Loading...
D-2. Well Maintenance Project: Approve Quote0 CITY OF BACKGROUND Fax: 952.227.1110 MEMORANDUM CHONSFN The City's well equipment must be maintained on a consistent schedule in order to Recreation Center 2310 Coulter Boulevard TO: Todd Gerhardt, City Manager 7700 Market Boulevard reduce City costs over time by decreasing the likelihood of expensive emergency PO Box 147 Chanhassen, MN 55317 FROM: Paul Oehme, Director Public Works /City Engineer Administration DATE: November 9, 2015 o Phone: 952.227.1100 Fax: 952.227.1110 SUBJ: Well Maintenance Project No. 15 -06: Approve Quote Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation PROPOSED MOTION D -� "The City Council approves a quote and awards the base bid amount for the 2015 Well Maintenance project in the amount of $78,190.00 to E.H. Renner & Sons, City Project No. 15 -06. City Council approval requires a simple majority vote of the City Council present." Phone: 952.227.1120 BACKGROUND Fax: 952.227.1110 standards recommends well equipment undergo rehabilitation by a well contractor Fax: 952.227.1110 The City's well equipment must be maintained on a consistent schedule in order to Recreation Center 2310 Coulter Boulevard increase the longevity of the pumps and motors. This regular maintenance will also Phone: 952.227.1400 reduce City costs over time by decreasing the likelihood of expensive emergency Fax: 952.227.1404 repairs and prevent water supply interruptions. Planning & Natural Resources The City regularly inspects and performs routine maintenance on City wells. Industry Phone: 952.227.1130 standards recommends well equipment undergo rehabilitation by a well contractor Fax: 952.227.1110 every seven to eight years. This project includes inspecting and repairing the pump and motor if needed as well as replacing items that are nearing the end of their Public Works expected life. The Well Rehabilitation Program identifies Well #2 and #12 for 7901 Park Place maintenance this year. Phone: 952.227.1300 Fax: 952.227.1310 Well #2 is located on the cul -de -sac on the east end of W. 77th Street, east of the Senior Center intersection of W. 77th Street and Erie Avenue. This well was last repaired in 2008, Phone: 952.227.1125 seven years ago. The well has not had any known problems since it was last Fax: 952.227.1110 inspected. It is recommended that the system receive standard rehabilitation as part of this project. Website www.ci.chanhassen.mn.us Well #12 is located in South Lotus Lake Park, west of the entrance drive. This well was constructed in 2008. Well #12 has been running at normal levels, therefore staff does not anticipate a need for major repairs. It is recommended that the system receive standard rehabilitation as part of this project. g: \eng \}tgA�?�g�t�.j�ct�f��lillt& fad+ �f$ nP�i�N��AWIr�i%BikS#trSTPtY�r @b accept quote well #10.doc Todd Gerhardt Well Maintenance Project: Approve Quote November 9, 2015 Page 2 DOTES Four alternates were included in the solicitation. Alternates 1 and 2 include items for cleaning Well #2 and # 12, respectively. Alternates 3 and 4 include items for the replacement of the pump bowl and cable for Well #2 and #12, respectively. As the performance of Wells #2 and #12 have not indicated the need for repairs listed in Alternates 1 thru 4, staff cannot determine whether they will need the alternate work until the contractor pulls the pump and motor for inspection. As a result, the low quote was determined by the Base Bids for Well #2 and 412. The quotes received are summarized as follows: *Indicates low quote * *Denotes corrected bid total per tabulation of the unit prices E.H. Renner & Sons has completed previous well projects for the City of Chanhassen, and their past work has been acceptable. Work is scheduled to be completed by January 31, 2016. The total recommended contract includes the Base Bid for Wells #2 and #12 in the amount of $78,190.00. If Alternates 1 thru 4 are necessary after the wells are inspected, this work may be added to the contract via a change order. Funding for the rehabilitation of Well #2 and #12 was budgeted for in the 2015 CIP W -032. Attachment: CIP Page Resolution c: Stephanie Smith, Project Engineer Kevin Crooks, Utility Superintendent Roger Renner, E.H. Renner & Sons gAeng \public \_2015 projects \15 -06 well maintanence #2 and 412 \communication \151109_cc_accept quote well #10.doc Base Bid Well #2 Base Bid Well 912 Sum of Base Bids E.H. Renner & Sons* $42,550.00 $35,640.00 $78,190.00 Ber erson Caswell $41,325.00 $41,005.00 ** $82,330.00 Mark J. Trout Wells, Inc. 1 $47,060.00 $42,235.00 $89,295.00 *Indicates low quote * *Denotes corrected bid total per tabulation of the unit prices E.H. Renner & Sons has completed previous well projects for the City of Chanhassen, and their past work has been acceptable. Work is scheduled to be completed by January 31, 2016. The total recommended contract includes the Base Bid for Wells #2 and #12 in the amount of $78,190.00. If Alternates 1 thru 4 are necessary after the wells are inspected, this work may be added to the contract via a change order. Funding for the rehabilitation of Well #2 and #12 was budgeted for in the 2015 CIP W -032. Attachment: CIP Page Resolution c: Stephanie Smith, Project Engineer Kevin Crooks, Utility Superintendent Roger Renner, E.H. Renner & Sons gAeng \public \_2015 projects \15 -06 well maintanence #2 and 412 \communication \151109_cc_accept quote well #10.doc Projects By Funding Source City of Chanhassen, MN Project # W -032 Project Name Well Rehabilitation Program 2015 thru 2019 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Account #1 700 - 7025 -4530 Account #3 Priority n/a Account #2 Account #4 Description I I Total Project Cost: $630,000 this program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years. It is recommended that the following pumps and motors be pulled and inspected for wear: 2015 - Well #2 and # 12 2016 -Well #3 and # 13 2017 - Well #7 and #8 2018 - Well #14 2019 - Well #9 Justification Performing regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system. Total Prior Expenditures 2015 2016 2017 2018 2019 225,000 Maintenance 90,000 90,000 90,000 45,000 90,000 405,000 Total Total 90,000 90,000 90,000 45,000 90,000 405,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total F--2-25—,00-01 Water Utility Fund 90,000 90,000 90,000 45,000 90,000 405,000 Total Total 90,000 90,000 90,000 45,000 90,000 405,000 Budget Impact/Other 112 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: November 9, 2015 RESOLUTION NO: 2015 -XX MOTION BY: SECONDED BY: A RESOLUTION APPROVING A QUOTE FOR WELL MAINTENANCE PROJECT NO. 15 -06 WHEREAS, quotes were received for the Well #2 and #12 maintenance Project No. 15 -06, and AND WHEREAS, it appears the quote from E.H. Renner & Sons in the amount of $78,190.00 is the lowest responsible quote. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with E.H. Renner & Sons in the name of the City of Chanhassen for the Well Maintenance Project No. 15 -06, according to the plans and specifications therefore approved by the City Council and on file in the office of the city clerk. Passed and adopted by the Chanhassen City Council this 9t' day of November, 2015. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT