Loading...
1e 2005 MUSA Area, 04-05 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax: 952.227.1110 Building Inspections Phone 952.227.1180 Fax 952.227.1190 Engineering Phone 952.227.1160 Fax 952.227.1170 Finance Phone 952.227.1140 Fax 952.227.1110 Park & Recreation Phone 952.227.1120 Fax 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax 952.227.1404 Planning & Natural Resources Phone 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone 952.227.1300 Fax 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.ci.chanhassen.mn.us ie - MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Paul Oehme, Dir. of Public Works/City Engineer PO. ~. DATE: August 22, 2005 SUBJ: Approve Contract for Final Design Services to Kimley-Horn Associates for the 2005 MUSA Area - Project No. 04-05 REQUESTED ACTION The City Council is requested to approve a Consultant Work Order with Kimley- Horn and Associates in the amount of $366,000 for final design engineering services for the 2005 MUSA Improvements. BACKGROUND On February 28, 2005, the City Council ordered the portion of the 2005 MUSA Improvements that will not be constructed as a part of the TH 212 project. These improvements include various street and utility improvements within the 2005 MUSA area as detailed in the August 2004 Feasibility Report prepared by Kimley-Horn and Associates. The contract with Kimley-Horn and Associates . was in the amount of $52,000. The contract was closed with approved billings totaling $50,765.00 On March 28,2005, the City Council approved a Consultant Work Order with Kimley-Horn and Associates for preliminary design services for the 2005 MUSA Improvements in the amount of $ 86,500. Over the past four months, City staff and Kimley-Horn have been working to further develop plans for the infrastructure required to support development in the 2005 MUSA area. On August 8, 2005 staff present the recommended design improvements for the 2005 MUSA area at the Council work session. These improvements include various roadway, watermain, sanitary sewer, and storm sewer improvements as described below. 1. Roadway Improvements . East-West Collector Roadway between Audubon Road and Powers Boulevard . East-West Collector Roadway/Audubon Road Turn Lanes and Traffic Signal The City 01 Chanhassen . A growing tO~lwi.n~JI&,Il'lUaJH\I ssll.Tal~t~~biJr.i/jjlnW6$wilJd;iA(fJ[oi~gl(Jlj.lJBGutiful parks. A great place to live. work. and play Todd Gerhardt August 22, 2005 Page 2 2. Watermain Improvements · Extension of existing trunk watermain in Lyman Boulevard to the proposed location of the East-West Collector Roadway · Trunk watermain along the East-West Collector Roadway between Audubon Road and Powers Boulevard 3. Sanitary Sewer Improvements · Extension of trunk sanitary sewer from an existing lift station along the south side of Lyman Boulevard east of Audubon Boulevard . Trunk Sanitary Sewer along the East-West Collector Roadway between Audubon Road and Powers Boulevard 4. Storm Drainage Improvements · Storm sewer and ponding improvements along the East-West Collector Roadway between Audubon Road and Powers Boulevard The proposed improvements are generally consistent with those described in the feasibility report; however, modifications have been made based upon additional engineering analysis, new existing conditions/base mapping information, and input from the area property owners. Based upon current estimates, the total estimated project cost of these infrastructure improvements is approximately $8.5 million. Staff has been meeting with the property owners in the area to review the proposed preliminary infrastructure designs. This has included numerous meetings with individual property owners and neighborhood meetings on May 16, 2005, June 22, 2005, July 6, 2005, and August 4, 2005. DISCUSSION The next step in the implementation of these improvements is to prepare final plans and specifications. Some of the property owners in the project area are anxious for the improvements to proceed to construction since they are necessary for their pending development. Staff is considering two separate bid packages for the project to allow some of the construction to occur in 2005. The following is a description of the improvements included as a part of each bid package and a proposed schedule for the design and construction of the improvements. Bid Package #1 - Bluff Creek Bridge and Trunk Watermain and Sanitary Sewer Improvements The improvements included as a part of Bid Package #1 are as follows: G:\ENGIPUBLIC\04-05 2005 MUSA\82205 bkgd 2005 MUSA fmal eog (2).doc Todd Gerhardt August 22, 2005 Page 3 . Installation of trunk watermain along the east side of Bluff Creek between Lyman Boulevard and the East-West Collector Roadway. · Installation of trunk sanitary sewer along the east side of Bluff Creek between Lyman Boulevard and the East-West Collector Roadway. · Installation of trunk watermain along the East-West Collector Roadway. · Installation of trunk sanitary sewer along the East-West Collector Roadway. · Construction of a Bebo bridge across Bluff Creek including the realignment of a portion of the creek channel. These improvements are proposed to be constructed during the late fall/early winter months of 2005 to take advantage of frozen ground conditions and low flows in Bluff Creek. Bid Package #2 - Roadway, Storm Sewer and Trunk Utility Improvements The improvements included as a part of Bid Package #2 are as follows: . Construction of the East- West Collector Roadway between Audubon Road and Powers Boulevard. . Improvements to the Audubon Road and East-West Collector Roadway intersection including the installation of a traffic signal. . Installation of storm sewer along the East-West Collector Roadway including the construction of a stormwater pond along the south side of the roadway at Bluff Creek. These improvements are proposed to be constructed during the summer of 2006. A preliminary schedule for the improvements is provided below: Bid Package #1 Approve Plans & Specs. and Authorize Ad for Bids Accept Prelim. Assessment Roll & Call Assessment Hearing Bid Opening Assessment Hearing and Award Contract Start Construction Construction Complete Bid Package #2 Final Plans Complete for Submittal to MnDOT State Aid Approve Plans & Specs. and Authorize Ad for Bids Accept Prelim. Assessment Roll and Call Assessment Hearing Bid Opening Assessment Hearing and A ward Contract G:\ENGIPUBLlC\04-05 2005 MUSA\82205 bkgd 2005 MUSA fmal eng (2).OOc Sept. 12,2005 Sept. 26,2005 Oct. 14, 2005 Oct. 24, 2005 Nov. 7, 2005 Feb. 3,2006 Jan. 9,2006 Jan. 23,2006 Jan. 23,2006 Feb. 17,2006 Feb. 27,2006 Todd Gerhardt August 22, 2005 Page 4 Start Construction Construction Complete May 1,2006 Nov. 3,2006 The final design and construction of the improvements will need to be closely coordinated with the adjacent property owners. This coordination may require changes in the schedules detailed above. Staff has solicited a proposal from Kimley-Horn & Associates for the final design tasks described above. It is staff's opinion that the final design services should be performed by Kimley-Horn & Associates due to the following: . The quality of their previous services for the 2005 MUSA area. . Their knowledge and background of the project area. . Their knowledge of the property owners in the project area. . The tight schedule required to allow these improvements to proceed to meet the needs of the area property owners. . Their familiarity with the TH 212 project. Kimley-Horn's estimate cost for the final design work is as follows: Work Task 1. Final Plans Bid Package #1 Bid Package #2 2. Additional Design Services Wetland Delineation Field Surveying 3. Project Manual 4. Engineer's Estimate 5. Bidding 6. Permits 7. Utility Coordination 8. Meetings 9. Legal Descriptions/Exhibits Subtotal Reimbursable Expenses Permitting Fees Total Estimated Cost Estimated Fee $ 85,000 $ 215,000 $ 3,000 $ 5,000 $ 5,000 $ 2,000 $ 5,000 $ 2,000 $ 1,000 $ 12,000 $ 10,000 $ 345,000 $ 20,000 $ 1,000 $ 366,000 Requests for proposals for the 2005 MUSA Feasibility Study were solicited in 2004 for this work. Kimley-Horn & Associates was the low bidder. Also, the TH 212 design verification and inspection contract was competitively bid which Kimley-Horn & Associates was the low bidder. In addition, the AUAR contract for this area was competitively bid which Kimley-Horn & Associates was the low G:\ENGIPUBLlC\04-05 2005 MUSA\82205 bkgd 2005 MUSA fmal eng (2).doc Todd Gerhardt August 22, 2005 Page 5 bidder. Recently, Kimley-Hom & Associates designed and inspected the Northbay Trunk Watermain improvements. Their work on this job was acceptable and they were within the budgeted amount for the approved contract. The hourly rates Kimley-Hom & Associates are proposing are almost the same as for the feasibility study contract and are very competitive with other consulting firms. Kimley-Hom & Associates is proposing to perform the work on a time and materials basis not to exceed $366,000. This is less than 6% of the total estimated construction cost of the improvements which is well within industry standards for final design phase services. They will be required to submit time sheets verifying the hours worked on the project and expense sheets. Staff will review the invoices and expense sheets for accuracy and conformance to the contract. Funding for final design services will be provided primarily by assessments to the benefiting property owners as identified in the 2005 MUSA Feasibility Study. Funding for the rest of the engineering work will come from MSA, and the utility funds. c: Jon Horn, Kimley-Hom & Associates Kate Aanenson, Community Development Director G:\ENGIPUBLIC\04-05 2005 MUSA\82205 bkgd 2005 MUSA frnal cog (2).OOc