E-4. 2016 Street Recon Project 16-01 Accept Feasibility Study and Call PH0 CITY OF CHANHASSEN 7700 Market Boulevard PC Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 E -1 MEMORANDUM TO: FROM DATE: SUBJ: Paul Oehme, Director of Public Works /City Engineer Alyson Fauske, Assistant City Engineer 01� December 14, 2015 0 2016 Street Reconstruction Project No. 16 -01: Accept Feasibility Study; Call Public Hearing PROPOSED MOTION "The City Council accepts the feasibility report for the 2016 Street Reconstruction Project No. 16 -01 and calls the public hearing for January 25, 2016. City Council approval requires a simple majority vote of the City Council present." BACKGROUND At the June 22, 2015 work session, staff reviewed with Council the proposed 2016 Street Reconstruction project. On August 24, 2015, the City Council authorized the preparation of the feasibility study. On November 18, 2015, an open house was held to discuss the proposed project. DISCUSSION Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2016 Street Reconstruction Project, staff is proposing to reconstruct approximately 1.1 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, site investigations and utility problems in the area. Website The proposed project is in the Minnewashta www.ci.chanhassen.mn.us Manor neighborhood in the northwest corner of the city. G: \ENG \PUBLIC\ 2016 PROJECTS \16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16 -01 accept feasibility.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow MRwwaHtta Mawr e _ d 7 r G: \ENG \PUBLIC\ 2016 PROJECTS \16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16 -01 accept feasibility.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2016 Street Reconstruction Project December 14, 2015 Page 2 The streets in this project area were constructed in 1971 and were sealcoated in 1994 and 1999. The pavement condition indices (PCIs) are shown on the graphic below. A PCI of 100 represents a new street. Streets with a PCI below 45 typically indicate distresses that require a full reconstruction, therefore it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. OV - -44 Staid d shy . .f- Ct lit 01, Jr *1 � ♦ � '4� aid Lane r O jU' L 4F low +` �,� � - sue! ,.�� :. �a •!�''�f � o�s,�'a a7 ' SzVO? l x do Ol y i y -leg -.-s The street widths vary between 20' and 28' within 50' or 60' wide right of way. The drivable portion of the streets (i.e. the bituminous surface and the concrete gutter) is proposed to be the same as the existing widths. The proposed pavement section includes 18" of sand, 10" of Class 5 and 3.5" of bituminous as recommended by the soils engineer. High back, B -618 curb is proposed to be installed in this area if adequate storm water rate, volume and water quality features can be incorporated into the design. Water Main Improvements The water main in this area is either cast or ductile iron pipe. Locations of the documented breaks are shown on the graphic below. Staff proposes to replace the water main with PVC water main. All G: \ENG \PUBLIC \_2016 PROJECTS \16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16- Olaccept feasibility.doc Paul Oehme 2016 Street Reconstruction Project December 14, 2015 Page 3 services would also be replaced. Alternatives to open cut installation, such as pipe bursting and directional drilling, will be bid as a potential cost - saving measure. Al 4. 1 10 r Sanitary Sewer Improvements 1 'T L i )L Sta r -�O Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 50 feet of sewer is proposed to be replaced due to the condition of the pipe. The remaining sewer pipe is in good structural condition, although some require mineral removal, grouting and /or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. A 10" diameter sanitary sewer force main extends from Lift Station 94 and under the north -south section of Washta Bay Road. The Utility Department will pothole the force main and verify the condition of the pipe. An anode bag will be added to act as a sacrificial material to prolong the life of the force main. G: \ENG\PUBLIC\ 2016 PROJECTS \16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16 -01 accept feasibility.doc Paul Oehme 2016 Street Reconstruction Project December 14, 2015 Page 4 .�• - _ta Forcemain . MI 104 4,1 tAfr V . % ' T. LS 4 2 • ;cA a�jW 1 Storm Sewer Improvements The existing corrugated metal pipe within the Washta Bay Road and Sandpiper Trail right of way is in poor condition and proposed to be abandoned. Reinforced concrete pipe is proposed to be installed within these streets. The project area is developed, therefore, there is minimal space to provide traditional stormwater management, namely treatment ponds. The feasibility study includes the following alternatives: 1) Restoring the wetland located in the SE corner of Sandpiper Trail and Piper Ridge Lane. 2) Raingardens along Washta Bay Road. 3) A grit chamber at the 90 degree bend in Washta Bay Road, and another at the intersection of Tanagers Lane, Tanagers Point and Sandpiper Trail. G: \ENG \PUBLIC\ 2016 PROJECTS\16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16 -01 accept feasibility.doc Paul Oehme 2016 Street Reconstruction Project December 14, 2015 Page 5 Private Small Utilities There are overhead private utilities within the project area. The private utility companies will be notified of the proposed project. In 2012, the estimated cost to convert the overhead utilities to underground in the Minnewashta Heights neighborhood was $5,000 per property. Given the additional cost to property owners staff will not pursue underground conversion. An open house was held November 18, 2015 to discuss the proposed project and to answer questions; approximately 20 people attended. All of the residents' questions were answered at the meeting and /or with a follow -up after the meeting. The feasibility report was prepared by WSB and Associates. A copy of the feasibility report is available in the Engineering Department. PROJECT FUNDING Assessments will be based on the City's assessment practice of assessing 40% of the street improvement cost to the benefitting properties on a per lot basis. The assessments would be proposed for a 10 -year term at a preliminary interest rate of 5.25 %. Budgets for the proposed work have been included in the 2016 CIP. A summary of the feasibility estimate and CIP budget is below: G: \ENG \PUBLIC\ 2016 PROJECTS\16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16 -01 accept feasibility.doc Paul Oehme 2016 Street Reconstruction Project December 14, 2015 Page 6 Funding Source Feasibility Estimate Budget Revolving Assessment Fund $1,400,900 $1,560,000 Stormwater Utility Fund $363,100 $300,000 Sanitary Sewer Utility Fund $237,400 $300,000 Water Utility Fund $836,900 $825,000 Total $2,838,300 $2,885,000 The estimated costs include 10% contingency and 11% indirect costs. A portion of the storm sewer within Washta Bay Road conveys drainage from State Highway 7. Staff will request that MNDOT contribute funding for a portion of the storm sewer replacement cost. Estimated Assessments: Total estimated street costs: $1,400,900 Total estimated assessable street costs: $1,203,600* 40% assessed: 40% of $1,203,600 = $481,440 59 assessable units $481,440 - 59 units = $8,160 /unit ** *Staff proposes that the City fund more than 60% of the cost of North Manor Road and Orchard Lane due to the low number of properties adjacent to these streets. * *The estimated assessment was rounded up to the nearest $10 increment. The final assessment will be based on the bid price and will be to the nearest $0.01. The estimated assessment lies within the benefit range identified of past consultation reports. SCHEDULE The proposed project schedule is as follows: Public Hearing; Authorize Preparation of Plans and Specifications January 25, 2016 Approve Plans and Specifications; Authorize Advertisement for Bids February 22, 2016 Call Assessment Hearing March 21, 2016 Assessment Hearing; Accept Bids and Award Contract April 25, 2016 Start Construction June, 2016 Construction Substantially Complete August, 2016 Attachments: 1. CIP pages 2. Resolution G: \ENG\PUBLIC\ 2016 PROJECTS \16 -01 Street and Utility Reconstruction \Communication\20151214 proj 16 -01 accept feasibility.doc Projects By Funding Source 2015 thru 2019 Department Street Improvements City of Chanhassen, MN Contact Paul Oehme Project # ST-012 Project Name Annual Street Improvement Program Account #1 601-xxxx4753 Account 42 Account #3 Account 94 Type Improvement Useful Life Unassigned Category Streets/Highways Priority n1a Description Total Project Cost: $22,769,500 Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas: 2015 - Carver Beach area (south and west of Carver Beach Road) MSA - Kerber Blvd overlay (north of West 78th Street) and Dakota Ave (Hwy 5 to Lake Dr E) 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashta Woods Drive MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area, Ches Mar Drive, Lone Cedar and Saddlebrook Pass neighborhood MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point — MSA - Minnewashta Par",2y overlay Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. The Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a missing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a trail. This trail sement is planned to be constructed along with the 2017 MSA street reconstruction. Prior Expenditures 2015 2016 2017 2018 2019 Total Construction 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Total Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Prior Funding Sources 2015 2016 2017 2018 2019 =ti Total Assessment/Revolving 1,850,000 1,560,000 1,622,400 1,687,300 1,754,800 8,474,500 t-lbbuz>b FUT)U Total MSA 1,400,000 900,000 1,400,000 900,000 4,600,000 Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Budget Impact/Other i This project may decrease maintenance costs 88 Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # SWMP -019 Project Name Street Improvement Projects - Storm Water Mgmt Account #1 720 - 7025 -4751 Account #2 Account #3 Account #4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Description Total Project Cost: $2,075,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 1,225,000 construction "Total 2016 2017 300,000 75,000 2018 2019 200,000 75,000 2020 Total 200,000 850,000 Total 300,000 75,000 200,000 75,000 200,000 850,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,225,000 Surface Water Utility Fund 300,000 75,000 200,000 75,000 200,000 850,000 Total Total 300,000 75,000 200,000 75,000 200,000 850,000 Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map i City of Chanhassen, MNT Project 4 SS-014 Project Name Sanitary Sewer Replacement 2015 thi•ii 2019 Department Sanitaiy SeNver Improvements Contact Paul Oehmc Type Improvement Useful Life Unassigned Category Utilities Account #1 701-7025-4751 Account 43 Priority n/a Account #2 Account #4 Description Total Project Cost: $1,640,000 Zeplacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. PHOT Expenditures Construction Total 2015 2016 2017 2018 2019 Total 75,000 300,000 40,000 250,000 50,000 715,000 Total 75,000 300,000 40,000 250,000 50,000 715,000 This project will decrease maintenance costs. M Projects By Funding Source 2015 thru 2019 Department Water System Irnprovements City of Chanhassen, MN Contact Paul Ochnie Project tt W-024 Project Name Watermain Replacement Account4I 700-7025-4751 Account a2 Account #3 Account#4 Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $4,270,000 ,ment of existing water main lines incoordination with the reconstruction of the City street projects or minor fixes o f water distribution for street rehabilitation projects. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. if significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. Budget Impact/Other rhese projects will decrease maintenance costs. ill Prior Expenditures 2015 2016 2017 2018 2019 Total F-4375,0001 Construction 125,000 825,000 75,000 770,000 100,000 1,895,000 'rotai Total 125,000 825,000 75,000 770,000 100,000 1,895,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total F77,375:0:00:] Water Utility Fund 125,000 825,000 75,000 770,000 100,000 1,895,000 Total Total 125,000 825,000 75,000 770,000 100,000 1,895,000 Budget Impact/Other rhese projects will decrease maintenance costs. ill CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: December 14, 2015 RESOLUTION NO: 2015 -XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING THE PUBLIC HEARING FOR THE 2016 STREET RECONSTRUCTION (MINNEWASHTA MANOR AREA) PROJECT NO. 16-01 WHEREAS, pursuant to resolution of the Council adopted August 24, 2015, a report has been prepared by City staff with reference to the above - referenced project, and this report is being received by the Council on December 4, 2015, and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost - effective, and feasible. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The Council will consider the improvement of such project in accordance with the report and the assessment of abutting properties for a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the street improvements of $1,400,900. 2. Public hearing for the proposed improvements within the 2016 Street Reconstruction (Minnewashta Manor Area) Project No. 16 -01 shall be held on January 25, 2016 in the Council Chambers of City Hall at 7:00 PM. The clerk shall give mailed and published notice of the hearing and improvement as required by law. Passed and adopted by the Chanhassen City Council this 10 day of December, 2015. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT