Loading...
D-3. 2016 Street Project Consultant Contract and Feasibility StudyCITY OF CAANNASSEN 7700 Market Boulevard PC Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952 227,1400 Fax: 952, 227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952 227,1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 MEMORANDUM TO: FROM: DATE: SUBJ: Paul Oehme, Director of Public Works /City Engineer 0. Alyson Fauske, Assistant City Engineer August 24, 2015 6 W10 d p -3 2016 Street Reconstruction Project No. 16 -01: Approve Consultant Contract; Authorize Preparation of Feasibility Study PROPOSED MOTION "The City Council is recommended to approve a consultant contract in the amount of $208,737.00 with WSB & Associates and authorize the preparation of a feasibility study for the 2016 Street Reconstruction Project, No. 16 -01. City Council approval requires a simple majority vote of the City Council present." The Capital Improvement Program has planned for reconstructing the Minnewashta Manor area (north of Lake Minnewashta) next year. The streets in Minnewashta Manor were selected using the City's Pavement Management Program and site investigations. The streets in this project area were constructed in 1971. The streets are in poor condition with pavement condition indices ranging from www.ci.chanhass Webss en.mous 9 to 47, with an average of 31. A PCI of 100 represents a new street. Streets with a PCI below 45 typically indicate distresses that require a full reconstruction, therefore it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2016 Street Reconstruction Project August 24, 2015 Page 2 wdsh�' Stat - . a N8y Ct i k � �6, n}r° r Lane° i �ry Aao Asti. oa° ,1 �iewashtay, _ 7 CD R�d9? > a :,,F b The street widths vary between 21' and 21' within 50' or 60' wide right of way. The streets are proposed to be reconstructed to the existing widths. Concrete curb and gutter is anticipated to be added to this area if adequate storm water rate, volume and water quality features can be incorporated into the design. G:\ G\PUBUL 2016 PROMCMIMI Strea avd Utility Re covstructwv \Cownvvicetivv�20150624 approve wmvLLam wnhact.MCx Paul Oelune 2016 Street Reconstruction Project August 24, 2015 Page 3 The water main in this area is either cast or ductile iron pipe. Trunk water main is within North Manor Road (12 inch diameter) and Orchard Lane (10 inch diameter). The locations of the documented water main breaks are shown on the graphic to the right. s E Wash e 4 State Hwy d6 \y� Lane 2A ` z �o . T Pfln'•�s,ash:a SI�011 Staff proposes to replace the water o main with PVC a water main. All services would also be replaced. Alternatives to open cut installation, such as pipe bursting and directional drilling will be bid as a potential cost - saving measure. The sanitary sewer has been televised. Staff will review the information to determine the condition and look for evidence of inflow /infiltration into the system. A forcemain from Lift Station 4 also lies within the project area. There are no known issues with this forcemain. An anode bag will be added to act as a sacrificial material to prolong the life of the forcemain. 4 $met a Forcemain ,_•. .. •y. Ro t�tFt o t•-.; YT i 1 a G: E G\PUBUC\_2016 PROJECTS \16 -01 Str and Utility Remomvaion \Co=unimtion\20150824 approve consultant wn re .does Paul Oehme 2016 Street Reconstruction Project August 24, 2015 Page 4 The project area is developed therefore there is minimal space to provide traditional stormwater management, namely curb and gutter, storm sewer and treatment ponds. The feasibility study will: • Identify and address existing infrastructure and drainage issues • Review existing City and Minnehaha Creek Watershed District (MCWD) hydraulic and hydrologic models for issues • Provide possible solutions to identified issues Address current National Pollutant Discharge Elimination System (NPDES) and MCWD requirements • Identify if project scope exceeds the threshold for each agency and design accordingly • Identify potential areas for water quality treatment • Identify potential areas for abstraction through infiltration, capture and use or other methods • Provide discussion of infeasibility if that is the findings • Identify areas where increases in impervious surface may be minimized • Review City wetland protection plan, MCWD wetland protection plan, National Wetland Inventory (NWI), Public Waters Inventory (PWI) and other available resources for potential wetlands within the project area, delineating wetlands where necessary. There are overhead private utilities within the project area. The private utility companies will be notified of the proposed project and asked to provide an estimate to bury the utility. Should the neighborhood wish to pursue burying the private utilities, 100% of the cost will be assessed to the benefitting property owners. Project Financing Budgets for the proposed work