Loading...
D-3. Orchard Lane Area Street and Utility Reconstruction City Project 18-01: Accept Feasibility Study, Call Public Hearing CITY OF CHANHASS-EN Chanhassen is a Community for Life-Providing for Today and Planning for Tomorrow A A MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Paul Oehme, Public Works Director/City Engineer ` DATE: August 14, 2017 SUBJ: 2018 Street Reconstruction Project No. 18-01: Accept Feasibility Study; Call Public Hearing PROPOSED MOTION "The City Council accepts the feasibility report for the 2018 Street Reconstruction Project No. 18-01 and calls the public hearing for August 28, 2017. City Council approval requires a simple majority vote of the City Council present." BACKGROUND On March 13, 2017, the City Council approved a consultant contract for the 2018 Street Reconstruction Project and authorized preparation of the feasibility study. On July 12, 2017, an open house was held to discuss the proposed project. DISCUSSION Orchard Lane Neighborhood Every year the City considers streets that are in poor V0 condition to be rehabilitated or reconstructed. For the 2018 Street Reconstruction Project, staff is proposing to make improvements to approximately 0.7 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, site investigations and utility problems in the area. The proposed project is in the Orchard Lane neighborhood in the northwest corner of the city. Sixty-fourth (64th) Street was constructed in 1988 and was sealcoated in 1995 and 1999. All other streets where generally constructed in 1974 and were sealcoated in 1995 and 1999. The pavement condition indices (PCIS) are shown on the graphic below. A PCI of 100 represents a new street. Streets with a PH 952.227.1100• www.Cl.chanhassen.mn.us• FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 PCI below 45 typically indicate distresses that require a full reconstruction,therefore it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. State atate, v - prchard Lane o 0 OCcra(d Lane .. j GA CD �O newashta 43 I e The street widths vary between 20' and 26' within 30' up to 60' wide of right-of-way. The drivable portion of the streets (i.e. the bituminous surface and the concrete gutter) is proposed to be the same as the existing widths. Sixty-fourth(64h) Street has curb and gutter and was constructed in 1988. These streets are somewhat newer than the other streets and show less distress. However, the streets area significantly block cracked and major maintenance is needed at this time. An overlay would prolong the life of the street however the street will show the reflective cracks soon after the street is paved. The street is proposed for a partial reconstruction which would include reclaiming the existing roadway, removing some of the subgrade,placing 10"of reclaimed material as aggregate base matching the existing section, spot curb and gutter replacement, and placing new 4"bituminous surfacing. All other streets are proposed to be fully reconstructed. The proposed pavement section includes 18" of sand, 10" of Class 5 and 4" of bituminous as recommended by the soils engineer. Surmountable curb is proposed to be installed in this area. Draintile is proposed to be added in the back of the curb. Watermain Improvements The watermain in this area is either cast iron or ductile iron pipe. Sixty-fourth (64th) Street is the only area with ductile iron pipe which is not proposed to be replaced. One documented watermain break is shown on the graphic below. Due to the poor performance of cast iron pipe in the City, staff is proposes to replace the cast iron pipe with PVC watermain. All services would also be replaced where watermain is being replaced. . Mate f.� 2 gyp: f i Sanitary Sewer Improvements Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 110 feet of sewer is proposed to be replaced due to the condition of the pipe. The remaining sewer pipe is in good structural condition, although some requires mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. Storm Sewer Improvements This areas have very little stormwater infrastructure. Using the Surface Water Management Plan, a new storm sewer system is proposed for the project area. Based on a hydrologic analysis, there is a need for catch basins and storm sewer to transition from rural sections to urban sections and to tie into the existing public storm sewer on the easterly end of the project area. The system will be comprised of reinforced concrete pipe (RCP). Stormwater water quality improvement options have been identified along with estimated costs and treatment efficiencies for two different potential water quality treatment options to provide improved conveyance and stormwater treatment. The proposed options would implement stormwater measures to provide treatment to reduce both phosphorous and total suspended solids while still providing conveyance and rate control. Though several options were reviewed for feasibility, the limited public land available, topography and narrow right-of-way in this area limits the options for stormwater improvements. Easements may be required depending on the specific option(s) chosen. The specific water quality Best Management Practices (BMPs) recommended for consideration consist of: 1. Rain gardens at 2500 and 2630 Orchard Lane at the existing low point. 2. Adding a drainage swale on the City property at Herman Field Park. Rdn Carden■1 �z Ran eaf*n t2 Mi1.0 h M4 f 6M l]h9 OI.P9.1 MMD.eA9 M;Ae.9 A.Y' Ae PDlpoeed Wabf QUakty S.nle Nsr NNOaed EnMnamem Pmjad 10 he completed Wrd.2017-2018 Feasibility Report The feasibility report was prepared by WSB and Associates. A copy of the feasibility report is available in the Engineering Department. An open house was held on Wednesday, July 12, 2017 to discuss the proposed project and to answer questions; approximately 30 people attended. All of the residents' questions were answered at the meeting and/or with a follow-up after the meeting. PROJECT FUNDING Assessments will be based on the City's assessment practice of assessing 40% of the street improvement cost to the benefitting properties on a per lot basis. The assessments would be proposed for a 10-year term at an interest rate of prime rate plus 2% at the time the contract is awarded. Budgets for the proposed work have been included in the 2017 CIP. A summary of the feasibility estimate and CIP budget is below: Funding Source Feasibility Budget Estimate Revolving Assessment Fund $ 1,184,000.00 $1,687,300 Stormwater Utility Fund $ 262,000.00 $200,000 Sanitary Sewer Utility Fund $100,000 $250,000 Water Utility Fund $560,000 $770,000 Total $2,106,000 $2,907,300 The estimated costs include 10% contingency and 11% indirect costs. Estimated Assessments (Orchard Lane, Forest Circle, Forest Lane, and Oriole Ave): Total estimated assessable street costs: $739,926.00 40% assessed: 40% of$1,203,600 = $295,970.40 36 assessable units $295,970.40 - 36 units =$8,221.40/unit** Estimated Assessments for 64th Street: Total estimated assessable street costs: $110,890.00 40% assessed: 40% of$1,203,600 = $44,356.00 12 assessable units $44,356.00 - 12 units = $3,696.33/unit** The estimated assessment lies within the benefit range identified of past consultation reports. SCHEDULE The proposed project schedule is as follows: Public Hearing; Authorize Preparation of Plans and Specifications August 28, 2017 Approve Plans and Specifications; Authorize Advertisement for Bids Dec. 11, 2017 Call Assessment Hearing March, 2018 Assessment Hearing; Accept Bids and Award Contract April, 2018 Start Construction June, 2018 Construction Substantially Complete August, 2018 Attachments: 1. CIP pages 2. Resolution gAeng\public\_2018 projects\18-01 orchard lane area recon\communication\20170814 proj 18-Olaccept feasibility.doc Capital Improvement Program 2017 thru 2021 Department Street Improvements City of Chanhassen, MN Contact Paul Qchme Project M ST-012 Type Improvement pseful Lite Unassigned Project Name Annual Street Improvement Program Category Streets/Highways Account Ml 601-xxxx-4751 Account M3 Priority n/a Account M2 Account#4 Description Total Project Cost. $30,680,000 Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas: 2017-Minnewashta Manor area and Lake Susan Hills Drive area (P MSA-Park Road and Park Place 1 2018-Orchard Lane area MSA-Lake Drive East and Dakota Ave(Highway 5 to Lake Drive East) (� 2019-Choctaw area,Kurvers Point area and 96th Street f MSA-Minnewashta Parkway overlay and trail 2020-Chan View area MSA-Lake Lucy Road(Highway 41 to Galpin Blvd)and trail 2021 -Stone Creek area and Cites Mar Drive Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective,a street will eventually deteriorate to a point that further maintenance is no longer cost effective. ;1 Rehabilitation pmiects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical,reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Prior Expenditures 2017 2018 2019 2020 2021 Total 16,405,000 Construction 4,375,000 2,700,000 2,300,000 3,800,000 1,100,000 14,275,000 'Dotal Total 4,375,000 2,700,000 2,300,000 3,800,000 1,10D,000 14,275,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total 16,405,000 Assessment/Revolving 3,275,000 1,600,000 1,100,000 3,300,000 1,100,000 10,375,000 Assess Fund Total MSA 1,10000 1,100,000 1,200,000 500,000 3,900,000 Total 4,375,000 2,700,000 2,300,000 3,800,000 1,100,000 14,275,000 Budget Impact/Other l This project may decrease maintenance costs. Capital Improvement Program 2017 thru 2021 Department Sanitary Sewer Improvements City Of Chanhassen, MN Contact Paul Ochme Project# SS-014 Type Improvement Project Name useful Life Unassigned Sanitary Sewer Replacement Category utilities Account#1 701-70254751 Account 113 Priority n/a Account#2 Account 94 Description ' Total Project Cost: $2,110,000 Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. i I Justification The City considers the condition of the existing utilities in the process to seleot streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Prior Expenditures 2017 2018 2019 2020 2021 Total 1,300,000 Construction 210,000 250,000 50,000 250,000 50,000 810,000 Total Total 2101000 250,000 50,000 250,000 50,000 810,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total 17300,000 Sewer Utility Fund 210,000 250,000 50,000 250,000 50;000 810,000 Total Total 210,000 250,000 50,000 250,000 50,000 810,000 Budget hnpact/Other This project will decrease maintenance costs. j .. i 4 I 80 i i L Capital Improvement Program 2017 thru 2021 Deparmient Surface Water Management City of Chanhassen, MN Contact Paul Oehme Project H SWMP-019 Type Improvement Useful Life Unassigned Project Name Street Improvement Projects-Storm Water Mgmt Category SWMP Account Hl 720-7025-4751 Account 43 Priority n/a Account H2 Account H4' i Description Total Project Cost: $2,685,000 �n annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal,state and local regulations,as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2017 2018 2019. 2020 2021 Total 1,525,000 Construction 500,000 250,000 80,000 250,000 80,000 1,160,000 Total Total 500,000 250,000 80,000 250,000 $0,000 1,460,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total 17525,000 Surface Water Utility Fund 500,000 250,000 80,000 250,000 80,000 1,160,000 "Total Total 500,000 250,000 80,000 250,000 80,000 1,160,000 Budget Impact/Other Inventory,inspection and maintenance of new infrastructure will be required. Citywide.No map F P P 98 Capital Improvement Program 2017 rhru 2021 pcpartment Water System Improvements 'silty of Chanhassen, MN Contact Paul Oehme Project# W-424 Type Improvement Project Name Watermain ReplacementUseful Life Unassigned Category Utilities Account#1 700-7025.4751 Account 43 Priority n/a Account 02 Account#4 Description Total Project cost. $5,220,000 Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets.If significant repairs are necessary to the existing water main,replacement may be the most cost effective option. Given the highly corrosive soils in the City,water main replacement is an ongoing project in the City. Prior Expenditures 2017 2018 2019 2020 2021 Total 3;325,000 1 Construction 75,000 770,000 100,000 850,000 100,000 1,895;000 Tota l Total 75,000 770,0¢0 100,000 850,000 100,000 1,895,000 Prior Funding Sources 2017 2018 2019 2020 2021 Total 3,325,000 1 Water Utility Fund 75,000 770,000 100,000 850,000 100,000 1,895,000 Total Total 75,000 770,000 100,000 850,000 100,000 1,895,000 Budget Impact/Other These projects will decrease maintenance costs. I � j � , 111 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES,MINNESOTA DATE: August 14,2017 RESOLUTION NO: 2017-XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING THE PUBLIC HEARING FOR THE 2018 STREET RECONSTRUCTION PROJECT NO. 18-01 WHEREAS, pursuant to resolution of the Council adopted March 13, 2017, a report has been prepared by City staff with reference to the above-referenced project, and this report is being received by the Council on August 14, 2017, and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost-effective, and feasible. NOW,THEREFORE,BE IT RESOLVED by the Chanhassen City Council: 1. The Council will consider the improvement of such project in accordance with the report and the assessment of abutting properties for a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the street improvements of$2,106,000. 2. Public hearing for the proposed improvements within the 2018 Street Reconstruction Project No. 17-01 shall be held on August 28, 2017 in the Council Chambers of City Hall at 7:00 PM. The clerk shall give mailed and published notice of the hearing and improvement as required by law. Passed and adopted by the Chanhassen City Council this 14th day of August, 2017. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT