Loading...
MMW Existing North Detention PondProject Information Calculator Version: Version 2: June 2014 Project Name: MMW Existing North Detention Pond User Name / Company Name: Cliff Buhman/Inspec Date: 9-5-15 Project Description: Existing North Detention Pond constructed in 2003 Site Information B Soils C Soils D Soils CITYOFCHANHASSEPI (acres) (acres) (acres) (acres) i3ECEIVED Retention Requirement (inches): 1.1 Site's Zip Code: 55331 SEP 0 8 2015 Annual Rainfall (inches): 29.6 Phosphorus EMC (mg/1): 0.3 CHANHAASSEN PLANNINGWI TSS EMC (mg/1): 54.5 3.65 Total Site Area Total Area (acres) 14.39 Land Cover A Soils B Soils C Soils D Soils Total (acres) (acres) (acres) (acres) (acres) Forest/Open Space - Undisturbed, protected 0 forest/open space or reforested land Managed Turf - disturbed, graded for yards or 10.74 10.74 other turf to be mowed/managed Impervious Area (acres) 3.65 Total Area (acres) 14.39 Site Areas Routed to BMPs Land Cover A Soils B Soils C Soils D Soils Total (acres) (acres) (acres) (acres) (acres) Forest/Open Space - Undisturbed, protected forest/open space or reforested land 0 Managed Turf - disturbed, graded for yards or other turf to be mowed/managed 10.74 10.74 Impervious Area (acres) 3.65 Total Area (acres) 14.39 Summary Information Performance Goal Requirement Performance goal volume retention requirement: 14574 ft3 Volume removed by BMPs towards performance goal: ft3 Percent volume removed towards performance goal % Annual Volume and Pollutant Load Reductions Post development annual runoff volume 13.6586 acre -ft Annual runoff volume removed by BMPs: 0 acre -ft Percent annual runoff volume removed: 0 % Post development annual particulate P load: 6.13 lbs Annual particulate P removed by BMPs: 3.8 lbs Post development annual dissolved P load: 5.02 lbs Annual dissolved P removed by BMPs: 0 lbs Percent annual total phosphorus removed: 34 % Post development annual TSS load: 2025 lbs Annual TSS removed by BMPs: 1215 lbs Percent annual TSS removed: 60 % BMP Summary De.i......�...n r �l c. Annual Vnluma Summary BMP Volume Volume Volume Volume Percent BMP Name Capacity Recieved Retained Outflow Retained Volume (ft3) (ft3) (ft3) (ft3) (%) 1 - Constructed stormwater pond 0 14574 0 14574 0 Annual Vnluma Summary Dawlnldafn Dhnmhnn,c cummam Load From Load From Volume Outflow Percent BMP Name Volume From Volume Volume Percent BMP Name From Direct Upstream Retained outflow Retained Watershed BMPs (acre -ft) (acre -ft) (%) 1 - Constructed stormwater pond (acre -ft) (acre -ft) 2.33 62 1 - Constructed stormwater pond 13.6586 0 0 13.6586 0 Dawlnldafn Dhnmhnn,c cummam Load From Load From Load Outflow Percent BMP Name Direct Upstream Retained Load Retained Watershed BMPs (lbs) (lbs) (%) (lbs) (lbs) 1 - Constructed stormwater pond 6.13 0 3.8 2.33 62 Dissolved Phosphorus Summary TSS Summary Load From Load From Load From Direct Load Upstream Outflow Direct Upstream Load Outflow Percent BMP Name (lbs) (lbs) (lbs) Retained Load Retained 810 Watershed BMPs (lbs) (lbs) (lbs) (lbs) (%) 1- Constructed stormwater pond 5.02 0 0 5.02 0 TSS Summary Load From Load From Direct Load Upstream Outflow Percent BMP Name Watershed BMPs Retained Load Retained (lbs) (lbs) (lbs) (lbs) (%) 1 - Constructed stormwater pond 2025 0 1215 810 60 BMP Schematic 1- Constructed s a.water pood