Loading...
D-5. 2016 Street Improvements Project 16-017700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 MEMORANDUM 0 TO: Paul Oehme, Director of Public Works/City Engineer FROM: Alyson Fauske, Assistant City Engineer o DATE: February 22, 2016 SUBJ: 2016 Street and Utility Improvements Project No. 16-01: Approve Plans & Specifications; Authorize Advertisement of Bids PROPOSED MOTION: "The City Council adopts a resolution approving the plans and specifications and authorizing ad for bids for the 2016 Street and Utility Improvement Project (Minnewashta Manor Area)." City Council approval requires a super majority vote of the City Council present. BACKGROUND Park & Recreation At the June 22, 2015 work session, staff reviewed with Council the proposed Phone: 952.227.1120 Fax: 952.227.1110 2016 Street Reconstruction project. Recreation Center On August 24, 2015, the City Council authorized preparation of the feasibility 2310 Coulter Boulevard study. Phone: 952.227.1400 Fax: 952.227.1404 On November 18, 2015, an open house was held to discuss the proposed project. Planning & Natural Resources On December 14, 2015, the City Council accepted the feasibility study and called Phone: 952.227.1130 the public hearing. Fax: 952.227.1110 At the January 25, 2016 meeting, the City Council held the public hearing and Public Works authorized the preparation of plans and specifications. 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 DISCUSSION Every year the City considers streets that are in poor condition to be rehabilitated Senior Center or reconstructed. For the 2016 Street Reconstruction Project, staff is proposing to Phone: 952.227.1125 Fax: 952.227.1110 reconstruct approximately 1.1 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, Website site investigations and utility problems in the area. www.ci.chanhassen.mn.us The proposed project is in the Minnewashta Manor neighborhood in the northwest corner of the city. The streets in this project area were constructed in 1971 and g:\eng\public\_2016 projects\16-01 street and utility reconstruction\communication\20160222 approve p&s authorize ad for bid.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2016 Street Reconstruction Project February 22, 2016 Page 2 were sealcoated in 1994 and 1999. The pavement condition indices (PCIs) are shown on the graphic below. A PCI of 100 represents a new street. Streets with a PCI below 45 typically indicates distresses that require a full reconstruction, therefore, it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. The street widths vary between 20' and 28' within 50' or 60' wide right of way. The drivable portion of the streets (i.e. the bituminous surface and the concrete gutter) is proposed to be the same as the existing widths. The proposed pavement section includes 18" of sand, 10" of Class 5 and 3.5" of bituminous as recommended by the soils engineer. It has been the City's practice to install concrete curb and gutter in reconstruction projects whenever possible. New developments always include concrete curb and gutter. Concrete curb and gutter effectively conveys drainage from the bituminous section of the street which helps to prolong the life of the street. It also provides a delineation between the street and yard which helps snow and ice control operations minimize yard damage. The addition of curb and gutter also directs run off to storm water features so the water can be treated and not end up in side or back yards where it can gAeng\public\_2016 projects\16-01 street and utility reconstruction\communication\20160222 approve p&s authorize ad for bid.doc Paul Oehme 2016 Street Reconstruction Project February 22, 2016 Page 3 cause problems. Staff recommends high back, B-618 curb in this area due to the hydraulics of the style. The addition of curb to the project increases the estimated assessment amount by $680. Water Main Improvements The water main in this area is either cast or ductile iron pipe. Locations of 10 documented water main breaks are shown on the graphic below. Staff proposes to replace the water main with PVC water main. All services would also be replaced. Alternatives to open cut installation, such as pipe bursting and directional drilling, will be bid as a potential time and cost-saving measure. w046� staff, `� ate,. i IC ` ° j 's + � as'f� "v ! ► r and la/W OP d j, �i' • ' ... j i i R �� • 11 � � ,fit°'?{ . '�,. . -� �r ' r � ,-,` r ���, e` ^''fir,•`: • �sh:a w,ro Sanitary Sewer Improvements Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 50 feet of sewer is proposed to be replaced due to the condition of the pipe. The remaining sewer pipe is in good structural condition, although some require mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. A 10" diameter sanitary sewer force main extends from Lift Station #4 and under the north -south section of Washta Bay Road. The Utility Department potholed the ductile iron force main and g:\eng\public\_2016 projects\16-01 street and utility reconstruction\communication\20160222 approve p&s authorize ad for bid.doc Paul Oehme 2016 Street Reconstruction Project February 22, 2016 Page 4 confirmed that the pipe is in good condition. An anode bag will be added to act as a sacrificial material to prolong the life of the force main. Storm Sewer Improvements The existing corrugated metal pipe within the Washta Bay Road and Sandpiper Trail right of way is in poor condition and is proposed to be abandoned and filled with sand. Reinforced concrete pipe is proposed to be installed within these streets. The corrugated steel pipe that serves TH 7 and is along Washta Bay Road is in poor condition and should be replaced. The project area is fully developed, therefore, there is minimal space to provide traditional stormwater management, namely treatment ponds. Staff recommends that the project include two rain gardens along Washta Bay Road, SAFL baffles and improvements within the vacant right of way from the Tanagers Lane/Sandpiper Trail intersection to Lake Minnewashta. Restoration of the wetland south of Sandpiper Trail is proposed to be completed in-house next year due to budget and time constraints resulting from permitting requirements. g:\eng\public\_2016 projects\16-01 street and utility reconstiuction\communication\20160222 approve p&s authorize ad for bid.doc Paul Oehme 2016 Street Reconstruction Project February 22, 2016 Page 5 .mow i• � � ��"�Y t' � '��^ �'���f}.�� iT� N~! - or4-110900V ve 44•�ie��, 1 .'si IL �T PROJECT FUNDING Assessments will be based on the City's assessment practice of assessing 40% of the street improvement cost to the benefitting properties on a per lot basis. The assessments would be proposed for a 10 -year term at a preliminary interest rate of 5.25%. Budgets for the proposed work have been included in the 2016 CIP. A summary of the feasibility estimate and CIP budget is below: Funding Source Feasibility Estimate Budget Revolving Assessment Fund $1,400,900 $1,560,000 Storm water Utility Fund $363,100 $300,000 Sanitary Sewer Utility Fund $237,400 $300,000 Water Utility Fund $836,900 $825,000 Total $2,838,300 $2,985,000 The estimated costs include 10% contingency and 11 % indirect costs. g:\eng\public\ 2016 projects\16-01 street and utility reconstruction\communication\20160222 approve p&s authorize ad for bid.doc Paul Oehme 2016 Street Reconstruction Project February 22, 2016 Page 6 A portion of the storm sewer within Washta Bay Road conveys drainage from State Highway 7. Based on conversations with staff it seems unlikely that MnDOT will contribute funding for a portion of the storm sewer replacement cost. Estimated Assessments: Total estimated street costs: $1,400,900 Total estimated assessable street costs: $1,203,600* 40% assessed: 40% of $1,203,600 = $481,440 59 assessable units $481,440 _ 59 units = $8,160/unit** *Staff proposes that the City fund more than 60% of the cost of North Manor Road and Orchard Lane due to the low number of properties adjacent to these streets. * *The estimated assessment was rounded up to the nearest $10 increment. The final assessment will be based on the bid price and will be to the nearest $0.01. The estimated assessment lies within the benefit range identified of past consultation reports. SCHEDULE The proposed project schedule is as follows: Call Assessment Hearing March 21, 2016 Assessment Hearing; Accept Bids and Award Contract April 25, 2016 Start Construction June, 2016 Construction Substantially Complete August, 2016 Attachments: 1. CIP pages 2. Resolution g:\eng\public\_2016 projects\16-01 street and utility reconstruction\communication\20160222 approve p&s authorize ad for bid.doc Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # ST -012 Project Name Annual Street Improvement Program Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Account #I 601-xxxx-4751 Account 43 Priority n/a Account #2 Account #4 Description Total Project Cost: $25,569,500 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane, Minnewashta Woods Drive, Fox Path area, Lone Cedar area, Ches Mar Drive and Stoughton Ave MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw, and Kurvers Point MSA - Minnewashta Parkway overlay 2020 - Chan View area I Justification I The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. The Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a missing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a trail. This trail segment is planned to be constructed along with the 2017 MSA street reconstruction. Prior 12,945,000 Total Prior 12,945,000 Total Expenditures 2016 2017 2018 2019 2020 Total Construction Funding Sources 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 2016 2017 2018 2019 2020 Total Assessment/Revolving 2,260,000 922,400 1,687,300 1,754,800 2,500,000 9,124,500 Assess Fund MSA 1,100,000 1,400,000 900,000 3,400,000 Other Agency Contribution 100,000 100,000 Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Budget Impact/Other This project may decrease maintenance costs. Capital Improvement Program 2016 thru 2020 Department Sanitary Sewer Improvements City of Chanhassen, MN Contact Paul Oehme Project # SS -014 Type Improvement Project NameUseful Life Unassigned Sanitary Sewer Replacement Category Utilities Account #1 701-7025-4751 Account 93 Priority n/a Account #2 Account #4 Description -� Total Project Cost: $1,890,000 teplacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Prior Expenditures 2016 2017 2018 2019 2020 Total 1,000,000 Construction 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 890,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,000,000 Sewer Utility Fund 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 890,000 Budget Impact/other This project will decrease maintenance costs. Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # SWMP-019 Project Name Street Improvement Projects - Storm Water Mgmt Account #1 720-7025-4751 Account #2 Account #3 Account #4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Description I Total Project Cost: $2,075,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2016 2017 2018 2019 2020 Total 1 722-5,-00-01 construction 300,000 75,000 200,000 75,000 200,000 850,000 Total Total 300,000 75,000 200,000 75,000 200,000 850,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,225,000 Surface Water Utility Fund 300,000 75,000 200,000 75,000 200,000 850,000 Total Total 300,000 75,000 200,000 75,000 200,000 850,000 Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map Capital Improvement Program 2016 thru 2020 City of Chanhassen, MN Project # W-024 Project Name Watermain Replacement Account#1 700-7025-4751 Account #2 Account #3 Account #4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Description Total Project Cost: $5,120,000 Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. Prior 2,500,000 Total Expenditures 2016 2017 2018 2019 2020 Total Construction 825,000 75,000 770,000 100,000 850,000 2,620,000 Total 825,000 75,000 770,000 100,000 850,000 2,620,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 2,500,000 Water Utility Fund 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Total 825,000 75,000 770,000 100,000 850,000 2,620,000 Budget Impact/Other [hese projects will decrease maintenance costs. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: February 22, 2015 RESOLUTION NO: 2016 -XX MOTION BY: SECONDED BY: A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING AD FOR BIDS FOR THE 2016 STREET RECONSTRUCTION (MINNEWASHTA MANOR AREA) PROJECT NO. 16-01 WHEREAS, pursuant to the resolution passed by the Council on January 25, 2016, the City Engineer has prepared plans and specifications for the 2016 Street Reconstruction (Minnewashta Manor area) Project and has presented such plans and specifications to the Council for approval; NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council: 1. Such plans and specifications, a copy of which can be reviewed at the office of the City Engineer, are hereby approved. 2. The city clerk shall prepare and cause to be inserted in the official city newspaper and QuestCDN.com, an advertisement for bids upon the making of such improvement under such approved plans and specifications. The ad shall be published at least three times, shall specify the work to be done, shall state that bids will be opened and that the responsibility of the bidders will be considered by the Council at 7:00 PM on Monday, April 25, 2016, for the 2016 Street Reconstruction (Minnewashta Manor area) Project No. 16-01, in the Council Chambers of the City Hall. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless sealed and filed with the clerk and accompanied by a bid security payable to the clerk for 5% of the amount of such bid. Passed and adopted by the Chanhassen City Council this 22" day of February, 2016. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT