A-2. AUAR Draft FindingsCITY OF C HANHASSE N Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow TO: Todd Gerhardt FROM: % Kate Aanenson �L DATE: February 27, 2017 p s \i `•' SUBJ: 2005 AUAR Update Attached is a brief memorandum outlining the key findings of the AUAR. There will be more detailed information and exhibits provided at the work session following the City Council meeting Monday night. The purpose of this meeting is to give you background information that will be presented at the AUAR Open House on February 28, 2017 from 5:00 pm to 7:00 pm in the Senior Center at Chanhassen City Hall. The AUAR measures the impacts of the development. The AUAR does not evaluate the uses or the architecture/design of the project. Those issues will be evaluated as part of a separate development application. G\PLAN\AUAR\2016 update\cc cover memo 2.17.17 PH 952.227.1100 • www.ci.chanhassen.mn.us • FX952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 Hoisington Koegler Group Inc. To: Kate Aanenson, Community Development Director From: Brad Scheib, AICP Subject: Chanhassen 2005 AUAR Council Memorandum for 2/27/2017 meeting Date: 22 February 2017 The purpose of this memorandum is to provide an update on the AUAR process and an overview of the AUAR update key findings, in preparation for a public meeting scheduled for 28 February 2017. This memorandum will follow an outline that will be used in presenting information to the Council on Monday the 27"' and the general public at an open house scheduled from 6:30 to 8:30 on Tuesday the 28`". Purpose and Process The Alternative Urban Areawide Review (AUAR) is a process established by Minnesota laws that allows for evaluation of the cumulative impact of development proposed for a certain area. The City of Chanhassen used this process in 2003 to evaluate the potential development impacts on the 2005 Metropolitan Urban Services Areas (MUSA) which was identified in the Comprehensive Plan. The AUAR was an appropriate tool at the time because a property owner/developer (Town and Country Homes) was proposing a significant development project that would require an environmental review, other property owners were speculating on potential development projects, and planning was well underway forthe construction of Highway 212 which was a catalyst for future growth. The 2005 AUAR was officially adopted in December of 2003. Per Minnesota laws, the AUAR needs to be updated in order to be valid for any current proposed development projects that might require environmental review. As you are aware, the Avienda project has ultimately materialized and triggered the need to update the AUAR document which was officially ordered by the City Council in late 2016. The following is an overview of the process and remaining steps to complete the updated AUAR: 1. Update existing development conditions of the project area (completed) 2. Confirm the alternative development scenarios for remaining developable lands (completed) 3. Update the AUAR document (DRAFT is near completion and will be finalized after receiving preliminary council and public input) 4. Facilitate the formal review of the completed DRAFT AUAR to include the following process: o Conduct a Planning Commission Public Hearing—Set for March 7 o Present to City Council on March 27 o Publish in EQB Monitor and distribute to agencies for review and comment April 3 o Revise draft based on comments and present to City Council for final consideration on May 8 pending complexity of comments received through review process. Summary of the Prior AUAR At the time of the original 2005 AUAR, no development had occurred within the project area and Highway 212 was designed but not constructed. A residential development project was being proposed and a school facility 123 North Third Street, Suite 100, Minneapolis, MN 55401-1659 Ph (612) 338-0800 FX (612) 338-6838 www.hkgi.com Direct (612) 252-7122 Email brad@hkgi.com 2005 AUAR Update Project update memo 22 February 2017 Page 2 was also being considered within the project area. The AUAR included a high level historical cultural resources study, documentation of existing natural resources, and some limited wetland delineation for the residential project being proposed. Land use concepts were explored based on the comprehensive plan and the development proposal being submitted forthe residential project. The development scenario assumed growth of just over 1,600 residential units, over 700,000 square feet of office/industrial development, and a new school. The development scenario assumed an internal roadway network that included a continuous through street (major collector street) connecting Powers Boulevard with Audubon Road. Mitigation strategies were established to manage potential development impacts. Existing Site Conditions Since the original AUAR was developed: • Highway 212 has been constructed; • the residential portion of the development scenario has largely been built out; • Bluff Creek Boulevard has been constructed up to the vacant land area which is the subject of the Avienda development proposal (note that the design and alignment of Bluff Creek Boulevard was established following the development scenario and mitigation strategies established in the AUAR); • portions of the Bluff Creek Corridor have been preserved consistent with the overlay district and platted lands; • a new park has been established to serve the residential area; and • and a new school has been builtjust outside of the project area instead of within it. The remainder of the project area is in a similar condition and use as was in 2003. Comprehensive Plan Guidance The Comprehensive Plan was updated in 2008. The plan continued with a dual guiding for land use in the area but introduced commercial development as a new use. The plan further provided a vision for a more regional serving lifestyle like center for this area. Development Scenarios Tested for the AUAR Update The AUAR tested two alternative development scenarios. The variation in the scenarios is largely driven by alternatives presented for the Avienda project as a result of attempting to minimize impacts to a significant wetland complex in the northeast quadrant of the project area. Key differentiations between the concepts include the degree of retail square footage. In addition, some development areas outside of Avienda were assumed as residential or business park uses. The difference between the original AUAR and the updated development scenarios areas follows: approximately 250 to 400 fewer housing units and approximately 500,000 to 600,000 square feet of non-residential space in -lieu of an anticipated high school. Traffic Impacts A complete traffic study was conducted as part of the original AUAR in 2003. A new traffic study has been conducted as part of the AUAR update. Staff is currently reviewing the draft traffic study results with MnDOT 2005 AUAR Update Project update memo 22 February 2017 Page 3 and Carver County. The results of the traffic study indicate consistent findings with the original study and provided recommended mitigation strategies that are necessary to maintain acceptable traffic flow. The mitigation strategies include: • continued extension of Bluff Creek Boulevard to its planned connection at Powers Blvd. • internal roadway connections serving the Avienda development and connecting to Lyman Blvd. • intersection controls (signalization at various intersections), • turn lane restriping at key intersections, • and monitoring of key intersections to proactively anticipate future signalization needs Other Impacts As with any development project, municipal sewer, potable water, and storm water management infrastructure must be provided to the site. These municipal infrastructure systems have been designed and maintained to accommodate the type of development being proposed on the site and are adequate. Internal collection and distribution systems will be designed following existing city ordinances and policies. It is anticipated that the remainder of the project area will develop within the next 15 to 20 years, with the Avienda project being the most near term development (anticipated built out within the next 5 years). A more detailed presentation will be provided with key exhibits at Monday's meeting. LT. a Z 2 a CA H m z D m z a m C 77 W D> z D> m m ED m m G m 9 a m a ME ::14 N NV@UL15 IMULL m d m d N HEEE$ i X'yI j` g� } p W N Rl 1 3 gi' MEMO f SEI EE xx ® , �ldi$NUFF a ::14 a