D-3. 2017 Street Rehabilitation Project: Authorize Preparation of Feasibility Study i) - 3 1101 MEMORANDUM CITY OF TO: Paul Oehme, Director of Public Works/City Engineer q CHANIIASSEN FROM: Alyson Fauske, Assistant City Engineer 00' 7700 Market Boulevard PO Box 147 DATE: September 12, 2016 0\' t Chanhassen,MN 55317 SUBJ: 2017 Street Rehabilitation Project No. 17-01: Authorize Preparation Administration of Feasibility Study Phone:952.227.1100 Fax:952.227.1110 PROPOSED MOTION Building Inspections "The City Council authorizes the preparation of a feasibility report for the 2017 Phone:952.227.1180 Street Rehabilitation Project No. 17-01 and approves the resolution. Fax:952.227.1190 Engineering City Council approval requires a simple majority vote of the City Council Phone:952.227.1160 present." Fax:952.227.1170 Finance BACKGROUND Phone:952.227.1140 At the August 22, 2016 work session, staff reviewed with Council the proposed 2017 Fax:952.227.1110 • Street Improvement project areas. Park&Recreation Phone:952.227.1120 DISCUSSION Fax:952.227.1110 Every year the City considers streets that are �1� • �' t., in poor condition to be rehabilitated or ,, dPt ; Recreation Center �, 46 2310 Coulter Boulevard reconstructed. The proposal for City Project pil. hi ik I.Phone:952.227.1400 No. 17-01 includes the rehabilitation of do. /0 Fax:952.227.1404 approximately 1.9 miles of streets. The street im:�, .• o. segments within the proposed project were - N♦r SO .t��� • : : Planning& identified by the City's Pavement ®. °0���'�!'�._ = ' i Natural Resources ® S� m Phone:952.227.1130 Management software in conjunction with site , by �S�� o ; e . Fax:952.227.1110 investigations. m ®Fill �,11111. �- ; 3 0 a; , Public Works The project lit, ;,,� 7901 Park Place location and the r.. . ., -...41, ,,4�0101 ® nIr �.-- j;' VI Phone:952.227.1300 pavement ® • Fax:952.227.1310 4i� , 5a m .., .. ri condition scorespirlir ,s Senior Center are shown on the .:.. "' - ` '=t, '' Phone:952.227.1125 adjacent graphic; .r` .A°k,'`" f36 r Fax:952.227.1110 a pavement ~; r. . condition score Website of 100 represents www.ci.chanhassen.mn.us '..• . ^- a new street ��; while a score of 0 represents a completely deteriorated street. G:\ENtirthiniatAli Ml&rTh1FaPl.rigg11 ('�@dWa#PfaMeRx6lflffrow Paul Oehme 2017 Street Rehabilitation Project September 12,2016 Page 2 The streets in the project area were constructed between 1989 and 1993. Sealcoats were performed in 1993, 1997 and 2005. A non-structural overlay was done on the northern leg of Lake Susan Hills Drive, Egret Court, Heron Drive and Ibis Court in 2002. Due to drainage issues in the area, approximately 1,050 feet of drain tile was installed on the east side of Flamingo Drive in 2011. The proposed improvements consist of reclaiming the pavement surface; severe pavement distresses will be removed and replaced. Some drain tile may be installed with the project. Water main gate valve and hydrant bolt replacements are anticipated for replacement in these areas. Minor sanitary sewer repairs are also expected. A feasibility report will be prepared by the Engineering Department staff. The anticipated project savings will be between $85,000 and $100,000 if feasibility report preparation, design and construction observation are not outsourced. PROJECT FUNDING Forty percent (40%) of the street improvement cost would be assessed back to the benefiting property owners, per the City's assessment practice. The remaining 60% of the street costs would be a City cost. Each project area would have its own proposed assessment. Any storm sewer, sanitary sewer and water main improvements replacement costs would be funded by the respective utility funds in the annual utility budgets. The following is the anticipated recommended project budget and funding sources: Funding Source Amount Budgeted Assessments/Revolving Assessment Fund $922,400 Storm Water Management Fund $75,000 Water Utility Fund $75,000 Sanitary Sewer Utility Fund $40,000 $1,112,400 SCHEDULE The proposed project schedule is as follows: Neighborhood Meeting October, 2016 Accept Feasibility Report October 24, 2016 Public Hearing; Order Plans & Specifications November 28, 2016 Approve Plans & Specifications; Order Ad for Bid January 23, 2017 Assessment Hearing March 27, 2017 Project Begins June, 2017 Substantial Completion September 1, 2017 Attachments: Resolution CIP Sheets G:\ENG\PUBLIC\ 2017 PROJECTS\17-01 Street Rehab\20160912 order feasibility.docx CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES,MINNESOTA DATE: September 12,2016 RESOLUTION NO: 2016-XX MOTION BY: SECONDED BY: AUTHORIZE PREPARATION OF FEASIBILITY STUDY FOR THE 2017 STREET REHABILITATION PROJECT NO. 17-01 WHEREAS,the areas for improvements in 2017 are as follows: Egret Court Mallard Court Flamingo Drive Merganser Court Heron Drive Pelican Court Ibis Court Tern Court Kingfisher Court Thrush Court Lake Susan Hills Drive NOW,THEREFORE,BE IT RESOLVED that the Chanhassen City Council hereby authorizes preparation of a feasibility study for the 2017 Street Rehabilitation Project No. 17-01. Passed and adopted by the Chanhassen City Council this 12th day of September,2016. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger,Mayor YES NO ABSENT Capital Improvement Program 2016 thru 2020 Department Sanitary Sewer Improvements City of Chanhassen, MN Contact Paul Oehme Project# SS-014 Type Improvement Useful Life Unassigned Project Name Sanitary Sewer Replacement Category Utilities Account#1 701-7025-4751 Account#3 Priority n/a Account#2 Account#4 Description I Total Project Cost: $1,890,000 Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by i consolidating these projects. Prior Expenditures 2016 2017 2018 2019 2020 Total 1,000,0001 Construction 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 890,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,000,000 Sewer Utility Fund 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 890,000 Budget Impact/Other This project will decrease maintenance costs. 82 Capital Improvement Program 2016 thru 2020 Department Street Improvements City of Chanhassen, MN Contact Paul Oehme Project# ST-012 Type Improvement Useful Life Unassigned Project Name Annual Street Improvement Program Category Streets/Highways Account#1 601-xxxx-475 I Account#3 Priority ilia Account#2 Account#4 Description Total Project Cost: $25,569,500 Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas: 2016-North Manor Road,Washta Bay Road,Tanagers Lane,Sandpiper Trail,Piper Ridge Lane,Minnewashta Woods Drive,Fox Path area, Lone Cedar area,Ches Mar Drive and Stoughton Ave MSA-Park Road overlay and Park Place i 2017-Flamingo Drive area ' MSA-Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018-Orchard Lane,Forest Avenue,Forest Circle,Oriole Avenue,64th Street and 96th Street 2019-Fox Path area,Frontier Trail(north of 77th Street),Choctaw and Kurvers Point MSA-Minnewashta Parkway overlay 2020-Chan View area I Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective,a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical,reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. The Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting"gap"represents a missing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a trail. This trail segment is planned to be constructed along with the 2017 MSA street reconstruction. Prior Expenditures 2016 2017 2018 2019 2020 Total 12,945,000 Construction 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Total Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Prior Funding Sources 2016 2017 2018 2019 2020 Total 12,945,000 Assessment/Revolving 2,260,000 922,400 1,687,300 1,754,800 2,500,000 9,124,500 Assess Fund Total MSA 1,100,000 1,400,000 900,000 3,400,000 Other Agency Contribution 100,000 100,000 Total 3,460,000 2,322,400 1,687,300 2,654,800 2,500,000 12,624,500 Budget Impact/Other I This project may decrease maintenance costs. 92 Capital Improvement Program 2016 thru 2020 ' Department Surface Water Management City of Chanhassen, MN Contact Paul Oehme Project# SWMP-019 Type Improvement Useful Life Unassigned Project Name Street Improvement Projects-Storm Water Mgmt Category SWMP , Account#1 720-7025-4751 Account#3 Priority n/a Account#2 Account#4 I Description 1 Total Project Cost: $2,075,000 l An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. IJustification I , ' Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal,state and local regulations,as well as protecting existing and proposed development adjacent to the projects. 1 Prior Expenditures 2016 2017 2018 2019 2020 Total I 1,225,0001 Construction 300,000 75,000 200,000 75,000 200,000 850,000 Total Total 300,000 75,000 200,000 75,000 200,000 850,000 111 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,225,000 Surface Water Utility Fund 300,000 75,000 200,000 75,000 200,000 850,000 Total Total 300,000 75,000 200,000 75,000 200,000 850,000 P I Budget Impact/Other Inventory,inspection and maintenance of new infrastructure will be required. Citywide.No map P P P P P p 102III ICapital Improvement Program 2016 thru 2020 Department Water System Improvements City of Chanhassen, MN Contact Paul Oehme IProject# W-024 Type Improvement Useful Life Unassigned Project Name Watermain Replacement Category Utilities 1 IAccount#1 700-7025-4751 Account#3 Priority ala Account#2 Account#4 Total Project Cost: Description � j $5,120,000 Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. I IJustification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets.If significant repairs are necessary to the existing water I main,replacement may be the most cost effective option. Given the highly corrosive soils in the City,water main replacement is an ongoing project in the City. IPrior Expenditures 2016 2017 2018 2019 2020 Total r 2,500,000 Construction 825,000 75,000 770,000 100,000 850,000 2,620,000 ITotal Total 825,000 75,000 770,000 100,000 850,000 2,620,000 I Prior Funding Sources 2016 2017 2018 2019 2020 Total 2,500,000 Water Utility Fund 825,000 75,000 770,000 100,000 850,000 2,620,000 Total Total 825,000 75,000 770,000 100,000 850,000 2,620,000 Budget Impact/Other These projects will decrease maintenance costs. , I I { I I I I I 115