 2 y J t uWi EWiE 3#3 d x.Eg Z �. $S -pj WQ .yi i1W OT. GZ d$€a$3 y�4 , -yH yd -f tlfl Q N88E 6'z N7 NV 6 M's_3�.,.a€s. $ 93b=a�3 afFa §g fsi9 z a Ha $e3€- $$ W geax'@ a' e�333aa33 W I .`$s P1, s16 1 N 4g,lai' :o;3=�es„ g`afjac 4§. a_azlyy S H g3ls :ye €aea3 Eas I e ijH$E �x9a;�;°� Hy '3PP34]Q��" M 0 Agfa: 3„pe �� -G .x Qa-{ g -ia= W. III °as?a-@3 baa` pf4Y3. Ea -ada` Yaeo®-f is§?°°? -afea:@a ae�€!"hd fa 3�'3-s rx`€aa3ae, 8a°a' Bas s fail€= MR ni yg gY$o aany§ aA'yd:o;€5 a= c pp Yw�°- 1i3 ggg'3 '7i{may S'p }E y 8 {9 Mg HN H. a pig a` €'-eb5c k°gga g fpa€YY ay€5 HN ti mm :;; ia=..e 1 P�Zi t4Ys5Pg?m s$`v-s IeY a9P 33a ea'ss $?a'sSaa #3Y85rge5 €7 I o §`• _ 1 \ off 133tl15 mm — - 33 x I P 44 , � a ofs a VIN � LY. 1 \\ 6 a r � a €s 9 d Aa E 3a. x = eeS { 9! 55 E - aig4la ii �:19ga If S E/if S\ w u2i pm 2 -C i7' tisY_ ppap Etl51i ie 5$a � U J O N z � w ¢ a v 2 F i ^ ru NOO N v 6 l PE bE ¢ a F 3.414 ate= � i€:3 9 � ffi x`g SEP, 'a ^i^i���4y4y"EY qEq !3 3Fa o \ y l PE bE ¢ a F 'a ell 61Pt !3 3Fa o \ y r o 71, 3 YB - E lit 5. p CZ 4 l h ell 61Pt !3 3Fa \ y r o 3 YB - �g[� p' ® a -•p 3 g Z w vvu'�i � 3 ayd N v z QWIQ— m QZ W Q Q 2 6 W .J = fill •§ °iy5 y'a 3ia '"0 V ww V u�t:, '3 [ �n xa$ zg C �y58 4 4i. x' 7 g A gr � Qb5 } rc 2 } ou 3 a x9 n6 g iso �y58 4 n $F i„ 19 � • !i ➢ r � x1 t4 E } ou 3 x9 n6 g iso sas ILII Wg F t�a34 ffi iso 15 5 e E —oma I y0 sas E�p5 iso � PY E S� $i 4• !� n til# In=�i#. Q O u 3 3 is##R yy .2x O 2 Z V Q 2it vs Q V 8 W Q a O 2 a w `qa S Z Y 33#S !# S ya R�i t0 w t^ o a` UHC V ti!'!. �4H.S3 anJ?' teE: nV O H V i ills, 55g g `� Mailxa 3 : a- 3a6A OneB p a 0 ga p ----------- will., i ° §§ Ga � •g 3a{ � 3 g 11 IIBM' $ p u A6B -6a ��n a � A a¢ x� o N � � xg p€555555E= 3i s 4 a 5 e ° � S Y F Ht S iA&@ ts g# N AAA s2€"y3# y tl y9£gp: m;ARR 9RR k9 Yk bi �31a� 33 8 'yA� 3 SA 52 A g ^AZ3 d d d -°$ �1,it'llf�� . s 5 r F 9 'x$ �� � 1 ��!• � i _tib � �� A - ) J � } r;lo� ! |, % EA t. - • |!§� ZR lzz 3K; �k§ ! : ]A1. }v ) elosauui yq 'uasseLjuego -11V13H hl-Id1O3dS N3SSVHNVHO ' T - v 5CLY.: i^.5 -:9 I eloseuuiW 'uesseyueyo llHl3a AIWIO3dS N3SSHHNVHO a�§ MAN STREET e Y'! Z ff jS eF]F !i1 � 9� B8 6 O J a ( 5 � Y F e 3 w rv3l�l Q Y m 3 . w v . n n E rv- _ I Bjosmvj'UBSS_<+[' 11Iv3 « \/ \ 'NOV �ev�as�s��� �i±o 2 `) A --- {( } ! } -- � ) `ƒ \ \ W!! ) 2F © /( \ ƒ2 \/! WX ± 21 / ____< ~Plop!- e|e. ! MIR , . % umv�d�s��H *t �!,/. §� _ {( } ! } -- � ) `ƒ \ \ W!! ) 2F © /( \ ƒ2 \/! WX ± 21 jCF elosauuiyy 'uasseyueyo r='� llt/13�1 ` A l l-lVIODdS N3SSVHWHO I N O pp � W pp a 0 di.$8d WZNZ 3 $V elos uuiW 'uesseyueyo g 43 . At hl-ldl03dS N3SSb HN dHO € .•Ed�� l a,, $ ling g�yiggp��$ q s$ 2 F Q m m �VA [] i xH" ejosem"-uesseyueyo mU.rs �r A-LIV133dS N3SSVHNVH3 O -- 1D �i n 2 93§ F° et I 195 2M pail- I e $�s p E $ d; I $Ca Ill Jill I I I I I I T T T aye T T T a � � _� < � § , . k . 2 �;�[|\j ulv�dS� A��H T\ : .� E! \ § (( ){ •| �( !` ) !\: :, ` ;, ` ^ elosauwW 'uasseyueyp ll`d13H l llVlOgdS N3SSVHNVHO ® 7 ,ems �_< | ;ice / �� ( l ||\q ƒ § m t ulv�A�s��H ' fes/ {|!y %# SOLOMON REAL ESTATE GROUP "Where Wisdom and Opportunity Meet" June 29, 2015 Mr. Bob Generous City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 RE: Planned Unit Development for Chanhassen Specialty Retail Venture Pass Partners, LLC as Applicant Dear Bob, I am writing this letter in support of the application made by Venture Pass Partners, LLC for the development of the property located at Outlot B, Villages on the Ponds 4 Addition. As a neighboring property owner, we believe it is important for the promotion of success of the retail businesses located within the Village on the Ponds to have the strong support and positive traffic generation that this proposed retail use will bring to the area. This area has lagged behind many of the businesses located across Highway 5 and needs the support of sizable, strong retailers in order to generate sufficient traffic to support strong sales volumes. In addition, this project will finally complete the Village on the Ponds development which will result in a healthy and vibrant look, feel and shopping experience. Last, the quality of the proposed architecture is strong and consistent with the other properties in the area and once completed all common areas will finally be installed in a manner consistent with the original vision for the Village on the Ponds project. We support the proposed project and hope that the City of Chanhassen will do the same. Sincerely, Jay Scott President 12300 Singletree Lane Suite 200 Eden Prairie, MN 55344 Phone: 952.974.9200 Fax: 952.974.9300 www.solomonregroul).com AI-1aff, Sharmeen From: Ed Vigil <ekvigil@usinternet.com> Sent: Wednesday, July 01, 2015 11:24 AM To: AI-Jaff, Sharmeen Cc: Generous, Bob Subject: FW: TWM Hi Sharmeen, I will be traveling for the next 2 weeks and I will not be able to attend the meeting on Tuesday the 7th. However, wanted to send you an email regarding the approval process of TWM in front of my property on Village on the Ponds. To the members of the City Council, My name is Ed Vigil, I am the owner of Bokoo Bikes and Paddlesports located at 550 Lake Dr in Chanhassen. Our building is situated directly adjacent to the proposed location of the new Total Wine and More retail store. I have been waiting for 15 years for this land to be developed and a business to open. Making use of this valuable location has been a long time coming and it is important that all potential businesses are given serious consideration. The recent recession did not help the prospects of this land being developed. There has been very little interest in this parcel over the years but there have been a few deals that fell through. Many of our customers have commented that we have a very nice pond in front of us and have been shocked to learn that the'pond' is actually a hole that was dug in preparation for underground parking for Extended Stay Suites proposed to develop in 2001. The most recent activity was the fiasco of having another national retailer, Trader Joe's, abandon their plans to move to Chanhassen because of a clause within Lakewind's Co-op and the property owners agreement. We now have a golden opportunity for another nationally recognized retailer open up shop in our city. I would like to ask the City Council to do whatever is necessary to not lose this chance and welcome a retailer of TWM's caliber. Out of all the retailers I could imagine, this is a business with a very successful business model that will draw their customer base from outside Chanhassen because of competition generated by municipalities. Based upon the experiences of other cities, TWM will likely greatly increase consumer traffic for Chanhassen as a whole. Chanhassen is very fortunate to have been chosen as a site for expansion. I fully endorse the approval to welcome TWM to Village on the Ponds in Chanhassen. Respectfully, Ed Vigil AI-Jaff, Sharmeen Subject: FW: VOP Association, Architectural Review Committee's Comments for "Chanhassen Specialty Retail ", Outlot B, Village on the Ponds 4th Addition. From: Mika Milovancev fmailto:mmiloCalmagarch.com] Sent: Friday, June 26, 2015 1:15 PM To: Vernelle Clayton Subject: FW: VOP Association, Architectural Review Committee's Comments for "Chanhassen Specialty Retail ", Outlot B, Village on the Ponds 4th Addition. To: Village on the Ponds Association c/o Vernelle Clayton, the Manager of the Association. Re. VOP- Architectural Review Committee's Comments for: "Chanhassen Specialty Retail", Outlot B, VOP 4t^ Addition, Proposed Development Plans. Developer: Venture Pass Date issued: 6/26/2015 Dear Vernelle, It is our understanding that the proposed Chanhassen Specialty Retail will be a welcome addition both to the City, as well as for the business environment of the VOP community area. And that was always the goal for our Village: a wide range of uses that together create pedestrian oriented streets and a vibrant urban setting. Keeping that in mind, we look favorably at the proposed development, even though it is not providing the desirable mix of uses (retail, residential, office...) within this specific site area. Also, the VOP Guidelines called for the main entry to be facing the Main Street, at least for the assumed office or residential uses Guidelines envisioned on the upper floors. However, we recognize that in this case of a large, single level retail store, in order to be successful in operation, the main entry needs to be as close as possible to the parking area. Especially in case of very cold winters we have in our Minnesota. In regard to some other specifics: --- Sheet L4.0- Lighting Plan: The existing Main Street lights are neither referred to, nor reflected on the plan, but those are to remain as part of VOP's overall streetscape. Also consider: - replacing "modern", powerful Gardco wall lights along the Main Street with Longman fixtures. Gardco would interfere/"diminish" the existing traditional lights on the street, as opposed to softer Lingman lights that would blend better with the overall character of this street. - providing a special lighting effect (landscape up lights?)for the curved "green wall" facing the Main Street. --- Sheet L2.0- Landscape plan: -It calls for the existing 5 street trees to remain. This is of essence due to a very tight space between the building wall and the street sidewalk/parking, which allows only for a rather minimal new landscaping to be planted along the wall. -Also, aside of the two linden trees called for in the plan, there is not any other ground cover/landscape indicated at the NW corner of the parking lot; that needs to be corrected and properly landscaped and irrigated. --- Sheet A2.0 -Architectural Elevations: -Overall, and as well described in the "Project Summary Narrative" part of the submittal package to the City, the