Loading...
A-1. 2016-2020 CIP Review0 Some highlights of capital replacement purchases planned for 2016 are: $120,000 for a A-1- MY Of Fax: 952 227.1190 $181,000 in various software, hardware and computer upgrades (EQ -013 & EQ -048); MEMORANDUM CHMNSEN the city's existing capital assets and add improvements or system expansions when Phone: 952.2271160 necessary. It is incumbent on the City Council and staff to exercise prudent stewardship Fax: 952.227.1170 over these capital assets. This plan will fully fund our capital needs while maintaining Finance existing services. Phone: 952.227.1140 TO: Mayor & City Council 1700 Market Boulevard Park & Recreation The city currently levies $800,000 per year for the Capital Replacement Equipment Fund PC Box 147 FROM: Greg Sticha, Finance Director Chanhassen, MN 55317 Recreation center $700,000 owed to the fund as an inter -fund loan from the Water Fund. The levy has not 2310 Coulter Boulevard DATE: October 12, 2015 Administration Fax: 952.227.1404 amount. Phone 952.227.1100 SUBJ: 2016-2020 CIP Review Fax: 952.227.1110 Building Inspections Some highlights of capital replacement purchases planned for 2016 are: $120,000 for a Phone: 952 227.1180 CAPITAL IMPROVEMENT PLAN Fax: 952 227.1190 $181,000 in various software, hardware and computer upgrades (EQ -013 & EQ -048); The capital improvement plan is a five-year projection of the funds needed to maintain Engineering the city's existing capital assets and add improvements or system expansions when Phone: 952.2271160 necessary. It is incumbent on the City Council and staff to exercise prudent stewardship Fax: 952.227.1170 over these capital assets. This plan will fully fund our capital needs while maintaining Finance existing services. Phone: 952.227.1140 Approximately $700,000 in capital improvements are scheduled for 2016 in the Park Fax: 952.227.1110 CAPITAL REPLACEMENT EQUIPMENT FUND Park & Recreation The city currently levies $800,000 per year for the Capital Replacement Equipment Fund Phone: 952.227.1120 Fax: 952 227.1110 (400) to finance capital equipment purchases. In 2016, these purchases are estimated to be $949,600. There is approximately $700,000 in reserves in this fund and an additional Recreation center $700,000 owed to the fund as an inter -fund loan from the Water Fund. The levy has not 2310 Coulter Boulevard been increased beyond its initial levy amount of $800,000 since 2005. For all these Phone: 952.227.1400 reasons, staff feels comfortable to have actual expenditures in 2016 beyond the levy Fax: 952.227.1404 amount. Punning & Natural Resources Some highlights of capital replacement purchases planned for 2016 are: $120,000 for a Phone: 952.227.1130 much needed roof replacement at the Recreation Center (PK&T-127); approximately Fax: 952.227.1110 $181,000 in various software, hardware and computer upgrades (EQ -013 & EQ -048); $95,000 for the replacement of the roof at Fire Station #1 (MB -026); and $66,000 for the Public Works replacement of a mower in the parks department (EQ -104). 7901 Park Place Phone: 952.227.1300 PARK DEDICATION FUND Fax: 952.227.1310 Senior Center Approximately $700,000 in capital improvements are scheduled for 2016 in the Park Phone: 952.227.1125 Dedication Fund. The largest is $400,000 for a hockey rink at Bandimere Community Fax: 952.227.1110 Park (PK&T-122). Website www.c i.chanhassen. mn.us Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mayor & City Council October 12, 2015 Page 2 OTHER MAJOR CAPITAL PROJECTS Reconstruction of CSAH 61 from TH 101 to Charlson Road (ST -033) will continue in 2016 at an estimated cost of $54 million. The only cost to the city will be $150,000 for a trail connection and $100,000 in utility improvements. Staff is also planning on improvements to TH 101 from Pioneer Trail to Flying Cloud Drive totaling $30.5 million. Most improvements are scheduled to take place in 2017 and 2018. The majority of the project is funded from other agencies, but there will be utility costs and some use of MSA funds in conjunction with this project. We have added a county -led project to improve safety at Powers Boulevard/Pleasant View Road (ST -035) for $570,000. The county will be paying for $500,000 of the improvements. In rate studies and CIPs from previous years, we have scheduled the second water treatment plant for 2023. This past summer, a feasibility study was performed and the results were shared with council a month ago. Increasing water quality issues in the high zone may require moving up the plant's construction schedule. Staff has now scheduled the plant for consideration in 2017. We will discuss the impacts of this move on water connections and rates at our rate study discussion in October/November. There are a number of utility projects that are dependent on development. Each of these will be evaluated on an annual basis and adjustments will be made to the CIP in future years as development dictates, and will also be made in conjunction with our annual rate study. In 2012 the city entered into a lease/buy agreement with Roadrunner Transportation for use of the City's vacant old public works building. Since that time the city established a fund to account for those activities and has accumulated $260,000 in cash reserves. The capital equipment replacement fund was originally started to fund only various equipment needs of the city. Since its inception in 2004, it has expanded to include building improvements, hardware/ software, and fire vehicles. The purchase of major fire vehicles like pumpers, engines and ladders can be very costly and to fund those large items out of the capital equipment fund would result in a significant reduction in the ability to purchase other much needed equipment in the city. Therefore, staff is recommending purchasing the mini pumper for $250,000 (EQ -054) using the cash reserves built up in the old public works building fund. Listed below are the capital items greater than $250,000 for 2016 that were not discussed earlier in this memo, including the related funding source: Project Funding Source Amount Sanitary Sewer Annual Rep (SS -014) Sanitary Sewer Fund $300,000 Annual Street Improvement Project (ST -012) Revolving Assessment Construction Fund & MSA $2,760,000 Street Pavement Management Maintenance (ST -018) Levy and Street Pavement Management Fund $485,000 Annual Water Main Repair -024) Water Utilit Fund $825,000 Repaint Lake Lucy Water Pipe (W-041) West 78`l' St Water Main Im (W-055) Water Utility Fund Water Utility Fund ;1,200,000 $250,000 f\gregs\cip\2016-2020\10-12-15 cip mview.docx Mayor & City Council October 12, 2015 Page 3 Staff will be looking for feedback on the capital items listed in the CIP document, and in particular, for direction on changes to any of the capital items for 2016. The final version of the 2016-2020 CIP will be adopted at the city council meeting on December 14, 2015. In addition, staff will be reviewing the long-range revolving assessment construction fund, bond tax levy spreadsheet, and the MSA funding and expense projection spreadsheet with the city council on Monday. ATTACHMENTS 1. 2016-2020 Capital Improvement Plan 2. Revolving Assessment Construction Fund 3. Bond Tax Levies Spreadsheet 4. MSA Funding Projection Spreadsheet f..\gregs\cip\2016-2020\10-12-15 cip review.docx w d T C d p n O E`a d L m -�O Se Lo U W mw NQ v 00 p 1O ea > p W mEo m o 0d m Q Q u E o d d y OE `m n c LL a E U y U A E E ✓E+ U N t d N m d T U S d m T d U i d i V 4 W d di. .Q e�'N am � �m �Nmi ornu`�io M°ey'om in W W QpVm m vp�.- Mn no W oa MQmM N Nva N r NM M to (A fA f9 �t9 t9 to m tn0 N tQ0 O OMi. W n tOO V Q OA O� V M Q tp A M N Q W � m N V n N W Q 0 M W th W O M n N N Nva a NN N �H49mMM�� O N 0 M v 0 0 0" W N v Na .r fbp O) N IOp Nr � fA f9 f9 fA f9 fA i9 i9 N V Q n O m Q N Q M O M eV� W Q N m N Q th A N O) a W Cl W N N � Nv Wf9 (9 Ni f9 t9 bi m Q Q p) M W W n m 1 N N m O W O W N O) W n W A Cl fpq N Q A O Q (p Q N " r N .J t9 Yi m f9 19 t9 t9 W W W W M M W n O A N Q Q N N N O M N M N N M m p1 Ip Of O W M Q M m N N N N W O Ol M N N z rm� V N 0 N [O N Q V A O W Q r r V) fA f9 Vi t9 H A b M A W 4p M W A N Q Q N N N O I. A W W 4) n A m h N Q n W N m W M m Ip V N W N N W O Q) W W M Q Q A O N n d W M Oi n W Q m n M n i0 O� Q N � � _ � V f9 WWM19 f9 m N m Am W O W M n m O W n Q Q Q n N Q Q N N N LL W p) O Cl! D1 W OJ OJ r W A W n O N m N N m 0 Ip W m M Q Q n W m A O N Q n h m Q O W M A Q A N Q Q W N O n a) m O A (h M W n N O) N O N W N N m N N Ip W W Q Q N A A O n W h A Q Q fq fq r (q '" W m m r W n M (p M W N W m f 0 O> A M m n Q n n Q n N Q Q W W m O Q N N N N N W M A Q N V N W W W W N N 4p fp N Q W n Q^ Q f Q O) n M M A N h W W A W A mn rn cp W o W m mm M� NnoWm�mo V •/ \ pO O y O W W �N O pO m W W W A n Q n N Q Q VOIQ A N W M W QW 4rC nmNN���W -� o O N W V n W W O) A A W W Ip n cq Iq n W W F (9 N W �LIL O o O W N m m O Q m mM N m N A A Q n N Q W OI m m O a N N O O O A Q W W O N a O n W N N Ip m W O Q fp Q n � N O m N T M m N n a) W A W W N M OI 10mm m m m Q A M n O m N n O m W N N W O O O M N N O OW W O M Ip A A Q n N O O O O O O m m N r O O> O O h_ MN m Q O W m m O O N W O n W N m �p 1p O O N OO W O N^ OI W m N n O) W A N r r r a0 r N O nj N N N N N N N Nm O O O O O O O O O O O O O O O 00 U L N N w d T C d p n O E`a d L m -�O Se Lo U W mw NQ v 00 p 1O ea > p W mEo m o 0d m Q Q u E o d d y OE `m n c LL a E U y U A E E ✓E+ U N t d N m d T U S d m T d U i d i V 4 W d di. .Q m m rn � M in F m o o m m m o e o m m a N rn n in r M o m m a m M N N M M N N m O O m O m r W N N A N .Wf9 f9W Wt9 to O O N O h O T O O m N N N m m N T m m Op M(p O m M a m V M m M m IM. f N A M N m m r M of m n m O O m m W V of m . M M N m o n o n N N r m m m o r in N V V -of-oto -f' V O N. . . W W� O M O N m m O C mV m on N m 1�m a N O Dov O omomvMmM m h O M O m M m nmro rM no vroai of oimvd e o m v o m o a m —M =rn M N N � �- m r N m M f9 fA eA fA f9 � f9 f9 ! 11 |||||||| ;! }//)/\------------ \)! }\} - ;§ 'S w „ 2 p ))\ !!! §\/ 11 |||||||| ;! }//)/\------------ \\ �3(\ ##4#k§! \ Br!!!B! - ;§ \\ �3(\ ##4#k§! \ Br!!!B! City of Chanhassen, MN Capital Improvement Program 2016 thru 2020 FUNDING SOURCE SUMMARY Source 2016 2017 2018 Assessment/Revolving Assess Fund Cable TV Fund Capital Replacement Equipment Fund Developer Assessments Federal Grant General Fund Surplus MSA Old Public Works Building Fund Other Agency Contribution Park Dedication Fund Revenue Bonds Sewer Utility Fund Street Pavement Management Surface Water Utility Fund Tax Levy Water Utility Fund GRAND TOTAL 2019 2020 Total 1,900,000 1,622,400 1,687,300 1,904,800 2,500,000 9,614,500 39,000 25,000 25,000 40,000 25,000 154,000 949,600 1,393,750 1,196,400 1,296,700 606,600 5,443,050 7,900,000 7,900,000 15,000 15,000 80,000 120,000 80,000 280,000 1,350,000 1,400,000 1,000,000 1,200,000 4,950,000 250,000 1,300,000 1,550,000 56,935,000 7,750,000 19,490,000 425,000 84,600,000 775,000 370,000 665,000 115,000 250,000 2,175,000 20,000,000 20,000,000 752,000 358,500 3,193,000 296,000 1,173,250 5,772,750 140,000 100,000 100,000 100,000 100,000 540,000 396,250 216,250 441,250 321,250 331,250 1,706,250 385,000 185,000 185,000 185,000 185,000 1,125, 000 2,662,000 188,500 2,068,000 2,811,000 4,695,250 12,424,750 66,628,850 33,729,400 30,130,950 8,694,750 19,066,350 158,250,300 City of Chanhassen, MN Capital Improvement Program 2016 thru 2020 PROJECTS BY FUNDING SOURCE Source Proiect# Priority 2016 2017 2018 2019 2020 Total Assessment/Revolving Assess Fund Tennis Court Refurbishment PK&T-072 n/a 150,000 150,000 Annual Street Improvement Program ST -012 We 1,560,000 1,622,400 1,687,300 1,754,800 2,500,000 9,124,500 TH101 Imp -Pioneer Trto Flying Cloud Dr (CSAH 61) ST -032 n/a 270,000 270,000 Powers Blvd/Pleasant View Rd Intersection Imp ST -035 n/a 70,000 70,000 Assessment/Revolving Assess Fund Total 1,900,000 1,622,400 1,687,300 1,904,800 2,500,000 9,614,500 Cable TV Fund AudioNisual Equipment EQ -026 n/a 25,000 25,000 25,000 25,000 25,000 125,000 Citizen Survey MB -023 n/a 14,000 15,000 29,000 Cable TV Fund Total 39,000 25,000 25,000 40,000 253000 154,000 Fapital Replacement Equipment Fund Fire Dept.: SCBA Equipment EQ -004 We 7,500 7,500 PPE'. Turnoul/Helmets EQ -010 We 28,200 28,650 29,100 29,600 303000 145,550 ComputerlNetwork Equipment Purchases/Upgrades EQ -013 n/a 93,700 72,900 69,700 79,000 79,800 395,100 Telecommunication PurchaseslUpgrades EQ -014 n/a 2,000 1,200 1,200 1,200 5,600 Light Duty Trucks: Community Dev. EQ -015 n/a 30,000 30,000 30,000 90,000 Dump/Plow Truck ReplacementslAdditions EQ -016 We 2253000 226,000 226,000 50,500 727,500 Light Duty Trucks: Public Works EQ -029 We 42,000 28,000 30,000 111,000 211,000 Software Purchases EQ -048 n/a 873400 90,200 77,600 76,600 78,600 410,400 Computerized Records Retention System EQ -049 n/a 4,400 5,600 4,600 2,000 1,000 17,600 Fire Vehicles EQ -054 We 20,000 640,000 53,000 713,000 Aerial Photography for City GIS Datasets EQ -055 n/a 22,300 2,200 2,200 11,800 2,200 40,700 Light Duty Trucks: Utilities EQ -062 We 10,000 10,000 Storage Area Network (SAN) EQ -081 nla 40,000 25,000 40,000 105,000 Office Furniture EQ -084 We 5,000 5,000 5,000 5,000 5,000 25,000 Radios EQ -094 We 350,000 350,000 Loader Mounted Snow Blower EQ -098 n/a 141,000 141,000 Light Duty Trucks - Parks EQ -100 n/a 30,000 30,000 45,000 30,000 135,000 Mower Replacement - Park EQ -104 n/a 66,000 104,000 104,000 274,000 Tractor Replacement - Park EQ -106 n/a 16,000 16,000 Brush Chipper EQ -115 n/a 56,000 56,000 Street Sweeper EQ -118 n/a 281,000 281,000 Annual Skid Loader Trade In EQ -124 n/a 13,000 13,000 13,000 13,000 13,000 65,000 Copier Replacements EQ -127 n/a 9,000 36,500 45,500 Paving Equipment EQ -131 me 31,000 25,000 56,000 Fleet Vehicles EQ -132 n/a 35,000 32,000 67,000 Hose Replacement EQ -137 nla 2,500 2,500 2,500 2,500 2,500 12,500 Recreation Center Revitalization Project EQ -140 n/a 25,000 25,000 25,000 25,000 100,000 Trailer Replacement- Parks EQ -143 nla 6,000 6,000 Toro Polar Trac EQ -144 n/a 52,000 52,000 Source Project# Priority 2016 2017 2018 2019 2020 Total Electronic Speed Display Signs EQ -145 Brine Outdoor Storage EQ -146 Security/Access Control Systems EQ -147 Downtown Banners EQ -148 Central Control Irrigation System EQ -149 Park Department Water Truck EQ -150 City Hall Remodel MB -010 Fire Department Building Improvements MB -026 Old Village Hall Repairs MB -028 Olson Community Garden Fence Replacement MB -029 Ree Center/Bluff Creek Elem Roof Reconstruction PK&T-121 Capital Replacement Equipment Fund ST -032 Total ST -033 Developer Assessments Lower Bluff Creek Trunk Utility Improvements SS -024 Developer Assessments Total Federal Grant Election Equipment EQ -138 Federal Grant Total General Fund Surplus Neighborhood Park Picnic Shelter lnitiafive PK&T-120 General Fund Surplus Total MSA West 78th St Streetlights ST -001 Annual Street Improvement Program ST -012 TH101 Imp -Pioneer Tr to Flying Cloud Or(CSAH 61) ST -032 TH 5 Acceleration Lane Improvements ST -034 MSA Total n/a 2,600 2,600 Old Public Works Building Fund Fire Vehicles EQ -054 Old Public Works Building Fund Total 131,000 131,000 n/a Other Agency Contribution Annual Street Improvement Program ST -012 TH101 Imp -Pioneer Tr to Flying Cloud Dr(CSAH 61) ST -032 Reconstruct-Cty Rd 61 from TH 101 to Chadson Rd ST -033 TH 5 Acceleration Lane Improvements ST -034 Powers BlvdlPleasent View Rd Intersection Imp ST -035 Lower Bluff Creek TMDL Implementation SWMP-024 Bluff Creek Drive Drainage Improvement Project SWMP-042 West Central Lotus Lake -Phase II SWMP-046 Upper Riley Creek Channel Stabilization SWMP-048 nla 12,000 12,000 n/a 25,000 25,000 n/a 37,500 37,500 n/a 2,600 2,600 nla 52,000 52,000 n/a 131,000 131,000 n/a 150,000 150,000 n/a 95,000 100,000 195,000 n/a 25,000 25,000 n/a 12,000 12,000 n/a 120,000 120,000 240,000 80,000 949,600 1,393,750 1,196,400 1,296,700 606,600 5,443,050 n/a 100,000 100,000 - 7,900,000 7,900,000 n/a 54,000,000 54,000,000 n/a 7,900,000 7,900,000 n/a 15,000 500,000 n/a 50,000 100,000 15,000 n/a 15,000 40,000 nla 325,000 15,000 n/a 80,000 120,000 80,000 280,000 80,000 120,000 80,000 280,000 n/a n/a n/a n/a 1,100,000 250,000 1,400,000 1,000,000 300,000 900,000 300,000 3,400,000 1,000,000 250,000 1,350,000 1,400,000 1,000,000 1,200,000 4,950,000 n/a 250,000 1,300,000 1,550,000 250,000 1,300,000 1,550,000 n/a 100,000 100,000 n/a 540,000 7,700,000 19,450,000 27,690,000 n/a 54,000,000 54,000,000 n/a 1,680,000 1,680,000 n/a 500,000 500,000 n/a 50,000 100,000 150,000 n/a 40,000 40,000 nla 325,000 325,000 n/a 75,000 75,000 Source Project# Priority 2016 2017 2015 2019 2020 Total Pioneer Trail Drainage Improvement SWMP-051 nla 40,000 40,000 Other Agency Contribution Total 56,935,000 7,750,000 19,490,000 425,000 84,600,000 Park Dedication Fund Picnic Tables/Park Benches PK&T-042 nla 10,000 10,000 10,000 10,000 10,000 50,000 Trees PK&T-043 We 15,000 15,000 15,000 15,000 15,000 75,000 Chanhassen Nature Preserve Trail, Final Phase PK&T-099 nla 90,000 90,000 Hockey Rink-Bandimere Community Park PK&T-122 nla 400,000 400,000 Bandimere Community Park Picnic Shelter PK&T-123 n/a 640,000 640,000 Galpin Blvd Trail Extension PK&T-125 n/a 150,000 150,000 Entry Signs-Bandimere Park & Lake Susan Park PK&T-126 nla 60,000 60,000 Roundhouse Park Sport Court PK&T-128 nla 135,000 135,000 Bandimere Park Tennis Court PK&T-129 We 225,000 225,000 Bandimere Park Parking Lot Expansion PK&T-130 nla 200,000 200,000 Reconstruct-Cty Rd 61 from TH 101 to Charlson Rd ST -033 n/a 150,000 150,000 Park Dedication Fund Total 775,000 370,000 665,000 115,000 250,000 2,175,000 Revenue Bonds West Water Treatment Plant W-037 n/a 20,000,000 20,000,000 Revenue Bonds Total 20,000,000 20,000,000 Sewer Utility Fund Dump/Plow Truck Replacements/Additions EQ -016 n/a 75,750 75,750 Light Duty Trucks: Utilities EQ -062 n/a 24,000 20,500 18,000 16,500 79,000 Annual Skid Loader Trade In EQ -124 nla 3,000 3,000 3,000 3,000 3,000 15,000 Utility Dept- Generator Trailer EQ -133 n/a 20,000 20,000 Lift Station 24 Roof Replacement MB -024 n/a 50,000 50,000 Inflow and Infiltration Abatement SS -012 nla 200,000 200,000 200,000 200,000 200,000 1,000,000 Sanitary Sewer Replacement SS -014 n/a 300,000 40,000 250,000 50,000 250,000 890,000 Sanitary Lift Station Rehabilitation Program SS -017 nla 25,000 20,000 20,000 25,000 28,000 118,000 2010 MUSA Sanitary Lift Station SS -020 ri 1,900,000 1,900,000 Lower Bluff Creek Trunk Utility Improvements SS -024 n/a 600,000 600,000 MUSA Trunk Sanitary Sewer Dversizing SS -025 n/a 75,000 75,000 SCADA Improvements SS -026 n/a 150,000 150,000 TH1011mp-Pioneer Trto Flying Cloud Dr(CSAH 61) ST -032 nla 750,000 750,000 Reconstrui Rd 61 from TH 101 to Charlson Rd ST -033 n/a 50,000 50,000 Sewer Utility Fund Total 752,000 358,500 3,193,000 296,000 1,173,250 5,772,750 Street Pavement Management Highcrest Meadows Trail Connector Improvements PK&T-131 n/a 20,000 20,000 Pavement Management ST -016 n/a 100,000 100,000 100,000 100,000 100,000 500,000 TH 5 Acceleration Lane Improvements ST -034 nla 20,000 20,000 Street Pavement Management Total 140,000 100,000 100,000 100,000 100,000 540,000 Surface Water Utility Fund Central Control Irrigation System EQ -149 n/a %000 10,000 Galpin Blvd Trail Extension PK&T-125 n/a 25,000 25,000 Property Acquisition SWMP-014 n/a 75,000 75,000 75,000 225,000 Source Project# Priority 2016 2017 2018 2019 2020 Total Street Improvement Projects -Storm Water Mgmt SWMP-019 Na 200,000 75,000 200,000 75,000 200,000 750,000 Lower Bluff Creek TMDL Implementation SWMP-024 n/a 24,000 20,000 75,000 16,500 95,000 Lake Minnewashta Outlet SWMP-026 n/a 3,000 3,000 30,000 3,000 3,000 30,000 Stormwater Pond Improvements SWMP-032 n/a 20,000 60,000 20,000 60,000 20,000 180,000 LID Implementation Project SWMP-035 n/a 11,250 11,250 11,250 11,250 11,250 56,250 Bluff Creek Drive Drainage Improvement Project SWMP-042 n/a 150,000 80,000 80,000 Storm Water Infrastructure Maintenance/Replacement SWMP-045 n/a 25,000 25,000 25,000 25,000 25,000 125,000 West Central Lotus Lake -Phase II SWMP-046 nla 50,000 75,000 75,000 Upper Riley Creek Channel Stabilization SWMP-048 nla 15,000 75,000 770,000 100,000 850,000 15,000 Pioneer Trail Drainage Improvement SWMP-051 nla 40,000 90,000 45,000 90,000 50,000 40,000 Surface Water Utility Fund Total W-041 n/a 396,250 216,250 441,250 321,250 331,250 1,706,250 Tax Levy Pavement Management ST -018 n/a 385,000 185,000 185,000 185,000 185,000 1,125,000 Tax Levy Total 385,000 185,000 185,000 185,000 185,000 1,125,000 Water Utility Fund Dump/Plow Truck Replacements/Additions EQ -016 n/a 75,750 75,750 Light Duty Trucks: Utilities EQ -062 n/a 24,000 20,500 18,000 16,500 79,000 Annual Skid Loader Trade In EQ -124 n/a 3,000 3,000 3,000 3,000 3,000 15,000 Central Control Irrigation System EQ -149 n/a 20,000 20,000 Lower Bluff Creek Trunk Utility Improvements SS -024 n/a 1,100,000 1,100,000 SCADA Improvements SS -026 nla 150,000 150,000 TH101 Imp -Pioneer Tr to Flying Cloud Dr(CSAH 61) ST -032 n/a 800,000 800,000 Reconstruct-Cty Rd 61 from TH 101 to Chanson Rd ST -033 n/a 50,000 50,000 Watermain Replacement W-024 n/a 825,000 75,000 770,000 100,000 850,000 2,620,000 Well Rehabilitation Program W-032 We 90,000 90,000 45,000 90,000 50,000 365,000 Repaint Lake Lucy Water Stand Pipe W-041 n/a 1,250,000 1,250,000 Low Zone 1 million gallon Elevated Storage Tank W-046 n/a 2,600,000 2,600,000 78th Street Watermain Loop Improvements W-055 n/a 250,000 250,000 MUSA Trunk Watermain Oversizing W-056 n/a 150,000 150,000 Well#16 W-059 n/a 1,400,000 1,400,000 2015 MUSA Trunk Watermain Extension W-060 n/a 300,000 300,000 Repaint Watertower Place Tank W-061 n/a 1,200,000 1,200,000 Water Utility Fund Total 2,662,000 188,500 2,068,000 2,811,000 4,695,250 12,424,750 GRAND TOTAL 66,628,850 33,729,400 30,130,950 8,694,750 19,066,350 158,250,300 City of Chanhassen, MN Capital Improvement Program 2016 thru 2020 DEPARTMENT SUMMARY Department 2016 2017 2018 2019 2020 Total Major Equipment 1,071,600 1,345,750 1,247,400 1,263,700 1,972,100 6,900,550 Municipal Buildings 146,000 50,000 115,000 150,000 461,000 Park & Trail Improvements 845,000 635,000 745,000 265,000 250,000 2,740,000 Sanitary Sewer Improvements 825,000 335,000 2,370,000 275,000 10,078,000 13,883,000 Street Improvements 60,825,000 11,007,400 23,972,300 3,239,800 2,785,000 101,829,500 Surface Water Management 501,250 241,250 481,250 746,250 331,250 2,301,250 Water System Improvements 2,415,000 20,165,000 1,265,000 2,790,000 3,500,000 30,135,000 TOTAL 66,628,850 33,729,400 30,130,950 8,694,750 19,066,350 158,250,300 City of Chanhassen, MN Capital Improvement Program 2016 thru 2020 PROJECTS BY DEPARTMENT Department Project# Priority 2016 2017 2018 2019 2020 Total Major Equipment Fire Dept.: SCBA Equipment EQ -004 n/a 7,500 7,500 PPE: Turnout/Helmets EQ -010 n/a 28,200 28,650 29,100 29,600 30,000 145,550 Computer/Network Equipment Purchases/Upgrades EQ -013 n/a 93,700 72,900 69,700 79,000 79,800 395,100 Telecommunication Purchases/Upgrades EQ -014 n/a 2,000 1,200. 1,200 1,200 5,600 Light Duty Trucks: Community Dev. EQ -015 n/a 30,000 30,000 30,000 90,000 Dump/Plow Truck Replacements/Additions EQ -016 n/a 225,000 226,000 226,000 202,000 879,000 Audio/Visual Equipment EQ -026 n/a 25,000 25,000 25,000 25,000 25,000 125,000 Light Duty Trucks: Public Works EQ -029 n/a 42,000 28,000 30,000 111,000 211,000 Software Purchases EQ -048 n/a 87,400 90,200 77,600 76,600 78,600 410,400 Computerized Records Retention System EQ -049 n/a 4,400 5,600 4,600 2,000 1,000 17,600 Fire Vehicles EQ -054 nla 250,000 20,000 640,000 1,353,000 2,263,000 Aerial Photography for City GIS Datasets EQ -055 n/a 22,300 2,200 2,200 11,800 2,200 40,700 Light Duty Trucks: Utilities EQ -062 n/a 58,000 41,000 36,000 33,000 168,000 Storage Area Network (SAN) EQ -081 n/a 40,000 25,000 40,000 105,000 Office Furniture EQ -084 nla 5,000 5,000 5,000 5,000 5,000 25,000 Radios EQ -094 n/a 350,000 350,000 Loader Mounted Snow Blower EQ -098 n/a 141,000 141,000 Light Duty Trucks - Packs EQ -100 n/a 30,000 30,000 45,000 30,000 135,000 Mower Replacement - Park EQ -104 n/a 66,000 104,000 104,000 274,000 Tractor Replacement - Park EQ -106 nla 16,000 16,000 Brush Chipper EQ -115 nla 56,000 56,000 Street Sweeper EQ -118 n/a 281,000 281,000 Annual Skid Loader Trade In EQ -124 nla 19,000 19,000 19,000 19,000 19,000 95,000 Copier Replacements EQ -127 n/a 9,000 36,500 45,500 Paving Equipment EQ -131 n/a 31,000 25,000 56,000 Fleet Vehicles EQ -132 We 35,000 32,000 67,000 Utility Dept- Generator Trailer EQ -133 n/a 20,000 20,000 Hose Replacement EQ -137 n/a 2,500 2,500 2,500 2,500 2,500 12,500 Election Equipment EQ -138 We 15,000 15,000 Recreation Center Revitalization Project EQ -140 n/a 25,000 25,000 25,000 25,000 100,000 Trailer Replacement - Parks EQ -143 n/a 6,000 6,000 Toro Polar Trac EQ -144 n/a 52,000 52,000 Electronic Speed Display Signs EQ -145 n/a 12,000 12,000 Brine Outdoor Storage EQ -146 n/a 25,000 25,000 Security/Access Control Systems EQ -147 n/a 37,500 37,500 Downtown Banners EQ448 n/a 2,600 2,600 Central Control Irrigation System EQ -149 nla 82,000 82,000 Park Department Water Truck EQ -150 nla 131,000 131,000 Major Equipment Total 1,071,600 1,345,750 1,247,400 1,263,700 1,972,100 6,900,550 Municipal Buildings City Hall Remodel MB -010 nla 150,000 150,000 Citizen Survey MB -023 n/a 14,000 15,000 29,000 Lift Station 24 Roof Replacement MB -024 nla 50,000 50,000 Fire Department Building Improvements MB -026 n/a 95,000 100,000 195,000 Department Project# Priority 2016 2017 2018 2019 2020 Total Old Village Hall Repairs MB -028 n/a 25,000 25,000 Olson Community Garden Fence Replacement MB -029 nla 12,000 12,000 Municipal Buildings Total 146,000 50,000 115,000 150,000 461,000 Park & Trail Improvements Picnic Tables/Park Benches PK&T-042 n/a 10,000 10,000 10,000 10,000 10,000 50,000 Trees PK&T-043 n/a 15,000 15,000 15,000 15,000 15,000 75,000 Tennis Court Refurbishment PK&T-072 n/a 150,000 150,000 Chanhassen Nature Preserve Trail, Final Phase PK&T-099 n/a 90,000 90,000 Neighborhood Park Picnic Shelter Initiative PK&T-120 We 80,000 120,000 80,000 280,000 Hockey Rink-Bandimere Community Park PK&T-122 rue 400,000 400,000 Bandimere Community Park Picnic Shelter PK&T-123 nla 640,000 640,000 Galpin Blvd Trail Extension PK&T-125 Na 175,000 175,000 Entry Signs-Bandimere Park & Lake Susan Park PK&T-126 We 60,000 60,000 Rec Center/Bluff Creek Elem Roof Reconstruction PK&T-127 We 120,000 120,000 240,000 Roundhouse Park Sport Court PK&T-128 We 135,000 135,000 Bandimere Park Tennis Court PK&T-129 n/a 225,000 225,000 Bandimere Park Parking Lot Expansion PK&T-130 n/a 200,000 200,000 Highcrest Meadows Trail Connector Improvements PK&T-131 n/a 20,000 20,000 Park & Trail Improvements Total 845,000 635,000 745,000 265,000 250,000 2,740,000 Sanitary Sewer Improvements Inflow and Infiltration Abatement SS -012 We 200,000 200,000 200,000 200,000 200,000 1,000,000 Sanitary Sewer Replacement SS -014 n/a 300,000 40,000 250,000 50,000 250,000 890,000 Sanitary Lift Station Rehabilitation Program SS -017 n/a 25,000 20,000 20,000 25,000 28,000 118,000 2010 MUSA Sanitary Lift Station SS -020 nla 1,900,000 1,900,000 Lower Bluff Creek Trunk Utility Improvements SS -024 n/a 9,600,000 9,600,000 MUSA Trunk Sanitary Sewer Oversizing - SS -025 nla 75,000 75,000 SCADA Improvements SS -026 Na 300,000 300,000 Sanitary Sewer Improvements Total 825,000 335,000 2,370,000 275,000 10,078,000 13,883,000 [Street Improvements West 78th St Streetlights ST -001 n/a 300,000 300,000 Annual Street Improvement Program ST -012 We 2,760,000 3,022,400 1,687,300 2,654,800 2,500,000 12,624,500 Pavement Management ST -016 nla 485,000 285,000 285,000 285,000 285,000 1,625,000 TH101 Imp -Pioneer Tr to Flying Cloud Dr(CSAH 61) ST -032 We 810,000 7,700,000 22,000,000 30,510,000 Reconstruct-Cty Rd 61 from TH 101 to Chadson Rd ST -033 We 54,250,000 54,250,000 TH 5 Acceleration Lane Improvements ST -034 We 1,950,000 1,950,000 Powers Blvd/Pleasant View Rd Intersection Imp ST -035 n/a 570,000 570,000 Street Improvements Total 60,825,000 11,007,400 23,972,300 3,239,800 2,765,000 101,829,500 Surface Water Management Property Acquisition SWMP-014 n/a 75,000 75,000 75,000 225,000 Street Improvement Projects - Storm Water Mgmt SWMP-019 We 200,000 75,000 200,000 75,000 200,000 750,000 Lower Bluff Creek TMDL Implementation SWMP-024 We 70,000 175,000 245,000 Lake Minnewashta Outlet SWMP-026 n/a 30,000 30,000 Stormwater Pond Improvements SWMP-032 n/a 20,000 60,000 20,000 60,000 20,000 180,000 LID Implementation Project SWMP-035 n/a 11,250 11,250 11,250 11,250 11,250 56,250 Bluff Creek Drive Drainage Improvement Project SWMP-042 n/a 120,000 120,000 Storm Water Infrastructure Maintenance/Replacement SWMP-045 We 25,000 25,000 25,000 25,000 25,000 125,000 West Central Lotus Lake -Phase II SWMP-046 n/a 400,000 400,000 Upper Riley Creek Channel Stabilization SWMP-048 n/a 90,000 90,000 Pioneer Trail Drainage Improvement SWMP-051 n/a 80,000 80,000 Department Project# Priority 2016 2017 2018 2019 2020 Total Surface Water Management Total W-032 n/a 501,250 241,250 481,250 746,250 331,250 2,301,250 Water System Improvements Watermain Replacement W-024 nla 825,000 75,000 770,000 100,000 850,000 2,620,000 Well Rehabilitation Program W-032 n/a 90,000 90,000 45,000 90,000 50,000 365,000 West Water Treatment Plant W-037 n/a 20,000,000 20,000,000 Repaint Lake Lucy Water Stand Pipe W-041 n/a 1,250,000 1,250,000 Low Zone 1 million gallon Elevated Storage Tank W-046 n/a 2,600,000 2,600,006 78th Street Watermain Loop Improvements W-055 n/a 250,000 250,000 MUSA Trunk Watermain Oversizing W-056 nla 150,000 150,000 Well#16 W-059 nla 1,400,000 1,400,006 2015 MUSA Trunk Watermain Extension W-060 n/a 300,000 300,001 Repaint Watertower Place Tank W-061 n/a 1,200,000 1,200,001 Water System Improvements Total 2,415,000 20,165,000 1,265,000 2,790,000 3,500,000 30,135,001 GRAND TOTAL 66,628,850 33,729,400 30,130,950 8,694,750 19,066,350 158,250,300 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -004 Project Name Fire Dept.: SCBA Equipment Account#1 400-4115-4705 Account 43 Account#2 Account44 program is to Department Major Equipment Contact Don Johnson Type Equipment Useful Life 20 years Category Fire Priority n/a Total Project Cost: $156,600 masks, and upgrades to SCBA air packs as needed. Justification ?irefighting is a very rigorous and demanding activity that is performed in an environment of extremes. The periodic replacement and/or .o SCBA equipment is required to maintain current quantities through replacement of damaged or destroyed equipment and to equip new Prim Expenditures 2016 2017 2018 2019 2020 Total 149,100 Equipment 7,500 7,500 Total Total 7,500 7,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 149,100 Capital Replacement 7,500 7,500 Total Equipment Fund Total 7,500 7,500 Budget Impact/Other fhere should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project EQ -010 Project Name PPE: Turnout/Helmets Account41 40041054705 Account#2 Account#3 Account 44 Department Major Equipment Contact Don Johnson Type Equipment Useful Life 5-7 years Category Fire Priority n/a Total Project Cost: $329,250 is for the purchase of PPE (turnout gear) to meet the NFPA 1851 standard, along with the replacement of turnout gear that has reached its ige service life of 5 to 7 years, The department will also provide new members with turnout gear after they complete their probationary period. gear lasts approximately 5-7 years on average. Prior Expenditures 2016 2017 2018 2019 2020 Total —18-3.7-0-01 Maintenance 28,200 28,650 29,100 29,600 30,000 145,550 Total Total 28,200 28,650 29,100 29,600 30,000 145,550 Prior Funding Sources 2016 2017 2018 2019 2020 Total 183,700 Capital Replacement 28,200 28,650 29,100 29,600 30,000 145,550 Total Equipment Fund Total 28,200 28,650 29,100 29,600 30,000 145,550 should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -013 Project Name Computer/Network Equipment Purchases/Upgrades Account#1 400-4126-4703 Account#2 Account #3 Account#4 the purchase of replacement user and network computer, d in 1999 and is subject to modification by the MIS Coo Justification Department Major Equipment Contact Richard Rice Type Equipment Useful Life 3-8 years Category Administration Priority Na Total Project Cast: $1,126,600 peripherals, and networking hardware. The replacement schedule was with the approval of the City Manager and department heads. ;ctmg and purchasing computer equipment through this project allows the City greater flexibility to direct equipment to where it is needed the , rather than in individual budgets. The replacement schedule was developed by the MIS Coordinator in 1999 and approved by the 1999 icil appointed IT Task Force. Expenditures in the 2016 budget requests are for the replacement of two Vmware host servers, 3 network :hes, 4 workstations, 12 desktop PC's, 3 notebook PC's and 3 tablets. Most of the equipment being replaced will be recycled and re -issued to staff. The oldest equipment in the inventory will be sold on the City public surplus auction site. Prior Expenditures 2016 2017 2018 2019 2020 Total 7317500 Office Equipment 93,700 72,900 69,700 79,000 79,800 395,100 Total Total 93,700 72,900 69,700 79,000 79,800 395,100 Prior Funding Sources 2016 2017 2018 2019 2020 Total 731500 Capital Replacement 93,700 72,900 69,700 79,000 79,800 395,100 Equipment Fund Total Total 93,700 72,900 69,700 79,000 79,800 395,100 Most items purchased for this account come with a I to 3 year warranty. Repairs to items are done by MIS staff after the warranty period expires. Spare parts or outside repairs are funded out of 101-1160-4530 (Repair & Maintenance -Equipment) or 101-1160-4300 (Consulting). Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project EQ -014 Project Name TelecommunicationPurchases/Upgrades Account#1 4004101-4703 Account 03 Account#2 Account#4 Description Department Major Equipment Contact Richard Rice Type Equipment Useful Life 10 years Category Administration Priority n/a Total Project Cost: $96,300 chis project funds the expansion and upgrades to the City telephone systems, excluding cellular equipment and service which remains an individual department budget item. The current City telephone system is a Mitel model 5000 and is located in the server room at City Hall. This system provides phone service for City Hall, the Library, Public Works, the Recreation Center, Fire Station 1 and the Water Treatment Plant. central PBX system simplifies the management of phone services and allows for the integration of phone services with other City applications ch as unified messaging and fax services. The PBX system was replaced with a Mitel 5000 in 2012. Additional 1P and digital handsets will be iered as replacements for existing Intertel digital phones at City Hall and the Fire Station. Prior Expenditures 2016 2017 2018 2019 2020 Total 90,700 Office Equipment 2,000 1,200 1,200 1,200 5,600 Total Total 2,000 1,200 1,200 1,200 5,600 Prior Funding Sources 2016 2017 2018 2019 2020 Total 90,700 Capital Replacement 2,000 1,200 1,200 1,200 5,600 Total Equipment Fund Total 2,000 1,200 1,200 1,200 5,600 for the replacement telephone system will be funded out of the 1160-4300 services account. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -015 Project Name Light Duty Trucks: Community Dev. Account41 400-4107-4704 Account#2 Description Account 43 Account#4 Department Major Equipment Contact Paul Oehme Type Vehicles Useful Life Unassigned Category Community Development Priority n/a Total Project Cost: $203,000 es are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program. 2016 - #610 2004 Dodge Dakota 2017 - #604 2002 Ford Ranger Pickup 2018 - #6012005 Dodge Dakota vehicles are used. to provide building inspection services throughout average replacement age is over 13 years. Prior Expenditures 2016 2017 2018 2019 2020 Total 113,000 Vehicles 30,000 30,000 30,000 90,000 Total Total 30,000 30,000 30,000 90,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 113,000 Capital Replacement 30,000 30,000 30,000 90,000 Total Equipment Fund Total 30,000 30,000 30,000 90,000 purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. Capital Improvement Program 2016 ihru 2020 City of Chanhassen, MN Project # EQ -016 Project Name Dump/Plow Truck Replacements/Additions Account#1 400-41084704 Account 43 Account 92 Account#4 Description Department Major Equipment Contact Paul Oehme Type Vehicles Useful Life Unassigned Category Street Equipment Priority n/a Total Project Cost: $2,248,800 ;e purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow sander. These vehicles are purchased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are ,ally required to be placed up to one year in advance of delivery. lacement schedule is as follows: 7 - # 124 1998 Ford L8513 Dump/Plow Truck 8 - # 126 2000 Sterling L8513 Dump/Plow Truck 9 - # 127 2001 Sterling L8513 Dump/Plow Track Justification vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling The average replacement age is 18.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the inity creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule. Prior Expenditures 2016 2017 2018 2019 2020 Total 1,369,800 Vehicles 225,000 226,000 226,000 202,000 879,000 Total Total 225,000 226,600 226,000 202,000 879,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,369,800 Capital Replacement 225,000 226,000 226,000 50,500 727,500 Equipment Fund Total Sewer Utility Fund 75,750 75,750 Water Utility Fund 75,750 75,750 Total 225,000 226,060 226,000 202,000 879,600 purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to Capital Improvement Program 2016 thru 2020 City of Chanhassen, NIN Project # EQ -026 Project Name Audiovisual Equipment Account#1 210-0000-4705 Account #2 Account #3 Account#4 for the systematic maintenance and upgrading of audio/visual equipment. Justification was 2012. Department Major Equipment Contact Chelsea Petersen Type Equipment Useful Life Unassigned Category Administration Priority n/a Total Project Cost: $250,000 Prior Expenditures 2016 2017 2018 2019 2020 Total 125,000 Maintenance 25,000 25,000 25,000 25,000 25,000 125,000 Total Total 25,000 25,000 25,000 25,000 25,000 125,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F --T2-5-,-00-0-1 Cable N Fund 25,000 25,000 25,000 25,000 25,000 125,000 Total Total 25,000 25,000 25,000 25,000 25,000 125,000 Budget Impact/Other 'uture upgrades include expanding access to programming to those without access to cable, and continued enhancement of the live and broadcast Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -029 Project Name Light Duty Trucks: Public Works Account#1 400-4120-4704 Account #2 Account#3 Account 94 Department Major Equipment Contact Paul Octane Type Vehicles Useful Life Unassigned Category Street Equipment Priority n/a Total Project Cost: $320,000 vides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program. 2016 - #112 2002 Chevrolet 3/4 ton with plow 2017 - #151 1995 Chevrolet 1/2 ton pickup 2018 - #101 2004 Chevrolet 3/4 ton pickup 2020 - #130 2007 Chevrolet 3/4 ton pickup vehicles are used for a variety of services throughout the community. The average replacement age is 14 years. These purchases are tent with the Vehicle Replacement Program. Prior Expenditures 2016 2017 2018 2019 2020 Total 109,000 Vehicles 42,000 28,000 30,000 111,000 211,000 Total Total 42,000 28,000 30,000 111,000 211,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F--io-q—,000l Capital Replacement 42,000 28,000 30,000 111,000 211,000 Total Equipment Fund Total 42,000 28,000 30,000 111,000 211,000 a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -048 Project Name Software Purchases Account#1 400-4117-4703 Account #2 Account#3 Account #4 Department Major Equipment Contact Richard Rice Type Equipment Useful Life 3-6 years Category Administration Priority n/a Total Project Cost: $970,850 project funds the purchase and renewal of major software programs for all City departments that are not associated with a specific, indivi, ct. Smaller annual software support and license renewal fees are funded out of account 101-1160-4300. The major reoccurring software were moved to this account in 2010. Justification The major portion of funds requested for this project are for Springbrook Software, ESRI, Laserfiche and Microsoft software purchases and renewals. Those reoccurring costs were moved to this project in 2010. The City joined the Microsoft Enterprise Purchasing Agreement for the State of Minnesota in 2007. All Microsoft software is purchased and renewed under this agreement. Participating in the state agreement allows the City to spread the cost of the product over a period of three years in which there are no additional fees for product upgrades. The City is participating in ajoint software licensing agreement with Carver County and several other cities for ESRI GIS software which is funded from this project. This allowed for unlimited GIS application licenses which are in use in every department at reduced cost. Prior Expenditures 2016 2017 2018 2019 2020 Total F-56-0,4-50-1 Office Equipment 87,400 90,200 77,600 76,600 78,600 410,400 Total Total B7,400 90,200 77,600 76,600 78,600 410,400 Prior Funding Sources 2016 2017 2018 2019 2020 Total 560,450 Capital Replacement 87,400 90,200 77,600 76,600 78,600 410,400 Total Equipment Fund Total 87,400 90,200 77,600 76,600 78,600 410,400 Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -049 Project Name Computerized Records Retention System Account#1 400-4124-4703 Account#2 Account N3 Account#4 Department Major Equipment Contact Richard Rice Type Equipment Useful Life 3-5 Years Category Administration Priority n/a Total Project Cost: $120,600 This project originally funded the purchase of an electronic records retention system in 2002. Laserfiche was the vendor chosen for the project. This project is now used to fund its add on modules and the replacement costs for associated scanning equipment, which have a useful life expectancy of 5 to 7 years. Additional client licenses are planned to accommodate project workflows. Additional software modules are proposed for later years to allow for improved integration with the City web site. Justification This system allows for quick and simultaneous retrieval of documents from any computer on the City network. Both physical document storage space and the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access can be easily made available to the public from any internet capable computer or mobile device. The system was upgraded to Laserfiche Avante platform in 2015. This upgrade included a new workflow engine, web enabled clients and improved auditing and scanning functions. Workflows for automating the scanning and importing of documents were started in 2015. Additional workflow will be created to manage property development Prior Expenditures 2016 2017 2018 2019 2020 Total 103,000 Office Equipment 4,400 5,600 4,600 2,000 1,000 17,600 Total Total 4,400 5,600 4,600 2,000 1,000 17,600 Prior Funding Sources 2016 2017 2018 2019 2020 Total 103,000 Capital Replacement 4,400 5,600 4,600 2,000 1,000 17,600 Equipment Fund Total Total 4,400 5,600 4,600 2,000 1,000 17,600 Budget Impact/Other Hardware maintenance and repairs are funded out of the 101-1160-4300 services account Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -054 Project [name Fire Vehicles Account #1 400-4135-4704 Account#2 emergency response Account #3 Account#4 and major apparatus. This request outlines a Department Major Equipment Contact Don Johnson Type Vehicles Useful Life 10-15 years Category Fire Priority n/a Total Project Cost: $2,693,500 for existing vehicles. 2016 - Replace Rescue 12 with a mini -pumper that includes a fleet reduction of Rescue 11 for re -purposed use or sale 2017 - Replace 2005 Polaris Grass Response 2019 - Replace 1996 Toyne Engine 21 Replace 2008 Command Vehicle 4 2020 - Replace 1989 100 ft. Platform Ladder Replace Fire Marshal Vehicle icles are reaching or exceeding useful life standards outlined by NFPA for emergency response front line service. Major apparatus require a year process to spec, order and manufacture. Prior Expenditures 2016 2017 2018 2019 2020 Total F---43-0—,50-01 Vehicles 250,000 20,000 640,000 1,353,000 2,263,000 Total Total 250,000 20,000 640,000 1,353,000 2,263,000 Prior Funding Sources 430,500 capital Replacement Equipment Fund Total Old Public Works Building Fund 2016 2017 2018 2019 2020 Total 20,000 040,000 w,mu 250,000 1,300,000 1,550,000 Total 250,000 20,000 640,000 1,353,000 2,263,000 are considered front line response vehicles and impact response to fire incidents within the City and to mutual aid partners. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -055 Project Name Aerial Photography for City GIS Datasets Account#1 400-00004752 Account#2 Account 93 Account 44 Department Major Equipment Contact Richard Rice Type Improvement Useful Life 2-3 years Category Administration Priority n/a Total Project Cost: $109,350 This project funds the aerial photography for the integration with the City's existing GIS datasets. The City is participating with Carver County and several other cities and counties in ajoint project to purchase services and data. An initial joint aerial flyover for high resolution orthographic imagery data was conducted in April of 2005 and was scheduled to be re -flown every three years. The next flight will be done in 2016 and will include high resolution orthographic and oblique photography. The County typically pays the entire cost and bills the City portion over a two year period. There is a state contract bid proposal in progress which the County will be utilizing which may reduce the cost to the City. Pricing will not be available until the contract is finalized. Justification Ny Planners, Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents and =tractors without repeated site visits. It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire lepartment when conducting area searches. In 2008, Carver County chose a new vendor (Pictometry), which added a three dimensional view to napping data. The Pictometry solution provides the ability for staff to view each side of buildings and includes a toolset which allows for accurate neasurement of areas and lines. Enhanced map layers (Planometrics), created from the aerial data collected is also used by staff to measure and jisolav hard surface coverage such as driveways, parking lots and others. Prior Expenditures 2016 2017 2018 2019 2020 Total 68,650 Total Maintenance 22,300 Total 22,300 2,200 2,200 2,200 2,200 11,800 11,800 2,200 2,200 40,700 40,700 Prior Funding Sources 2016 2017 2018 2019 2020 Total 6$650 Capital Replacement 22,300 2,200 2,200 11,800 2,200 40,700 Total Equipment Fund Total 22,300 2,200 2,200 11,800 2,200 40,700 impact is expected. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -062 Project Name Light Duty Trucks: Utilities Account#1 700-7025-4704 Account #2 701-7025.4704 allows for replacement of existing 6 - 4315 1995 Chevrolet 1/2 ton pickup #320 2003 Chevrolet 3/4 ton pickup 7 - 4321 2004 Chevrolet 3/4 ton pickup 9 - #304 2005 Chevrolet 3/4 ton pickup 0 - #305 2006 Chevrolet 3/4 ton pickup replaces pickups in accordance with the Account#3 Account#4 in the Water Department Major Equipment Contact Paul Oehme Type Vehicles Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $454,000 Prior Expenditures 2016 2017 2018 2019 2020 Total 286,000 Vehicles 58,000 41,000 36,000 33,000 168,000 Total Total 58,000 41,000 36,000 33,000 168,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F ---28-6—,00—o1 Capital Replacement 10,000 10,000 Equipment Fund Total Sewer Utility Fund 24,000 20,500 18,000 16,500 79,000 Water Utility Fund 24,000 20,500 18,000 16,500 79,000 Total 58,000 41,000 36,000 33,000 168,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project EQ -081 Project Name Storage Area Network (SAN) Account#1 400-4147-4703 Account#3 Account #2 Account #4 Description Department Major Equipment Contact Richard Rice Type Improvement Useful Life 5-7 years Category Administration Priority n/a Total Project Cost: $248,600 is project funds the data storage equipment for the City storage area network, which is where the majority of all City electronic data is tintained. This storage are network (SAN) is a system comprised of numerous individual storage arrays, all managed from a single console. The N allows disk storage to be easily modified as storage needs change, without any downtime for users. This equipment also hosts the City's tual network servers. Production storage arrays are located at City Hall in the main server room. Backup replication storage arrays are located an auxiliary server room at the Public Works facility. The need for digital storage space for City documentation and applications is growing at a rate of approximately 1 Tb per year. Existing storage space became difficult to manage on individual physical network servers. Internal storage utilization is inefficient, and requires system downtime to reconfigure. Storage area network (SAN) technology allows for real time reconfiguration as well as the ability to make real time copies for redundancy and for daytime backup processes. The majority of the City physical network servers were virtualized and integrated into just three host servers which utilize this storage. One new producing storage array is planned for 2016 and another in 2018. These arrays will be replacing units that are no longer supported by the manufacturer. Future plans will be to maintain 2 physical arrays for production and one for replication. Prior Expenditures 2016 2017 2018 2019 2020 Total 143,600 Equipment 40,000 25,000 40,000 105,000 Total Total 40,000 25,000 40,000 105,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 143,600 Capital Replacement 40,000 25,000 40,000 105,000 Equipment Fund Total Total 40,000 25,000 40,000 105,000 and hardware support for the storage systems will be funded out of the MIS services account 101-1160-4220. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -084 Project Name Office Furniture Account#1 400-0000-4703 Account#3 Account #2 Account #4 for office furniture Justification Chis item will allow items to be replaced as they wear out or Department Major Equipment Contact Chelsea Petersen Type Unassigned Useful Life Category Administration Priority n/a Total Project Cost: $65,000 Prior Expenditures 2016 2017 2018 2019 2020 Total 40,000 Office Equipment 5,000 5,000 5,000 5,000 5,000 25,000 Total Total 5,000 5,000 5,000 5,000 5,000 25,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F---4-0,-00-01 Capital Replacement 5,000 5,000 5,000 5,000 5,000 25,000 Total Equipment Fund Total 5,000 5,000 5,000 5,000 5,000 25,000 Impact/Other Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project# EQ -094 Project Name Radios Account#1 400-4122-4705 Account#2 Account#3 Account#4 Department Major Equipment Contact Don Johnson Type Equipment Useful Life 7-10 years Category Fire Priority n/a Total Project Cost: $380,000 The fire department utilizes 800mghz technology to communicate during emergency response. The current cache of radios will be reaching end of life in 2016 and no longer supported by the manufacturer. Justification Radios are used to communicate during emergencies to coordinate deployment of resources, strategy and tactics , articulating conditions, actions and needs, etc. Effective radio communications are essential to operational effectiveness. Prior Expenditures 2016 2017 2018 2019 2020 Total 30,000 Equipment 350,000 350,000 Total Total 350,000 350,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 30,000 Capital Replacement 350,000 350,000 Total Equipment Fund Total 350,000 350,000 no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project EQ -098 Project Name Loader Mounted Snow Blower Account#1 400-0000-4705 Account 03 Account #2 Account 94 1989 Loader Mounted Snow Blower Department Major Equipment Contact Paul Oehme Type Equipment Useful Life Category Public Works Priority n/a Total Project Cost: $141,000 snow blower is used by the street and park departments for removal of snow primarily in the downtown streets, library parking lot and trails. large snow events or when snow piles up, snow needs to be removed from the downtown because of lack of storage space. 2016 2017 2018 2019 2020 Total 141,000 141,000 Total 141,000 141,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 141,000 141,000 Equipment Fund Total 141,000 141,000 BudgetImpact/Other Capital Improvement Program 2016 thru 2020 Department Major Equipment City of Chanhassen, MN Contact Paul Oehme Project EQ -100 Project Name Light Duty Trucks - Parks Account#1 400-4120-4704 Account 42 forschedu: Liz contract. 6 - #404 1991 Ford F-250 8 - 9412 1995 Chevrolet C-20 9 - #401 2004 Chevrolet 4x4 with plow 0 - #402 2004 Chevrolet 4x4 Prior 105,000 Total Account #3 Account#4 trucks in the parks department. Type Vehicles Useful Life Category Park Priority n/a Total Project Cost: $240,000 are purchased using the State 2016 2017 2018 2019 2020 Total 30,000 30,000 45,000 30,000 135,000 Total 30,000 30,000 45,000 30,000 135,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 105,000 Capital Replacement 30,000 30,000 45,000 30,000 135,000 Equipment Fund Total Total 30,000 30,000 45,000 30,000 135,000 Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project EQ -104 Project Name Mower Replacement -Park Account#1 400-0000-4705 Account#3 Account #2 Account #4 6 - 2003 Toro 4000D (#454 7 - 2000 Toro 580D (#453) 8 - 2004 Toro 580D (#455) Department Major Equipment Contact Todd Hoffman Type Equipment Useful Life Category Park Priority n/a Total Project Cost: $426,000 Justification Che City had 4 high -production grounds mowers. Each machine is used daily during the growing season and needs to be in good working =dition. In 2012, the City replaced two 325D mowers with one large Toro 4000 mower. It is anticipated that staff will be able to mow just as nuch with one large mower. Prior Expenditures 2016 2017 2018 2019 2020 Total 152,000 Equipment 66,000 104,000 104,000 274,000 Total Total 66,000 104,000 104,000 274,000 Prior 152,000 Total Sources 2016 2017 2018 2019 2020 Total nacement 66,000 1U4,000 tU4,000 Fund Total 66,000 104,000 104,000 274,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -106 Project Name Tractor Replacement - Park Account#1 400-0000-4705 Account #3 Account#2 Account#4 Description Phis tractor is used for field maintenance at park 2016. 1999 John Deere 455 (#469) tractor is used for maintenance and upkeep of baseball fields. The tractor Department Major Equipment Contact Todd Hoffman Type Equipment Useful Life Category Park Priority n/a Total Project Cost: $32,000 17 years old before it is replaced. Prior Expenditures 2016 2017 2018 2019 2020 Total 16,000 Equipment 16,000 16,000 Total Total 16,000 16,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 16,000 Capital Replacement 16,000 16,000 Equipment Fund Total Total 16,000 16,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -115 Project Name Brush Chipper Account41 400-0000-4705 Account H3 Account#2 Account#4 Description Department Major Equipment Contact Paul Oehme Type Equipment Useful Life Category Street Equipment Priority n/a Total Project Cost: $56,000 is item is to replace the brush and tree limb chipper. This unit will be 18 years old when it is replaced. This unit is used the public works departments and needs to be in good working condition. 7 - # 147 1999 Vermeer 1800A Brush Chipper keep equipment in good repair. This purchase Budget program. Expenditures 2016 2017 2018 2019 2020 Total Equipment 56,000 56,000 Total 56,000 56,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 56,000 56,000 Equipment Fund Total 56,000 56,000 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project# EQ -118 Project Name Street Sweeper Account#1 400-0000-4705 Account#3 Account 42 Account #4 purchase is required to maintain a reliable piece of equipment for street Elgin Eagle Street Sweeper (4136) Justification Department Major Equipment Contact Paul Oehme Type Equipment Useful Life Category Street Equipment Priority n/a Total Project Cost: $281,000 This piece of equipment was purchased in 2003 and provides street sweeping for the 108 miles of streets within the City of Chanhassen. The street department sweeps all the streets at least once a year starting as soon as weather permits in the spring. This piece of equipment is also used spring through fall to maintain safe streets void of debris that accumulates from storms, construction and general use. Street sweeping is also part of the City's Storm Water MS4 permit requirement. This equipment purchase is consistent with the equipment replacement schedule. Expenditures 2016 2017 2018 2019 2020 Total Eauioment 281,000 281,000 Total 281,000 281,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 281,000 281,000 Equipment Fund Total 281,000 281,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -124 Project Name Annual Skid Loader Trade In Account#1 400-0000-4705 Account 03 Account#2 Account 94 Description the annual trade in Bobcat Skidloader (#149) Bobcat Skidloader (#413) Bobcat Skidloader (#150) Bobcat Skidloader (#702) Department Major Equipment Contact Paul Oehme Type Equipment Useful Life Category Street Equipment Priority n/a Total Project Cost: $109,000 ie to the state bid pricing, the City is able to trade our skid loaders annually for approximately $14.00 per hour. Trading in newer machines arantees there will be no other expenses except oil changes and grease jobs because the machine will always have a warranty. This approach is o a better life cycle cost over keeping the machines for 15 years. There is no guarantee on the state bid pricing or the trade in price, so staff will pricing annually to determine if it is a good deal or if we should hold on to the machine for an extended period. Prior Expenditures 2016 2017 2018 2019 2020 Total 14,000 Equipment 19,000 19,000 19,000 19,000 19,000 95,000 Total Total 19,000 19,000 19,000 19,000 19,000 95,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 14,000 Capital Replacement 13,000 13,000 13,000 13,000 13,000 65,000 Equipment Fund Total Sewer Utility Fund 3,000 3,000 3,000 3,000 3,000 15,000 Water Utility Fund 3,000 3,000 3,000 3,000 3,000 15,000 Total 19,000 19,000 19,000 19,000 19,000 95,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -127 Project Name Copier Replacements Account#1 400-4109-4703 Account#3 Account#2 Account#4 item funds the replacement of departmental copiers. Copiers were previously part department by the Finance Director in 2012. Justification Department Major Equipment Contact Richard Rice Type Equipment Useful Life 5-7 years Category Administration Priority n/a Total Project Cost: $59,500 department requests but were moved to The City has 4 multifunction departmental copiers located in City Hall and the Public Works Facility. The three copiers located at City Hall were replaced in 2013 and are under a shared maintenance plan. A new color copier is scheduled in 2016 to replace the existing black and white copier and a color printer at the Public Works Facility. Dept Item Year Purchased Administration Konica Bizhub C754 2013 Building Konica Bizhub C454 2013 Eneineerina Konica Bizhub C454 2013 Prior Expenditures 2016 2017 2018 2019 2020 Total 14,000 Equipment 9,000 36,500 45,500 Total Total 9,000 36,500 45,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 14,000 capital Replacement 9,000 36,500 45,500 Total Equipment Fund Total 9,000 36,500 45,500 and supplies will be consolidated in 2015 and funded from account Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project# EQ -131 Project Name Paving Equipment Account#1 400-0000-4705 Account #2 Account#3 Account#4 equipment is used for bituminous patching and roadway and trail repairs. 7 - #133 1989 Rosco Vibrating Compactor 8 - # 137 1993 Sullair Compressor Justification replacement Department Major Equipment Contact Paul Oehme Type Equipment Useful Life Category Streets/Highways Priority n/a Total Project Cost: $56,000 has reached its expected useful life. Expenditures 2016 2017 2018 2019 2020 Total Equipment 31,000 25,000 56,000 Total 32,000 25,000 56,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 31,000 25,000 56,000 Equipment Fund Total 32,000 25,000 56,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, NIN Project EQ -132 Project Name Fleet Vehicles Account#1 400-4120-4704 Account#3 Account 42 Account#4 Description are used for picking up parts, delivering vehicles for 7 - # 151 1995 Chevrolet 1/2 ton pickup 8 - #155 2002 Chevrolet 1/2 ton pickup vehicles will average 19 years Department Major Equipment Contact Paul Oehme Type Vehicles Useful Life Category Public Works Priority n/a Total Project Cost: $67,000 are replaced. They are becoming rusty and unreliable. Expenditures 2016 2017 2018 2019 2020 Total Vehicles 35,000 32,000 67,000 Total 35,000 32,000 67,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 35,000 32,000 67,000 Eauioment Fund Total 35,000 32,000 67,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -133 Project Name Utility Dept - Generator Trailer Account 91 701-7025-4705 Account#3 Account#2 Account 44 project allows for the replacement #311 1998 Ford L8513 Generator Truck Justification To make the generator on this truck more versatile, it is when it is replaced. Department Major Equipment Contact Paul Octane Type Vehicles Useful Life Category Utilities Priority n/a Total Project Cost: $20,000 generator truck with a trailer. replaced with a trailer. This truck will be 20 years old Expenditures 2016 2017 2018 2019 2020 Total Equipment 20,000 20,000 Total 20,000 20,000 Funding Sources 2016 2017 2018 2019 2020 Total Sewer Utility Fund 20,000 20,000 Total 20,000 20,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -137 Project name Hose Replacement Account#1 400-4127-4705 Account#3 Account #2 Account #4 scription a year all fire hose is tested for compliance to NFPA. Hose that fails certification or account. apparatus is required to maintain and certify the proper square footage of hose for Department Major Equipment Contact Don Johnson Type Equipment Useful Life Category Fire Priority n/a Total Project Cost: $50,000 I during use is replaced with expenditures Prior Expenditures 2016 2017 2018 2019 2020 Total 37,500 Equipment 2,500 2,500 2,500 2,500 2,500 12,500 Total Total 2,500 2,500 2,500 2,500 2,500 12,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 37,500 Capital Replacement 2,500 2,500 2,500 2,500 2,500 12,500 Equipment Fund Total Total 2,500 2,500 2,500 2,500 2,500 12,500 Capital Improvement Program 2016 rhru 2020 Department Major Equipment City of Chanhassen, MN Contact Karen Engelhardt Project # EQ -138 Project Name Election Equipment Account #1 Account#2 City. of an upgrade to Account 0 Account 94 includes new tabulators, ballot boxes Type Equipment Useful Life Category Administration Priority n/a Total Project Cost: $15,000 if federal grant will be available to Expenditures 2016 2017 2018 2019 2020 Total Equipment 15,000 15,000 Total 15,000 15,000 Funding Sources 2016 2017 2018 2019 2020 Total Federal Grant 15,000 15,000 Total 15,000 15,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -140 Project Name Recreation Center Revitalization Project Account#1 400-4125-4706 Account #2 Account#3 Account#4 Department Major Equipment Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $125,000 Purchase of new fitness center equipment, replacement carpet, countertops, window treatments throughout the facility, failing tables and chairs need replacement, upgrades are required to the fitness center audio system for participants and a digital lobby information system is needed to improve customer experience at the Chanhassen Recreation Center. Justification The Recreation Center is entering its 20th Anniversary. Due to age, usage and wear; a number of items require replacement or upgrades at this 6 - replace elliptical machine and replace carpet in lobby, office, Conference Room, Lake Ann Room, Lotus Lake Room and locker room 7 - replacement countertops for Lake Ann Room and Lotus Lake Room, window treatments for Lake Minnewashta and Lake Ann rooms and upright bikes and an elliptical machine for fitness center 8 - window treatments for Lake Susan and Lotus Lake Rooms, replacement countertops for locker rooms, ten padded chairs and five, eight foot es and one stair climber and two elliptical machines for fitness center 9 - window treatments for fitness center, studio and Conference Room, ten padded chairs, four, six foot tables and a five foot round table and ellintical machine- one treadmill and one recumbent bike for fitness center Prior Expenditures 2016 2017 2018 2019 2020 Total 25,000 Maintenance 25,000 25,000 25,000 25,000 100,000 Total Total 25,000 25,000 25,000 25,000 100,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 25,000 Capital Replacement 25,000 25,000 25,000 25,000 100,000 Tota] Equipment Fund Total 25,000 25,000 25,000 25,000 100,000 costs and increased customer experience at the Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -143 Project Name Trailer Replacement - Parks Account#1 Account 93 Account #2 Account #4 is used to haul bobcat and equipment. 1998 Felling Trailer trailer is very rusty and still be very rusty. Department Major Equipment Contact Todd Hoffman Type Equipment Useful Life Category Park Priority n/a Total Project Cost: $6,000 next spring. If the trailer is not replaced, the brake system will have to be replaced and the 2016 2017 2018 2019 2020 Total Total 6,000 6,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 6,000 6,000 Equipment Fund Total 6,000 6,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -144 Project Name Toro Polar Trac Account 91 Account#3 Account#2 Account#4 Grounds Master Department Major Equipment Contact Todd Hoffman Type Equipment Useful Life Category Park Priority n/a Total Project Cost: $52,000 urrently snow removal around City Hall and the Library are completed by hand and walk behind snow blowers. The Polar Trac system will allow it maximum efficiency throughout the winter and will be used year round as a zero turn mower throughout the growing season. This will replace Toro 325-D mower. Expenditures 2016 2017 2018 2019 2020 Total Equipment 52,000 52,000 Total 52,000 52,000 Sources 2016 2017 2018 2019 2020 Total 52,000 Total 52,000 52,000 Capital Improvement Program 2016 fhru 2020 City of Chanhassen, MN Project EQ -145 Project Name Electronic Speed Display Signs Account#1 Account #2 Account#3 Account#4 Department Major Equipment Contact Paul Oehme Type Equipment Useful Life Category Streets/Highways Priority n/a Total Project Cost: $12,000 injunction with the City's Leadfoot program, property owners routinely request the City look at calming traffic in their neighborhood. An ,live tool is to temporarily install an electronic speed display sign. These signs give the traveling public instantaneous feedback on drive speed gives the City traffic data such as speeds and volume of traffic. help with traffic calming initiatives in request the signs be temporarily installed. Expenditures 2016 2017 2018 2019 2020 Total Equipment 12,000 12,000 Total 12,000 12,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 12,000 12,000 Equipment Fund Total 12,000 12,000 Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -146 Project Name Brine Outdoor Storage Account#1 Account#2 Account 43 Account#4 Department Major Equipment Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: $25,000 rrchase would construct a small outdoor shed to house the snow and ice control brine equipment at also extend electrical service to the shed to operate the equipment. item Justification Currently the brine equipment is in the Public Works parking garage. The brine equipment uses salt that has to be loaded in to the brine -quipment. This process is messy and salt particles get in the air and cause exposed metal in the garage to rust. The equipment should be moved outside in a separate building to avoid the mess and corrosion the brine process can have on metal. Expenditures 2016 2017 2018 2019 2020 Total Construction 25,000 25,000 Total 25,000 25,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 25,000 25,000 Equipment Fund Total 25,000 25,000 Capital Improvement Program 2016 rhru 2020 Department Major Equipment City of Chanhassen, MN Contact Richard Rice Project EQ -147 Project Name Security/Access Control Systems Account #1 Account #2 Account 03 Account 44 Type Improvement Useful Life Category Administration Priority n/a Total Project Cost: $37,500 s project funds the expansion of the security and access control systems in City Hall, Public Works, Water Treatment Plant, Fire Station 1 an Recreation Center. An access control system was installed in City Hall and Fire Station 1 in 2015. The project also included software and dware conversions for the system originally installed at the Public Works Facility. All access control systems are now on one central control Justification will include upgrades to the existing system already in place. Expenditures 2016 2017 2018 2019 2020 Total Maintenance 37,500 37,500 Total 37,500 37,500 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 37,500 37,500 Equipment Fund Total 37,500 37,500 system will be funded out of the 101-1160-4300 services account. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # EQ -148 Project Name Downtown Banners Account #1 Account 93 Account#2 Account#4 will be designed in-house to highlight the many assets and accolades Department Major Equipment Contact Chelsea Petersen Type Improvement Useful Life Category Administration Priority n/a Total Project Cost: $2,600 ie banners downtown were purchased in 2012 and are very tattered and weathered, and a number are maintain the current banners but they are quickly approaching the end of their useful life. Expenditures 2016 2017 2018 2019 Public Works has done 2020 Total Improvement 2,600 2,tiuu Total 2,600 2,600 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 2,600 2,600 Equipment Fund Total 2,600 2,600 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# EQ -149 Project Name Central Control Irrigation System Account #1 Account #3 Account#2 Account#4 central control irrigation system that would allow multiple systems to run 1 he current irrigation system operates on an individual control b will improve water saving capabilities and extensive labor costs. location. Department Major Equipment Contact Todd Hoffman Type Equipment Useful Life Category Park Priority n/a Total Project Cost: $82,000 control would allow the system to run from a single location which Expenditures 2016 2017 2018 2019 2020 Total Equipment 82,000 82,000 Total 82,000 82,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 52,000 52,000 Equipment Fund Surface Water Utility Fund 10,000 10,000 Water Utility Fund 20,000 20,000 Total 82,000 82,000 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # EQ -150 Project Name Park Department Water Truck Account #1 Account#2 Account 93 Account#4 Department Major Equipment Contact Paul Octane Type Vehicles Useful Life Category Park Priority n/a Total Project Cost: $131,000 This purchase is to replace the park department water truck. This truck is used to ester ice rinks in the winter and to irrigate trees in the summer. 2018 - #417 1997 Ford CF 8000 Justification This truck has become very rusty and the floor boards in the cab have rusted out. Expenditures 2016 2017 2018 2019 2020 Total Vehicles 131,000 131,000 Total 131,000 131,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 131,000 131,000 Fouinment Fund _ Total 131,000 131,000 Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # MB -010 Project Name City Hall Remodel Account#1 4004148 Account#3 Account#2 Account#4 remodel and refurbish areas of City Hall that need paint, carpet or storage areas Department Municipal Buildings Contact Chelsea Petersen Type Improvement Useful Life Category Administration Priority n/a Total Project Cost: $190,000 Certain areas of City Hall will be in need of some small repair and maintenance needs in 2016. Prior Expenditures 2016 2017 2018 2019 2020 Total F-455,7551 Maintenance 150,000 150,000 Total Total 150,000 150,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 40,000 Capital Replacement 150,000 150,000 Equipment Fund Total Total 150,000 150,000 Capital Improvement Program City of Chanhassen, MN Project MB -023 Project Name Citizen Survey Account#1 210-0000-4300 Account#2 City will conduct a City will use the feedback to survey of residents. 2016 thru 2020 Department Municipal Buildings Contact Chelsea Petersen Type Improvement Useful Life 14,000 Category Administration Account#3 Priority n/a Account#4 Total Project Cost: $43,000 respond to residents values and concerns. Prior Expenditures 2016 2017 2018 2019 2020 Total 14,000 Study 14,000 15,000 29,000 Total Total 14,000 15,000 29,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 14,000 Cable N Fund 14,000 15,000 29,000 Total Total 14,000 15,000 29,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# MB -024 Project Name Lift Station 24 Roof Replacement Account #1 Account#3 Account#2 Account 04 Department Municipal Buildings Contact Paul Oehme Type Maintenance Useful Life Category Utilities Priority n/a cription Total Project Cost: $50,000 project is to replace the failing asphalt shingle roof and install a steel shingle system and gutters on Lift Station 24 pump station building, original roof that was installed in 1991 is failing and losing shingles. A steel roofing system is recommended for hail and wind protection. current lack of gutters and down spouts is creating water damage on the walkway in front of the doors. Expenditures 2016 2017 2018 2019 2020 Total Maintenance 50,000 50.000 Total 50,000 50,000 Funding Sources 2016 2017 2018 2019 2020 Total Sewer Utility Fund 50,000 50,000 Total 50,000 50,000 Capital Improvement Program 2016 rhru 2020 Department Municipal Buildings City of Chanhassen, NN Contact Don Johnson Project# MB -026 Project Name Fire Department Building Improvements Account#1 400-4003 Account 93 Account#2 Account#4 roof and update the kitchen and restrooms at Station 1. roof is outdated and has leaked on multiple occasions. The building has 3 separate r. The section that leaks was replaced in 2015. Type Maintenance Useful Life Category Fire Priority n/a Total Project Cost: 8240,000 be repaired independent The fire department is utilized for several public events such as; elections, open house, Lion's breakfast, and official fire department ceremonies. City employees frequent the kitchen and work out areas on a regular basis as well. The kitchen, restrooms and locker rooms are in need of repair. Prior Expenditures 2016 2017 2018 2019 2020 Total F-74-5-,5-65`1 Maintenance 95,000 100,000 195,000 Total Total 95,000 100,000 195,000 Prior Fundi 45,000 Capital Equipa Total Sources 2016 2017 2018 2019 2020 Total Fund 95,000 Total 95,000 100,000 195,000 Capital Improvement Program 2016 rhru 2020 Department Municipal Buildings City of Chanhassen, MN Contact Chelsea Petersen Project # MB -028 Project Name Old Village Hall Repairs Account #1 Account #2 roof on Old of repairs. Account#3 Account 94 Type Maintenance Useful Life Category Administration Priority n/a Total Project Cost: $25,000 Justification '.t was recommended that the condition of the wood shake roof be monitored for signs of moisture infiltration until the reroofing can be tccomplished. At that time, it is recommended that the cap flashing be redone. The corbel mortar on the chimney is extremely deteriorated and :he tower base of the bell and flagpole needs to be redone. Expenditures 2016 2017 2018 2019 2020 Total Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 25,000 25,000 Equipment Fund Total 25,000 25,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # MB -029 Project Name Olson Community Garden Fence Replacement Account #1 Account #2 of Western red Account #3 Account 94 gates Department Municipal Buildings Contact Kate Amenson Type Maintenance Useful Life Category Community Development Priority n/a Total Project Cost: $12,000 The current fence is original to the development of the site and was installed in 2002. The portion of the fence along Kerber Blvd and Santa Vera Drive is made of red cedar. The wood is rotting in critical locations at gate openings and in sections adjacent to garden plots and can no longer support further modifications for improvements. The site is used daily by any one of the 65 gardeners who rent plots. The condition of the fence impedes their access to this public site and impacts their overall experience at the gardens. Expenditures 2016 2017 2018 2019 2020 Total Maintenance 12,000 12,000 Total 12,000 12,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 12,000 12,000 Equipment Fund Total 12,000 12,000 Capital Improvement Program City of Chanhassen, MN Project # PK&T-042 Project Name Picnic Tables/Park Benches Account#1 410-000-4705 Account#3 Account #2 Account #4 Description tables and park benches. tables and benches are needed annually to replace 2016 thru 2020 and meet new needs. Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life 30 Years Category Park Priority n/a Total Project Cost: $126,000 Prior Expenditures 2016 2017 2018 2019 2020 Total 76,000 Equipment 10,000 10,000 10,000 10,000 10,000 50,000 Total Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F---76-,0-00-1 Park Dedication Fund 10,000 10,000 10,000 10,000 10,000 50,000 Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# PK&T-043 Project Name Trees Account#1 410-0000-4701 Account#2 Account#3 Account#4 Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life 50 Years Category Park Priority n/a Description I Total Project Cost: $200,000 Annual tree planting program. This program is proposed to be accelerated to mitigate the affects of Emerald Ash Borer. Justification Parklands and other City properties experience tree loss annually, due to storm damage, disease, stress, etc Prior 125,000 Total 2016 15,000 2017 2018 2019 2020 Total 15,000 15,000 15,000 15,000 75,001 Total 15,000 15,000 15,000 15,000 15,000 75,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 125,000 Park Dedication Fund 15,000 15,000 15,000 15,000 15,000 75,000 Total Total 15,000 15,000 15,000 15,000 15,000 75,000 Budget Capital Improvement Program City of Chanhassen, MN Project PK&T-072 Project Name Tennis Court Refurbishment Account#1 601-0000-4706 Account#3 Account #2 Account #4 Description 2016 thru 2020 id crack seal tennis courts at Lake Susan Park, Meadow Green Park, North Lotus Recreation Center. courts offered are kept in playable condition Prior Expenditures 200,000 Maintenance Total 2016 Department Park & Trail Improvements Contact Todd Hoffinan Type Improvement Useful Life 25 years Category Park Priority n/a Total Project Cost: $350,000 Park. South Lotus Lake Park and resurfacing on a six to ten year cycle. 2017 2018 2019 2020 Total 150,000 150,000 Total 150,000 150,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 200,000 Assessment/Revolving 150,000 150,000 Assess Fund Total Total 150,000 150,000 Maintenance and operations costs. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project PK&T-099 Project Name Chanhassen Nature Preserve Trail, Final Phase Account#1 410-0000-4710 Account #2 Account#3 Account#4 900 foot section of eight foot wide bituminous trail, located at Justification f trail is the final phase of a two mile trail loop around the Chanhassen I: Expenditures 2016 2017 2018 Construction Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $90,000 boretum Business Park 7th Addition. Preserve. 2019 90,000 2020 112M,` Total in 1995. Total 90,000 90,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 90,000 90,000 Total 90,000 90,000 and operation costs. Will need to be included in the pavement management program. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project PK&T-120 Project Name Neighborhood Park Picnic Shelter Initiative Account#1 400-4008-4706 Account #2 on of covered park shelters for activities and events. Account#3 Department Park& Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Account#4 Total Project Cost: $500,000 to serve as central gathering locations, provide shelter from inclement weather and l 16 - Greenwood Shores Park and Carver Beach Playground 17 - Minnewashta Heights Park, Herman Field Park and South Lotus Lake Park 18 - Sunset Ridge Park and Prairie Knoll Park Justification iative will till a current void in the City's park and recreation infrastructure system helping to ensure that our park system in our mission of providing for today while planning for the future. Prior Expenditures 2016 2017 2018 2019 2020 Total 220,000 Construction 80,000 120,000 80,000 280,000 Total Total Total 80,000 120,000 80,000 280,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F ---2-20-,—O0-01 General Fund Surplus 80,000 120,000 80,000 280,000 Total Total 80,000 120,000 80,000 280,000 Budget Impact/Other This will add minimal annual operations impact. a astrong Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # PK&T-122 Project Name Hockey Rink-Bandimere Community Park Account#1 410-0000-4705 AccountO Account #2 Account #4 of an outdoor hockey rink, Justification Phis rink will fill a recreation service area that currently has limited access to Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $400,000 at Bandimere Community Park. recreation facilities. Expenditures 2016 2017 2018 2019 2020 Total Construction 400,000 400,000 Total 400,000 400,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 400,000 400,000 Total 400,000 400,000 increase of $5,000 per year in operation and maintenance costs. Capital Improvement Program City of Chanhassen, MN 2016 thru 2020 Project # PK&T-123 Project Name Bandimere Community Park Picnic Shelter Account #1 Account #2 n imere Park is the City's picnic shelters. Account 93 Account#4 including modem restrooms and storage at park without a shelter. Lake Ann Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $640,000 Community Park near the playgrou Susan Park and the Expenditures 2016 2017 2018 2019 2020 Total Construction 640,000 640,000 Total 640,000 640,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 640,000 640,000 Total 640,000 640,000 per year in operation and maintenance costs. Center all Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project PK&T-125 Project Name Galpin Blvd Trail Extension Account#1 410-0000-4710 Account #2 720-7025-4706 trail will complete another Account#3 Account 94 pedestrian trail from Pheasant to community trail connection. Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $175,000 City border. Expenditures 2016 2017 2018 2019 2020 Total Construction 175,000 175,000 Total 175,000 175,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 150,000 150,000 Surface Water Utility Fund 25,000 25,000 Total 175,000 175,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # PK&T-126 Project Name Entry Signs-Bandimere Park & Lake Susan Park Account 91 Account #3 Account #2 Account #4 monument signs including illuminated letters at Bandimere and Lake Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Pak Priority n/a Total Project Cost: $60,000 signs provide consistent identification for the entry ways to the City's Community Parks. Design and materials will be consistent with the new at Lake Ann Park. Expenditures 2016 2017 2018 2019 2020 Total Construction 60,000 60,000 Total 60,000 60,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 60,000 60,000 Total 60,000 60,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # PK&T-127 Project Name Rec Center/Bluff Creek Elem Roof Reconstruction Account#1 Account 92 Account#3 Account 44 Department Park & Trail Improvements Contact Todd Hoffman Type Maintenance Useful Life Category Park Priority n/a Total Project Cost: $240,000 istruction of the roof on the Recreation Center/Bluff Creek Elementary School. The project is estimated to cost $1,000,000. The City of iassen is responsible for 24% of this cost per our lease agreement with Eastern Carver County Schools. The project will be split between years 2016 and 2017. Justification fhe original roof constructed in 1995 was built using the cheapest construction methods available. Having reached 20 years of age, the roof has ieveloped dozens of leaks which now require extensive patching efforts to minimize damage to the interior of the Recreation Center and School. The new roof will be constructed using improved construction materials and design. Expenditures 2016 2017 2018 2019 2020 Total Construction 120,000 120,000 240,000 Total 120,000 120,000 240,000 Funding Sources 2016 2017 2018 2019 2020 Total Capital Replacement 120,000 120,000 240,000 Equipment Fund Total 120,000 120,000 240,000 costs will be reduced or Capital Improvement Program 2016 [hru 2020 Department Park & Trail Improvements City of Chanhassen, MN Contact Todd Hoffman Project PK&T-128 Project Name Roundhouse Park Sport Court Account 91 Account #2 of a sport court. Account #3 Account #4 to be included are yet to be Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $135,000 A double tennis court has been included in the park master plan since 1997. Roundhouse Park is one of two remaining planned locations for tennis courts in the City's park system. The Roundhouse Park neighborhood overwhelmingly voted the addition of a tennis court their number one priority during a July 28th community meeting with the Park and Recreation Commission. Tennis is a lifelong sport that can be played or practiced alone, in pairs or groups. Tennis courts can be striped to play the game of pickleball with the addition of temporary nets. Pickleball courts cannot be converted to play tennis. Expenditures 2016 2017 2018 2019 2020 Total Construction 135,000 135,000 Total 135,000 135,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 135,000 135,000 Total 135,000 135,000 will be included in the tennis court refurbishment plan that expends approximately $150,000 every six to ten years to repair the City's tennis Capital Improvement Program 2016 thru 2020 Department Park & Trail Improvements City of Chanhassen, MN Contact Todd Hoffman Project # PK&T-129 Project Name Bandintere Park Tennis Court Account#1 Account 43 Account#2 Account#4 Description a double asphalt surface tennis court including Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $225,000 and basketball hoops. double tennis court was identified in the 2014 expansion planning work for the park. Bandimere Park is one of two remaining planned location r tennis courts in the City's park system. The location identified in the park plan is ideally suited to accommodate a double tennis court. Tennis a lifelong sport that can be played or practiced alone, in pairs or groups. Tennis courts can be striped to play the game of pickleball with the dition of temporary nets. Pickleball courts cannot be converted to play tennis. Expenditures 2016 2017 2018 2019 2020 Total Construction 225,000 225,000 Total 225,000 225,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 225,000 225,000 Total 225,000 225,000 et Impact/Other will be included in the tennis court refurbishment plan that expends approximately $150,000 every six to ten years to repair the Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # PK&T-130 Project Name Bandimere Park Parking Lot Expansion Account#1 Account #2 Account #3 Account#4 fiction of a 28 stall parking lot on the newly acquired park expansion property. storm water accommodations, landscaping and trail connections. Department Park& Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority n/a Total Project Cost: $200,000 is will include an asphalt par} dimere Park is underserved by vehicle parking spaces. The recent acquisition of two properties expanding the park provides the opportunity to additional parking accommodations. The grass and dirt field where the puking lot is to be constructed is routinely utilized by the public as an flow parking area. Expenditures 2016 2017 2018 2019 2020 Total Construction 200,000 200,000 Total 200,000 200,000 Funding Sources 2016 2017 2018 2019 2020 Total Park Dedication Fund 200,000 200,000 Total 200,000 200,000 term repair and maintenance of the parking lot will be included in the City's pavement management program. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # PK&T-131 Project Name Highcrest Meadows Trail Connector Improvements Account#1 Account 42 Account#3 Account 44 Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Priority Na Total Project Cost: $20,000 struction of new concrete pedestrian ramps with truncated domes and improved curb tapers. Construction o: on each side of trail ramps. Installation of highly visible "No Motor Vehicles Allowed" signs on both sides. vehicles have periodically been using the i ;es less attractive to motor vehicle drivers. as a cut through. These improvements are designed to Expenditures 2016 2017 2018 2019 2020 Total Construction 20,000 20,000 Total 20,000 20,000 Funding Sources 2016 2017 2018 2019 2020 Total Street Pavement Management 20,000 20,000 Total 20,000 20,000 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # SS -012 Project Name Inflow and Infiltration Abatement Account 41 701-70xx-4751 ' Account 43 Account 42 Account 44 Description Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: 51,900,000 annual project mcmaes tetevistng, repairs ana remmintation of existing sanitary sewer. t ne program also aetects ana ei minmes points or of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration urt and aspects of the program are included in the annual street project. The projects were reviewed by Metropolitan Council and approved in of surcharge fees. y staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage ament. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its i into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to City for sewage disposal and increasing the load on the City's lift stations. Prior Expenditures 2016 2017 2018 2019 2020 Total —qo—000-o-J Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000 Total Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Prior Fund 900,000 sewer Total ;Sources 2016 2017 2018 2019 2020 Total Fund 200,000 Total 200,000 200,000 200,000 200,000 200,000 1,000,000 is may decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # SS -014 Project Name Sanitary Sewer Replacement Account#1 701-7025-4751 Account#2 Account M3 Account #4 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a 1 Total Project Cost: $1,890,000 or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification fhe City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by =solidating these projects. Prior Expenditures 2016 2017 2018 2019 2020 Total 1,000,000 Construction 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 890,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,000,000 Sewer Utility Fund 300,000 40,000 250,000 50,000 250,000 890,000 Total BudgetImpact/Other Total 300,000 40,000 250,000 50,000 250,000 890,000 costs. Capital Improvement Program City of Chanhassen, MN Project# SS -017 Project Name Sanitary Lift Station Rehabilitation Program Account#1 701-7025-4751 Account 42 Account 43 Account 94 2016 thru 2020 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $628,000 The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The City currently maintains 31 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years are as follows: 16-#23 17 - #25 and 426 18-#18 19-#28 Justification emergency calls and potential sewer Prior Expenditures 2016 2017 2018 2019 2020 Total 510,000 Maintenance 25,000 20,000 20,000 25,000 28,000 118,000 Total Total 25,000 20,000 20,000 25,000 28,000 118,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total F__5_1_0,_0_001 Sewer Utility Fund 25,000 20,000 20,000 25,000 28,000 118,000 Total Total 25,000 20,000 20,000 25,000 28,000 118,000 Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SS -020 Project Name 2010 WSA Sanitary Lift Station Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Account#1 701-70254702 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: $1,900,000 Phis lift station will be located on Powers Boulevard south of TH 212 to service the future 2010 MUSA and will also be used to service the area of he City south of Pioneer Trail. The project needs to be constructed before this area starts to develop and is contingent on when that happens. aired for future development future connection fees. MUSA along Powers Blvd. The cost for this for by future developments Expenditures 2016 2017 2018 2019 2020 Total Construction 1.900.000 t ann nnn Total 1,900,000 1,900,000 Funding Sources 2016 2017 2018 2019 2020 Total Sewer Utility Fund 1,900,000 1,900,000 Total 1,900,000 1,900,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SS -024 Project Name Lower Bluff Creek Trunk Utility Improvements Account#1 Account #2 Account 03 Account #4 Department Sanitary Sewer hnprovements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: $9,600,000 This project will help pay for trunk sewer and water service below the bluff along Flying Cloud Drive. The project primarily will help pay for It. station improvements and watermain oversizing necessary to service future development along Flying Cloud Drive. This project will be development driven and may be constructed along with a development of a standalone City project. This project has been budgeted through the utility rate study and paid for with hookup charges. provide sewer service to Bluff Creek Sewer Expenditures 2016 2017 2018 2019 2020 Total Construction 9,600,000 9,600,000 Total 9,600,000 9,600,000 Funding Sources 2016 2017 2018 2019 2020 Total Developer Assessments 7,900,000 7,900,000 Sewer Utility Fund 600,000 600,000 Water Utility Fund 1,100,000 1,100,000 Total 9,600,000 9,600,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SS -025 Project Name MUSA Trunk Sanitary Sewer Oversizing Account#1 Account #2 Account #3 Account#4 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: $75,000 This project pays for the oversizing of the lateral sewer pipe for future developments. Payment for the project will be from trunk sewer funds. The infrastructure will most likely be constructed with a development project. Justification IThe project is necessary to support growth in the city and to ensure proper pipe sizing for future growth areas that will use this infrastructure. Expenditures 2016 2017 2018 2019 2020 Total Construction 75,000 75,000 Total 75,000 75,000 Funding Sources 2016 2017 2018 2019 2020 Total Sewer Utility Fund 75,000 75,000 Total 75,000 75,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project SS -026 Project Name SCADA Improvements Account #1 Account #2 Account#3 Account#4 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: 5300,000 City's SCADA (Supervisory Control and Data Acquisition) is over 10 years old and needs to be upgraded. The system controls all the sewer water infrastructure for the City, including lift stations, wells, water towers and the water treatment plant. The current system is not supported note so new software is required. Justification The current SCADA software can not be supported and needs to be information of sewer and water operations. SCADA system is critical to Expenditures 2016 2017 2018 2019 2020 Total Equipment 300,000 300,000 Total 300,000 300,000 Funding Sources 2016 2017 2018 2019 2020 Total Sewer Utility Fund 150,000 150,000 Water Utility Fund 150,000 150,000 Total 300,000 300,000 Budget Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # ST -001 Project Name West 78th St Streetlights Account#1 Account#2 Account#3 Account M4 Install street lights on West 78th Street from the western edge of Lake Ann Park to Century 78th Street east of this section of road. Expenditures 2016 2017 2018 Department Street Improvements Contact Paul Octane Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost: $300,000 Street lights already exist on f 2019 2020 Total Equipment 300,000 300,000 Total 300,000 300,000 Funding Sources 2016 2017 2018 2019 2020 Total MSA 300,000 300,000 Total 300,000 300,000 increase maintenance and electrical usage costs. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# ST -012 Project Name Annual Street Improvement Program Account41 601-xxxx-4751 Account #2 Account#3 Account#4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost: $25,569,500 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2016 - North Manor Road, Washita Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane, Minnewashta Woods Drive, Fox Path area, Lone Cedar area, Clues Mar Drive and Stoughton Ave MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point MSA - Minnewashta Parkway overlay 2020 - Chan View area _ City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. abilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have ;riorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to sider the merits of the project andscope of work. - Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a sing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in absence of a trail. This trail segment is planned to be constructed along with the 2017 MSA street reconstruction. Prior Expenditures 2016 2017 2018 2019 2020 Total 12,945,000 Construction 2,760,000 3,022,400 1,687,300 2,654,800 2,500,000 12,624,500 Total Total 2,760,000 3,022,400 1,687,300 2,654,800 2,500,000 12,624,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 12,945,000 Assessment/Revolving 1,560,000 1,622,400 1,687,300 1,754,800 2,500,000 9,124,500 Assess Fund Total MSA 1,100,000 1,400,000 Other Agency Contribution 100,000 900,000 3,400,000 100,000 Total 2,760,000 3,022,400 1,687,300 2,654,800 2,500,000 12,624,500 project may decrease maintenance costs. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project ST -018 Project Name Pavement Management Account#1 420-0000-4751 Account#3 Account#2 Account#4 Description Department Street Improvements Contact Paul Oehme Type Maintenance Useful Life 7-10 years Category Streets/Highways Priority n/a Total Project Cost: $3,760,000 s project will provide maintenance such as crack sealing, seal -coating, pothole patching, replacement of curb and gutter and sidewalk repairs for y streets. Also included in this project are trails and City parking lot rehabilitations. Seal -coat projects will be determined annually based on pavement condition index as generated by the pavement management program. The street department uses this funding source to pay for aninous material for annual street patching, will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures. Prior 2,135,000 Total 2016 2017 2018 2019 2020 Total Total 485,000 285,000 285,000 285,000 285,000 1,625,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 2,135,000 Street Pavement Management 100,000 100,000 100,000 100,000 100,000 500,000 Total Tax Levy 385,000 185,000 185,000 185,000 185,000 1,125,000 Total 485,000 285,000 285,000 285,000 285,000 1,625,000 Budget Impact/Other these improvements will cost effectively prolong the life of the street so major improvements such as reconstruction projects can be delayed. Capital Improvement Program City of Chanhassen, MN 2016 thru 2020 Project # ST -032 Project Name TH101 Imp -Pioneer Tr to Flying Cloud Dr (CSAR 61) Account#1 605-0000 Account N2 Account#3 Account#4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: $31,410,000 This project will reconstruct TH 101 from Pioneer Trail (CSAR 14) to Flying Cloud Drive (CSAR 61). This is the last section of TH 101 that needs improvements from TH 5 into the City of Shakopee. The improvements are proposed to improve safety, mobility and to plan for future growth in the region. The project is consistent with the 2007 TH 101 corridor scoping study. State, Federal and Carver County funds will be used to pay for most of the improvements. The City contribution to the project is anticipated to help pay for some environmental work, watermain improvements, corridor landscaping, trails and storm sewer improvements. The tentative schedule is to complete final design in 2016. Right of way acquisition would take place in 2017 and construction would commence in 2018. improve safety and mobility on TH 101. The project also plans for growth in the Prior Expenditures 2016 2017 2018 2019 2020 Total 900,000 Planning/Design 810,000 810,000 Total Land Acquisition 7,700,000 7,700,000 Construction 22,000,000 22,000,000 Total 810,000 7,700,000 22,000,000 30,510,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 900,000 Assessment/Revolving 270,000 270,000 Assess Fund Total MSA 1,000,000 1,000,000 Other Agency Contribution 540,000 7,700,000 19,450,000 27,690,000 Sewer Utility Fund 750,000 750,000 Water Utility Fund 800,000 800,000 Total 0102000 7,700,000 22,000,000 30,510,000 The City would be responsible for the future maintenance of the trunk watermain and Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project ST -033 Project Name Reconstruct-Cty Rd 61 from TH 101 to Chanson Rd Account #1 Account#2 Account#3 Account 44 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: $54,250,000 of Flying Cloud Drive (CSAR 61) between TH 101 and Charlson Road. This section of Flying Cloud Drive (CSAR 61) was a tum back from the State of Minnesota in 2009 and was previously known as TH 212. The project is in the early stages of the project development process and construction is anticipated in 2016. The City's contribution to the project is for trail improvements in Chanhassen to connect to the Eden Prairie trail system. * Pavement is in poor condition and needs replacement * Improve safety * Minimize transportation disruptions caused by seasonal flooding of the Minnesota River * MnDOT is transferring the highwav to the county for future operation and maintenance Expenditures 2016 2017 2018 2019 2020 Total Construction 54,250,000 54,250,000 Total 54,250,000 54,250,000 Funding Sources 2016 2017 2018 2019 2020 Total Other Agency Contribution 54,000,000 54,000,000 Park Dedication Fund 150,000 150,000 Sewer Utility Fund 50,000 50,000 Water Utility Fund 50,000 50,000 Total 54,250,000 54,250,000 City will be responsible for operation and maintenance of the segment Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# ST -034 Project Name TH 5 Acceleration Lane Improvements Account#1 Account #2 Account#3 Account#4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: $1,950,000 Minnesota Department of Transportation is planning to add acceleration lanes on TH 5 at the intersections of Market Blvd, Great Plains BI TH l01/Dakota Lane. Also included in the project is the signal replacement at Great Plains Blvd and the pedestrian trail from Great Plains i to TH 101. The signal at TH 5 and Market Blvd will also be painted. at these intersections and replace warn out infrastructure. Expenditures 2016 2017 2015 2019 2020 Total Construction 1,950,000 1,950,000 Total 1,950,000 1,950,000 Funding Sources 2016 2017 2015 2019 2020 Total MSA 250,000 250,000 Other Agency Contribution 1,680,000 1,680,000 Street Pavement Management 20,000 20,000 Total 1,950,000 1,950,000 impact/Other Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project# ST -035 Project Name Powers Blvd/Pleasant View Rd Intersection Imp Account #1 Account 02 Account#3 Account#4 Department Street Improvements Contact Paul Ochme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: $570,000 a county led project to improve safety at the intersection of Powers Blvd and Pleasant View Road. This project will construct a super J curve on Powers Blvd at this intersection. In order to construct the super elevated curve trail modifications are required. the winter months vehicles have been leaving the traveled lane and hitting the guard rail and trail railing at this intersection. Also, some have driven over the retaining wall. This project will improve safety at the intersection. Expenditures 2016 2017 2018 2019 2020 Total Construction 570,000 570,000 Total 570,000 570,000 Funding Sources 2016 2017 2018 2019 2020 Total AssessmentlRevolving 70,000 70,000 Assess Fund Other Agency Contribution 500,000 500,000 Total 570,000 570,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SWMP-014 Project Name Property Acquisition Account#1 720-7025-4701 Account#3 Account #2 Account 44 acquire property in accordance within the City must be acquired in order to achieve Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Total Project Cost: $800,000 and Surface Water Management Plans. set forth in the Water Management Plans. Prior Expenditures 2016 2017 2018 2019 2020 Total 575,000 Land Acquisition 75,000 75,000 75,000 225,000 Total Total 75,000 75,000 75,000 225,000 Prior 575,000 Total Sources 2016 2017 2018 2019 2020 Total ater Utility Fund 75,000 75,000 75,000 225,000 Total 75,000 75,000 75,000 225,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SWMP-019 Project Name Street Improvement Projects -Storm Water Mgmt Account #1 720-70254751 Account #2 Account 93 Account #4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Description I Total Project Cost: $1,975,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2016 2017 2018 2019 2020 Total 7,225,000 construction 200,000 75,000 200,000 75,000 200,000 750,000 Total Total Total 200,000 75,000 200,000 75,000 200,000 750,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 17225,000 Surface Water Utility Fund 200,000 75,000 200,000 75,000 200,000 750,000 Total Total 200,000 75,000 200,000 75,000 200,000 750,000 maintenance of new infrastructure will be required. Citywide. No map Capital Improvement Program City of Chanhassen, MN Project# SWMP-024 Project Name Lower Bluff Creek TMDL Implementation Account#1 720-70254751 Account H3 Account #2 Account #4 Description 2016 thru 2020 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Total Project Cost: $1,080,000 Phe Bluff Creek Total Maximum Daily Load (TMDL) report identified the lower reach of Bluff Creek (south of Pioneer Trail) as the primary source of total suspended solids (TSS). During the calibration time period (6/25 to 11/17) TSS loads at the TH 101/CR 61 "Y" exceeded the TSS load at Pioneer by more than 400%- 41,280 lbs to 9,900 lbs. In addition to the turbidity issues, there exists a discontinuity between the lower reach and the upper reach resulting from a severe drop in elevation at the downstream end of the culvert under the Hennepin County Regional Trail. These findings are consistent with the Bluff Creek Natural Resource Management Plan. Both indicate that the numerous escarpments and gullies tributary to and contained within the Bluff Creek channel are the primary source of sediment to Bluff Creek. This project will decrease sediment load to Bluff Creek, improve the fish assemblage within Bluff Creek and will assist Chanhassen in meeting their Waste Load Allocation (WLA) for Bluff Creek, the Minnesota River and the Metro Mississippi Watershed. Riley -Purgatory -Bluff Creek Watershed District has expressed. their interest in nartnerine with Chanhassen on this project. Justification 1 2017 - Source Volume Reduction and Rate 2019 - Ravine 46 Stabilization Prior Expenditures 2016 2017 2018 2019 2020 Total 835,000 construction 70,000 175,000 245,000 Total Total 70,000 175,000 245,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total f--8-35—,00-01 Other Agency Contribution 50,000 100,000 150,000 Surface Water Utility Fund 20,000 75,000 95,000 Total Total 70,000 175,000 245,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Projects SWMP-026 Project Name Lake Minnewashta Outlet Account#t 720-70254751 Account #2 Account 03 Account#4 a permanent outlet structure at the outlet for Lake Minnewashta. current outlet is sand and is therefore easily altered. Alterations to the outlet can cause the Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority n/a Total Project Cost: $30,000 to drain down to the outlet elevation. Expenditures 2016 2017 2018 2019 2020 Total Construction 30,000 30,000 Total 30,000 30,000 Funding Sources 2016 2017 2018 2019 2020 Total Surface Water Utility Fund 30,000 30,000 Total 30,000 30,000 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # SWMP-032 Project Name Stormwater Pond Improvements Account 01 720-7025A751 Account #2 Account#3 Account#4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority rda Total Project Cost: $460,000 project will provide inspection and cleaning if required of all City stormwater ponds on a rotating four (4) year schedule, to identify any agement needs and perform needed repairs and improvements. This may include sediment removal, placement of blanket, rip -rap or other on control BMP's, vegetation management and assessment, repair and replacement of inlet and outlet structures. Justification There are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban Runoff Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal Separate Storm Sewer System permit. Prior Expenditures 2016 2017 2018 2019 2020 Total 280,000 Maintenance 20,000 60,000 20,000 60,000 20,000 180,000 Total Total 20,000 60,000 20,000 60,000 20,000 180,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 280,000 Surface Water Utility Fund 20,000 60,000 20,000 60,000 20,000 180,000 Total Total 20,000 60,000 20,000 60,000 20,000 180,000 Budget Impact/Other I_ require an input of other public works staff hours. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # SWMIP-035 Project Name LID Implementation Project Account#1 720-70254751 Account #2 Account 43 Account#4 is project will work with residents within the City of Chanhassen who are willing to construct their property and assist them with the design and construction of these features. Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Total Category SWMP Priority n/a Total Project Cost: $152,500 stormwater best management ter Resources staff have been approached by several Chanhassen residents and neighborhood groups interested in incorporating these features i their landscaping plans and looking for guidance and assistance with the design and construction. By identifying and assisting residents with design and implementation of alternative stormwater treatment features, the City will be able to address water quality and quantity issues in y developed areas where regional ponding is not a practical option. This project will also meet requirements of the City's NPDES permit and idegradation plan as well as meeting issues identified in the Second Generation Surface Water Management Plan. Prior Expenditures 2016 2017 2018 2019 2020 Total 96,250 construction 11,250 11,250 11,250 11,250 11,250 56,250 Total Total Total 11,250 11,250 11,250 11,250 11,250 56,250 Prior Funding Sources 2016 2017 2018 2019 2020 Total 96,250 Surface Water Utility Fund 11,250 11,250 11,250 11,250 11,250 56,250 Total Total 11,250 11,250 11,250 11,250 11,250 56,250 require additional notices, mailings and web page Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SWMP-042 Project Name Bluff Creek Drive Drainage Improvement Project Account#1 720-7025-4300 Account#2 720-7025-4706 Account#3 Account 04 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority a/a Total Project Cost: $140,000 ,t proposes to work cooperatively with the Parks Department to identify possible stormwater treatment best management practices and them into the design and construction of the trail. This is likely to include ponding within the right-of-way ditches, the installation of storm sewer pipe and structures and possibly the utilization of pervious pavement sections in part of the trial. Bluff Creek Drive is a steep road with minimal storm sewer infrastructure and no stormwater treatment. As a result of these conditions, numerous gullies have developed on private property which are threatening these properties as well as Seminary Fen. Five of the six watershed areas tributary to Bluff Creek Drive are identified in the Surface Water Management Plan as needing additional ponding and treatment. Prior F-20-00-01 Total 2016 2017 2018 2019 2020 Total 12u,uuu Total 120,000 120,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 20,000 Other Agency contribution 40,000 40,000 Total Surface Water Utility Fund 80,000 80,000 Total 120,000 120,000 constructed will need long-term maintenance. The cost of the trail may be distributed among two separate funding Capital Improvement Program 2016 ihru 2020 City of Chanhassen, MN Project# SWMP-045 Project Name Storm Water Infrastructure Maintenance/Replacement Account#1 720-7025-xxxx Account#2 Account N3 Account#4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority Na Total Project Cost: $275,000 project is an annual maintenance budget used to maintain or replace failing or deficient public storm water infrastructure and have a auction cost less than $25,000. In some instances public works staff can complete the work and pay for materials out of this fund. Other a contractor may be needed to complete the work. Justification ,very year the City replaces culverts, storm water structures and pipe throughout the City that have failed. These replacements are unforeseen and ire typically noticed only after they have failed. Often these failures result in public safety issues or pose a potential threat to private property or rther Citv infrastructure. Prior Expenditures 2016 2017 2018 2019 2020 Total 150,000 construction 25,000 25,000 25,000 25,000 25,000 125,000 Total 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Prior 150,000 Total Sources 2016 2017 2018 2019 2020 Total ater Utility Fund 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Budget Impact/Other Chese activities will likely involve the utilization of public works labor. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SWMP-046 Project Name West Central Lotus Lake -Phase 11 Account#1 Account 42 Account #3 Account#4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority n/a Total Project Cast: $400,000 project will stabilize approximately 1,600 feet of deeply incised channel tributary to Lotus Lake. Along with the stabilization, best [gement practices aimed at reducing nutrient loading to Lotus Lake will be implemented. Justification The watershed draining through this channel is 362 acres in size or over 36% of the entire watershed draining to Lotus Lake and a similar percentage of the sediment load. A 2008 feasibility report recommended three phases of improvements. Phase I was completed in 2009 decreasing the rate of discharge into the channel. City staff has been contacted by several of the adjoining property owners inquiring as to the status of this phase of the project. City staff will submit for 2016 bi-annual budget request for consideration in Clean Water Legacy Grant cycles. Expenditures 2016 2017 2018 2019 2020 Total Maintenance 400,000 400,000 Total 400,000 400,000 Funding Sources 2016 2017 2018 2019 2020 Total Other Agency Contribution 325,000 325,000 Surface Water Utility Fund 75,000 75,000 Total 400,000 400,000 Impact/Other lishment of understory vegetation will require maintenance for 2 to 4 years. This project will help meet per the anti -degradation plan and MS4 permit. to Lotus Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project SWMP-048 Project Name Upper Riley Creek Channel Stabilization Account#1 720-7025 Account#2 Account #3 Account 94 near stream bank undercutting, escarpment and gully erosion. Department Surface Water Management Contact Paul Oehme Type Unassigned Useful Life 90,000 Category SWMP Priority Na Total Project Cost: $122,500 part of the approval for the Public Works Facility, Riley Creek adjacent to the facility was to be stabilized. In 2013, a visual assessment of the ier Riley Creek Corridor from Lake Ann to Lake Susan was evaluated. This assessment revealed significant in and near stream erosion issues ilting in sediment deposition into Riley Creek and, subsequently, into Lake Susan. Prior Expenditures 2016 2017 2018 2019 2020 Total 32,500 Maintenance 90,000 90,000 Total Total 90,000 90,000 Prior Funding Sources 32,500 Other Agency Contribution Total Surface Water Utility Fund Total 90,000 90,000 2016 2017 2018 2019 2020 Total 75,000 75,000 15,000 15,000 some of the City match will involve in-kind labor. This would likely involve the use of City staff and equipment for hauling Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# SWMP-051 Project Name Pioneer Trail Drainage Improvement Account #1 Account#2 Account 93 Account 44 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority n/a Description I Total Project Cost: $80,000 This project will replace an old concrete farm drain tile that drains the watershed east of Highway 101 and the wetland at the comer of Highway 101 and Pioneer Trail. The concrete tile has failed and is no longer working. This causes the wetland to bounce more than normal and caused runoff to say in back yards longer than it has in the past. This project would replace the old drain tile by directionally boring in a new plastic pipe reduce the risk of flooding homes along Pioneer Trail. Expenditures 2016 2017 Maintenance Funding Sources 2018 2019 2020 Total Total 80,000 80,000 2016 2017 2018 2019 2020 Total Other Agency Contribution 40,000 4U,000 Surface Water Utility Fund 40,000 40,000 Total 80,000 80,000 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # W-024 Project Name Watermain Replacement Account #1 700-70254751 Account 93 Account#2 Account#4 cription acement of existing water main lines in coordination with the reconstruction of the City street in for street rehabilitation projects. Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $5,120,000 or minor fixes of water distribution City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by ;olidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water t, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing ect in the City. Prior Expenditures 2016 2017 2018 2019 2020 Total 27500,000 construction 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Total 825,000 75,000 770,000 100,000 850,000 2,620,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 2,500,000 Water Utility Fund 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Total 825,000 75,000 770,000 100,000 850,000 2,620,000 projects will decrease maintenance costs. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # W-032 Project Name Well Rehabilitation Program Account #1 700-7025-4530 Account #2 Account#3 Account#4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $680,000 tis program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years. is recommended that the following pumps and motors be pulled and inspected for wear: 6 - Well #3 and #13 7 - Well 47 and #8 8- Well #14 9 - Well #9 0 - Well #4 Justification 'erforming regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system. Prior Expenditai 315,000 Maintenance Total 2016 2017 2018 2019 2020 Total Total 90,000 90,000 45,000 90,000 50,000 365,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 315,000 Water Utility Fund 90,000 90,000 45,000 90,000 50,000 365,000 Total Total 90,000 90,000 45,000 90,000 50,000 365,000 Capital Improvement Program 2016 lhru 2020 City of Chanhassen, MN Project# W-037 Project Name West Water Treatment Plant Account#1 Account #2 Account#3 Account 44 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: 520,000,000 filtering of potable water for iron and manganese in the high zone area and the west side of town is programmed for construction in 2017. treatment plant, along with the east treatment plant, will be sized to accommodate the water treatment needs for the City for full build out. proposed location for the plant is at the comer of Galpin Blvd and Lake Hazeltine Road. remove iron and manganese from the western well field water prior to distributing. The City has documented an amount I is above the industry standard for potable use. Expenditures 2016 2017 2018 2019 2020 Total Construction 20.000.000 20,000,000 Total 20,000,000 20,000,000 Funding Sources 2016 2017 2018 2019 2020 Total Revenue Bonds 20,000,000 20,000,000 Total 20,000,000 20,000,000 BudgetImpact/Other manganese Capital Improvement Program 2016 fhru 2020 City of Chanhassen, MN Project# W-041 Project Name Repaint Lake Lucy Water Stand Pipe Account #1 700-7025-4751 Account 02 Account#3 Account#4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: $1,2509000 project will remove the existing exterior paint and repaint the interior and exterior surfaces of the Lake Lucy stand pipe. The exterior paint )les of the tank show the prime coat is too weathered to repaint and the existing paint has heavy metals and needs to be removed. Also, a rural analysis of the tank has shown supports in the interior of the tank need to be replaced. The tank was constructed in 1987 with an exterior ng placed in 2001. The base coat is now 27 years old and has served the City well, having exceeded the service life of 20 years. inspection report will be drafted prior to construction justifying the work. The tank was last painted in 2001. Expenditures 2016 2017 2018 2019 2020 Total Construction 1,250,000 1,250,000 Total 1,250,000 1,250,000 Funding Sources 2016 2017 2018 2019 2020 Total Water Utility Fund 1,250,000 1,250,000 Total 1,250,000 1,250,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project 4 W-046 Project Name Low Zone 1 million gallon Elevated Storage Tank Account4l 700-70254751 Account N2 Account #3 Account 94 Department Water System Improvements Contact Paul Octane Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: $2,600,000 s tank is needed to meet the peak day irrigation demand and potential emergency demand for the growth of the community. It is needed in the zone pressure area to service the growth area south of Lyman Boulevard. The location for the tank has not been determined, but a few itions are feasible or identified in the 2008 water comprehensive plan. This tank is dependent on development. Staff plans to evaluate the need this tank annually and adjust the construction date accordingly. meet peak irrigation and emergency water demands for the growing community m identified in the 2008 water comprehensive plan. Expenditures 2016 2017 2018 2019 2020 Total Construction 2,600,000 2,600,000 Total 2,600,000 2,600,000 Funding Sources 2016 2017 2018 2019 2020 Total Water Utility Fund 2,600,000 2,600,000 Total 2,600,000 2,600,000 Budget Impact/Other Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # W-055 Project Name 78th Street Watermain Loop Improvements Account #1 700-7025 Account #2 Account 03 Account #4 project will extend an 8" watermain on 78th Street from TH 41 west to Justification Department Water System Improvements Contact Paul Octane Type Improvement Useful Life Category Utilities Priority Na Total Project Cost: $250,000 4rbor's development is Tully built out and water for this area is served by a trunk watermain on Tanadoona Drive. This development has a service area which is currently not looped. During high flow events such as hydrant flushing this area can experience water hammers that can hot water heater valves to open. This can lead to damage in the properties. To eliminate the water hammer problem the best solution is to the watermain to TH 41. Expenditures 2016 2017 2018 2019 2020 Total Construction 250,000 250,000 Total 250,000 250,000 Funding Sources 2016 2017 2018 2019 2020 Total Water Utility Fund 250,000 250,000 Total 250,000 250,000 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project W-056 Project Name MUSA Trunk Watermain Oversizing Account 91 700-7025 Account #2 Account#3 Account#4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: $200,000 project pays for the oversizing of lateral watermains for future developments and is development driven. Payment for this project i the Trunk Water fund which is funded by development hook-up charges. The infrastructure will most likely be constructed with a lopment project. Justification necessary to support to ensure proper water pressure Prior Expenditures 2016 2017 2018 2019 2020 Total 50,000 Construction 150,000 150,000 Total Total 150,000 150,000 Prior 50,000 Total Sources 2016 2017 2018 2019 2020 Total Total 150,000 150,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project W-059 Project Name Well#16 Account #1 Account #2 well is proposed to meet the er levels. Justification Co meet the growing water needs Expenditures Account 43 Account 44 City planned for in the 2008 water comprehensive plan. Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Total Project Cost: $1,400,000 pendent on growth, summer water usage and 2016 2017 2018 2019 2020 Total Construction 1,400,000 1,400,000 Total 1,400,000 1,400,000 Funding Sources 2016 2017 2018 2019 2020 Total Water Utility Fund 1,400,000 1,400,000 Total 1,400,000 1,400,000 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project# W-060 Project Name 2015 MUSA Trunk Watermain Extension Account#1 Account#3 Account #2 Account #4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Category Utilities Priority n/a Description Total Project Cost: $300,000 Phis project will pay for extension of trunk watennain south of Pioneer Trail. The infrastructure may be put in under a City project or Tong with development projects. The project will allow for water service to be extended to service new developments. This project is levelopment driven. project allows for future water service to developments. Funding for this work was included in the rate study and paid for by hookup charges. Expenditures 2016 2017 2018 2019 2020 Total Construction 300,000 300,000 Total 300,000 300,000 Sources 2016 2017 2018 2019 2020 Total 300,000 Total 300,000 300,000 Budget Impact/Other Capital Improvement Program 2016 th a 2020 City of Chanhassen, MN Project# W-061 Project Name Repaint Watertower Place Tank Account#1 Account t* Account#2 Account#4 Description Maintenance This project will remove the existing paint and repaint the interior and exterior surface of the tower expected life expectancy of a tank coating is 20 years. An inspection report will be drafted prior to Department Water System Improvements Contact Paul Oehme Type Maintenance Useful Life 1,200,000 2017 2018 2019 2020 Category Utilities Priority n/a Total Project Cost: $1,200,000 The tank was constructed in 1995 and the Expenditures 2016 2017 2018 2019 2020 Total Maintenance 1,200,000 1,200,000 Total Funding Sources 2016 1,200,000 2017 2018 2019 2020 1,200,000 Total Water Utility Fund 1,200,000 1,200,000 Total 1,200,000 1,200,000 Le - E� ci of o r4 14 Oi N 0 w 00 00; N cli 00 m t o .0 ,J 1 0 N&00 00 00. 44 00 C'T ct. kD 0 0 0 w LM ml00 - w Op > CO Rt Vi. co Ln C) o 0 0 k\00 00 m m CO c M CD 0 co to up .2 C"L CL r tLulc c WX c to w 0 m co