D-4. 2016 Infiltration/Inflow Project No. 16-02: Accept Bids and Award Contract. Y • � w 9 S CITY OF CIIANHASSEN Chanhassen isa Community for Life-Providing for Today and Planning for Tomorrow NIRS MEMORANDUM �q t TO: Paul Oehme, Director of Public Works/City Engineer FROM: Stephanie Smith, Project Engineer Cer DI7e DATE: January 23, 2017 SUBJ: 2016 Sanitary Sewer(I/I) Project No. 16-02: Accept Bids and Award Construction Contract PROPOSED MOTION "The City Council awards a construction contract for the 2016 Sanitary Sewer(I/I) Project No. 16-02 to Visu-Sewer, Inc. in the amount of$261,471.25." City Council approval requires a simple majority vote of the City Council present. DISCUSSION The Metropolitan Council monitors the flow of sanitary sewer from each city to determine the amount of Infiltration and Inflow(I/I) to their treatment plant. If a city exceeds the allowance set by the Metropolitan Council, the City is surcharged a fee based on the amount of flow above the allowed amount. The City of Chanhassen has chosen to participate in the Metropolitan Council's Ongoing I/I Reduction Program. The program's aim is to encourage communities to rehabilitate their sanitary sewer systems and reduce I/I on a local level. Through this program, the City may forgo the surcharge fee so long as they are investing the funds in I/I prevention in the sanitary sewer system. The 2016 Sanitary Sewer (I/I) Project will help prevent I/I from entering the sanitary sewer system. The project consists of lining the aging vitrified clay pipe, grouting leaking pipe joints and manhole sections, and spot repairing damaged pipe cured-in-place pipe systems. The areas being addressed are areas that are part of a street project to be completed in 2017 as well as the Lift Station#2 sewershed area. Staff feels that this area is a large contributor of I/I to the sanitary sewer system. PH 952.227.1100• www.ci.chanhassen.mn.us• FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 Paul Oehme 16-02 Sanitary Sewer Rehabilitation(I/I)Project January 23,2017 Page 2 This project was originally let in October 2016,however the bids received were higher than anticipated. On November 14, 2016, the City Council voted to reject the bids and allow staff to adjust the scope of the project and re-advertise it for bids. The scope change included eliminating work in the Park Road area. Park Road will be included in a future I/I project. On January 13, 2017, one bid was received and opened as shown below: Bidder Base Bid Visu-Sewer, Inc. $261,471.25* Engineer's Estimate $273,753.00 *Notes recommended item to be awarded There were three bidders on the Planholders List but only one decided to bid on the project. The lone bidder for this project was Visu-Sewer, Inc. This contractor has completed work in Chanhassen in the past and their work was acceptable. The work will be completed by September 14, 2017. Funding for the project is proposed from the Sanitary Sewer Utility Fund. The adjacent property owners are not proposed to be assessed for the project. Attachments: 1. CIP Pages 2. Location Maps 3. Resolution Capital Improvement Program 2016 thru 2020 Department Sanitary Sewer Improvements City of Chanhassen, MN Contact Paul Oehme Project ii SS-012 Type Improvement Useful Life Unassigned Project Name Inflow and Infiltration Abatement Category Utilities Account#1 701-70xx-4751 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: $1,900,000 This annual project includes televising,repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration Report and aspects of the program are included in the annual street project. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. Justification City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks,displaced joints,manhole covers,or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Prior Expenditures 2016 2017 2018 2019 2020 Total 900,0001 Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000 Total Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1 900,000) Sewer Utility Fund 200,000 200,000 200,000 200,000 200,000 1,000,000 Total Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Budget Impact/Other The efforts may decrease operational costs,MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund for those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems. 81 Capital Improvement Program 2016 thru 2020 Department Sanitary Sewer Improvements City of Chanhassen, MN Contact Paul Oehme Project# SS-014 Type Improvement Useful Life Unassigned Project Name Sanitary Sewer Replacement Category Utilities Account#1 701-7025-4751 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: $1,890,000 Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Prior Expenditures 2016 2017 2018 2019 2020 Total I- 1,000,000 Construction 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 890,000 Prior Funding Sources 2016 2017 2018 2019 2020 Total 1,000,000 Sewer Utility Fund 300,000 40,000 250,000 50,000 250,000 890,000 Total Total 300,000 40,000 250,000 50,000 250,000 090,000 Budget Impact/Other This project will decrease maintenance costs. 82 -6)noF---- _______ , fcL m ti 'l"��s�s�. J IV� O �S2L{O� 1; o0 .c .c c ca I .' eL PAI9 Q aecpe>i 0 ,0 `saw O II a 1 , & 990.41 A 4 --,„.._„„ •• 4 • a , r n • r 1 r. a)Nip q a, t 0. I r j' L ei a /tog 4 -• 7 r _ . .6 .Q I60-1 0 r9a : .O I ,,,,, 4/0 .._ :_, A 10,,, ._ wo. 4, Z O n, L q r 3 23 �tsa Illanr (�L 4 as 4 01,1 • -0 PP 41; . V q � meq as n t7r '. �a`t 0111 a + ---___N inammonwilliella M °\1 al 'naei 111 0 v•C: .` �a� d ` t PIIIIPM\Ie la . o CV N 11 L U z''' )) •) • N i f o ,, r r 0 ke'l.O0 �o4S . ii NM Nel a '� N N 1 _ N to a a cv I z\ i o • � l p 0 N T Cn L. J J 1:42 OP ''C' -\\NN 1 o \* D.‘ - - N �9� 0 Cco ` \ N N N to = gt` 7 . a 0 2 r °t _ <� ' N N N N L U 2 Q NI \ ________ 4'4:, Ill pi ' I • • 4 41 e Nf N1 r 1 _ t-._-.__.-. __.___J i. r f� -r A.411111144P 41411#"r14° , NA �3:A.. ., ` I -- ..., lei*, eia , . . co eeov, v k . J., o d °��� ri __ ' co • . al luron Q fO� , - 6�0. a . N 0� 11. Alliez C 96• e elvO op:Jei y g aft iJ l T i p 1, Q�q 'n X10, ^ iroquds Ave I }moi „.0._ o� �'' R eo 4--, �t I rc,4)nj\IA OP isaii ,.,:411,TA e" � ■ L' obi,- N Cl)3 • 0- 0 •... `�` 1,-4.57, OA-ft ✓�gQf� J y A Illir h6 ^3Q a 11111 1IIP X.„........14 X1 N .- liVe Al r) ;ik 'Pea_ CD 4- 4141 N o tillRi �y 1 O t3 iN FMgl O oTp _ _. 1 . .1- 1;..4:ti) # ZI M=NINE. Fli id 4 g ir--7-1 .,,, ,... _.•NI ..,. 4.•\, 0 017%—r- ,, MN OF.'''I INtip rya 1 1 1 1 /t3 .epi —, 'N 11, 1100 p rig ilk 0* 4 L. 0_ 00 c c c• c c f/1 J C�}J 41 `1 M c O J M M• r r 0 c � i 4 11070101101111"ir 0 N M a N A. O • Q co U 414 OF co 0001111111b%i u)• 0 let4 . 4. 4 jik- _ it , Li It* cuCe ; o il 0 N N M"E' 8 E cD .. IMO Of '11111 10 1114 _r-3-. imailli4)1 co V* 1411111 -r r N N I- - 6 O a 0 U 01111 \ -0c am� c Ell = a 0 J prive N . CU 4-0 ce u a s C 1.1U (DC a)5 111111LL r 1 PI 3 M c Mill @ roen• e Circle 1 Zlec a) c J O L cn Q. ! ii1" • L Oh o ° 0) (16: 2 OA T cO zo o Q 7 COs ^ CD St A e zos1e - `l. � '� r Cage, .11 0 Q• 0 • N 5);O i� Oe . D 49,..te0 N. ^ _ O 0 ctO • r O! 04 gcr Q N �oO. r + c.. L 4' 4‘q141 IP 11 II C .� O ,1-4 : i 6 e 9 p O I Fore V 111"3 }s%.lo ., z ' a) u? _Co M ..4ra cu lit c4 ,.. J id to L V p e - o t co" d Mcn < N M a el MEI•c'5 c.. 6 Oil ;0 to • + M r p a O• 'C., i • et p • in N N 0 _ L O Q 4 l < • u) r • • — Mik ,', ______._ CL '5 _ ,7 . _ * , A� `° N M gat ,-. 0 '''\. i lot ' . E II M O i .. , al+ ° : - . Tanagers}�e►�it o 1 N p N 111 O in I c.75" M co 2 CO N �' ° 2 6,itil M ♦�� p e .. L in N + O r 03 - cc4 i c,r. c_..k < Ior ' p0°q ?, �,a,n ,� C ! 1 , F C � G• N .._ •._. . ._ '?f r O , £ 3\x CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: January 23,2017 RESOLUTION NO: 2017-XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING BIDS AND AWARDING CONTRACT FOR THE 2016 SANITARY SEWER TELEVISING (I/I) PROJECT NO. 16-02 WHEREAS,pursuant to a request for bids for the 2016 Sanitary Sewer Televising(I/I)Project, one bid was received and opened. The bid is as follows: Bidder Base Bid Visu-Sewer, Inc. $261,471.25* Engineer's Estimate $273,753.00 AND WHEREAS,Visu-Sewer,Inc. is the lowest responsible bidder with a total bid amount of $261,471.25. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Visu- Sewer, Inc. in the name of the City of Chanhassen for the 2016 Sanitary Sewer Televising(I/I) Project No. 16-02 according to the plans and specifications therefore approved by the City Council and on file in the office of the city clerk. Passed and adopted by the Chanhassen City Council this 23rd day of January, 2017. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT