Loading...
A-2. 2016 Street Projects Update0 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Website www.ci.chanhassen.mn.us A - �' MEMORANDUM TO: FROM: DATE: SUBJECT: Paul Oehme, Director of Public Works /City Engineer '—\7,. , Alyson Fauske, Assistant City Engineer January 25, 2016 rV 42I ' Update on 2016 Street Improvement Projects DISCUSSION Annually, the City considers making improvements to streets that can no longer be maintained cost effectively with sealcoating or patching. There are four project areas identified for improvements in 2016, as shown on the graphic below: Minnewash`ta Manor Area AW*7 r 4 Trolls Glen Area r► 0 5 Fox Chase Arei Park Road and Park Place Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme January 25, 2016 2016 Street Improvement Projects Page 2 Below is a summary of the proposed work within each area: Minnewashta Manor Fox Chase and Trolls -Glen Park Road/Place Reconstruction Resurfacing Resurfacing Streets PCI range: 22 to 26 and PCI range: 9 to 42 11 to 73, respectively PCI range: 47 to 51 Eliminate one storm Storm sewer discharge to Lake Replace culvert Sewer Minnewashta. Replace Minor repairs as needed. under east side of storm sewer along North Park Road. Manor Road. In November, open houses were held for the Minnewashta Manor, Fox Chase and Trolls -Glen neighborhoods. An open house for the Park Road /Place project will be held in February. The City of Victoria plans to have their portion of West 77th Street in the Trolls -Glen neighborhood resurfaced with this project. Staff from both Cities recommend that Chanhassen take the lead on this project to ensure competitive pricing and to provide a unified project for the residents of both cities. The City of Victoria will remunerate the City of Chanhassen for their portion of the project costs. The necessary documentation will be presented to the City Council for approval at a future date. The projects are expected to be bid and awarded this spring. Work in Minnewashta Manor will begin in June with substantial completion in August or early September, depending on weather. Resurfacing in the Trolls -Glen and Fox Chase areas will occur between June and late August; the contract documents will limit the amount of time between milling up the existing pavement and installing the new pavement. The work within Park Road /Place could take place between July gAeng \pub1ic \_2016 projects\20160125 cc worksession 2016 street projects update.docx Replace damaged curb and Curb Proposed to add curb and gutter in each area. Install Replace damaged and gutter throughout the new curb and gutter along the curb and gutter. Gutter project area south end of Lone Cedar Lane. Replace lateral main, Water services up to the Minor repairs as needed. Minor repairs as Main property line and curb needed. stops. Sanitary About 50' of pipe to replaced. Minor repairs Minor repairs as needed. Minor repairs as Sewer needed. as needed. Eliminate one storm Storm sewer discharge to Lake Replace culvert Sewer Minnewashta. Replace Minor repairs as needed. under east side of storm sewer along North Park Road. Manor Road. In November, open houses were held for the Minnewashta Manor, Fox Chase and Trolls -Glen neighborhoods. An open house for the Park Road /Place project will be held in February. The City of Victoria plans to have their portion of West 77th Street in the Trolls -Glen neighborhood resurfaced with this project. Staff from both Cities recommend that Chanhassen take the lead on this project to ensure competitive pricing and to provide a unified project for the residents of both cities. The City of Victoria will remunerate the City of Chanhassen for their portion of the project costs. The necessary documentation will be presented to the City Council for approval at a future date. The projects are expected to be bid and awarded this spring. Work in Minnewashta Manor will begin in June with substantial completion in August or early September, depending on weather. Resurfacing in the Trolls -Glen and Fox Chase areas will occur between June and late August; the contract documents will limit the amount of time between milling up the existing pavement and installing the new pavement. The work within Park Road /Place could take place between July gAeng \pub1ic \_2016 projects\20160125 cc worksession 2016 street projects update.docx Paul Oehme January 25, 2016 2016 Street Improvement Projects Page 3 and October with the contract documents stipulating the number of working days that the contractor will have to complete the project. The Park Road improvements are dependent upon securing funding through the State Bridge Fund and advancement of State Aid funds. Project funding is proposed as follows: Attachment: CIP Pages gAeng \pub1ic\_2016 projects\20160125 cc worksession 2016 street projects update.doex $1,400,900 (Minnewashta Manor) Assessments /Revolving $100,000 (Park Place) Assessment Fund $700,000 (Fox Chase, Trolls -Glen) Municipal State Aid (MSA) Funds $900,000 (Park Road street and storm sewer costs) State Aid Bridge Bond Funds $150,000 (Park Road) Stormwater Management Fund $363,100 (Minnewashta Manor) $25,000 (Fox Chase, Trolls -Glen) Water Utility Fund $836,900 (Minnewashta Manor $25,000 (Fox Chase, Trolls -Glen, Park Road /Place) Sanitary Sewer Fund $237,400 (Minnewashta Manor) $50,000 (Fox Chase, Trolls -Glen, Park Road /Place) Attachment: CIP Pages gAeng \pub1ic\_2016 projects\20160125 cc worksession 2016 street projects update.doex Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # ST -012 Project Name Annual Street Improvement Program Account #1 601- xxxx4751 Account #3 Account #2 Account #4 Description Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost: $25,569,500 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane, Minnewashta Woods Drive, Fox Path area, Lone Cedar area, Ches Mar Drive and Stoughton Ave MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point MSA - Minnewashta Parkway overlay 2020 - Chan View area Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a sing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in absence of a trail. This trail segment is vlanned to be constructed alone with the 2017 MSA street reconstruction. Prior Expenditures 2016 2017 2018 2019 2020 Total F-1-2,-94-5-,-00-0-1 Construction 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Total Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 12,945,000 Assessment/Revolving 2,260,000 922,400 1,687,300 1,754,800 2,500,000 9,124,500 Assess Fund Total MSA 1,100,000 1,400,000 900,000 3,400,000 Other Agency Contribution 100,000 100,000 Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Budget Impact/Mer This project may decrease maintenance costs. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # SS -014 Project Name Sanitary Sewer Replacement Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Account #1 701 - 70254751 Account 0 Priority n/a Account 42 Account 44 Description Total Project Cost: $1,890,000 teplacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Prior Expenditures 1,000,000 Construction Total Prior Funding Sources 1,000,000 Sewer Utility Fund Total 2016 2017 2018 2019 2020 Total 300,000 40,000 250,000 50,000 250,000 890,000 Total 300,000 40,000 250,000 50,000 250,000 890,000 2016 2017 2018 2019 2020 Total 300,000 40,000 250,000 50,000 250,000 890,000 Total 300,000 40,000 250,000 50,000 250,000 890,000 Budget Impact/Other this project will decrease maintenance costs. Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # SWMP -019 Project Name Street Improvement Projects -Storm Water Mgmt Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Account #1 720 - 70254751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $2,075,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2016 2017 2018 2019 2020 Total 1,225,000 Construction 300,000 75,000 200,000 75,000 200,000 850,000 Total Prior Total Funding Sources 300,000 2016 75,000 2017 200,000 2018 75,000 2019 200,000 2020 850,000 Total 1,225,000 Surface Water Utility Fund 300,000 75,000 200,000 75,000 200,000 850,000 Total Total 300,000 75,000 200,000 75,000 200,000 850,000 Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map Capital Improvement Program 2016 rhru 2020 City of Chanhassen, MN Project # W -024 Project Name Watermain Replacement Account #1 700 - 7025 -4751 Account #2 Account #3 Account #4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a iption I Total Project Cost: $5,120,000 ;ment of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution for street rehabilitation projects. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. Prior Expenditures 2016 2017 2018 2019 2020 Total 7-2,5-55—,5551 construction 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Prior Funding Sources Total 825,000 2016 75,000 2017 770,000 2018 100,000 2019 850,000 2020 2,620,000 Total 2,500,000 Water Utility Fund 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Budget Impact/Other Total 825,000 75,000 770,000 100,000 850,000 2,620,000 These projects will decrease maintenance costs.