E-5. 2016 Street Rehab Project 16-05 Accept Feasibility Study and Call PH0
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Website
www.ci.chanhassen.mn.us
MEMORANDUM r
TO: Paul Oehme, Director of Public Works /City Engineer �tf
FROM: Alyson Fauske, Assistant City Engineer V%
DATE: December 14, 2015
SUBJ: 2016 Street Rehabilitation Project No. 16 -05: Accept Feasibility
Study; Call Public Hearing
PROPOSED MOTION
"The City Council adopts the attached resolution accepting the feasibility report for
the 2016 Street Rehabilitation Project No. 16 -05 and calls the public hearing for
February 8, 2016.
City Council approval requires a simple majority vote of the City Council present."
BACKGROUND
At the June 22, 2015 work session, staff reviewed with Council the proposed 2016
Street Improvement areas. Staff also discussed with the Council the need to make
improvements to more local streets than what is currently budgeted in the Capital
Improvement Plan.
On October 26, 2015, the City Council authorized preparation of the feasibility study.
On November 18, 2015, staff held an Open House for the proposed project.
DISCUSSION
Every year the City
considers streets that are
in poor condition to be
rehabilitated or
reconstructed.
For the 2016 Street
Rehabilitation Project,
staff is proposing to
rehabilitate approximately
one mile of streets in the
Trolls -Glen (Lone Cedar
area) and Fox Chase
- t
AM ,
�-t 4
Am
?`
At-
.S 6
#.`F• L
o
F,
neighborhoods. The street
segments within the proposed project were identified by the City's Pavement
Management Software in conjunction with site investigations.
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Paul Oehme
2016 Street Improvement Project:
Accept Feasibility Study; Call Public Hearing
December 14, 2015
Page 2
The original project scope included Ches Mar Drive and Stoughton Avenue. The Ground
Penetrating Radar indicated - and the Streets Department has verified - that there is little to no Class
5 underneath the pavement on these streets. Without sufficient Class 5, the roadbed cannot
withstand the load of the construction equipment. Staff will reevaluate these street sections and
recommend adding them to a future project.
A feasibility report was prepared by the Engineering Department staff. It is estimated the City will
save about $100,000 with feasibility report preparation and design not being outsourced. Due to the
inspection needs for the 2016 Street Reconstruction Project No. 16 -01, the construction observation
for this project will be performed by a consultant. A copy of the feasibility report is available in the
Engineering Department. A summary of the feasibility findings are included in this report.
The proposed improvements are similar to what was done in the Carver Beach area during the
summer of 2015: reclaiming the pavement surface and the Class 5 underneath the pavement,
removing the top four inches of reclaimed material, and paving two, two -inch lifts of asphalt.
Severe pavement and subgrade distresses will be removed and replaced. Minor drainage
improvements are also proposed to be addressed. The water main in each project area is thought to
be in relatively good condition.
Trolls -Glen Area (0.4 miles)
The streets in this area are between 40
and 44 years old and were sealcoated
in 1994, 1999 and 2008.
The street conditions in this area were
last surveyed in 2014. The Pavement
Condition Indices (PCIs) from the
survey are shown on the adjacent map.
A PCI below 45 typically warrants
reconstruction however the utilities in
the area are in fair condition, therefore
staff recommends reclaiming the
streets at this time. Subgrade
corrections will be done as needed.
Lone Cedar Lane was originally constructed as a rural residential street in 1971 when the sanitary
sewer and water main were installed in the area. At that time, there were only lots along the
southern portion of what is now known as Lone Cedar Lane. In 1975, the Trolls -Glen development
was approved and the remainder of Lone Cedar Lane, West 77th Street and Forest Ridge Circle were
constructed. The streets in the Trolls -Glen development were urbanized, leaving the southern 500
feet of Lone Cedar Lane as the only rural section within the Street Project No. 16 -05 project area.
The proposed improvements include urbanizing this 500 foot section.
Lone Cedar Circle is not included in the project as it was improved by MnDOT in 2012 when the
Lone Cedar Lane access to State Highway 5 was removed.
g: \eng \public \_2016 projects \16 -05 2016 street resurfacing project \communication\20151214 proj 16 -05 accept feasibility.docx
Paul Oehme
2016 Street Improvement Project:
Accept Feasibility Study; Call Public Hearing
December 14, 2015
Page 3
The water main in this area is ductile iron. City records do not show any water main breaks in this
area. It is estimated that two valves and two hydrants will be replaced with this project. The Utility
Department will verify the scope of work to be included in the project.
The sanitary sewer system in this area will be televised to determine the scope of sanitary sewer
repairs. The feasibility study includes costs to replace the sanitary sewer lids and install I &I barriers
in each manhole. The Utility Department will inspect the manholes in the area this winter to
determine the scope of repairs.
The feasibility estimate includes 400 feet of drain tile based on field observations. Minor
replacement and repairs of the existing storm sewer is expected with this project and are included in
the estimated storm sewer costs. The Streets Department will inspect the storm sewer system to
determine the final scope of work to be performed with this project.
The Trolls -Glen neighborhood includes 460 feet of West 77th Street that is within the City of
Victoria. Staff from Victoria was notified of Chanhassen's proposed project and has budgeted for
their portion of West 77th Street. The majority of street work in the Trolls -Glen area is in
Chanhassen. Staff from both municipalities agree that the project will be more cohesive and cost
effective if the City of Chanhassen takes the lead on the design, bidding and construction
administration for the project. The City of Victoria would reimburse the City of Chanhassen for
these services. The feasibility study, cost estimates and budgets presented in this report do not
include the work to be performed in Victoria.
Fox Chase Area (0.6 miles)
The streets in this area are 30 years old and were
sealcoated in 1993, 1998 and 2007. The street
conditions in this area were last surveyed in 2013.
The Pavement Condition Indices (PCIs) from the
survey are shown on the adjacent map.
A PCI below 45 typically warrants reconstruction
however the utilities in the area are in fair condition,
therefore staff recommends reclaiming the streets at
this time. Subgrade corrections will be done as
needed.
The Fox Chase area includes a large paved area
commonly referred to as an "eyebrow ". This area is
approximately 90 feet wide and 100 feet long.
Staff has drafted an alternative to the "eyebrow" in order to minimize the mass of pavement surface
in this area. Residents that would be affected by this reconfiguration have been contacted to
g: \eng \public \_2016 projects \16 -05 2016 street resurfacing project \communication\20151214 proj 16 -05 accept feasibility.docx
Paul Oehme
2016 Street Improvement Project:
Accept Feasibility Study; Call Public Hearing
December 14, 2015
Page 4
determine if there is support for the proposed design. Staff will provide an update at the Public
Hearing.
The water main in this area is ductile iron. There
is one documented water main break in this area.
It is recommended to replace some valves and
hydrant bolts at this time. The Utility
Department will verify the scope of work to be
included in the project.
The sanitary sewer system in this area will be
televised to determine the scope of sanitary sewer
repairs. The feasibility study includes costs to
replace the sanitary sewer lids and install I &I
barriers in each manhole. The Utility
Department will inspect the manholes in the area
this winter to determine the scope of repairs.
OL
The streets within the project area are residential M
streets with concrete curb and gutter and storm
sewer to facilitate runoff. The feasibility
estimate includes 750 feet of drain tile based on field observations.
if
JP
1�
Minor replacement and repairs of the existing storm sewer is expected with this project and are
included in the estimated storm sewer costs. The Streets Department will inspect the storm sewer
system to determine the final scope of work to be performed with this project.
g: \eng \public \_2016 projects \16 -05 2016 street resurfacing project \communication\20151214 proj 16 -05 accept feasibility.docx
Paul Oehme
2016 Street Improvement Project:
Accept Feasibility Study; Call Public Hearing
December 14, 2015
Page 5
PROJECT FUNDING
Forty percent (40 %) of the street improvement cost is proposed to be assessed to the benefitting
property owners, per the City's assessment practice. The remaining 60% of the street costs and all
of the utility costs would be paid by the City. The preliminary funding is shown below:
Funding Source
Estimated
Amount
March 7, 2016
Project Cost
Budgeted
Assessments /Revolving Assessment Fund
$560,000
$700,000
Stormwater Management Fund
$41,000
$50,000
Water Utility Fund
$24,000
$25,000
Sanitary Sewer Utility Fund
$12,000
$50,000
$637,000
$825,000
The estimated assessment for each project area is calculated as follows:
Trolls -Glen
Total Estimated Street Cost: $250,000
40% assessed: 40% of $250,000 = $100,000
Number of assessable units: 33
Estimated unit assessment: $100,000 - 33 units = $3,000 /unit*
Fox Chase
Total Estimated Street Cost: $310,000
40% assessed: 40% of $310,000 = $124,000
Number of assessable units: 50
Estimated unit assessment: $124,000 - 50 units = $2,500 /unit*
*The estimated assessments were rounded to the nearest $100. Final assessment amounts
will be based on the lowest bid and will be calculated to the nearest $0.01.
The cost estimates include a 10% contingency and 5% indirect costs.
SCHEDULE
The proposed project schedule is as follows:
Public Hearing; Authorize Preparation of Plans and Specifications
February 8, 2016
Approve Plans and Specifications; Authorize Advertisement for Bids
March 7, 2016
Call Assessment Hearing
April 11, 2016
Assessment Hearing; Accept Bids and Award Contract
May 9, 2016
Project Begins
June, 2016
Substantial Completion
August 30, 2016
Attachments: Resolution
CIP Sheets
g: \eng \public \_2016 projects \16 -05 2016 street resurfacing project \communication\20151214 proj 16 -05 accept feasibility.docx
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: December 14, 2015 RESOLUTION NO: 2015 -XX
MOTION BY:
SECONDED BY:
A RESOLUTION ACCEPTING FEASIBILITY STUDY AND
CALLING THE PUBLIC HEARING FOR THE 2016 STREET
REHABILITATION (FOX CHASE & TROLLS -GLEN AREAS)
PROJECT NO. 16-05
WHEREAS, pursuant to resolution of the Council adopted October 26, 2015, a report has been
prepared by City staff with reference to the above - referenced project, and this report is being received
by the Council on December 4, 2015, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible.
NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
1. The Council will consider the improvement of such project in accordance with the report and the
assessment of abutting properties for a portion of the cost of the improvement pursuant to Minnesota
Statutes, Chapter 429 at an estimated total cost of the street improvements of $560,000.
2. Public hearing for the proposed improvements within the 2016 Street Rehabilitation (Fox Chase and
Trolls -Glen Areas) Project No. 16 -05 shall be held on February 8, 2016 in the Council Chambers of
City Hall at 7:00 PM.
The clerk shall give mailed and published notice of the hearing and improvement as required by law.
Passed and adopted by the Chanhassen City Council this 14th day of December, 2015.
ATTEST:
Todd Gerhardt, City Manager
Denny Laufenburger, Mayor
YES NO ABSENT
Capital Improvement Program 2016 rhru 2020
City of Chanhassen, M1
Project # ST -01.2
Project Name Annual Street Improvement Program
Account #1 601 -xxxx -4751 Account #3
Account #2 Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life Unassigned
Category Streets /Highways
Priority n/a
Total Project Cost: $25,569,500
Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas:
2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane, Minnewashta Woods Drive, Fox Path area,
Lone Cedar area, Ches Mar Drive and Stoughton Ave
MSA - Park Road overlay and Park Place
2017 - Flamingo Drive area
MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension.
