Loading...
D-5. 2016 Sanitary Sewer Televising (I/I) Project No. 16-02: Approve Quote0 CITY OF CgANAASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 rs MEMORANDUM TO: Paul Oehme, Director of Public Works/City Engine, - FROM: Stephanie Smith, Project Engineer k_C-5�1 - DATE: June 13, 2016 SUBJ: 2016 Sanitary Sewer Televising (I/I) Project No. 16-02: Approve Quote PROPOSED MOTION "The City Council approves a quote for the 2016 Sanitary Sewer Re -Televising (I/I) Project No. 16-02 to Pipe Services Corporation in the amount of $39,640.11." City Council approval requires a simple majority vote of the City Council present. DISCUSSION The Metropolitan Council is currently monitoring the flow of sanitary sewer from each city to determine the amount of Inflow and Infiltration (UI) to the Met Council's treatment plant. If the city exceeds the allowance set by the Met Council, the city will be surcharged a fee based on the amount of flow above the allowed amount. This project will help reduce 1/1 from entering the sanitary sewer system. The 2016 Sanitary Sewer Televising (I/I) project will assist city staff in locating inflows and other contributors to UI in the city's sanitary sewer system. Sanitary sewer televising consists of cleaning out the sanitary sewer and recording video of the lengths of pipe in the project area. The contractor will report the deficiencies observed during the video examination of the pipes. Planning & On April 27, 2015, City Council approved initial televising for sanitary sewer areas Natural Resources Phone: 952.227.1130 for the 2016 I/I Project. Televising data collected at that time showed that the Fax: 952.227.1110 concrete pipe along Audubon Road was in better condition than anticipated. Staff does not recommend I/I maintenance in that area at this time. Public Works 7901 Park Place Staff recommends televising the area that is serviced by Lift Station No 2. This lift Phone: 952.227.1300 station shows an increase in pumping during rain events that signals an I/I problem. Fax: 952.227.1310 The information obtained from the 2016 Sanitary Sewer Re -televising (I/I) will be used to plan what sanitary sewer repairs will be included as part of the 2016 UI Senior Center Phone: 952.227.1125 Project. It also includes televising for the 2017 Street Improvement Projects in the Fax: 952.227.1110 Lake Susan and Saddlebrook neighborhoods. Website Bidder Base Bid www.ci.chanhassen.mn.us Pipe Services Corporation* $39,640.11 Hydro Klean $56,132.66 *Notes recommended items to be awarded. g:\eng\publltc_�e s'�1t5- c�jel<\Ctfmmibi{��tf� T8l1�YLYWrbVPffi4eTANYLte.dc The City of Chanhassen put out a request for quotes from three contractors on May 6, 2016. Two quotes were received. The low quote for this project was from Pipe Services Corporation. This contractor has completed work in Chanhassen in the past and their work was acceptable. The Lift Station No. 2 pipe televising was budgeted for in the CIP and will be paid for under Project #SS -012. The amount budgeted for 2016 is $200,000. The Lake Susan and Saddlebrook pipe televising will be paid for under the enterprise fund for sanitary sewer. All work associated with this project is eligible for offsetting the MCES surcharge. ATTACHMENTS 1. Resolution. 2. Quotes. 3. 2016 Sanitary Sewer Televising (I/I) Project Location Maps. 4. CIP Page 81. c: Kevin Crooks, Utility Superintendent Kerry Blaisdell, Pipe Services Corporation g:\eng\public\_2016 projects\16-02 i&i project\communication\160613_approve re -televising quote.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: June 13, 2016 . RESOLUTION NO: 2016 -XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING QUOTES AND AWARDING CONTRACT FOR ADDITIONAL 2016 SANITARY SEWER TELEVISING PROJECT NO. 16-02 WHEREAS, pursuant to a request for quotes for additional 2016 Sanitary Sewer Televising (1/1), two quotes were received and opened. The quotes are as follows: Bidder Total Bid 1. Pipe Services Corporation $39,640.11 2. Hydro Klean $56,132.66 AND WHEREAS, Pipe Services Corporation had the lowest responsible quote with a total quote amount of $39,640.11. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Pipe Services Corporation in the name of the City of Chanhassen for additional 2016 Sanitary Sewer Televising (1/1), Project No. 16-02, according to the plans and specifications therefore approved by the City Council and on file in the office of the city clerk. 2. The city clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Passed and adopted by the Chanhassen City Council this 13t1i day of June, 2016. ATTEST: Todd Gerhardt, City Manager YES g:\admin\resol\20161san sewer televising 061316.doc Denny Laufenburger, Mayor NO ABSENT 2016 Sanitary Sewer I&I Retelevising Quotes Bidder #2: Hydro Klean $56,132.66 142% G:\ENG\PUBLIC\_2016 PROJECTS\16-02 I&I Project\Contract Administration\Televising Bid Tab_2.xls Engineer's Bidder #1: Estimate Pipe Services LUMP SUM TOTAL $42,447.66 $39,640.11 PERCENTAGE OF LOW BID 107% 100% Bidder #2: Hydro Klean $56,132.66 142% G:\ENG\PUBLIC\_2016 PROJECTS\16-02 I&I Project\Contract Administration\Televising Bid Tab_2.xls Lake Susan Development co 01 M M r Cl) N N M M MQ n At/ N N }. Oa �GJV r O M M M. r M i V N N J T 92L �� £ Cl) '' Y co r A( 1pe C4 P a A r r p C4 < M M N M N N O O� T N Al N N Q Q ! -<-f O �leJj r n N ry� 00! ^O^ W) r T et r OD . Op IOC � � ►�, w o —�—, i,��i; suieid ,le t8 t Huron Q y�ot a� 8���r ser 9e e` 968[ ! '2 " N 9v0 4 n N to co Q ^ f0(jU015 V8 N N�9 n ? �C, N C N 0 Q oco N wp 4 �19 UN �p iN 4 N` t0 OQ N 4 co T 0 N M N T f q N O A N r M - �Q N N ry�A rc O N �A et Cl) S_ \\ J N y In18 4 �agaa� T� �t c T co 98p'�6 0 •~- ti T "t ~ 0 r t- o T ti J Jklm . ?v ramr-, L&O 1=9 U'` T Capital Improvement Program City of Chanhassen, MN Project # SS -012 Project Name Inflow and Infiltration Abatement Account N1 701-70xx-4751 Account #2 Account#3 Account #4 2016 thru 2020 Expenditures Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Description I Total Project Cost: S1,900,000 This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration Report and aspects of the program are included in the annual street project. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. Justification City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Prier Expenditures 2016 2017 2018 2019 2020 Total 900,000 Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000 Total Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 900,000 Sewer Utility Fund 200,000 200,000 200,000 200,000 200,000 1,000,000 Total Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Budget Impact/Other I The efforts may decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund for those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems. 81