D-6. 2016 Street Resurfacing Project 16-05CITY OF
CHANHA3SEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952 227.1100
Fax 952.227.1110
Building Inspections
Phone: 952 2271180
Fax: 952.227.1190
Engineering
Phone: 952.2271160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.2271130
Fax 952.227.1110
Public Works
7901 Park Place
Phone: 9522271300
Fax 952 227.1310
Senior Center
Phone: 952.2271125
Fax: 952.227.1110
MEMORANDUM
TO: Paul Oehme, Director of Public Works/City Engineer
FROM: Alyson Fauske, Assistant City Engineer
DATE: October 26, 2015
SUBJ: 2016 Street Rehabilitation Project No. 16-05: Authorize Preparation
of Feasibility Study
PROPOSED MOTION
"The City Council authorizes the preparation of a feasibility report for the 2016
Street Rehabilitation Project No. 16-05 and approves the resolution.
City Council approval requires a simple majority vote of the City Council
present."
At the June 22, 2015 work session, staff reviewed with Council the proposed 2016
Street Improvement project areas. Staff also discussed with the Council the need to
make improvements to more local streets then are currently budgeted for in the
capital replacment plan.
Every year the City considers
streets that are in poor condition
to be rehabilitated or
reconstructed. At the August 24,
2015 meeting, the City Council
approved a contract with WSB &
Associates for the reconstruction
of 1.1 miles of streets within the
Minnewashta Manor
neighborhood located on the
north side of Lake Minnewashta.
This work is proposed to be
completed under City Project No.
16-01.
Website The proposal for City Project No.
weimuchanhassen.unn.us 16-05 includes the rehabilitation
of approximately 1.4 miles of
rm vim Nn R
ciw�xr orlw � --
r
MoupMm Avenue
streets. The street segments within the proposed project were identified by the City's
Pavement Management software in conjunction with site investigations and are
shown on the adjacent graphic.
G:\EN(abffiW.JaMJ(6a�1 5LJN 6 �j j Ppipffj�� pjggj p�(m ¢pp,gt120151026 order feasibility.docx
Paul Oehme
2016 Street Rehabilitation Project
October 26, 2015
Page 2
The proposed improvements generally consist of milling and overlaying the pavement surface.
Severe pavement distresses will be removed and replaced. Minor drainage improvements are also
proposed to be addressed in the project areas. Water main gate valve and hydrant bolt replacements
are proposed for replacement in these areas.
A feasibility report will be prepared by the Engineering Department staff. The anticipated project
savings will be between $85,000 and $100,000 if feasibility report preparation, design and
construction observation are not outsourced.
Proiect Area #1: Lone Cedar Area
Approximately 0.4 miles of urban streets are proposed to be milled and overlaid within the Lone
Cedar neighborhood located north of Highway 5 and east of Minnewashta Parkway. The streets in
this area are 39 years old and were sealcoated in 1994, 1999 and 2008.
The street conditions in this area
were last surveyed in 2014. The
Pavement Condition Indices (PCIs)
from the survey are shown on the
map to the right.
A PCI below 45 typically warrants
reconstruction; however, the utilities
in the area are in fair condition and
therefore staff is recommending a full
depth mill and overlay of the streets
at this time. Subgrade corrections
would be done as needed.
The sanitary sewer system in this
area will be televised to determine the scope of sanitary sewer repairs.
The water main in this area is ductile iron. City records do not show any water main breaks in this
area. It is recommended to replace the bolts on the valves and some hydrants at this time.
Storm sewer exists within the project area. No additional storm sewer is proposed with this project.
The existing infrastructure will be surveyed to determine if any repairs are necessary.
Budgets for the proposed work were included in the proposed 2016 CIP. The budgets will be
reviewed and updated based upon current construction cost estimates.
Project Area #2: Fox Path Area
This project area consists of 0.6 miles of urban streets south of Pleasant View Road and west of the
northern tip of Lotus Lake. The streets in this area are 30 years old and were sealcoated in 1993,
1998 and 2007.
G\ENG\PUBLIC\_2016 PROJECTS\16-05 2016 Street Resurfacing Project\Communication\20151026 order feasibility.doex
Paul Oehme
2016 Street Rehabilitation Project
October 26, 2015
Page 3
The street conditions in this area
were last surveyed in 2013. The
Pavement Condition Indices (PCIs)
from the survey are shown on the
map to the right.
A PCI below 45 typically warrants
reconstruction; however, the
utilities in the area are in fair
condition and therefore staff is
recommending a full depth mill and
overlay of the streets at this time.
Subgrade corrections would be
done as needed.
The sanitary sewer system in this
area will be televised to determine
the scope of sanitary sewer repairs.
Properties in this area are serviced
by ductile iron water main. There
was one documented water main
break in the area on Lake Point in
2013. It is recommended to replace
the bolts on the valves and some
hydrants at this time.
Storm sewer exists within the
project area. No additional storm sewer is proposed with this project. The existing infrastructure will
be surveyed to determine if any repairs are necessary.
Project Area #3: Ches Mar Drive
Ches Mar Drive is a 0.2 mile rural residential street on the west side of Highway 41 near Lake
Minnewashta Regional Park. This street was constructed in 1960. There are no records of sealcoats
on this road. Ches Mar Drive was surveyed in 2014 and the PCI was 13, therefore a full depth mill
and overlay is proposed for this road.
The properties that access Ches Mar Drive are not serviced by City sanitary sewer or water. There is
no storm sewer in the area. No storm sewer improvements are proposed with this project.
Project Area #4: Stoughton Avenue
Stoughton Avenue is a 0.2 mile street in the southwest corner of the City, extending west from Flying
Cloud Drive and into the city of Chaska. This street was constructed in 1950 and overlaid in 1999.
The street was surveyed this year and the PCI is 33. Stoughton Avenue is a Municipal State Aid
street and is eligible for funding from the State. Staff is not recommending using State Aid funds for
G:\ENG\PUBLIC\_2016 PROJECTSV 6-05 2016 Street Resurfacing Project\Co=uniwion\20151026 order feasibihty.docx
Paul Oehme
2016 Street Rehabilitation Project
October 26, 2015
Page 4
this project given the small scope of this project; there are other, larger scale MSA routes such as
Park Road for which the City will pursue State Aid funding.
The City of Chanhassen does not have public sanitary sewer or water main in this area. The City of
Chaska provides sanitary sewer and water service to Gedney Pickle, which is located west of the
project area. The remaining properties in the area within the Chanhassen city limits are serviced by
well and septic systems.
There are no storm sewer improvements within the project area. There are no storm sewer
improvements proposed with this project.
PROJECT FUNDING
Forty percent (40%) of the street improvement cost would be assessed back to the benefiting property
owners, per the City's assessment practice. The remaining 60% of the street costs would be a City
cost. Each project area would have its own proposed assessment. Any storm sewer, sanitary sewer
and water main improvements replacement costs would be funded by the respective utility funds in
the annual utility budgets.
The following is the anticipated recommended project budget and funding sources:
Source
Assessment Fund
Storm Water Management Fund
Water Utility Fund
Sanitary Sewer Utility Fund
SCHEDULE
The proposed project schedule is as follows:
Neighborhood Meeting
Accept Feasibility Report
Public Hearing; Order Plans & Specifications
Approve Plans & Specifications; Order Ad for Bid
Assessment Hearing
Project Begins
Substantial Completion
Attachments: Resolution
CIP Sheets
Amount
$50,000
$25,000
$50,000
$825,000
November, 2015
December, 2015
February, 2016
March, 2016
May, 2016
June, 2016
August 30, 2016
G:\ENG\PU13LIC\_2016 PROJECT8\16-05 2016 Street Resurfacing Project\Communication\20151026 order feasibility.doex
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: October 26, 2015 RESOLUTION NO: 2015 -XX
MOTION BY:
SECONDED BY:
AUTHORIZE PREPARATION OF FEASIBILITY STUDY FOR THE
2016 STREET REHABILITATION (MILL AND OVERLAY) PROJECT NO. 16-05
WHEREAS, the areas for improvements in 2016 are as follows:
Ches Mar Drive
Fox Path Area
Lone Cedar Area
Stoughten Avenue
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
authorizes preparation of a feasibility study for the 2016 Street Rehabilitation (Mill and Overlay)
Project No. 16-05.
Passed and adopted by the Chanhassen City Council this 26'x' day of October, 2015.
ATTEST:
Todd Gerhardt, City Manager
Denny Laufenburger, Mayor
YES NO ABSENT
Capital Improvement Program 2016 rhru 2020
City of Chanhassen, MN
Project # ST -012
Project Name Annual Street Improvement Program
Account41 601-xxxx-0751 Account#3
Account42 Account 44
Description
Department
Street Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Streets/Highways
Priority
n/a
Total Project Cost: $25,569,500
Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas:
2016 - North Manor Road, Washm Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane, Minnewashta Woods Drive, Fox Path area,
Lone Cedar area, Clues Mar Drive and Stoughton Ave
MSA - Park Road overlay and Park Place
2017 - Flamingo Drive area
MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension.
2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street
2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point
MSA - Minnewashta Parkway overlay
2020 - Chan View area
The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have
deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to
consider the merits of the project and scope of work.
Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a
ing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in
Ibsence of a trail. This trail segment is planned to be constructed along with the 2017 MSA street reconstruction.
Prior Expenditures 2016 2017 2018 2019 2020 Total
—12,-94-5,00—ol Construction 3,460,000 2,322,400 1.,687,300 2,654,800 2,500,000 12,624,500
Total Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500
Prior Funding Sources 2016 2017 2018 2019 2020 Total
12,945,000 Assessment/Revolving 2,260,000 922,400 1,687,300 1,754,800 2,500,000 9,124,500
Assess Fund
Total MSA 1,100,000 1,400,000 900,000 3,400,000
Other Agency Contribution 100,000
100,000
Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500
project may decrease maintenance costs.
Capital Improvement Program 2016 thru 2020
City of Chanhassen, MN
Project# SWMP-019
Project Name Street Improvement Projects -Storm Water Mgmt
Account#1 720-70254751
Account #2
Account #3
Account#4
annual amount set aside for storm water management infrastructure construction or
lertaken by the engineering and public works departments.
Department
Surface Water Management
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
n/a
Total Project Cost: $1,975,000
ssociated with street improvement projects
improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
1, state and local regulations, as well as protecting existing and proposed development adjacent to the projects.
Prior
Expenditures
2016
2017
2018
2019
2020
Total
1,225,000
Construction
200,000
75,000
200,000
75,000
200,000
750,000
Total
Total 200,000
75,000
200,000
75,000
200,000
750,000
Prior
1,225,000
Total
Impact/Other
Sources
2016 2017 2018 2019 2020 Total
runa 1uu,uuu
Total 200,000 75,000 200,000 75,000 200,000 750,000
of new infrastructure will be required. Citywide. No map
Capital Improvement Program 2016 rhru 2020
City of Chanhassen, NIN
Project # W-024
Project Name Watermain Replacement
Account #1 700-70254751 Account #3
Account#2 Account#4
Description
Leplacement of existing water main lines in
ystem for street rehabilitation projects.
Department Water System Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Total Project Cost: $5,120,000
City street projects or minor fixes of water
City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
olidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
i, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
;ct in the City.
Prior
Expenditures
2016
2017
2018
2019
2020
Total
2,500,000
Construction
825,000
75,000
770,000
100,000
850,000
2,620,000
Total
Total 825,000
75,000
770,000
100,000
850,000
2,620,000
Prior
Funding Sources
2016
2017
2018
2019
2020
Total
27500,000
Water Utility Fund
825,000
75,000
770,000
100,000
850,000
2,620,000
Total
Total 825,000
75,000
770,000
100,000
850,000
2,620,000
projects will decrease maintenance costs.
Capital Improvement Program 2016 thru 2020
City of Chanhassen, MN
Project # SS -014
Project Name Sanitary Sewer Replacement
Account NI 701-7025-4751
Account #2
or rehabilitation
these projects.
Account#3
Account#4
sewer
Department
Sanitary Sewer Improvements
Contact
Paul Ochme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Total Project Cost: 51,890,000
with the reconstruction of the City street.
of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost
Prior
Expenditures
2016
2017
2018
2019
2020
Total
1,000,000
Construction
300,000
40,000
250,000
50,000
250,000
890,000
Total
Total 300,000
40,000
250,000
50,000
250,000
890,000
Prior
Funding Sources
2016
2017
2018
2019
2020
Total
l 700-0—,00-01
Sewer Utility Fund
300,000
40,000
250,000
50,000
250,000
890,000
Total
Total 300,000
40,000
250,000
50,000
250,000
890,000
Budget Impact/61er
This project will decrease maintenance costs.