D-6. Award of Quote, Concrete Work Associated with the 2017 Park Shelter Project �1 0� 9 �v CITY OF ClIANIIASSEN q S Chanhassen isa Community for Life-Providing for Today and Planning for Tomorrow MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Adam Beers, Park Superintendent DATE: April 10, 2017 SUBJ: Award of Quote, Concrete work associated with the 2017 Park Shelter Project PROPOSED MOTION: "The City Council awards the quote for concrete work to be completed at Minnewashta Heights Park, Herman Field Park, and South Lotus Lake Park to Theis Construction, Inc. in the amount of$41,790." Approval requires a simple majority vote of the City Council. BACKGROUND This year's Park and Trail Capital Improvement Budget contains $120,000 for the installation of covered shelters in three parks. This budget includes the purchase of the shelters, installation, site amenities, concrete foundations, and site restoration. The structures will serve as central gathering locations for organized activities and events and provide shelter from inclement weather. The addition of these shelters will fill a void in the city's park and recreation infrastructure to help ensure that our park system remains a strong element in our mission to provide for today while planning for the future. These improvements are scheduled to be completed by early summer. The following quotes were received for concrete work to be completed and are within the anticipated capital improvement budget: Bidder Total Cost Theis Construction, Inc. $41,790 Dayco Concrete $75,700 PH 952.227.1100• www.ci.chanhassen.mn.us• FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 Todd Hoffman Park Shelters Concrete Quote April 10, 2017 Page 2 2017 PICNIC SHELTER BUDGET Associated Concrete Work $41,790 Shelter Structures (Approved by City Council on March 13, 2017) $54,502 Anticipated Additional Construction Costs Site Amenities $10,000 Erosion Control/Site Restoration $5,000 Total Project Cost $111,292 Budgeted Project Cost $120,000 RECOMMENDATION On March 28, 2017 the Park and Recreation Commission unanimously recommended that the City Council award the 2017 shelter concrete quote to Theis Construction Inc. in the amount of $41,790. Funds for the project are included in the 2017 Capital Improvement Program. ATTACHMENTS 1. Quotes. 2. CIP Sheet PK&T— 120 Neighborhood Park Shelter Initiative. 3. Park Plan Sheets. g:\pw\adam\park shelter initiative\2017 shelter project\april 10 2017 shelter concrete council approval.docx PROJECT CHANHASSEN 2017 PARK SHELTERS QUOTE FORM CITY OF CHANHASSEN OWNER: City of Chanhassen Todd Gerhardt Quotes must be returned by Friday,February 10th,2017. City Manager Email or Fax Chenhaesen,MN Email:abeerst ci.chenhassen.mn.us Fax 952.227,1310 Attn:Adam Beers SUBMITTED BY: Name g'8 9 -2$�trJ 3 Address - _ /2!7 "- • - i' lse.a? Telephone n �'` �3I Fax Vg.6 ^ 6 9 a q �" email Conrad 'W` PROJECT DESCRIPTION j work as Indicated in plans at three separate park locations(Hermon Field Park,MInnewashta Heights Park,and South Lotus Park) Contractor to verify work In field with owner. OFFER The undersigned,beingfamiliar with the local conditions affecting the cost of the work and with the Contract Documents,Including the Drawings and ANY Addenda,and in accordance with the provisions thereof,hereby propose to furnish all labor,materials,and equipment necessary to complete construction for 2017 Park knprovemems In Chanhassen Parks. estimatedauanttties listed on euotw form or iarttied In Add e„�•m will be used alonewith ononctors submhted unIt prices and lump sum etice5 so tabulate ouote totals.Each sglamirted quote will be calculated using the ewe e9ttmeted ouentitice.Estimated Quantities shown on the Quote Form are not guaranteed. "UNIT PRICE"Items shall include at labor,materials,storing.equipment,overhead,profit,Insurance,tags,etc.,neeessaryto cover the work described In the Contract Documents.Final payment to the contractor for'UNIT PRICE"items shall be based on the actual authorized and installed quantities in the Contractor's uNtprice. Each Contractor must verify or establish quantities and the extent of work to their own satisfaction for"LUMP Sum' Items,and submit a total quote sufficient to cover all the work outlined In the Contract Documents,"LUMP SUM"quotes Shell include all labor,materials,storm&equipment,overhead,profit,Insurance,tap, etc,,necessary to cover the work described in the contract Docvmenct.Freal payment to the Corer mar fur"LUMP sure items she be based on the Contractors price forcompletlon of the work outlined In the Contract Documents. The Contractor Is familiar with the PLANS and understands the provisions thereof,The Contractor is responsible for reviewing the site conditions(both surface and subsoil)and Contract Documents to establish a clear understanding of the work within the scope of this project The bidder Shall not rely on verbal information obtained from employees of the Owner or Consultant OWNER'S RIGHT The Owner reserves the right to revise the scope of the work outlined on the Contract Documents and listed in the schedule.The Owner,based an budgetary considerations,reserves the right to eliminate a particular line item. "Lump Sum"and"Unit Price"items In the Schedule shell prevail for eliminating or changing quantities of work items from those Indicated In the Contract Documents. AWARD OF CONTRACT The Contract for the work outlined In the Contract Documents end this Quota Form,will be awarded to the lowest qualified quote.Lowest quote will be determined by the TOTAL,BID PRICE for the accepted Items and quantities,plus any alternates chosen by owner. A. SC_HED - iF "• TIT MS No. Section Description Est.Qty. Unit Unit Price Total unit x qty) 1 6 inch concrete walks/grin pads&base(3 park lowtione) 2178,00 SFrp I ^ 3a�r 2 4 inch concrete shelter slab whebar&base(3 park locations) 2250.00 SF _yZs,� I 31553-- p 2.3 75—r 3 Concrete drop curbing at parking tot(Herman Field) '1.00 LS f��� /a„sDk '- 4 a Concrete drop curbing at play container(Minnewashta Hts) 1,00 LS ",, opa 5 Pedestrian ramp with truncated donees all oompleta(Minnewashta Hts) 1.00 LS dry 6 Thickened cone edge to 6'Done walk at play eentalner(Herman Fed) 316.00 IF dD , —_ J 6110• T 30 die Concrete tooting for shelter(3 park locations) 16.00 EA 657.9A- 4 9 Aar 9 9474 e eft bituminous frail&base(Minnewasrea His) 113.00 LF BABE BID TOTAL. /' 9,119�/ I hereby propose and agree to furrlsh all labor,materials,removal,overhead,profit,insurance,and other costs required to complete the work described In the Drawing`s for the following amount. WRITTEN: 4 .44,14441 - .,_ _ .. ,DOLLARS NUMERICAL: 6 � 9 ?4 6. CONTRACT TIME AND QUALITY CONTROL The undersigned agrees to achieve substantial Completion of all work by May as,2017, Contractor understands the retainer Is set at 5.0%until setltactoryoompletlon of work, 012 Chanhassen Perks 02/03/2017 14:16 9525560279 DAYCO PAGE 03/06 Page No. 1 of 2 Pages PROPOSAL ' Concrete Company CHANHASSEN LAKES BUSINESS PARK 1850 Lake Drive West, Chanhassen,Minnesota 55317 Telephone: 952-556-0278 • Fax: 952-556-0279 Proposal Submitted To: City of Chanhassen Att'n:Adam Beers Date: 2-3-2017 7700 Market Blvd. Telephone: 952-227-1304 Chanhassen,Minnesota 55317 Fax; 952-227-1310 Project: 2017 Shelter Improve. Herman Field Park Project Location; Chanhassen,Minnesota Architect; Hoisington Koegler Group We hereby subm t estimates for all labor and materials for concrete and masonry work as per plan: As detailed on page 2 attached —1-7-4-A.f C,0, 1-• 3 • ss -� S 11)0 • We propose hereby to fur ish material and labor—complete in accordance with above specifications,for the sum of Thirty Seven Thous-rid Nine Hundred Fifty and.00/100 dollars (8 37,950.00 ) Payment to be made within 30 days on portion completed(monthly billings.)At the end of thirty(30)days from the completion of said work there shall be a percent(1 %z%)service charge for each month with said service charge to be calculated at the rate of percent() '4%)of the firm price.It is understood by the undersigned that this prop.sal is a legal notice to owner and that the contractor may file a lien against the above described property within one hundred and twenty days of c.mpletion of the work If the contractor is not paid within said one hundred and twenty days. All material is guaranteed to be as p miffed.All work to be completed in a workmanlike manner according to standard practices.Any alteration or Authorized deviation from above specifications involving extra costs will be executed Signature only upon written orders,and will become an extra charge over and above / James R.Berg(estimator the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. NOTE:This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANOB OF PROPOSAL—The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to Signature do the work as specified.Payment will be made as outlined above. Date of Acceptance Signature 02/03/2017 14:16 9525560279 DAYCO PAGE 05/06 Page No. 1 of 2 ,Pages PROPOSAL •y Concrete Company CHA.NI`IASSEN LAKES BUSINESS PARK 1850 Lake Drive West, Chanhassen, Minnesota 55317 Telephone: 952-556-0278 • Fax: 952-556-0279 Proposal Submitted To: City of Chanhassen Att'n:Adam Beers Date: 2-3-2017 7700 Market Blvd. Telephone: 952-227-1304 Chanhassen,Minnesota 55317 Fax: 952-227-1310 Project: 2017 Shelter Improvements South Lotus Park Project Location: Chanhassen,Minnesota. Architect: Hoisington Koegler Group We hereby submit estimates for all labor and materials for concrete and masonry work as per plan: As detailed on page 2 attached We propose hereby to furnish material and labor—complete in accordance with above specifications,for the sum of Seventeen Thousand Four Hundred Fifty and 00/100 dgi1ars($ 17,450.00 ) Payment to be made within 30 days on portion completed(monthly billings.)At the end of thirty(30)days from the completion of said work there shall be a percent(I '''A%)service charge for each month with said service charge to be calculated at the rate of percent(1 %z%)of the firm price,It is understood by the undersigned that this prop sal is a legal notice to owner and that the contractor may file a lien against the above described property within one hundred and twenty days of impletion of the work if the contractor Is not paid within said one hundred and twenty days. Al!material is guaranteed to be as specified.All work to be completed in a workmanlike manner according td standard practices.Any alteration or Authorized deviation from above specifications involving extra costs will be executed Signature only upon written orders,and will become an extra charge over and above Ja es R.Berg les9matosi the estimate,All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance, NOTE:This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL—The above prices,specifications and conditions are satisfactory and am hereby accepted.You ate authorized to Signature do the work as specified.Payment will be made as outlined above. Date of Acceptance Signature • 02/03/2017 14:16 9525560279 DAYCO PAGE 01/06 Page No. 1 of 2 Pages PROPOSAL ' - Concrete Company CHAIVHASSEN LAKES BUSINESS PARK 1850 Lake Drive West, Chanhassen,Minnesota 55317 Telephone: 952-556-0278 • Fax: 952-556-0279 Proposal Submitted To: City of Chanhassen Att°n: Adapt Beers Date: 2-3-2017 7700 Market Blvd. Telephone: 952-227-1304 Chanhassen, Minnesota 55317 Fax: 952-227-1310 Project: 2017 Shelter Improve, Minnewashta Heights Project Location: Chanhassen,Minnesota Architect: Hoisington Koegler Group We hereby sub i t estimates for all labor and materials for concrete and masonry work as per plan: As detailed on page 2 attached We propose hereby to nish material and labor—complete in accordance with above specifications,for the sum of: Twentt Thousand ee Hundred and 00/100 doll($ 20,300.00 Payment to be made within i days on portion completed(monthly billings.)At the end of thirty(30)days from the completion of said work there shall be a percent(1 '/_%)service charg for each month with said service charge to be calculated at the rate of percent(1 '4%)of the firth price.It is understood by the undersigned that this pro sal is a legal notice to owner and that the contractor may file a lien against the above described property within one hundred and twenty days of 4 repletion of the work if the contractor Is not paid within said one hundred and twenty days. Ail materials guaranteed to be as:pacified.All work to be completei- a workmanlike manner according .standard practices.Any alteration or Authorize 11111 deviation from above specification:involving extra costs will be executed Signature .; �_� ' - - only upon written orders,and will .ecome an extra charge over and above James R.Berg the estimate,All agreements Conti gent upon strikes,accidents or delays beyond our control.Owner to , fire,tornado and other necessary insurance, NOTE:This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROFOSA —The above prices,specifications and conditions arc satisfactory and are hereby accepted.You are authorized to Signature do the work as specified,Payment will be made as outlined above, Date of Acceptance Signature Capital Improvement Program 2017 thru 2021 Department Park&Trail Improvements City of Chanhassen, MN Contact Todd Hoffman Project# PK&T-120 Type Improvement Useful Life Project Name Neighborhood Park Picnic Shelter Initiative Category Park Account#1 400-4008-4706 Account#3 Priority n/a Account#2 Account#4 Description l otal Project Cost: $500,000 Installation of covered park shelters in parks to serve as central gathering locations,provide shelter from inclement weather and provide a meeting location for activities and events. 2017-Minnewashta Heights Park,Herman Field Park and South Lotus Lake Park 2018-Sunset Ridge Park and Prairie Knoll Park Justification This initiative will fill a current void in the City's park and recreation infrastructure system helping to ensure that our park system remains a strong element in our mission of providing for today while planning for the future. Prior Expenditures 2017 2018 2019 2020 2021 Total 300,000 Construction 120,000 80,000 200,000 Total Total 120,000 80,000 200,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total 300,000 General Fund Surplus 120,000 80,000 200,000 Total Total 120,000 80,000 200,000 Budget Impact/Other This will add minimal annual operations impact. N4: :'\\N< ,%4 ypv.•:4 ,,. _INN\N South Lotus Park ``-�— (playground area) n .�` `' By Contractor `"'�"•y • concrete walk and base ,"`'~"�.�.. • shelter concrete walk and base N.., \ii • shelter footings e71417 ..:1„, , . ?7,,/ Th d "� 8.0' MEET GRADES OF EX.TRAIL a 128SFCONC WALK By Others 16 0' • provide shelter and install aByStaff 4/ � • erosoncontrow' '' - • grading andecavationto accept 1concrete and concrete base material 6.0' �`' • stakin /survel9 Y • • restoration ILL �-, 8'01' • grill and picnic tables Y) 28FT SHELTER • 750 SF-VERIFY CONC PAD SIZE WITH c SHELTER SHOP DWGS EROSION CONTROL (BY CITY) 7 .f . N fo eik ./. 74//://1::: ' :. :90i ik ., gh e6 ,` 0 5 15 30 60 GN 1 1 A 1 Key: Description: Date REV 1.23.17 Prepared by: Client: Project: SHEET ©©Hoisington Koegler Group Inc. City of Chanhassen 2017 Shelter Improvements ........................................................................................................................................... 123 North Third Street,Suite 100 Park and Recreation Dept. BaMinneapolis,Minnesota 55401 612.338.0800 fax.612.338.6838 7700 Market Blvd. Sheet Title: • Chanhassen, MN 55307 South Lotus Park Minnewashta Heights Park 1 PED RAMP:SAW CUT AND REMOVE EXISTING /---- CURB,INSTALL NEW CURBING AND TRUNCATED DOMES AS PER CITY STANDARD. By Contractor --- • concrete walk and base • concrete pedestrian ramp (curb • l; i i Herman Field Park / 1 By Contractor • concrete walk and base • concrete play container edge and walk •B concrete play container ramp 8 LF NEW CURB WITH 4LF FLAT AND TAPERED TO MEET EXISTING CURB • concrete parking lot curb • shelter concrete walk and base APPROX.1922 SF CONC WALK • shelter footings mom LS\ , ■SIlig By Others Ie • provide shelter and install • ��0��11/ani® �e { By Staff CLEAR ■ee 1101 ____G- . • erosion control a WAL DIMENSIONS �I�" • ■®4 • removals ■ 78 S CONC.RAMP : t,/ � !�%,� �� • ! • radin and excavation to accept concrete and �� • .tea / 9 9 ® w �� ���r/�t,`�- � � 1� 1,-- concrete base material I thy . ,; ,,, t.�_ removal of la container timbered e 4 - play g • I 20.0' w. .4 w, • removal of play container pea gravel and addition • `s 4 GRILL AREA • of playcontainer wood mulch / _ (GRILL BY CITY) �k • staking/survey for ® • • restoration • 16.0' •`—� a / grill andpicnic tables �� 28FT SHELTER •1-1- 750 SF-VERIFY CONC PAD SIZE WITH • ak i I SHELTER SHOP DWGS t I EROSION CONTROL • l� (BY CITY) IPI a 4.0' it I .41111.411111` 41 8.0 "w1110r N 316 LF THICKENED CONC DGER Alk CONCRETE WALK WIDER FOR BENCH-CENTER ON CO TAINER LENGTH VIP BENCH BY CITY 5 15 30 60 ) 1 0 r Key: Description: Date: REV I.Z . / Prepared by: Client: Project: SHEET ©©Hoisington Koegler Group Inc. City of Chanhassen 2017 Shelter Improvements _._..._._.._.... 123 North Third Street,Suite 100 Park and Recreation Dept. ®1IMinneapolis,Minnesota 612.338.0800 fax.612..338.338.6838 7700 Market Blvd. Sheet Title: Chanhassen, MN 55307 Herman Field Park CONCRETE WALK INTEGRAL CONC. PLAY CURB (2) #4 REBAR, CONT. 23"R EXPANSION JOINTS EVERY 40 FT 1' 1' USE 2—#5 X 12" LONG EPDXY COATED DOWELS \I "R / 10" / REFER TO PLANS FOR DIM f 10" / / SLIP DOWELS, WOOD MULCH BY CITY CONCRETE BROOM CONTRACTION JOINTS EVERY 4FT. \ \ 2 "R 24"R i' 2.. \ . FINISH � DEPTH WILL VARY ,' �>V -.. 11 '4.) ,, :.. ,`1I1'as "y { .`'4 "', " \. '-'r<",;,-,3,>2,77's, \ \ ENGINEERED WOOD MULCH BY CITY 1— V �d1Y 95% COMPACTED SUBGRADE �," M o �' "(ASTM D1557) 3' 9" 3' 4" APPROVED GRANULAR BORROW, ' / / / / 4,• APPROVED GRANULAR BORROW RECYCLED CLASS 7 AGGREGATE BASE, OR / / SAND COMPACTED TO 95%, ASTM D1557 RECYCLED CLASS 7 AGGREGATE BASE, OR SAND COMPACTED TO 95%, ASTM D1557 1 CONCRETE CURB PLAY CONTAINER CURB INTEGRAL TO WALK 3 PLAY CONTAINER ACCESSIBLE CONCRETE RAMP-TYPICAL 4 0 1 2 Fr 4 0 1 2 Fr NO. 4 EPDXY COATED REBAR SLIP DOWELS — 6" LONG, SPACED 24" D.C. / 10" / REFER TO PLANS FOR DIM / 10" j, ALONG EDGE WHERE ACCESSIBLE SURFACE CONCRETE MEETS CONCRETE WOOD MULCH PLAY CONTAINER CURB. BY CITY — DEPTH CAULK WITH URETHANE SEALANT ALONG ENTIRE LENGTH WILL VARY OF RAMP WHERE IT ABUTS CONCRETE EDGE. CONCRETE BROOM CONC. PLAY CONTAINER TOP OF CONC WALK \ 23"R FINISH 24"R CURB INTEGRAL TO WALK, 4 FT TYPICAL 10" WOOD MULCH REFER TO DETAIL / BY CITY . CONC. WALK, CONCRETE BROOM REFER TO DETAIL FINISH 2 "R -'^, 1 .'v;-•— ? I 'fT "x""71:7714,u*WI ,,..4„. \ LID Y 1r1741r Alf •r ',y, y •'-k ��,y ti � 's •3 I o'-.,rrte.- VI-'....,...,*.� Ysf' ' �livav �fiiiili v\ /3/ 9„ /3/ N0. 4 EPDXY COATED REBAR SLIP '. . v� �v . v' . \\ 1'-3” DOWELS — 6" LONG, SPACED 24" O.C. 1,• A.24 ;T;r2,', ,E,„ V, d / / ALONG EDGE WHERE ACCESSIBLE SURFACE CONCRETE MEETS CONCRETE PLAY CONTAINER CURB. CDO 4" APPROVED GRANULAR BORROW,4 / 1' / RECYCLED CLASS 7 AGGREGATE BASE, OR SAND COMPACTED TO 95%, ASTM D1557 2 PLAY CONTAINER ACCESSIBLE CONCRETE RAMP AT CONC.PLAY CONTAINER CURB 4 PLAY CONTAINER ACCESSIBLE CONCRETE RAMP SECTION AT TOP OF RAMP 4 4 0 1 2 F' 0 1 2 FT Key.!Description: Date: REV 1.23.17 Prepared by: Client: Project: SHEET ©©Hoisington Koegler Group Inc. City of Chanhassen 2017 Shelter Improvements 123 North Third Street,Suite 100 Park and Recreation Dept. MilMinneapolis,Minnesota 55401 7700 Market Blvd. Sheet Title: 612.338.0800 fax.612.338.6838 DETAILS 4 Chanhassen, MN 55307 ANCHOR BOLTS FOR SHELTER POSTS BY SHELTER INSTALLER TOP OF FTG, BROOM FINISH LEVEL WITH CONCRETE WALK 4 °• ' 4 e e d 6" CONCRETE SIDEWALK • SEE CITY STANDARDS SAWCUT CONTROL JOINT (1/8") ° AT 1/3 THICKNESS OF THE SLAB. Q° ° EXP JOINT AT CONCRETE WALK REFER TO PLANS FOR JOINT SPACING • .4 TIP CELL EXPANSION JOINT MATERIAL. e e Y2" EXPANSION JOINT TO OCCUR 100' O.C. MAX. AND 0.5 INCH RADIUS AT TURF ° ° ° AT CONST. JOINTS, RAMPS, WALLS AND OTHER VERTICAL APPROX. '. 4 OBSTRUCTIONS. 1/8" ° ed EDGE CONDITIONS VARY, ° HOLD DOWN APPROX. 4 TO ALLOW FOR JOINT SEALANT. Ipu HOLD DOWN TOP OF MULCH OR ' ° FINISH GRADE FOR TURF 1 INCH. ° 1111 (8) #6 VERTICAL BARS (EQUALLY SPACED) 2% \ a ° MAX CROSS—S S ' TYP. LAN a 3 INCH CLEAR , TYP SEE GRADING PLANS LIGHT BROOM FINISH PERPENDICULAR o _ o- �I_ 3__ _•_'_•-•_ _ • ° ° ° TO TRAFFIC FLOW, REFER TO PLAN �I—�I—I —III—III 11=III—III— III—III=III=1 III=1� a e #4 TIES HORIZONTAL @ 12" O.C. III-11 l i 11=III=11 III-III—1 1 1—I —I i t—1 i t—III III-1 Il i t W/2 TIES IN THE TOP 5" 6" APPROVED STOCKPILED SUBGRADE, IIIIII RECYCLED CLASS 7 AGGREGATE BASE, OR 3" CLEAR TYP SAND COMPACTED TO 95%, ASTM D1557 (SEE SPECS) UNDISTURBED SOIL OR 95% COMPACTED FILL EXTEND BASE 2—INCHES 30 " DIA 95% COMPACTED SUBGRADE (ASTM D1557) PAST CONC. EDGE / / CONCRETE DESIGN BASED ON: AT 28FT SHELTER 2 DAY STRENGTH OF 3000PSI SLUMP OF 4" (+/— 1") ® 6 INCH CONCRETE SIDEWALK TYPICAL SHELTER CONCRETE FOOTING DETAIL 0 1 211 0 1 2 F EXP JOINT AT CONCRETE WALK TYP 4 INCH CONCRETE SLAB AT SHELTERS TOP OF FTG, BROOM FINISH . LEVEL WITH CONCRETE WALK TOPSOIL 3" MONOLITHIC BITUMINOUS LIFT, HOLD FINISHED GRADE OF TURF 1" MnDOT WEAR COURSE. SPNWEA23OC iie ., — BELOW TRAIL SURFACE 6" COMPACTED CLASS 5 AGGREGATE IVqo �° %° 4 #4 EXPDXY COATED REBAR 1:1 TAPER TYP. 2% MAX. CROSS SLOPE, TYP. BASE A °�° 4• �° 2° �° 4° g° 2-8" EACH WAY, TYP , . ._ op O O � o 80 !o, . . ° ..• • \•_., 2 /, �� 00, �b o ,,•O• /� •• CONCRETE DESIGN BASED ON: 6 INCH CLASS 5 IV•-�moa o�< --°o " O °�8 T.0411w ,i p� Cipo ' 2 DAY STRENGTH OF 3000PSI II .0 0 0' I O'�0•—oo :- UNDISTURBED SOIL OR 95% COMPACTED FILL I 4o I I I—� I— SLUMP OF 4" (+/— 1") TYP. — / 1' SEE PLANS TYPICAL. COMPACTED SUBGRADE TO 95%— MODIFIED PROCTOR DENSITY ® BITUMINOUS TRAIL -TYPICAL 4 SHELTER CONCRETE SLAB DETAIL 5 0 1 2FT Key: Description: Date: REV 1.23.17 Prepared by: Client: Project: SHEET ©©Hoisington Koegler Group Inc. City of Chanhassen 2017 Shelter Improvements 123 North Third Street,Suite 100 Park and Recreation Dept. . 111101 Minneapolis,Minnesota 55401 7700 Market Blvd. Sheet Title: 612.338.0800 fax.612.338.6838 Chanhassen, MN 55307 DETAILS )