proposed building massing, "warm toned" fa4ade materials, colors and various articulations, provide for desired varieties and good integration within the existing VOP community. - However, in regard to faSade segments covered with the utility brick #2 at the East end North elevations, with their face flush with the adjacent wall areas, consider to change them to be either somewhat recessed, or projected out from the rest of the walls around them. That would give them a pronounced appearance and create more variety and interest on these elevations. - Specifically, at the Main Street, that wall segment could nicely follow the curved shape of the "green wall", thus breaking the monotony of the long and high flat building wall along the street. In absence of the building entry from the street, that, along with some possibly expended seating area there, would grant some interest and more of a "pedestrian oriented" feel to the street. In Conclusion: The above comments were based on our review of the set of preliminary plans (with a focus on architectural and landscape plans) as provided to us on 6/22/2015. We hope the above comments would help, along with further City's reviews and hearings, towards a successful completion and integration of this development into the VOP and City of Chanhassen urban core. Please let us know if we can be of any further assistance. Thank you, Mika Milo, r. architect For VOP Association, Architectural Review Committee. This email has been checked for viruses by Avast antivirus software. www.avast.com 40tfastr This email has been checked for viruses by Avast antivirus software. af— www.avast.com AI-Jaff, Sharmeen From: Randy Rauwerdink <RRauwerdink@VENTUREPASS.NET> Sent: Wednesday, July 01, 2015 11:18 AM To: AI-Jaff, Sharmeen Cc: Dave Carland; Andy Krenik Subject: VOP review comments Sharmeen, as follow up to a voice message that I just left for you, I wanted to discuss how or if we were to react to the plan review comments that Mika provided last Friday (through Vernelle). We generally found his comments to be very favorable, but did have some clarification or concern with some of the comments. We want to understand if any of this becomes a part of staff report or conditions, and if so we want to provide some input. Below is an initial response from our architect that addresses Mika's comments: L4.0: Lighting Plan Main Street lights will remain and are so noted on 1-1.0 (removed and reinstalled) • The lighting plan will need to be redone as there was not enough time to redo the plan per the 19,909 sf building revision • 1 have a call in to the lighting designer to see if/how changing to the Ligman fixture will alter the lighting levels • Uplights at the green wall are not allowed per my understanding as fixtures need to have a 90 degree cutoff L2.0: Landscape Plan • Sod/irrigatation noted for the NW corner but plants can be placed there instead if so desired A2.0: Architectural Elevations Brick #2 projects out 4" at East and North Elevations. Not in favor of projecting brick #2 out any further but we can at an added cost to footings and foundation. Corner brick #1 elements are already projecting out 8" to provide varying depths for fagade along with projecting canopies and varying roof lines. Curving the brick wall on the east elevation will add substantial cost for additional footings and foundation work, will come very close to Utility Easement (but technically not over), and will reduce depth of planting area. The green wall is curved for that specific reason to break up the length of the elevation without adding costs and reducing planting area. Randy Rauwerdink Venture Pass Partners, LLC 19620 Waterford Court Shorewood, MN 55331 612.801.4313 rra uwerdink(a)ventu repass. net VENTURE PASS �PARTNfRS 7/2/2015 .•. Roettger, Julie Houlihans Restaurant 530 Pond Promenade Chanhassen, MN 55317 Sharmeen Al-Jaff Senior Planner City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 Dear City Planner, I have reviewed the request for amendment to Villages on the Ponds Planned Unit Development; Subdivision of approximately three acres into one lot and one outlot (Villages on the Ponds 11th Addition), and Site Plan Review to construct a 19,909 square -foot liquor store on property zoned Planned Unit Development (PUD) and located on Outlot B, Villages on the Ponds 4th Addition and the development application. I do support this project because I believe the customer traffic generated by the proposed high volume retailer will benefit our business while not adding additional direct competition. I also believe the architecture and design are excellent and are cohesive to the high standards that have been achieved with previous building within the development. Regards, Roettger, Julie Vice President of Operations Houlihans Restaurant AI-Jaff, Sharmeen From: AmericInn Chanhassen, MN <Chanhassen.MN@americinn.com> Sent: Thursday, July 02, 2015 9:32 AM To: AI-Jaff, Sharmeen Subject: Our support behind the Villages on the Pond development Dear Ms. AI-Jaff - As the General Manager of the AmericInn Hotel & Suites of Chanhassen, I want to pass along my support for a new development of the vacant land located near our hotel in the Villages on the Pond area. We understand there is a possibility of a large retailer being located in a new building on that vacant land. We would be in support of the additional retailer being located there. Any retailer who can generate additional foot traffic and exposure to our businesses — as well as be an amenity for our guests — is a welcome addition to the area. We were looking at the Chanhassen Planning web site and feel the design and size of the building is complimentary to all of the neighbors. We fully support this recent development application. Thanks, Matt Matt Mayben I General Manager AmericInn Hotel & Suites — Chanhassen 570 Pond Promenade I Chanhassen, MN 55317 Phone: (952) 934-3888 1 Fax: (952) 974-9394 1 Northolt Hospitality I cOJG&uW * SO POAA Of ,De ter_: AMRICINN I NOUNAN's I PSAAINS AASTANAANYASAUAY ; THAAd 1I4M 0001AUTY CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on June 25, 2015, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Chanhassen Specialty Retail — Planning Case 2015-17 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscrib and sworn to before me thi� ay of tl h 2015. 2 Notary Publr Karma J. Engel , Depu6,4herk IfEKIM T. MEUWISSEN ft PubNcMkr»�ahCam�4Mm tpkw.Nn tt, 9010 m E ' N p d N0- Lo a) T o�0 Eo t$ o ac 3 'C ° � 0 > N m -p n ovaEE '3°w- °T '6 2 d j I m YQO Of•wy cc C PI a w C O.. C m w w'C ° L M U N w .m. C d!-. d C C m C 0 m @ NU v@+ �E� W £E EEEo >. _ o� d7 @ �= d J'd 3 0 -0 0 d C m N ° ° d o o)o fGN yEovE Eawda a.,� �. E.mw WvaaW� m a V(oVd OC daa)i C a N dd->0NC•C C mET �co- oEdvaa E 6-p c9 V O C N J C� >'d m L V O N 0) @ TE m E•C O• >i L d 0 (� a wwUwq: cim dCO > d 0 C > �N E .L.. U N ac C L E C E T JW °' O m d I Ecw@mac c vm ate= " as r m o m crn A a uoEd od' E O ° °uo°CU da d E a 3 0�, t 10 _a) d C 000--5 i70) C•- 00 _ p 0 N a0 D E 0 ap T@ N C d M O E w d C'Nl dd mA a 3`mE ma` wcgE u_`'t5c5 a> t m •- d C d •O d) d Q C J r N O 0 0) C a C 3 ID R 7 N ... E« •m L d 0 3 v o -8>.w dL'3 a0a Ew .5. `O=•vE dcc U•6 D y N V a J C N O d U i U C'- O H 3 3 v �w3 c+rni$ E �°L^`o sa`w E 2O co a601Cd N CL 0)d N -cd = E`3 > d In NC. 0Nmd NN G �E� mc�c EvO Nd5 UNd c N d C.L..0 c c d'3— m Ea `o @ d E-0 m 0, c)O� 'U Eam odm�coS'.rc�3 �. gca 0o r d� c dN N a m 'mEooa0 �..Nd0�daadcm� U d q E° , J a O I� N �• @£ m am U N._ L O ..L.. `� N C .D d '° m o_ U30di�y U nod odo°aa�_w_ OO Nd T•60"C C CL U CNL O: OL --.-a) V d Ndp -LW O) U G O d 9 O. mo,E �wQ__ 3o�°a m a- p n o L E op U m c s Jaj d` N d VOCC a)>O C O m QC dLd o J C oC d w H ° E w=.a tea` ^'w (6c� ma0 dEdN�U Y d°@ ��gL >o °'�5 T:�EmE °-.0 d. dv N =do a'W�O� (pvE @ I d C Y: a _ . .Moo«ypTc d d C O.' V O r+ ._ �. -p N ryayaoo i> >= m$ E p La X Z d C Oa+pa C d C� m 0) N �J(Co3 p a L:-3: 4) d @O '° ..`o- C n g- o m t -- d'� Eca!-'q6u N9U - C n C 7 (o Il O y a)' m E L 0) Ld-NMN `� U 0 0 9�oaccn =9 d'na°-E m�cr$ -'U c (a. m c N o d V d C m C C- d „N, N.L. 3 4) mJ0 Ev °- d oLE d`a �a`a vam_c-• v, r� c c E m N m L_ C a d q > _dpm 0 Q C+ U m m N d L m' O a) 4- O E C J E cEcEwa Nwo` ¢ 9 ,. - g v m o 8,6- T.c J J Q d O i6 N N 6 ..N. d O` 01 ._ C d U d C- M 0' C O@ T> �a w N Nw 0- m d w a t E 9 0 - - yE.o 'my-ccno -Ec Eb N O WL C Ndm N N a d L NNa'�' °'EUOC m -0 m 9 O L��dU'mmp a: E= co 2wE a Ya a;ao o'w aaa ycS w O�'3�E[L>c C 0. cl �(1 -L@@ W L) (D Vp 0.3 O7E N� .c'PQ v+a.E E'E ns `�`�Ea Ta)Up co _ wj>3(o mo a)3m mLo a)3�•V o.@M Cd an -cc =�- QEoE o'w^a2'�ci N c= Dad J� p N'O d w o U Jcc O. U? V (AFUd L VCdO? 7 V d E �w' d C j� C Em���mn c9d`d mono J d J 0 t a O d TCL d E a) I� °- d g O m 'o) > E o _ a'e d E w E� `E o c F AU d J d d �(n 0 O 00>OQFmma, d -0 NMV '-'-w� w L N sEwO. O.00C �. m d N EES ysctU nrn�v�a wn3 0-Emw5 a'_mBo.tEB�'E_N go�c ._ av'o='Eu d. C J L 7 C C'o $E c a°''S=i'va�Aa$sa E'oS eaS Ci nat oen E Qd N N o d c2 O N m0 C dy p d J C_ Cy8`cw•S Et mS envoy LUy `t E C p 6 C d CL to C GE Ed L-U cnL v�r�`aw y:sddw m O U) mL THamti O O d (wm n aP 5.msc2nna 59v6=o8�, C J oCL o dwC 0, M 1 LaN.: w 44 v ° a° o LO D o o Ea Eo IL 0. -1 zJ ca 3 'C C C OHO Y O N ` d N N N O L d W ,�- d > NOHLr m -p z °m`o aq myv` w `� a .1 o'q a m'>,n oau 90 Va O.. O N 7 yQ d Cc a) �' C d E Eon= =8: `m n 8` ` ^C 0 O' N (a `r C� d -C U m 0)= N N N d CC0 d U r N o d C.N. C O O p) m _ES EcE Ec E mE cE aS� troy o°0'E >. O� d7.m. J'N 3 ° d O D)o q.Evmva - 3 N a V m V d O C!= O V C T a C a d> fq C'[ E C wE>, E>as 33oEud�n p)f0 V O C m J C d co a d O O) 3 L >` m E C a L d (� d wUa AmU w�``w osoc ao M > m N O .. y C m EL. U N N a C J U O G E O N ° E a_=..`� `ocEa, a'n9 'ov Exc �cv�mcraS p= as r m d o C 0) m C OOd•V u C' O E d N U C o d' E d O V O U d V d T CUa N y C•N a `c $ E a _ d d or8a `m C 0 a. O) -p d O p w aO.�L E d o J m N C E w J y d m m c Eo dL L = .Et==v� a` 8_aUEE-�U��E 3to 2waa3a r£' ~ o m C N•O W a) y :� a Q a), � c cL O w (D O C. •!C L E ?' o H >i 3 ay$ w$EO yyaE �O� "u�m v o V N Q m N C Q N a +-• O) d y d E a)C.. > N d N N j i0 v o i, n c t c o E 2O C 06 U r N O C a) C N N d N d L • O..T, c v c-°or=mma d 0 C d N y C 'C ' E 3:.co 00 N E V a ) .. o N N E 'p. a y c 'U - E w c $ a °9' -2-. O t r m «L. N G O L 'NOS ami m o 3 O N m y °- @ yL.. U_ > d U d q E° , J a O I� N �• d T'4 p C C a U C N O L O ..L.. `� N C .D d '° N d 7 _ L ?� O d °) U C O O d d =L„ - O ..= c i a'o U S U N OdOU mJ(Lv VOD)d ZN 0 C mCom '0 mE J C Q y E o'oc�ao,o mBEEw a- @ c L E C C a o o V J d` -p C.L.. d ) O > O. a E 'O U N n> d •o c X V C 3-- Q o N a a) d N O) xL d Y d°@ J C 7 L a p ° __ L O Q d O d o U U a d. dv N Y o E y y U U o 0 -t- p L E p.r U o ° � =S d C C.r. d N 7 J C' W p 3 d N L N W N do N L m 0 �q�._�9 o a vE°i"w-GE `a-c.w"ga,z N 0 'p U C C C a @ �7 r O c y. 0 ca d 0) 0 d y NL.. U C' L >>"d 0 0 d�ac `o E"�v _c -E Na W o,r c_o 's c._ :9a f` - C dao. C La m (o Il NO dUd C m C w J d > (o d U m m J 0 E N C' V 0' d J c=aEmw van v a s,', �.E=Ecv >mao c E N m Q d> N cm.- (6 ° N O 0)-5,.2 ..N. m V m t O p' C O M T> 0 w N E C @ d tE'8m' oac BwLy Ea=sy ca"E C JNO J OO �L@CN=Rd O. a,`=aCNd dL. mL 0w(D d O.tm 'r -� FES`m $.=Eman `a `o'ysw > m U OC!O da)m ,� O. E a > ENN O N m 3 m E U a"' m L dU'CCcmp C N V d m 7 ° O E 00 ` v¢o r�Q= y a E a E_ n m m t E EEmY��wEn>nc-a m$io .T. N!n> _a�m0 C d CwL',CdEn mLOJLJ m O•>+ 3�•d CmM 01d"CN°N 9Uo $.omE-cwwyg'w&"cc nU�o ycS j' ->-p N@yJCi00.0 C U 65 F U a... NE�.rO-C��•C O U d r O. d C>> m"d0_� C aur ornCmca me �° o.M. ti-=E..;SESE` d d J .d. _ D'Ly >�> dJ Jd add p J_L (D -0 aDJ E Td 0>.N a, '3.� �E aA'E�>"8 E•A°fit F �U Wu) ow 00> 0 F m m a�N M� w ND NL E N cLi N C C 0 N N 'E BEY �am,�trci mo°S,�m oa.°ay vt � E 2 z. — E. v a 6 u o E; `oc N Q/ C .d. @ °- ca v„_`a �5d3 �ocg �a < d d. C J L 7 C C'o $E c a°''S=i'va�Aa$sa E'oS eaS Ci nat oen E Qd N N C JC F c2 O N m0 C =� p d (n Wi :y p 6 U - d CL N E Y Umv'aa`E ag Cn-tEacB>.` Na2crn�"=3EE�ca�aBEE m 2 O y Ed 3 p ca � Uo=mra>man 2.5 6_” o0 E's @- C J (L 0 L) z CL na AUSMAR DEVELOPMENT CO LLC CHANHASSEN RETAIL LLC CHCR LLC 5916 HANSEN RD 9478 RILEY LAKE RD PO BOX 1038 MINNEAPOLIS, MN 55436-2513 EDEN PRAIRIE, MN 55347-3490 MASON CITY, IA 50402-1038 CHURCH OF ST HUBERT 8201 MAIN ST CHANHASSEN, MN 55317-9647 LAKE SUSAN APARTMENT HOMES LLC 11455 VIKING DR # 350 EDEN PRAIRIE, MN 55344-7206 ROSEMOUNT INC 12001 TECHNOLOGY DR EDEN PRAIRIE, MN 55344-3695 VIGIL COMPANIES LLC 550 LAKE DR CHANHASSEN, MN 55317-9378 WHEATSTONE RESTAURANT GROUP 250 EAST LAKE DR CHANHASSEN. MN 55317-9364 COMMUNITY BANK CORPORATION PO BOX 177 CHANHASSEN, MN 55317-1177 NORTHCOTT COMPANY 250 EAST LAKE DR CHANHASSEN, MN 55317-9364 SILO BUILDING LLC 3561 44TH ST W MINNEAPOLIS, MN 55410-1359 VILLAGES ON THE PONDS ASSN INC PO BOX 404 CHANHASSEN, MN 55317-0404 KINSALE OF CHANHASSEN LLC PO BOX 404 CHANHASSEN, MN 55317-0404 PHM/CHANHASSEN INC 2845 HAMLINE AVE N ROSEVILLE, MN 55113-7127 STORE MASTER FUNDING VI LLC 8501 E PRINCESS DR STE 190 SCOTTSDALE, AZ 85255-5494 VOP I LLC PO BOX 404 CHANHASSEN, MN 55317-0404