2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street
2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point
MSA - Minnewashta Parkway overlay
2020 - Chan View area
Justification I
['he City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
ife of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
tehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have
leteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to
.onsider the merits of the project and scope of work.
ie Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a
issing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in
e absence of a trail. This trail seement is nlanned to be constructed alone with the 2017 MSA street reconstruction.
Prior Expenditures
2016
2017
2018
2019
2020
Total
12,945,000 Construction
3,460,000
2,322,400
1,687,300
2,654,800
2,500,000
12,624,500
Total
Total 3,460,000
2,322,400
1,687,300
2,654,800
2,500,000
12,624,500
Prior Funding Sources
2016
2017
2018 2019
2020 Total
12,945,000 Assessment/Revolving
2,260,000
922,400
1,687,300 1,754,800
2,500,000 9,124,500
Assess Fund
Total RASA
1,100,000
1,400,000
900,000
3,400,000
Other Agency Contribution
100,000
100,000
Total
3,460,000
2,322,400
1,687,300 2,654,800
2,500,000 12,624,500
Budget Impact/Other
This project may decrease maintenance costs.
Capital Improvement Program 2016 thru 2020
City of Chanhassen, NM
Project # SWMP -019
Project Name Street Improvement Projects - Storm Water Mgmt
Account #1 720 -7025 -4751
Account #2
Account #3
Account #4
Department
Surface Water Management
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
nfa
Description Total Project Cost: 51,975,000
An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
undertaken by the engineering and public works departments.
Justification
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects,
Prior Expenditures
1,225,000 Construction
Tota 1
2016 2017 2018 2019 2020 Total
200,000 75,000 200,000 75,000 200,000 750,000
Total 200,000 75,000 200,000 75,000 200,000 750,000
Prior
Funding Sources
2016
2017
2018 .
2019
2020
Total
1,225,000
Surface Water Utility Fund
200,000
75,000
200,000
75,000
200,000
750,000
'Dotal
Total
200,000
75,000
200,000
75,000
200,000
750,000
Budget Impact/Other
Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map
Capital Improvement Program 2016 thr•u 2020
City of Chanhassen, MN
Project # W -024
Project Name Watermain Replacement
Account #1 700 - 7025 -4751
Account #2
Account 0
Account #4
Department Water System Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Description Total Project Cost: $5,120,000
Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution
system for street rehabilitation projects.
Justification
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City.
Prior
Expenditures
2016
2017
2018
2019
2020
Total
2,500,000
construction
825,000
75,000
770,000
100,000
850,000
2,620,000
,Fatal
Total 825,000
75,000
770,000
100,000
850,000
2,620,000
Prior
Funding Sources
2016
2017
2018
2019
2020
Total
F-2-.-5-0-0—,000-1
Water Utility Fund
825,000
75,000
770,000
100,000
850,000
2,620,000
Total
Total 825,000
75,000
770,000
100,000
850,000
2,620,000
Budget Impact/Other
------- - - - - --
These projects will decrease maintenance costs.
Capital Improvement Program 2016 rhrie 2020
City of Chanhassen, MN
Project # SS -014
Project Name Sanitary Sewer Replacement
Department
Sanitary Sewer Improvements
Contact
PaulOehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Account #1 701- 7025 -4751 Account #3 Priority nia
Account #2 Account #4
Description Total Project Cost: S1,890,000
Replacement or rehabilitation of existing sanitary sewer Iines in conjunction with the reconstruction of the City street.
Justification
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects.
Prior Expenditures
1,000,000 Construction
Total
2016 2017
300,000 40,000
2018 2019
250,000 50,000
2020 Total
250,000 890,000
Total 300,000 40,000 250,000 50,000 250,000 890,000
Prior
Funding Sources
2016
2017
2018
2019
2020
Total
1,000,000
Sewer Utility Fund
300,000
40,000
250,000
50,000
250,000
890,000
Total
Total 300,000
40,000
250,000
50,000
250,000
890,000
Budget Impact/Other