Loading...
G-1. 2016 Street Improvement Project0 CITE OF CHANNASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Website www.ci.chanhassen.mn.us G -1 MEMORANDUM 61 TO: Paul Oehme, Director of Public Works/City Engineer FROM: Alyson Fauske, Assistant City Engineer DATE: January 25, 2016 0�• SUBJECT: 2016 Street Reconstruction Project No. 16-01: Public Hearing; Authorize Preparation of Plans and Specifications PROPOSED MOTION "The City Council orders the preparation of plans and specifications for the 2016 Street Reconstruction Project No. 16-01. City Council approval requires a super majority vote of the City Council present." BACKGROUND At the June 22, 2015 work session, staff reviewed with Council the proposed 2016 Street Reconstruction project. On August 24, 2015, the City Council authorized preparation of the feasibility study. On November 18, 2015, an open house was held to discuss the proposed project. On December 14, 2015, the City Council accepted the feasibility study and called the public hearing. DISCUSSION Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2016 Street Reconstruction Project, staff is proposing to reconstruct approximately 1.1 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, site investigations and utility problems in the area. The proposed project is in the Minnewashta Manor neighborhood in the northwest corner of the city. Wn-snla Manor No'ghbomo d g \e1 anhasseni�'a community Or Lei e ° r'ovvi' ing°'or`�oJi anti canning Of IOmOp 6�OW25 ph order p&s.docx Paul Oelrtne 2016 Street Reconstruction Project January 25, 2016 Page 2 The streets in this project area were constructed in 1971 and were sealcoated in 1994 and 1999. The pavement condition indices (PCIs) are shown on the graphic below. A PCI of 100 represents a new street. Streets with a PCI below 45 typically indicate distresses that require a full reconstruction, therefore it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. "A"• Via.` - . 37 � .... I Sta Ct Ilk P WOOP . lift TC)jJ QaY �+ atd Lane y r (+ 0 O owash:a • l A7 SayOV , aC2 d e ` a Ni tsJ l The street widths vary between 20' and 28' within 50' or 60' wide right of way. The drivable portion of the streets (i.e. the bituminous surface and the concrete gutter) is proposed to be the same as the existing widths. The proposed pavement section includes 18" of sand, 10" of Class 5 and 3.5" of bituminous as recommended by the soils engineer. High back, B-618 curb is proposed to be installed in this area if adequate stormwater rate, volume and water quality features can be incorporated into the design. This street plan is the same as was constructed in the Minnewashta Shores neighborhood in 2014. Drain tile is also proposed to be installed behind the curb throughout the project. Water Main Improvements The water main in this area is either cast or ductile iron pipe. Locations of 10 documented water main breaks are shown on the graphic below. Staff proposes to replace the water main with PVC g:\eng\pLiblic\-2016pi-ojects\16-01 street and utility reconstrur ction\communication\20160125 ph orderp&s.docx Paul Oehme 2016 Street Reconstruction Project January 25, 2016 Page 3 water main. All services would also be replaced. Alternatives to open cut installation, such as pipe bursting and directional drilling, will be bid as a potential time and cost-saving measure. Sta H_ O t i r•g Ct XW San 1 f{ r 'V J ✓ ldge ? Ir Sanitary Sewer Improvements Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 50 feet of sewer is proposed to be replaced due to the condition of the pipe. The remaining sewer pipe is in good structural condition, although some require mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. A 10" diameter sanitary sewer force main extends from Lift Station #4 and under the north -south section of Washta Bay Road. The Utility Department potholed the ductile iron force main and confirmed that the pipe is in good condition. An anode bag will be added to act as a sacrificial material to prolong the life of the force main. g:\eng\public\_2016 projects\16-01 street and utility reconstruction\communication\20160125 ph order p&s.docx Paul Oehme 2016 Street Reconstruction Project January 25, 2016 Page 4 Storm Sewer Improvements The existing corrugated metal pipe within the Washta Bay Road and Sandpiper Trail right of way is in poor condition and is proposed to be abandoned and filled with sand. Reinforced concrete pipe is proposed to be installed within these streets. The corrugated steel pipe that serves TH 7 and is along Washta Bay Road is in poor condition and should be replaced. The project area is fully developed, therefore, there is minimal space to provide traditional stormwater management, namely treatment ponds. The feasibility study includes the following alternatives: 1) Restoring the wetland located in the SE corner of Sandpiper Trail and Piper Ridge Lane. 2) Raingardens along Washta Bay Road. 3) A grit chamber at the 90 degree bend in Washta Bay Road, and another at the intersection of Tanagers Lane, Tanagers Point and Sandpiper Trail. g:\eng\public\_2016 projects\16-01 street and utility reconstruction\communication\20160125 ph order p&s.docx Paul Oehme 2016 Street Reconstruction Project January 25, 2016 Page 5 (2) Raingartlon 11 - ^a (2) RaingardenD2 -, (3) Water Ouality Treatment Structure (2) Raingarden 3 F - L(2)- ((2) Raingarden :4 Mnnewaslfri MA ((2) Public Access Improvement . Revolving Assessment Fund Legend $1,560,000 Stormwater Utility Fund $363,100 $300,000 Sanitary Sewer Utility Fund '�■ 'A1.r OuNry Suuave ■ S mce $300,000 Water Utility Fund St H (3)11'ater Quality Sd0" Es Treatmera Structure . Prcgowtl aartn S.w«r Proposed Drainage Areas Dreq Pm�.ttAna MNtlYd DN�nea::' R•mn■ruwE S—, Paice■ t:. a Water Ouality Treatment Structure TI— !f ... r(1)Weiland DEnhancement l with Pretreatment Forebay II wetnna enhmcsment PROJECT FUNDING Assessments will be based on the City's assessment practice of assessing 40% of the street improvement cost to the benefitting properties on a per lot basis. The assessments would be proposed for a 10 -year term at a preliminary interest rate of 5.25%. Budgets for the proposed work have been included in the 2016 CIP. A summary of the feasibility estimate and CIP budget is below: Funding Source Feasibility Estimate Budget Revolving Assessment Fund $1,400,900 $1,560,000 Stormwater Utility Fund $363,100 $300,000 Sanitary Sewer Utility Fund $237,400 $300,000 Water Utility Fund $836,900 $825,000 Total $2,838,300 $2,985,000 The estimated costs include 10% contingency and 11 % indirect costs. g:\eng\public\_2016 projects\16-01 street and utility reconstltiction\conununication\20160125 ph order p&s.docx Paul Oehme 2016 Street Reconstruction Project January 25, 2016 Page 6 A portion of the storm sewer within Washta Bay Road conveys drainage from State Highway 7. Staff will request that MnDOT contribute funding for a portion of the storm sewer replacement cost. Estimated Assessments: Total estimated street costs: $1,400,900 Total estimated assessable street costs: $1,203,600* 40% assessed: 40% of $1,203,600 = $481,440 59 assessable units $481,440 - 59 units = $8,160/unit" *Staff proposes that the City fund more than 60% of the cost of North Manor Road and Orchard Lane due to the low number of properties adjacent to these streets. **The estimated assessment was rounded up to the nearest $10 increment. The final assessment will be based on the bid price and will be to the nearest $0.01. The estimated assessment lies within the benefit range identified of past consultation reports. SCHEDULE The proposed project schedule is as follows: Approve Plans and Specifications; Authorize Advertisement for Bids Call Assessment Hearing Assessment Hearing; Accept Bids and Award Contract Start Construction Construction Substantially Complete ATTACHMENTS 1. CIP Pages 2. Resolution 3. Affidavit of Mailing Notice of Public Hearing gAeng\public\ 2016 projects\16-01 street and utility reconstruction\communication\20160125 ph order p&s.docx February 22, 2016 March 21, 2016 April 25, 2016 June, 2016 August, 2016 Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # ST -012 Project Name Annual Street Improvement Program Account#1 601-xxxx-4751 Account#3 Account#2 Account#4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Description Total Project Cost: $25,569,500 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane, Minnewashta Woods Drive, Fox Path area, Lone Cedar area, Ches Mar Drive and Stoughton Ave MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point MSA - Minnewashta Parkway overlay 2020 - Chan View area Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a sing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in absence of a trail This trail segment is planned to be constructed along with the 2017 MSA street reconstruction. Prior 12,945,000 Total Expenditures 2016 2017 2018 2019 2020 Total Construction 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 12,945,000 Assessment/Revolving 2,260,000 922,400 1,687,300 1,754,800 2,500,000 9,124,500 Assess Fund Total MSA 1,100,000 1,400,000 900,000 3,400,000 Other Agency Contribution 100,000 100,000 Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Budget Impact/Other This project may decrease maintenance costs. Capital Improvement Program 2016 thr a 2020 City of Chanhassen, MN Project # SS -014 Project Name Sanitary Sewer Replacement Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Account #1 701-7025-4751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $1,890,000 Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Prior Expenditures 1,000,000 Construction Total Prior Funding Sources 1,000,000 Sewer Utility Fund Total 2016 2017 2018 2019 2020 Total 300,000 40,000 250,000 50,000 250,000 890,000 Total 300,000 40,000 250,000 50,000 250,000 890,000 2016 2017 2018 2019 2020 Total 300,000 40,000 250,000 50,000 250,000 89U,000 Total 300,000 40,000 250,000 50,000 250,000 890,000 Budget Impact/Other This project will decrease maintenance costs. Capital Improvement Program 2016 fhru 2020 City of Chanhassen, MN Project # SWMP-019 Project Name Street Improvement Projects -Storm Water Mgmt Department Surface Water Management Contact PaulOehme Type Improvement Useful Life Unassigned Category SWMP Account #1 720-7025-4751 Account #3 Priority n/a Account 42 Account 44 Description I Total Project Cost: $2,075,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 1,225,000 Construction Total Prior Funding Sources 1,225,000 Surface Water Utility Fund Total Total 300,000 75,000 200,000 75,000 200,000 850,000 2016 2017 2018 2019 2020 Total 300,000 75,000 200,000 75,000 200,000 850,000 Total 300,000 75,000 200,000 75,000 200,000 850,000 2016 2017 2018 2019 2020 Total 300,000 75,000 200,000 75,000 200,000 850,000 Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map Capital Improvement Program 2016 lhru 2020 City of Chanhassen, MN Project # W-024 Project Name Watermain Replacement Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Account #1 700-7025-4751 Account #3 Priority n/a Account #2 Account #4 Description I Total Project Cost: $5,120,000 Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. Justification I The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. Prior Expenditures 2016 2017 2018 2019 2020 Total 2,500,000 Construction 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Total 825,000 75,000 770,000 100,000 850,000 2,620,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 2,500,000 Water Utility Fund 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Total 825,000 75,000 770,000 100,000 850,000 2,620,000 Budget Impact/Other These projects will decrease maintenance costs. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: January 25, 2016 RESOLUTION NO: 2016 -XX MOTION BY: SECONDED BY: A RESOLUTION ORDERING IMPROVEMENTS & AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2016 STREET RECONSTRUCTION (MINNEWASHTA MANOR AREA) PROJECT NO. 16-01 WHEREAS, on December 14, 2015, the City Council received the feasibility report for the 2016 Street Reconstruction Project (Minnewashta Manor area) and called for the public hearing to be held on January 25, 2016 for the 2016 Street Reconstruction Project (Minnewashta Manor area), and AND WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the hearing was held thereon on the 25th day of January, 2016 which all persons desiring to be heard were given an opportunity to be heard thereon. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed in the Council resolution adopted January 25, 2016. 3. Authorizes preparation of plans and specifications for the 2016 Street Reconstruction (Minnewashta Manor area) Project No. 16-01. Passed and adopted by the Chanhassen City Council this 25th day of January, 2016. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT L CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on January 13, 2016, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for the 2016 Street and Utility Reconstruction Project No. 16-01 (Minnewashta Manor Area) to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this 13'' `' day of'; c;_ r _n.�ti , 2016. Notary Public Kare5A. Eng h rdt, D ty Clerk J#Notary JEAN M. S!; --"')(LING PUbiio,Minnesota y Commlwson Exptree Jen 31.2019 January 13, 2016 PUBLIC HEARING NOTICE Re: Notice of Public Hearing for the 2016 Street and Utility Reconstruction Project No. 16-01 (Minnewashta Manor area) Dear Property Owner: A Public Hearing has been scheduled for 7:00 p.m, or as soon thereafter as possible on Monday, January 25, 2016, in the City Council Chambers at Chanhassen City Hall during a regularly scheduled Council meeting. The hearing is your opportunity to voice your opinion directly to the City Council before they make their decision whether or not to authorize the preparation of plans and specifications. The assessment methodology or amounts are not determined at this City Council meeting; these issues will be addressed at the assessment hearing which is tentatively scheduled for April, 2016. The feasibility study discusses the proposal to reconstruct the following streets in the Minnewashta Manor area: Minnewashta Woods Drive, North Manor Road, Orchard Lane (from Sandpiper Trail to Minnewashta Woods Drive), Sandpiper Trail, Tanagers Lane, Washta Bay Road. The proposed project also includes replacing the water main within the streets, replacing the portion of the water services within the public right of way, miscellaneous sanitary sewer repairs and storm sewer improvements within the project area.. The sanitary sewer within the street was televised to evaluate the condition of the pipe. If you would like the Chanhassen Utility Department to televise your sewer service from your home to the sanitary sewer within the street, please contact me at afauskealci.chanhassen.mn.us or 952-227-1164. Please note that this would require access to the interior of your home; therefore a representative age 18 or older must be present to let City personnel into your home. If you would like to submit written comments, please email them to me at afauskenci.chanhassen.mn.us or send them to my attention at City Hall by 3:30 p.m. on Thursday, January 22, 2016. Comments received will then be distributed to Councilmembers. If you do not want your comments included in the public record, please indicate so in your correspondence. The estimated cost of the street improvement is $1,400,900. Consistent with the City's practice, the feasibility study proposes to assess a portion of the street reconstruction cost to the benefiting properties in the project area. The street assessment for your property is currently estimated to be $8,160.00. The water main, sanitary sewer and storm sewer costs will be paid by City utility funds. If the project moves forward and construction bids are received, the actual construction cost will be used to calculate the final assessment. If you have any questions or comments, please contact me at 952-227-1164 or afauske&i.chan hassen.mn.us. Sincerely, CITY OF CHANHASSEN Alyson Fauske, P.E. Assistant City Engineer gAeng\pub1ic\_2016 projects\16-01 street and utility reconstruction\communication\ph notice • feasibility 011316.doc ANNE L CHRISTIAN PAUL DIERKING 2971 WASHTA BAY RD 2951 WASHTA BAY RD EXCELSIOR, MN 55331-7823 EXCELSIOR, MN 55331-7823 CHANDA R LYONS JEROME E COVENY 2931 WASHTA BAY RD 2921 WASHTA BAY RD EXCELSIOR, MN 55331-7823 EXCELSIOR, MN 55331-7823 DONALD M NICHOLSON SHAWN D WISCHMEIER 2901 WASHTA BAY RD 2851 WASHTA BAY RD EXCELSIOR, MN 55331-7823 EXCELSIOR, MN 55331-7821 KRISTEN L ORTLIP ANN M FURY 2831 WASHTA BAY RD 2821 WASHTA BAY RD EXCELSIOR, MN 55331-7821 EXCELSIOR, MN 55331-7821 PATRICIA L PFEFFER VERNA JENSEN ETAL 2850 TANAGERS LN 4181 HILLCREST LN EXCELSIOR, MN 55331-7830 WAYZATA, MN 55391-3603 MICHAEL R FAEGRE JUNGGON SEC) 2800 SANDPIPER TRL 2750 SANDPIPER TRL EXCELSIOR, MN 55331-7811 EXCELSIOR, MN 55331-7810 RICHARD R TRADWELL KERI J FREIENMUTH 5515 TIMBER LN 2720 SANDPIPER TRL SHOREWOOD, MN 55331-1710 EXCELSIOR, MN 55331-7810 KATHERINE P OLSEN HEATHER E CAMPAIN 2821 TANAGERS LN 2837 TANAGERS LN EXCELSIOR, MN 55331-7819 EXCELSIOR, MN 55331-7819 CHRISTOPHER A & JULIA S HOLDEN DAVID E & COURTNEY L H OLSON 2851 TANAGERS LN 2820 TANAGERS LN EXCELSIOR, MN 55331-7819 EXCELSIOR, MN 55331.7818 STEPHEN M & LEE A MRAZEK LESLIE M MICHEL 1291 MULBERRY CT 2840 WASHTA BAY RD MARCO ISLAND, FL 34145 EXCELSIOR, MN 55331-7820 JOHN F & MARY C SCHUMACHER 2941 WASHTA BAY RD EXCELSIOR, MN 55331-7823 MICHAEL HUGH GILMORE 2911 WASHTO BAY RD EXCELSIOR, MN 55331-7823 BRUCE 1 & JEANNINE T HUBBARD 2841 WASHTA BAY RD EXCELSIOR, MN 55331-7821 PER & E LAURIE JACOBSON 2840 TANAGERS LN EXCELSIOR, MN 55331-7830 ERIK A HAYS 2810 SANDPIPER TRL EXCELSIOR, MN 55331-7811 MARK STAUBLY 2740 SANDPIPER TRL EXCELSIOR, MN 55331-7810 MARK & GARRY FRAZIER 2700 SANDPIPER TRL EXCELSIOR, MN 55331-7810 SIDNEY LOREN LEVIN 2841 TANAGERS LN EXCELSIOR, MN 55331-7819 JAMES P SENST 2820 WASHTA BAY RD EXCELSIOR, MN 55331-7820 WILLIAM HOOFNAGLE 2910 WASHTA BAY RD EXCELSIOR, MN 55331-7822 JOHN L FERM WILLIAM J & MARY JANE KILBY WILLIAM JOHN KILBY 2920 WASHTA BAY RD 2930 WASHTA BAY RD 2930 WASHTA BAY RD EXCELSIOR, MN 55331-7822 EXCELSIOR, MN 55331-7822 EXCELSIOR, MN 55331-7822 ETHAN MCCALLUM CHAD HERMAN DENNIS L HANSEN 2950 WASHTA BAY RD 2851 NORTH MANOR RD 2841 NORTH MANOR RD EXCELSIOR, MN 55331-7822 EXCELSIOR, MN 55331-7836 EXCELSIOR, MN 55331-7836 MICHAEL P CHAPMAN ERIC D & DAWN R RYNDERS NEWTON A & LINDA S BRISLEY 2831 NORTH MANOR DR 2821 NORTH MANOR RD 5317 COUNTY ROAD 6 SW EXCELSIOR, MN 55331-7836 EXCELSIOR, MN 55331-7836 HOWARD LAKE, MN 55349-5005 STEWART R & MARILYN J PETERSON DEAN R & JUDITH M BERSIE ROBERT A & JENNIFER BUSHWAY 2810 TANAGERS LN 2800 TANAGERS LN 2721 SANDPIPER TRL EXCELSIOR, MN 55331-7818 EXCELSIOR, MN 55331-7818 EXCELSIOR, MN 55331-7812 CHRISTOPHER 1 ERICKSON STEPHEN T & MARY A HUGHES JAMES F & MARY ELLEN JESSUP 2731 SANDPIPER TRL 2741 SANDPIPER TRL 6350 MINNEWASHTA WOODS DR EXCELSIOR, MN 55331-7812 EXCELSIOR, MN 55331-7812 EXCELSIOR, MN 55331-8898 WILLIAM & PATRICIA WISNIEWSKI JEREMY & BETH CONE MICHAEL P RENNINGER 6340 MINNEWASHTA WOODS DR 6320 MINNEWASHTA WOODS DR 6310 MINNEWASHTA WOODS DR EXCELSIOR, MN 55331-8898 EXCELSIOR, MN 55331-8898 EXCELSIOR, MN 55331-8898 JEFFREY L KAMRATH KATHRYN F KLADEK CYNTHIA PALMA KELLY 2731 ORCHARD LN 6321 MINNEWASHTA WOODS DR 6331 MINNEWASHTA WOODS DR EXCELSIOR, MN 55331-7842 EXCELSIOR, MN 55331-8897 EXCELSIOR, MN 55331-8897 JAMIE A KIEFER DOMINIKA CHARTIER MANUEL 11ORDAN 800 N. ARM DR 6345 MINNEWASHTA WOODS DR 6347 MINNEWASHTA WOODS DR ORONO, MN 55364-8215 EXCELSIOR, MN 55331-8897 EXCELSIOR, MN 55331-8897 MICHAEL SCHLAERTH PAUL R & CAROLINDA PRENEVOST ROBERT L ALFORD 1649 GULL LN 6351 MINNEWASHTA WOODS 6355 MINNEWASHTA WOODS DR MOUND, MN 55364-1229 EXCELSIOR, MN 55331-8897 EXCELSIOR, MN 55331-8897 JOHN T & BARBARA N NEVIN DAVID C & STACY L BRAY 6361 MINNEWASHTA WOODS DR 2751 SANDPIPER TRL EXCELSIOR, MN 55331-8897 EXCELSIOR, MN 55331-7843