Loading...
Approve Quote for Lake Lucy Ln Storm Sewer ImpCITY COUNCIL STAFF REPORT Monday, April 23, 2018 Subject Resolution 2018­32: Approving Quote for Lake Lucy Lane Storm Sewer Improvement Section CONSENT AGENDA Item No: E.9. Prepared By Paul Oehme, Director of Public Works/City Engineer File No: PW437 PROPOSED MOTION “The City Council approves a quote for Lake Lucy Lane Storm Sewer  Improvements to Minger Construction in the amount of $64,982.75, City Project No. PW437." Council approval requires a Simple Majority Vote of members present. BACKGROUND In the fall of 2017, an old 8­inch field tile failed under Lake Lucy Lane just south of Pheasant Hill Park.  This tile was the primary means of discharging surface water from the wetland on the north side of Lake Lucy Lane to the south side. Due to failure (collapse) of this field drain tile after large rain events, Lake Lucy Road floods and has to be pumped down. The only means of discharge currently is through infiltration and evaporation.  Staff has studied the problem and worked with the neighbors on a solution. The city also needed to work with the Riley Purgatory Bluff Creek Watershed District to obtain a permit since wetlands are adjacent to the project area. The city enlisted the services of Wenck and Associates to work through the permit process as soon as the problem was identified. Staff originally envisioned just replacing the old field tile with a culvert pipe. Due to the potential wetland impacts and hydraulic considerations, this plan was soon dismissed. After many meetings, discussions, and plan revisions, the city was able to obtain a Watershed District permit on April 4th. The plan calls for constructing a storm sewer system with storm sewer manholes. The design also includes many more feet of pipe than was originally planned. After receiving the Watershed District permit, the city was able to solicit construction quotes. On April 13th at 2:00 PM,  the City received quotes as follows: G.F. Jedlicki                     $98,263.50 GM Contracting $94,867.09 Minger Construction        $64,982.75 Minger Construction was the low bidder. Minger Construction has worked on other city projects and their work has been acceptable. CITY COUNCIL STAFF REPORTMonday, April 23, 2018SubjectResolution 2018­32: Approving Quote for Lake Lucy Lane Storm Sewer ImprovementSectionCONSENT AGENDA Item No: E.9.Prepared By Paul Oehme, Director of PublicWorks/City Engineer File No: PW437PROPOSED MOTION“The City Council approves a quote for Lake Lucy Lane Storm Sewer  Improvements to Minger Construction in theamount of $64,982.75, City Project No. PW437."Council approval requires a Simple Majority Vote of members present.BACKGROUNDIn the fall of 2017, an old 8­inch field tile failed under Lake Lucy Lane just south of Pheasant Hill Park.  This tile wasthe primary means of discharging surface water from the wetland on the north side of Lake Lucy Lane to the southside. Due to failure (collapse) of this field drain tile after large rain events, Lake Lucy Road floods and has to bepumped down. The only means of discharge currently is through infiltration and evaporation. Staff has studied the problem and worked with the neighbors on a solution. The city also needed to work with theRiley Purgatory Bluff Creek Watershed District to obtain a permit since wetlands are adjacent to the project area. Thecity enlisted the services of Wenck and Associates to work through the permit process as soon as the problem wasidentified.Staff originally envisioned just replacing the old field tile with a culvert pipe. Due to the potential wetland impacts andhydraulic considerations, this plan was soon dismissed. After many meetings, discussions, and plan revisions, the citywas able to obtain a Watershed District permit on April 4th. The plan calls for constructing a storm sewer system withstorm sewer manholes. The design also includes many more feet of pipe than was originally planned. After receivingthe Watershed District permit, the city was able to solicit construction quotes.On April 13th at 2:00 PM,  the City received quotes as follows:G.F. Jedlicki                     $98,263.50GM Contracting $94,867.09Minger Construction        $64,982.75Minger Construction was the low bidder. Minger Construction has worked on other city projects and their work has been acceptable. The project was included in the 2018 CIP #SWMP­055. Funding above the budgeted amount is proposed to come from the Storm Sewer Enterprise Fund. ATTACHMENTS: Resolution CIP Sheet CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: April 23, 2018 RESOLUTION NO: 2018-XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING QUOTES AND AWARDING A CONTRACT FOR THE LAKE LUCY LANE STORM SEWER IMPROVEMENTS PW437 WHEREAS, quotes were received for the Lake Lucy Lane Storm Sewer Improvements; and WHEREAS, it appears the quote from Minger Construction in the amount of $64,982.75 is the lowest responsible quote. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Minger Construction in the name of the City of Chanhassen for the Lake Lucy Lane Storm Sewer Improvements, PW437, in the amount of $64,982.75, according to the plans and specifications therefore approved by the City Council and on file in the office of the city clerk. Passed and adopted by the Chanhassen City Council this 23rd day of April, 2018. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT