Loading...
D-5. The Preserve at Bluff Creek 6th Addition: Accept Street and Utility Improvements. IOW CITY OF MEMORANDUM CHAN TO: Paul Oehme, Director of Public Works/City Engineer `� 7700 Market Boulevard PO Box 147 FROM: Steve Ferraro, Engineering Tech. IV/Construction Manager Chanhassen,MN 55317 DATE: November 28, 2016 Administration Phone:952.227.1100 SUBJ: The Preserve at Bluff Creek 6th Addition, Project No. 14-09: Fax:952.227.1110 Accept Street and Utility Improvements Building Inspections Phone:952.227.1180 Fax:952.227.1190 PROPOSED MOTION Engineering Phone:952.227.1160 "The City Council accepts the street and utility improvements in The Preserve Fax:952.227.1170 at Bluff Creek 6th Addition." Finance City Council approval requires a simple majority vote of the City Council Phone:952.227.1140 Fax:952.227.1110 present. Park&Recreation Staff has received a letter from David Hempel of Westwood Professional Phone:952.227.1120 Fax:952.227.1110 Services, requesting the City consider acceptance of the street and utility improvements in The Preserve at Bluff Creek 6th Addition. Staff has performed a Recreation Center walk-through inspection of the public streets and utility portion of the project and 2310 Coulter Boulevard finds the completed improvements acceptable for perpetual maintenance and Phone:952.227.1400 ownership contingent upon receipt of lien waivers and two-year maintenance Fax:952.227.1404 bond. The City has not accepted the grading,backyard drainage, pond Planning& improvements and topsoil for the development. The City still holds a letter of Natural Resources credit for these items. Phone:952.227.1130 Fax:952.227.1110 Attachments: Letter from David Hempel dated October 20, 2016. Public Works Location Map 7901 Park Place Resolution Phone:952.227.1300 Fax:952.227.1310 c: Paul Oehme, City Engineer Alyson Fauske, Assistant City Engineer Senior Center Dave Hempel, Westwood Professional Services Phone:952.227.1125 Todd Baumgartner, Chanhassen Residential Development Partners Fax:952.227.1110 Website www.ci.chanhassen.mn.us \\cfs5\cfs5\shared_data\eng\projects\t-z\the preserve 6th\accept streets-utilities.doc Chanhassen is a Community for Life-Providing for Today and Planning for Tomorrow 7699 Anagram Drive Eden Prairie,MN 55344 Westwood Main (952)937-5150 Fax (952)937-5822 westwoodps.com (888)937-51W October 20, 2016 Steve Ferraro via email Construction Manager City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Subject: Preserve at Bluff Creek 6th Addition, Chanhassen,MN—Final acceptance of Street and Utility Improvements Ref: 0004181 Dear Steve: Professional engineering services, including the design and observation of public improvements for Preserve at Bluff Creek 6th Addition, have been provided by Westwood Professional Services, Inc. The public street and utility improvements,which includes sanitary sewer, water main, storm sewer, sidewalk and street construction were observed by our construction observer. Based upon construction observations and record construction documents, it is our opinion that the public improvements are in conformance with the approved plans and specifications for The Preserve at Bluff Creek 6th Addition. On behalf of the developer, we request the City of Chanhassen accept the public Street and Utility improvements for City ownership and that the project surety be reduced to the minimum amount per the conditions of the Developers Agreement for this project. Upon formal acceptance lien waivers and warranty bond will be provided for the public improvements. Please contact me at(952) 906-7496 if you have any questions or need anything else. Sincerely, WESTWOOD PROFESSIONAL SERVICES, INC. Day' empel Construction Coordinator/Project Manager Copy: Todd Baumgartner,Chanhassen Residential Development Partners Multi-Disciplined Surveying&Engineering TBPLS Firm No.10074302 westwoodps.com ! I .- 4-..:' ' ' . .0 l • • j .00 . , .s • i _ I, t so Vitt m eL m it - NJOvoblama �, • _ - - +ti C I �t l: < i - i ,‘, ; , I' . .,i ME - - • .. f� E IMF 1 _ i. i mit Fii. i 1 ► ! r " ,,,,,,-- ; \ _- --.- -- ` a •5 \,-' i * • F f ��'i• �` + 1 t i Iliiiiire - At : ... .,- ^fir X J� ..) I , =mss.` w , f' .` N • \ - IAtior CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES,MINNESOTA DATE: November 28,2016 RESOLUTION NO: 2016-XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING THE STREETS & UTILITIES IN THE PRESERVE AT BLUFF CREEK 6TH ADDITION PROJECT NO. 14-09 WHEREAS,the City has received a letter from David Hempel of Westwood Professional Services, indicating the above-referenced street and utility improvements have been completed in conformance with the approved plans and specifications and all testing has been successfully completed; and WHEREAS, staff has performed a walk-through inspection and finds the improvements acceptable for perpetual maintenance and ownership contingent upon receipt of lien waivers and a two-year maintenance bond. NOW,THEREFORE,BE IT RESOLVED that the Chanhassen City Council hereby accepts the street and utility improvements in The Preserve at Bluff Creek 6th Addition, Project No. 14-09, for perpetual maintenance and ownership contingent upon receipt of lien waivers and a two- year maintenance bond. Passed and adopted by the Chanhassen City Council this 28th day of November,2016. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger,Mayor YES NO ABSENT