have been included in the 2015 CIP. The budgets will need to be reviewed and updated based upon current construction cost estimates and after the feasibility report is drafted. Assessments will be based off the City's assessment practice of assessing 40% of the street improvements to the benefiting properties on a per lot basis. The assessments would be proposed for 10 years at a preliminary 6% interest rate. A consultation report will be drafted to help determine the final assessment amount. The Engineering Department will host neighborhood meetings to answer resident questions about the proposed improvements and assessments. These meetings also give staff an opportunity to gather additional information about the area to help make the project successful. Engineering Services Consultant engineering services would be needed for the street project. The engineering services would include feasibility report preparation, final design and construction administrative services. G:1 GIP UCt_2016 PROJECTS \] 6.01 Sv and Utility Rero=s ion \Co=uoicalma 0150824 approve c mltaot wo aa.docx Paul Oehme 2016 Street Reconstruction Project August 24, 2015 Page 5 Staff sent a request for proposals to two engineering companies: Kimley -Horn & Associates and WSB & Associates. Proposals were received from both consultants and are summarized below: The proposed WSB team has extensive street rehabilitation project experience including the following projects in Chanhassen: Minnewashta Heights (2012), Red Cedar Point (2011), and the Erie Avenue Area (2010). Their work in Chanhassen and other communities has been satisfactory. The consultant contract will be a time and materials based work not -to- exceed amount. As with all engineering contracts, the consultant must submit periodic invoices that staff will review before processing. The consultant will be required to submit timesheets verifying the hours worked on the project and expense sheets. Staff will review the invoices and expense sheets for accuracy and conformance to the contract. Funding Funding for the project is proposed to come from many sources and has been budgeted for in the 2015 Capital Improvement Plan as follows: Revolving Assessment Fund - Street Improvements including Assessments Stormwater Utility Fund — Storm Sewer Improvements Sanitary Sewer Utility Fund — Sanitary Sewer Improvements Water Utility Fund — Water Main Improvements G \ENO\PUBLIC\_2016 PROJECTS \I6 -01 Street and Utility Reconstruction \Communication\20150824 approve wnsultant wntrectdocx $1,560,000 $ 200,000 $ 300,000 825,000 Total $2,885,000 Kimley -Horn & Associates WSB & Associates Submitted prior to the deadline ✓ ✓ Proposal format ✓ ✓ Transmittal letter submitted ✓ ✓ Members of the consultant team identified ✓ ✓ Understanding of the project ✓ ✓ Total Hours 1,987 1,624 Total Cost $228,700 $208,737.00 The proposed WSB team has extensive street rehabilitation project experience including the following projects in Chanhassen: Minnewashta Heights (2012), Red Cedar Point (2011), and the Erie Avenue Area (2010). Their work in Chanhassen and other communities has been satisfactory. The consultant contract will be a time and materials based work not -to- exceed amount. As with all engineering contracts, the consultant must submit periodic invoices that staff will review before processing. The consultant will be required to submit timesheets verifying the hours worked on the project and expense sheets. Staff will review the invoices and expense sheets for accuracy and conformance to the contract. Funding Funding for the project is proposed to come from many sources and has been budgeted for in the 2015 Capital Improvement Plan as follows: Revolving Assessment Fund - Street Improvements including Assessments Stormwater Utility Fund — Storm Sewer Improvements Sanitary Sewer Utility Fund — Sanitary Sewer Improvements Water Utility Fund — Water Main Improvements G \ENO\PUBLIC\_2016 PROJECTS \I6 -01 Street and Utility Reconstruction \Communication\20150824 approve wnsultant wntrectdocx $1,560,000 $ 200,000 $ 300,000 825,000 Total $2,885,000 Paul Oehme 2016 Street Reconstruction Project August 24, 2015 Page 6 Schedule A tentative schedule is as follows: Approve Consultant Contract August 24, 2015 Complete Soil Borings /Ground Penetrating Radar Fall, 2015 Neighborhood Open House November, 2015 Accept Feasibility Report December, 2015 Hold Public Hearing January, 2016 Bid Opening March, 2016 Assessment Hearing April, 2016 Start Construction June, 2016 Construction Substantially Complete August, 2016 Attachments: Preliminary CIP pages Resolution G:\BNGTUBMC \_2016 MOMCM16 -01 Strew end Utility Reconsimaion \Communication @0150824 approve conmltant convey docx Projects By Funding Source City of Chanhassen, MN Project # ST -012 Project Name Annual Street Improvement Program Account fit 601 -xaxx -4751 Account #2 Account #3 Account #4 2015 thru 2019 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost: $22,769,500 nnual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2015 - Carver Beach area (south and west of Carver Beach Road) MSA - Kerber Blvd overlay (north of West 78th Street) and Dakota Ave (Hwy 5 to Lake Dr E) 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashm Woods Drive MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area, Clues Mar Drive, Lone Cedar and Saddlebrook Pass neighborhood MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point Justification City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. abilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have :riorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to sider the merits of the project and scope of work. Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a ;ing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in 3hsence of a trail. This trail seement is nlanned to be constructed alone with the 2017 MSA street reconstruction. Prior Expenditures 2015 2016 2017 2018 2019 Total 97695,000 Construction 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Total Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Prior Funding Sources 2015 2016 2017 2018 2019 - Total 9,695,000 Assessment/Revolving 1,850,000 1,560,000 1,622,400 1,687,300 1,754,800 8,474,500 Assess Fund Total MSA 1,400,000 900,000 1,400,000 900,000 4,600,000 Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 decrease maintenance costs. 88 Projects By Funding Source City of Chanhassen, MN 2015 thru 2019 Project# SWW -019 Project Name Street Improvement Projects - Storm Water Mgmt Account #1 720- 70254751 Account #2 Account #3 Account #4 annual amount set aside for storm water management infrastructure constructi on or lertaken by the engineering and public works departments. Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Total Project Cost: $1,775,000 associated with street improvement projects Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2015 2016 2017 2018 2019 Total 1,100,000 construction 125,000 200,000 75,000 200,000 75,000 675,000 Total Total 125,000 200,000 75,000 200,000 75,000 675,000 200,000 75,000 675,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total 17100,000 I Surface Water Utility Fund 125,000 200,000 75,000 200,000 75,000 675,000 Total Total 125,000 200,000 75,000 200,000 75,000 675,000 Budget maintenance of new infrastructure will be 011 map Projects By Funding Source City of Chanhassen, MN Project# SS -014 Project Name Sanitary Sewer Replacement Account #1 701 - 70254751 Account #2 Account #3 Account #4 2015 thru 2019 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority Na Description I Total Project Cost: $1,640,000 Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Prior Expenditures 2015 2016 2017 2018 2019 Total 925,000 Construction 75,000 300,000 40,000 250,000 50,000 715,000 Total Total 75,000 300,000 40,000 250,000 50,000 715,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total 92-5,0001 Sewer Utility Fund 75,000 300,000 40,000 250,000 50,000 715,000 Total Total 75,000 30D,000 40,000 250,000 50,000 715,000 Budget decrease maintenance costs. 80 Projects By Funding Source Citv of Chanhassen, MN Project # W-024 Project Name Watermain Replacement Account #1 700- 7025A751 Account 93 Account n2 Account #4 2015 thru 2019 Department Water System Improvements Contact Paul Oehme Type improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $4,270,000 Description Replacement of existing water mainlines incoordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. a Prior Expenditures 2015 2016 2017 2018 2019 Total 2,375,000 Construction 125,000 825,000 75,000 770,000 100,000 1,895,000 Total Total 125,000 825,000 75,000 770,000 100,000 1,895,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total 2,375,000 Water Utility Fund 125,000 825,000 75,000 770,000 100,000 1,895,000 Total Total 125,000 825,000 75,000 770,000 100,000 1,895,000 These projects will decrease maintenance costs. 111 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: August 24, 2015 RESOLUTION NO: 2015 -XX MOTION BY: SECONDED BY: A RESOLUTION APPROVING CONSULTANT CONTRACT; AUTHORIZE PREPARATION OF FEASIBILITY STUDY FOR THE 2016 STREET RECONSTRUCTION PROJECT NO. 16 -01 WHEREAS, the streets for reconstruction in the Minnewashta Manor neighborhood in 2016 are as follows: Minnewashta Woods Drive North Manor Road Sandpiper Trail Tanagers Lane Washta Bay Road NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby approves a consultant contract with WSB & Associates, Inc. in the amount of $208,737.00 for engineering services related to the project and authorize preparation of a feasibility study for the 2016 Street Reconstruction Project. Passed and adopted by the Chanhassen City Council this 24" day of August, 2015. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT