D-5. Approve Consultant Contract for Market Blvd Traffic Study7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone,- 952,227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952,227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952,227.1120
Fax: 952.227,1110
Recreation Center
2310 Coulter Boulevard
Phone: 952,227.1400
Fax: 952,227.1404
Planning &
Natural Resources
Phone: 952,227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952,227.1300
Fax: 952.2271310
Senior Center
Phone: 952,2271125
Fax: 952,227.1110
Website
MEMORANDUM
TO: Todd Gerhardt, City Manager 0
FROM: Paul Oelime, Director of Public Works/City Engineer
DATE
SUBJ
February 8, 2016
Approve Consultant Contract for Traffic Study Along Market Boulevard
Between TH 5 and W. 781h Street — PW236D
"Approve Consultant Contract with Kimley-Horn and Associates for Traffic Study along Market
Boulevard between TH 5 and W. 78th Street in the amount of $25,900, City Project PW236D
City Council approval requires a simple majority vote of the City Council present.
aMnow
The City has seen some traffic growth in the downtown over the last several years especially on
Market Boulevard. Some properties in the downtown may redevelop in the near future adding
additional traffic to the already congested roadway system. Staff is recommending a traffic study
be completed at this time and potential improvements be identified to plan for the future growth.
Also, the pavement condition on Market Street should be rehabilitated in a few years based on the
current pavement index. Potential traffic capacity improvements should be completed at the same
time. A traffic study to look at current and future needs in the downtown is one of the City
Council's 2016 Key Financial Goals. In order to complete this traffic study, the City will need
help from a consultant firm.
The scope of the traffic study includes:
1. Traffic volume and turning movement counts at each intersection along Market
Boulevard.
2. Complete current day traffic capacity analysis.
3. Review intersection access management.
4. Review potential redevelopment traffic impacts.
5. Complete future traffic volume forecasts.
6. Review historical crash records.
7. Estimated future turning movements at each intersection.
8. Identify potential improvements needed to accommodate potential future traffic needs.
9. Engineer's opinion on costs for potential improvements,
10. A report drafted and presented to the City Council for consideration.
Kimley-Horn and Associates has worked on traffic studies for the City in the past. Their work
has been acceptable. As with all engineering contracts, the consultant must submit periodic
invoices that staff will review before processing. The consultant will be required to submit
timesheets verifying the hours worked on the project and expense sheets. Staff will review the
invoices and expense sheets for accuracy and conformance to the contract.
Funding for the project would be from the Pavement Management Fund.
Attachments: Resolution
CIP# ST -018
ch lassMis 9 9,n -ife Tmflin oda and PI nning for Torn'?d row
ryintX for I Nrd
g:\Cf1-\PLib1ic\p,A11V6d market OLI evar ini rovements 0 6' -g ap v consultant contract. oc
CITY OF CHANHASSEN
• r , 1,
DATE:
C"r
MOTION: SECONDED
A RESOLUTION APPROVING CONTRACT
AND ASSOCIATES FOR PREPARATION OF A TRAFFIC STUDY ALONG MARKET
BOULEVARD BETWEEN TH 5 AND W. 78TH STREET
PW236D
BE IT RESOLVED that the City of Chanhassen enter into a consultant contract with
Kimley-Horn and Associates for professional services for the following scope of work:
The consultant work in generally includes: Preparing a traffic study along Market
Boulevard between TH 5 and W. 781h Street.
NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
Enter into a consultant contract with Kimley-Horn and Associates to provide the general
services necessary for preparing a traffic study along Market Boulevard between TH 5 and
W. 78th Street.
Passed and adopted by the Chanhassen City Council this 81h day of February, 2016.
ATTEST:
Todd Gerhardt, City Manager Denny Laufenburger, Mayor
YES NO ABSENT
Capital fine rovemomt Pro gr,9,1n 2016 thru 2020
Department Street Improvements
City of Chanhassen, Contact Paul Ochme
....... . ..
Projed # s,r-ol8 Type Maintenance
Prqkject Name Favement Management Useful Life 7-10years
...' ...... . .......... . .... Category Streets/Highways
Account #1 420-00004751 Account. #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $3,760,000
. ...... .. ........ -
U1 WIT) WHU 6ULLCY tum SIU W K'O
c "' at repffil�rs ffor
litystreets. Also included in this Project are trails and City parking lot rehabilitations, Seal -coat projects will be determined annually based on
he pavement condition index as generated by the pavement management program. The street department uses this funding source to pay for
)ituminous material for annual street patching,
will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures,
Prior
Expenditures
2016
2017
2018
2019
2020
Total
EE1=35,000
Maintenance
485,000
285,000
285,000
285,000
285,000
1,625,000
Totai
Total
485M
285,000
M1000
285,000
MAN
1,624000
Prior
Funding Sources
2016
2017
2018
2019
2020
Total
=.135000
Street Pavement Management
100,000
100,00
100,000
100,000
100,000
500,ODO
Total
Tax Levy
385,000
185,000
185,000
185,000
185,000
1,125,000
Total
485M
M1000
285,000
285,000
285MO
1,625iM
RE