1b Award Bid for Coulter Boulevard East of Century Boulevard Proj 97-IB-2 CITY OF CHANHASSEN 10 City Center Drive, PO Box 147 Chanhassm, Minnesota 55317 Phone 612.937.1900 Gmeral Fax 612.937.5739 ~nginetring Fax 612.937.9152 lublic Saftty Fax 612.934.2524 ~b www.ci.chanhassm.mn.us ib - MEMORANDUM TO: Don Ashworth, City Manager Anita Benson, City Engineer ~ July 8, 1998 FROM: DATE: SUBJ: Approve A ward of Bid for Coulter Boulevard (east of Century Boulevard) Project No. 97-1B-2 On Tuesday, July 7, 1998, bids were received and opened for Coulter Boulevard (east of Century Boulevard) Project No. 97-IB-2. A total of six bids were received ranging from a low of $618,044 to -$691,972.20 which is a bid spread of approximately 10%. The low bid which was received from S.M. Hentges & Sons, Inc. is approximately 9% less than the engineer's estimate of $682,200. All of the permits needed for the project have been obtained. The MnDOT State Aid Office has reviewed and approved the plans. Municipal state aid street funds will be used to pay for the cost to construct ~e road and related appurtenances. However, as part of MnOOTs review, worle elements were identified which are not eligible for municipal state aid funding as follows: 1. Street Lighting - Street lighting is typically considered a road project element and an eligible expense for municipal state aid street funds. However, the proposed location of the lighting (behind the trail and at a substantial distance from the actual roadway) makes it ineligible for MSA funding. Based on the low bid, this amounts to approximately $29,000. This would be funded by the City or the other alternative would be to move the street lighting to the standard location behind the curb and then MSA funding would pay for the entire cost of the lighting. 2. Storm Sewer - State aid funds will participate in 100% of the storm drainage improvements which serve the road facility. However, with this project there are some additional storm sewer piping and increased sizing which accommodate the drainage ofiproperties outside of the roadway for which MSA funds do not participate in. The total non-MSA participating storm sewer cost is approximately $46,000. Approximately 50% of this amount is proposed to be assessed to the Arboretum Business Park as a direct benefit specifically serving the business park property. The remainder of this cost would be paid for out of the surface water management fund. 3. Wetland Benning & Spillway - During the project design and public involvement process, discussions arose regarding methods which could be used to enhance existing wetland features in the area. The project plans Ie City of Chanhassen. A growing community with clean lakes, quality schools, a channing downtown, thriving businesses, and beautiful parks. A great place to live, work, and play. Don Ashworth July 8, 1998 Page 2 have incorporated the requested wetland enhancement elements; specifically, the wetland benning and spillway in the creek channel. This will raise the water level in the wetland area north of the road thus improving its ftature$ and allowing the City the opportunity to bank additional wetland credits. The cost for this improvement based on the low bid is $40,000 which is not eligible forMSA funding. However, this type of improvement is often conducted through the Surface Water Management Program. Therefore, this improvement would be paid for with.SWMP funding. 4. Landsc.inl-Based on the lowbidm:eived, the landscaping amounts to approximately $6S,OOO~MSAru1es limit landscaping funding eligibility to that typically associated with ,the roadway. For this project approximately $28,000 of the landscaping cost will be funded by state aid. These plans have incorporated an extensive amount of landscapiug and tree plantings around the two pondiq basins,creek"crossing, and median island located atthewes~ e~ oftheprojec~ a8:weUas wetland:restoration. The cost for landscaping in these areas is not eligible for state. aid participation. This amounts to a local cos.tparticipation responsibility of approximately $37,000. Approximately 20% of this local share will be paid from Surface . Water Management Funds for the weliand resto~ti.on and landscaping. The remaining amount of-wroJtitnately $31,000 would have to be funded through other local means such as General Fund or: TIP. It is recommended that Coulter Bou1evlll'd (east of CenturY Boulevard) Project No. 97-1B-2.beawardedto S;M. Hentges, !nc.in'me'8IJ)Ouut of $618,044 with the funding for non-participating state ~aid items as s~ .,.bove and the street lighting being relocated to the typical location (between the curb and the trail) so that it would be 100% eligible for MSA funding. ALB:jms Attachments: 1. 2. Letter fromBoncstroo & Associa~s dated July 7, 1998. Plan Sheet No. TItle Sheet, 8,9, lOA, lOB, and 11. c: ,. Phillip ElIdn, Water Resources Coordinator . PhibOravel, Bonestroo.& AssocialCS Fred Richter, Steiner Development g:'cll~-l~ ofbid.doci ~ 11 ~ Bonestroo ~ Rosene iii Anderlik & 1 \J 1 Associates Engineers & Architects July 7, 1998 Bonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer Principals: Otto G. Bonestroo, PE . Joseph C. Anderlik, PE. . Marvin L Sorvala, PE. . Richard E. Turner, PE. . Glenn R. Cook, PE. . Robert G. Schunicht, PE. . Jerry A. Bourdon, PE. . Robert W, Rosene, PE. and Susan M. Eberlin, C.PA., Senior Consultants Associate Principals: Howard A. Sanford, PE. . Keith A. Gordon, PE. . Robert R. Pfefferle, PE. . Richard W. Foster, PE. . David O. Loskota, PE. . Robert C. Russek, A.LA. . Mark A. Hanson, PE. . Michael T. Rautmann, PE. . Ted K.Field, PE. . Kenneth P Anderson, PE. . Mark R, Rolfs, PE, . Sidney P Williamson, PE., LS. . Robert F. Kotsmith . Agnes M. Ring. Michael P Rau, PE. . Allan Rick Schmidt, PE. Offices: St. Paul, Rochester, Willmar and St. Cloud, MN . Milwaukee, WI Website: www.bonestroo.com Ms. Anita Benson City of Chanhassen 690 City Center Drive, PO Box 147 Chanhassen, MN 55317 Re: Arboretum Business Park Area Coulter Boulevard East of Century City Project s 97-1 and 97-1B-2 Our File 393-98-064 Dear Anita: Bids were received today for the Coulter Boulevard East of Century project. The low bid was submitted by S. M. Hentges & Sons, Inc. in the amount of $618,044.00. A total of five bids were submitted. A copy- of the bid tabulation is attached to this letter. A summary of the low 5 bids is presented below. Low #2 #3 #4 #5 Contractor S.M. Hentges & Sons, Inc. G.M.H. Asphalt Corp. Northdale Construction Co. Utility Systems of America. Inc. Midwest Asphalt Corp. Total Base Bid $618,044.00 $625,954.25 $633,514.21 $676,659.10 $691.972.20 The bid amount of $618,044.00 is 9.4 percent less than the latest engineers estimate of $682,200.00 This contract is part of a multi-phased project included in the Feasibility Report for City Project 97-1. Several phases of the project are presently under construction with the remaining phases planned for the next two to three years. For your reference, we have prepared a summary table showing the estimated construction costs used for the Feasibility Report and the current known costs or estimated costs. The summary shows that the total project construction costs are slightly below the Feasibility Report estimates at this time. The summary table is presented below. ; ...Phase/Proiect Feasibilitv Report BidAmount/Current Estimate Century Blvd. (97-1A) Water Tower (79-1B 1) Coulter East (97-IB2) Local Share Signal (97-1B3) Century Blvd. No. (97-1C) Coulter West (97-1D) TOTAL PROJECT * to be bid on July 10th. The current total project cost estimate is approximately $462,250 less than the estimated total construction costs in the Feasibility Report. About $300,000 of this amount is the result of the reduction in size for the water tower. The remaining $162,250 is the result of favorable bids. $764,000 1,900,000 610,000 55,000 548,000 380.000 $4,257,000 $ 835,700 (bid) 1,213,000 (bid) 618,050 (bid) 70,000 (estimate) 548,000 (estimate) 510.000 (estimate)* $3,794,750 Note that the ll1"11ounts shown in the table above are construction costs. Total Project costs (including legal, administration, bonding, and engineering) are approximately 30 percent above the construction costs. 2335 West Highway 36 · St. Paul, MN 55113 · 612-636-4600 · Fax: 612-636-1311 Bids for project 97-1D (Coulter Boulevard west of Century Boulevard) will be received on Friday, July 10, 1998. We will have a separate memo available for those bids. S.M. Hentges & Sons, Inc. have worked for the City previously. We recommend award of the project to them for the bid amount of $618,044.00. You may want to consider relocating the street lights to four feet behind the curb. MnDOT considers the lights as landscaping in the present location behind the bituminous trail. Feel free to contact us if you have any questions or require any additional information. Sincerely, BONESTROO ROSENE ANDERLIK AND ASSOCIATES ~y Phil Gravel, P.E. LPG;jms cc: Attachment: Bid Tab