Loading...
D-5. 2017 Street Rehabilitation Project (Lake Susan Hills): Approve Plans and Specifications; Authorize Advertising for Bids • sv 9 CITY OF ClIANIIASSEN S Chanhassen is a Community for Life-Providing for Today and Planning for Tomorrow H AS MEMORANDUM TO: Paul Oehme, Director of Public Works/City Engineers FROM: Stephanie Smith, Project Engineer` DATE: January 23, 2017 G1 SUBJ: 2017 Street Rehabilitation Project No. 17-01: Approve Plans and Specifications; Authorize the Advertisement of Bids PROPOSED MOTION "The City Council adopts a resolution approving the plans and specifications and authorizing advertisement for bids for the 2017 Street Rehabilitation Project No. 17-01. City Council approval requires a super majority vote of the City Council present." BACKGROUND At the August 22, 2016 work session, staff reviewed with Council the proposed 2017 Street Rehabilitation in the Lake Susan Hills area. On September 12, 2016, the City Council authorized preparation of the feasibility study. On October 18, 2016, staff held an Open House for the proposed project. On October 24, 2016,the City Council accepted the feasibility study and ordered the public hearing. On November 28, 2016, the City Council held the public hearing and authorized the preparation of plans and specifications. DISCUSSION Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2017 Street Rehabilitation Project, staff is proposing to rehabilitate approximately 1.9 miles of streets in the Lake Susan Hills neighborhood. The street segments within the proposed project were identified by the City's Pavement Management software in conjunction with site investigations. PH 952.227.1100• www.ci.chanhassen.mn.us• FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 Paul Oehme 2017 Street Rehabilitation Project: Approve Plan&Specifications;Authorize Ad for Bids January 23,2017 Page 2 The proposed improvements generally consist of reclaiming I. ` }t 7.1117':.7..r. the pavement surface and the aggregate base underneath the . '�, s,„, Af: ,m,'�6\, l/ pavement. Atypical areas with insufficient base underneath {�� � ?4 • 46 the avement will be reconstructed. Minor draina a , VII kat improvements and some draintile installation are also " 7:j included within the project area. l�� �4 -, .�1. For the municipal water system, norm '` 9✓`tz-.p' �; gate valve and hardware � " ` � :; replacements are proposed along b +� '�,z �V,��v�`410 gi 'I with minimal hydrant 17 '�=a � ii �j" � °•ySrpoJ,� replacement. Sanitarysewer ' t" ,�" `v .y led -' I ik+ MS v work proposed includes spot , �r� '�� " 'ticet VI ; . .1 eE repairs of damaged manhole ' �.M`� "7. w r ,y structures and inflow/infiltration 'i,ri .�k'�`'� s4J�;lam 0,.. ; 4 remediation within the ��i• BI=�+.�. ' `4 be manholes. PAIIP .* O° t°14 i'vk-----, -1.i. The approximate 1.9 miles of streets in the project area were t 4� '. constructed between 1989 and 1993. Sealcoats were ��e�► ,, p 1� performed in 1993, 1997 and 2005. A non-structural overlay �_:- '•. '� ' - ��. was done on the northern leg of Lake Susan Hills Drive, r. ms•�'' lls,' Egret Court, Heron Drive and Ibis Court in 2002. All streets within the project are urban residential streets with concrete curb and gutter. Lake Susan Hills Drive, Flamingo Drive and Heron Drive have a 5-foot concrete sidewalk on one side. Pavement condition scores generated by the City's pavement management software were considered when determining street segments within the proposed rehabilitation area. Street segments are surveyed every three years and a score or Overall Condition Index (OCI) is assigned to the street segment. An OCI of 100 represents a new road. The streets within the Lake Susan Hills neighborhood were last surveyed in 2015, and the OCI ranged from 30.3 to 65.6. The proposed standard improvements include reclaiming the full depth of bituminous plus 4.5"-6.5" of the aggregate base of the street. The top four inches of reclaimed material will be removed and two, 2-inch lifts of asphalt are proposed to be installed. Select sidewalk panel replacement such as those associated with ADA ramp updates will be included with this project. Other sidewalk maintenance efforts such as grinding or jacking panels may be bid as a separate project and funded out of the annual maintenance. Hardware replacement is proposed on gate valves and will include the installation of zinc anode bags to forestall corrosion. Minimal hydrant replacement is proposed for this project. Sanitary sewer manholes with degraded concrete rings are proposed to have the rings replaced with this project. Infiltration barriers and sealed manhole covers are proposed for all sanitary structures to prevent future infiltration. The City's Public Works department will repair the infiltration between manhole joints in-house rather than be included with the proposed project. Paul Oehme 2017 Street Rehabilitation Project: Approve Plan&Specifications; Authorize Ad for Bids January 23,2017 Page 3 A quantity of draintile is proposed for this project for installation at the back of curb, as there is a record of resident concerns about subsurface drainage in the project area. Approximately 80 feet of drainage structure replacement is proposed to address problems observed in several drainage structures during inspection. Due to the shallow grade of the northern portion of Flamingo Drive, the project is proposed to include analysis of warrants for additional catch basins to pick up stormwater flow on the street. Because there are no additional impervious surfaces that will be added to the 2017 project area, this project would not trigger any of the Federal, State or Local surface water regulations. The proposed project includes minor water main and sanitary sewer repairs but would not require a permit from the MN Department of Health or the MN Pollution Control Agency,respectively. Because Lake Susan Hills Drive has two intersections with Powers Boulevard (CSAH 17), a work in right-of-way permit will be required from Carver County. PROJECT FUNDING Special assessments to the benefitting properties are proposed to pay for a portion of the proposed 2017 Street Improvement Project No. 17-01 per the City's Assessment Policy. The remaining project costs are proposed to be paid from City funds. All utility improvements are proposed to be paid for by the associated utility fund. The preliminary funding is shown below: Funding Source Project Cost Amount Budgeted Assessments/Revolving Assessment $1,105,000 $1,100,000 Fund Stormwater Management Fund $90,000 $500,000 Water Utility Fund $75,000 $75,000 Sanitary Sewer Utility Fund $127,000 $210,000 $1,397,000 $1,885,000 *Budgeted Amounts are from the proposed 2017 CIP Budget Unit assessments are proposed, meaning each parcel determined to be a benefitting property at the time the assessment roll is approved will pay the same amount. Final assessment amounts will be based on the construction bid price. Paul Oehme 2017 Street Rehabilitation Project: Approve Plan&Specifications;Authorize Ad for Bids January 23,2017 Page 4 Preliminary estimated assessments are detailed below: Total Estimated Street Cost: $1,105,000 40% assessed: 40% of$1,105,000 = $442,000 Number of assessable units: 187 Estimated unit assessment: $442,000± 187 units= $2,400/unit* *Estimated assessments have been rounded to the nearest $100 The cost estimate includes a 10% construction contingency and a 5% estimate of indirect costs. SCHEDULE The following schedule is proposed contingent upon City Council approval to proceed with the project: Bid Opening February 15, 2017 Assessment Hearing; Award Contract March 27, 2017 Construction Start June, 2017 Substantial Completion August, 2017 Attachments: 1. Resolution 2. CIP Sheets g:\eng\public\_2017 projects\17-01 street rehab\conununication\170123_cc_approve p&s authorize ad for bid.docx CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES,MINNESOTA DATE: January 23,2017 RESOLUTION NO: 2017-XX MOTION BY: SECONDED BY: A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING AD FOR BIDS FOR THE 2017 STREET REHABILITATION(LAKE SUSAN HILLS AREA) PROJECT NO. 17-01 WHEREAS,pursuant to the resolution passed by the Council on November 28, 2016,the City Engineer has prepared plans and specifications for the 2017 Street Rehabilitation(Lake Susan Hills Area) Project and has presented such plans and specifications to the Council for approval; NOW,THEREFORE,BE IT RESOLVED that the Chanhassen City Council: 1. Such plans and specifications, a copy of which can be reviewed at the office of the City Engineer, are hereby approved. 2. The city clerk shall prepare and cause to be inserted in the official city newspaper and QuestCDN.com, an advertisement for bids upon the making of such improvement under such approved plans and specifications. The ad shall be published at least three times, shall specify the work to be done, shall state that bids will be opened and that the responsibility of the bidders will be considered by the Council at 7:00 PM on Monday,March 27,2017, for the 2017 Street Rehabilitation(Lake Susan Hills Area)Project No. 17-01, in the Council Chambers of the City Hall. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless sealed and filed with the clerk and accompanied by a bid security payable to the clerk for 5% of the amount of such bid. Passed and adopted by the Chanhassen City Council this 23rd day of January,2017. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger,Mayor YES NO ABSENT 1 Capital Improvement Program 2017 thru 2021 Department Street Improvements City of Chanhassen, MN Contact Paul Ochme Type Improvement Project# ST-012 Useful Life Unassigned Project Name Annual Street Improvement Program Category Streets/Highways Account#1 601-xxxx-4751 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: 830,680,000 Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas: 2017-Minnewashta Manor area and Lake Susan Hills Drive area MSA-Park Road and Park Place 2018-Orchard Lane area MSA-Lake Drive East and Dakota Ave(Highway 5 to Lake Drive East) 2019-Choctaw area,Kurvers Point area and 96th Street MSA-Minnewashta Parkway overlay and trail 2020-Chan View area MSA-Lake Lucy Road(Highway 41 to Galpin Blvd)and trail 2021 -Stone Creek area and Ches Mar Drive Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective,a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical,reconstruction of the street is necessary. A feasibility study is written to considerthe merits of the project and scope of work. Prior Expenditures 2017 2018 2019 2020 2021 Total 16,405,000 Construction 4,375,000 2,700,000 2,300,000 3,800,000 1,100,000 14,275,000 Total Total 4,375,000 2,700,000 2,300,000 3,800,000 1,100,000 14,275,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total I 16,405,000 Assessment/Revolving 3,275,000 1,600,000 1,100,000 3,300,000 1,100,000 10,375,000 Assess Fund Total MSA 1,100,000 1,100,000 1,200,000 500,000 3,900,000 Total 4,375,000 2,700,000 2,300,000 3,800,000 1,100,000 14,275,000 Budget Impact/Other I This project may decrease maintenance costs. I 1 I I I 88 I ICapital Improvement Program 2017 thru 2021 Department Water System Improvements City of Chanhassen, MIN Contact Paul Oehme I Project# W-024 Type Improvement Useful Life Unassigned Project Name Watermain Replacement n Category Utilities I Account#1 700-7025-4751 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: $5,220,000 IReplacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. I mJustification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets.If significant repairs are necessary to the existing water main,replacement may be the most cost effective option. Given the highly corrosive soils in the City,water main replacement is an ongoing 1 project in the City. 1 Prior Expenditures 2017 2018 2019 2020 2021 Total 3,325,000 Construction 75,000 770,000 100,000 850,000 100,000 1,895,000 Total Total 75,000 770,000 100,000 850,000 100,000 1,895,000 I Prior Funding Sources 2017 2018 2019 2020 2021 Total 3,325,000 Water Utility Fund 75,000 770,000 100,000 850,000 100,000 1,895,000 Total Total 75,000 770,000 100,000 850,000 100,000 1,895,000 I Budget Impact/Other These projects will decrease maintenance costs. 0 I U III II II Ill 111 I Capital Improvement Program 2017 thru 2021 Department Surface Water ManagementI City of Chanhassen, MN Contact Paul Oehme Project# SWMP-019 Type Improvement 1 Useful Life Unassigned Project Name Street Improvement Projects-Storm Water Mgmt Category SWMP Account#1 720-7025-4751 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: $2,685,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. 11 1 Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal,state and local regulations,as well as protecting existing and proposed development adjacent to the projects. 1 Prior , Expenditures 2017 2018 2019 2020 2021 Total 1 1525,000 Construction 500,000 250,000 80,000 250,000 80,000 1,160,000 Total Total 500,000 250,000 80,000 250,000 80,000 1,160,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total 1,525,000 Surface Water Utility Fund 500,000 250,000 80,000 250,000 80,000 1,160,000 Total Total 500,000 250,000 80,000 250,000 80,000 1,160,000 l Budget Impact/Other Inventory,inspection and maintenance of new infrastructure will be required. Citywide.No map 1 ,1 I ,1 I .1 98 I Capital Improvement Program 2017 thru 2021 Department Sanitary Sewer Improvements City of Chanhassen, MN Contact Paul Oehme 1 Project# SS-014 Type Improvement Useful Life Unassigned Project Name Sanitary Sewer Replacement Category Utilities Account#1 701-7025-4751 Account#3 Priority n/a Account#2 Account#4 Description Total Project Cost: $2,110,000 Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. I Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. I Prior , Expenditures 2017 2018 2019 2020 2021 Total 1,300,000 Construction 210,000 250,000 50,000 250,000 50,000 810,000 1 Total Total 210,000 250,000 50,000 250,000 50,000 810,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total I 1,300,000 Sewer Utility Fund 210,000 250,000 50,000 250,000 50,000 810,000 Total Total 210,000 250,000 50,000 250,000 50,000 810,000 Budget Impact/Other This project will decrease maintenance costs. . I I I I I I 80 I