2016-51 •
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: July 25,2016 RESOLUTION NO: 2016-51
MOTION BY: McDonald SECONDED BY: Campion
A RESOLUTION APPROVING A FINAL PLAT
REPLATTING LOTS 14, 15 AND 16,BLOCK 1
PINEHURST 2ND ADDITION
WHEREAS, Kroiss Development, Inc and Mike&Deb Anderson have requested a
subdivision of the property into three lots; and
WHEREAS,the Chanhassen City Council held a hearing on July 25,2016, and found
the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance.
NOW,THEREFORE,BE IT RESOLVED that the Chanhassen City Council hereby
approves the replatting of Lots 14, 15 and 16,Block 1, Pinehurst 2nd Addition, Carver County,
Minnesota, subject to the following conditions:
1. Provide a 1:200"clean"plat drawing.
2. Demolition permits are required for the removal of any existing structures.
3. Buildings may be required to be designed by an architect and/or engineer as determined
by the Building Official.
4. Foundation soils will be evaluated at tine of excavation. Professional investigation and
correction may be required.
5. Retaining walls over four feet high require a permit and must be designed by a
professional engineer.
6. Each lot must be provided with separate sewer and water services.
7. The applicant and or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
8. Lot 15 shall be required to have three trees planted in the front yard.
9. Lot 16 shall be required to have two trees planted in the front yard.
1
10. All existing easements shall remain in place.
11. Construction on Lots 15 and 16 shall follow the approved grading plan for Pinehurst 2nd
when applying for building permits.
12. Existing storm sewer on the west side of proposed Lot 15, Block 1 shall be owned and
maintained by the property owner.
13. The landscaping along Amberwood Lane must be partially removed to facilitate driveway
access to Lots 15 and 16, Block 1 prior to issuing a building permit.
14. Landscaping must be moved or removed to prevent landscaping features from crossing lot
lines prior to recording the final plat.
15. The applicant is required to obtain all necessary permits for construction of retaining
walls and will be required to submit to the standard review process and fees in place at the
time of permit.
16. The City does not have the responsibility to maintain retaining walls on private property.
17. Partial hook-up fees are due with the recording final plat at the rate in effect at that time.
18. The remaining water and sanitary hook-up fees will be due with the building permit. The
fees will be assessed at the rate in effect at that time.
Passed and adopted by the Chanhassen City Council this 251x' day July of 2016.
ATTEST:
#jg e
Todd Gerhardt, City Manager D- y La If-nburger, ayor
YES NO ABSENT
Laufenburger None None
Campion
McDonald
Ryan
Tjornhom
2