Loading...
2019-2023 CIP 2019 - 2023 CapitalImprovementProgram 5-YEAR PLAN MAJOR EQUIPMENT MUNICIPAL BUILDINGS PARK & TRAIL IMPROVEMENTS PLANNING STREET IMPROVEMENTS SEWER SURFACE WATER MANAGEMENT WATER 2019-2023 Capital Improvements Program Table of Contents Chapter 1: Policy Capital Improvements Fiscal Policy ....................................................................................1 Chapter 2: Tables I: Funding Source Summary........................................................................................5 II: Projects by Funding Source .....................................................................................6 III: Department Summary ............................................................................................10 IV: Projects by Department ..........................................................................................11 Chapter 3: Major Equipment Fire Dept.: SCBA Equipment ...........................................................................................17 PPE: Turnout/Helmets ......................................................................................................18 Computer Purchases/Upgrades ..........................................................................................19 Telecommunications Purchases/Upgrades .........................................................................20 Community Development: Light Duty Trucks .................................................................21 Dump/Plow Truck Replacements/Additions .....................................................................22 Audio/Visual Equipment ...................................................................................................23 Public Works: Light Duty Trucks .....................................................................................24 Software Purchases ...........................................................................................................25 Computerized Records Retention System .........................................................................26 Fire Vehicles ......................................................................................................................27 Aerial Photography for City GIS Datasets .........................................................................28 Utilities: Light Duty Trucks ..............................................................................................29 Storage Area Network........................................................................................................30 Office Furniture .................................................................................................................31 Parks: Light Duty Trucks ..................................................................................................32 Mower Replacement: Parks ..............................................................................................33 Tractor Replacement: Parks ..............................................................................................34 Brush Chipper ....................................................................................................................35 Vactor Street Sweeper ........................................................................................................36 Annual Skid Loader Trade In ............................................................................................37 Copier Replacements .........................................................................................................38 Fleet Vehicles.....................................................................................................................39 Miscellaneous Fire Equipment/Hose Replacement ...........................................................40 Recreation Center Revitalization Project ...........................................................................41 Security / Access Control Systems ....................................................................................42 Zero Turn Mower Replacement - Parks .............................................................................43 Tar Kettle ...........................................................................................................................44 Hot Box with Asphalt Premix Heater ................................................................................45 Crack Sealer .......................................................................................................................46 Bobcat Trailer Replacement ..............................................................................................47 Mailing Folder/Inserter ......................................................................................................48 Compact Excavator ............................................................................................................49 Annual Zero Turn Mower Replacement - Park .................................................................50 Chapter 4: Municipal Buildings City Hall Remodel .............................................................................................................53 Citizen Survey ....................................................................................................................54 Fire Department Building Improvements ..........................................................................55 Senior Center Kitchen Update ...........................................................................................56 City Hall Roof Replacement ..............................................................................................57 Recreation Center Wall Replacement ................................................................................58 Chapter 5: Park & Trail Improvements Picnic Tables/Park Benches ...............................................................................................61 Trees ...................................................................................................................................62 Tennis Court Refurbishment .............................................................................................63 Lake Ann Lake Side Pavilion Roof Replacement .............................................................64 Arboretum Trail and Hwy 41 Underpass Cost Share ........................................................65 Park Equipment Replacement ............................................................................................66 Chapter 6: Sanitary Sewer Improvements Inflow and Infiltration Abatement .....................................................................................69 Sanitary Sewer Replacement ............................................................................................ 70 Sanitary Lift Station Rehabilitation Program ....................................................................71 2010 MUSA Sanitary Lift Station .....................................................................................72 Lower Bluff Creek Trunk Utility Improvements ...............................................................73 Chapter 7: Street Improvements Annual Street Improvement Program ................................................................................77 Pavement Management ......................................................................................................78 TH 101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)...................................................79 Market Blvd Improvements ...............................................................................................80 Lyman Blvd Improvements-Galpin Blvd to TH 41 ...........................................................81 Enhanced Pedestrian Roadway Crossings .........................................................................82 Galpin Blvd Improvements-Hwy 5 N to City limits ..........................................................83 TH 41 Rehabilitation – Pioneer Trail to TH 5 ...................................................................84 Downtown Signal Controller Replacement .......................................................................85 TH 5 Corridor Study (West of Hwy 41) ............................................................................86 Chapter 8: Surface Water Management Program Property Acquisition ..........................................................................................................89 Street Improvement Projects-Storm Water Management ..................................................90 Lower Bluff Creek TMDL Implementation ......................................................................91 Stormwater Pond Improvements ........................................................................................92 Storm Water Infrastructure Maintenance/Replacement .....................................................93 Lotus Lake Channels & Outfall Improvements .................................................................94 Upper Riley Creek Channel Stabilization ..........................................................................95 Rice Marsh Lake Iron Enhanced Sand Filter .....................................................................96 Pioneer Trail Flood Mitigation ..........................................................................................97 Downtown Water Reuse Project ........................................................................................98 Lake Virginia TMDL Load Reduction ..............................................................................99 Chapter 9: Water System Improvements Watermain Replacement ..................................................................................................103 Well Rehabilitation Program ...........................................................................................104 Low Zone 1 million gallon Storage Tank ........................................................................105 MUSA Trunk Watermain Oversizing ..............................................................................106 Repaint Watertower Place Tank ......................................................................................107 CAPITAL IMPROVEMENTS FISCAL POLICY GENERAL POLICY Chanhassen’s Capital Improvements Program reflects an assessment of the community’s needs and its ability to pay for major improvements. It is founded on the policy that reinvestment required for replacement, maintenance, or the increased efficiency of existing systems shall have priority over investments for expansion of existing systems or the provision of new services. FUNDING PRIORITIES Capital spending proposals will generally be funded on the following priority basis: 1.Those projects necessary for contributing to the public health and welfare. 2.Those projects which will help to maintain an existing system. 3. Those projects that will make an existing system more efficient. 4.Those projects representing the expansion of an existing system for new service or completely new public facility or service. FUNDING PRINCIPLES As a result, the following principles shall govern the implementation of the recommended Capital Improvements Program: 1.The City will make all capital improvements in accordance with the adopted Capital Improvements Program. 2.The City will develop a multi-year plan for Capital Improvements and update it annually. 3.The City will coordinate development of the Capital Improvements Program with development of the annual operating budget. Future optional costs associated with new capital improvements will be projected and included in operation budget forecasts. 1 2 Tables 3 This page intentionally left blank. 4 Capital Improvement Program City of Chanhassen, MN FUNDING SOURCE SUMMARY 2019 thru 2023 TotalSource2019 2020 2021 2022 2023 Assessment/Revolving Assess Fund 9,400,0002,025,000 300,000 4,875,000 2,200,000 Cable TV Fund 157,00040,000 25,000 25,000 42,000 25,000 Capital Replacement Equipment Fund 5,682,2451,177,000 765,000 756,900 860,945 2,122,400 Cash Reserves 1,000,0001,000,000 Developer Assessments 8,850,0008,850,000 MSA 8,600,0002,500,000 1,900,000 1,100,000 3,000,000 100,000 Other Agency Contribution 46,850,00017,725,000 21,350,000 465,000 7,310,000 Park Dedication Fund 725,00025,000 625,000 25,000 25,000 25,000 Park Replacement Fund 1,250,000245,000 255,000 245,000 250,000 255,000 Sewer Utility Fund 5,958,500519,500 1,175,500 395,000 3,333,500 535,000 State Funds 500,000500,000 Street Pavement Management 1,330,000290,000 260,000 260,000 260,000 260,000 Surface Water Utility Fund 3,181,000986,000 590,000 570,000 375,000 660,000 Tax Levy 465,00093,000 93,000 93,000 93,000 93,000 Water Utility Fund 10,378,5002,824,500 1,975,500 315,000 1,698,500 3,565,000 29,950,000 29,314,000 9,124,900 26,097,945 9,840,400 104,327,245GRAND TOTAL 5 Capital Improvement Program City of Chanhassen, MN PROJECTS BY FUNDING SOURCE 2019 2023thru TotalSource Project # Priority 2019 2020 2021 2022 2023 Assessment/Revolving Assess Fund PK&T-072 225,000150,000 75,000Tennis Court Refurbishment n/a ST-012 6,550,0001,850,000 300,000 2,200,000 2,200,000Annual Street Improvement Program n/a ST-037 2,600,0002,600,000Market Blvd Improvements n/a ST-044 25,00025,000TH 5 Corridor Study (West of Hwy 41)n/a 9,400,0002,025,000 300,000 4,875,000 2,200,000Assessment/Revolving Assess Fund Total Cable TV Fund EQ-026 125,00025,000 25,000 25,000 25,000 25,000Audio/Visual Equipment n/a MB-023 32,00015,000 17,000Citizen Survey n/a 157,00040,000 25,000 25,000 42,000 25,000Cable TV Fund Total Capital Replacement Equipment Fund EQ-004 200,045200,045Fire Dept.: SCBA Equipment n/a EQ-010 158,50035,500 30,000 30,400 31,300 31,300PPE: Turnout/Helmets n/a EQ-013 402,00082,200 85,600 75,500 87,500 71,200Computer/Network Equipment Purchases/Upgrades n/a EQ-014 59,0002,600 2,000 3,200 1,200 50,000Telecommunication Purchases/Upgrades n/a EQ-015 97,00031,000 33,000 33,000Light Duty Trucks: Community Dev.n/a EQ-016 683,000216,000 230,000 237,000Dump/Plow Truck Replacements/Additions n/a EQ-029 132,00047,000 85,000Light Duty Trucks: Public Works n/a EQ-048 434,40085,100 85,800 83,500 88,300 91,700Software Purchases n/a EQ-049 58,90022,000 21,900 3,000 5,000 7,000Computerized Records Retention System n/a EQ-054 1,522,000650,000 77,000 795,000Fire Vehicles n/a EQ-055 58,9002,300 26,000 2,300 2,300 26,000Aerial Photography for City GIS Datasets n/a EQ-081 110,00055,000 55,000Storage Area Network (SAN)n/a EQ-084 25,0005,000 5,000 5,000 5,000 5,000Office Furniture n/a EQ-100 187,00035,000 38,000 36,000 42,000 36,000Light Duty Trucks - Parks n/a EQ-104 168,00070,000 98,000Mower Replacement - Park n/a EQ-106 131,00018,000 113,000Tractor Replacement - Park n/a EQ-115 112,000112,000Brush Chipper n/a EQ-124 76,00019,000 19,000 19,000 19,000Annual Skid Loader Trade In n/a EQ-127 46,00018,500 9,000 9,000 9,500Copier Replacements n/a EQ-132 32,00032,000Fleet Vehicles n/a EQ-137 80,00015,000 15,000 15,000 15,000 20,000Miscellaneous Fire Equipment/Hose Replacement n/a EQ-140 25,00025,000Recreation Center Revitalization Project n/a EQ-152 25,50018,300 7,200Security / Access Control Systems n/a EQ-154 18,00018,000Zero Turn Mower Replacement - Parks n/a EQ-157 43,00043,000Tar Kettle n/a EQ-158 44,30044,300Hot Box with Asphalt Premix Heater n/a EQ-159 47,00047,000Crack Sealer n/a EQ-163 37,00037,000Compact Excavator n/a EQ-164 5,0001,000 1,000 1,000 1,000 1,000Annual Zero Turn Mower Replacement - Park n/a 6 TotalSource Project # Priority 2019 2020 2021 2022 2023 MB-010 150,000150,000City Hall Remodel n/a MB-026 100,000100,000Fire Department Building Improvements n/a MB-031 15,00015,000Senior Center Kitchen Update n/a MB-033 300,000300,000City Hall Roof Replacement n/a MB-034 69,70069,700Recreation Center Wall Replacement n/a PK&T-132 30,00030,000Lake Ann Lake Side Pavilion Roof Replacement n/a 5,682,2451,177,000 765,000 756,900 860,945 2,122,400Capital Replacement Equipment Fund Total Cash Reserves ST-038 1,000,0001,000,000Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a 1,000,0001,000,000Cash Reserves Total Developer Assessments SS-020 950,000950,0002010 MUSA Sanitary Lift Station n/a SS-024 7,900,0007,900,000Lower Bluff Creek Trunk Utility Improvements n/a 8,850,0008,850,000Developer Assessments Total MSA ST-012 3,100,000700,000 1,900,000 500,000Annual Street Improvement Program n/a ST-037 600,000600,000Market Blvd Improvements n/a ST-038 1,500,0001,500,000Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a ST-039 300,000300,000Enhanced Pedestrian Roadway Crossings n/a ST-040 3,000,0003,000,000Galpin Blvd Improvements-Hwy 5 N to City limits n/a ST-042 100,000100,000TH 41 Rehabilitation - Pioneer Trail to TH 5 n/a 8,600,0002,500,000 1,900,000 1,100,000 3,000,000 100,000MSA Total Other Agency Contribution EQ-118 30,00030,000Vactor Street Sweeper n/a ST-032 27,950,0007,500,000 20,450,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-038 9,100,0009,100,000Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a ST-039 300,000300,000Enhanced Pedestrian Roadway Crossings n/a ST-040 7,000,0007,000,000Galpin Blvd Improvements-Hwy 5 N to City limits n/a SWMP-024 1,000,000100,000 900,000Lower Bluff Creek TMDL Implementation n/a SWMP-046 200,000200,000Lotus Lake Channels & Outfall Improvements n/a SWMP-048 75,00015,000 60,000Upper Riley Creek Channel Stabilization n/a SWMP-053 250,000250,000Rice Marsh Lake Iron Enhanced Sand Filter n/a SWMP-056 685,000685,000Pioneer Trail Flood Mitigation n/a SWMP-057 250,000250,000Downtown Water Reuse Project n/a SWMP-058 10,00010,000Lake Virginia TMDL Load Reduction n/a 46,850,00017,725,000 21,350,000 465,000 7,310,000Other Agency Contribution Total Park Dedication Fund PK&T-042 50,00010,000 10,000 10,000 10,000 10,000Picnic Tables/Park Benches n/a PK&T-043 75,00015,000 15,000 15,000 15,000 15,000Trees n/a PK&T-138 600,000600,000Arboretum Trail and Hwy 41 Underpass Cost Share n/a 7 l Park Replacement Fund PK&T-141 1,250,000245,000 255,000 245,000 250,000 255,000Park Equipment Replacement n/a 1,250,000245,000 255,000 245,000 250,000 255,000Park Replacement Fund Total Sewer Utility Fund EQ-062 30,50015,000 15,500Light Duty Trucks: Utilities n/a EQ-124 9,5009,500Annual Skid Loader Trade In n/a EQ-160 3,5003,500Bobcat Trailer Replacement n/a EQ-161 5,0005,000Mailing Folder/Inserter n/a SS-012 1,000,000200,000 200,000 200,000 200,000 200,000Inflow and Infiltration Abatement n/a SS-014 560,000160,000 75,000 75,000 250,000Sanitary Sewer Replacement n/a SS-017 600,000135,000 130,000 120,000 130,000 85,000Sanitary Lift Station Rehabilitation Program n/a SS-020 950,000950,0002010 MUSA Sanitary Lift Station n/a SS-024 1,800,0001,800,000Lower Bluff Creek Trunk Utility Improvements n/a ST-032 750,000750,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-040 250,000250,000Galpin Blvd Improvements-Hwy 5 N to City limits n/a 5,958,500519,500 1,175,500 395,000 3,333,500 535,000Sewer Utility Fund Total State Funds ST-032 500,000500,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61) n/a 500,000500,000State Funds Total Street Pavement Management ST-018 1,300,000260,000 260,000 260,000 260,000 260,000Pavement Management n/a ST-043 30,00030,000Downtown Signal Controller Replacement n/a 1,330,000290,000 260,000 260,000 260,000 260,000Street Pavement Management Total Surface Water Utility Fund EQ-118 261,000261,000Vactor Street Sweeper n/a EQ-161 5,0005,000Mailing Folder/Inserter n/a SWMP-014 225,00075,000 75,000 75,000Property Acquisition n/a SWMP-019 1,310,000360,000 250,000 250,000 100,000 350,000Street Improvement Projects - Storm Water Mgmt n/a SWMP-024 125,00075,000 50,000Lower Bluff Creek TMDL Implementation n/a SWMP-032 720,00080,000 160,000 160,000 160,000 160,000Stormwater Pond Improvements n/a SWMP-045 275,00050,000 50,000 50,000 50,000 75,000Storm Water Infrastructure Maintenance/Replacement n/a SWMP-046 50,00050,000Lotus Lake Channels & Outfall Improvements n/a SWMP-048 25,00010,000 15,000Upper Riley Creek Channel Stabilization n/a SWMP-053 50,00050,000Rice Marsh Lake Iron Enhanced Sand Filter n/a SWMP-056 75,00075,000Pioneer Trail Flood Mitigation n/a SWMP-057 50,00050,000Downtown Water Reuse Project n/a SWMP-058 10,00010,000Lake Virginia TMDL Load Reduction n/a 3,181,000986,000 590,000 570,000 375,000 660,000Surface Water Utility Fund Total Tax Levy 8 Water Utility Fund EQ-062 30,50015,000 15,500Light Duty Trucks: Utilities n/a EQ-124 9,5009,500Annual Skid Loader Trade In n/a EQ-160 3,5003,500Bobcat Trailer Replacement n/a EQ-161 5,0005,000Mailing Folder/Inserter n/a SS-024 1,100,0001,100,000Lower Bluff Creek Trunk Utility Improvements n/a ST-032 800,000800,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-040 500,000500,000Galpin Blvd Improvements-Hwy 5 N to City limits n/a SWMP-057 50,00050,000Downtown Water Reuse Project n/a W-024 2,800,000600,000 1,100,000 200,000 900,000Watermain Replacement n/a W-032 330,00050,000 55,000 65,000 95,000 65,000Well Rehabilitation Program n/a W-046 2,600,0002,600,000Low Zone 1 million gallon Storage Tank n/a W-056 150,000150,000MUSA Trunk Watermain Oversizing n/a W-061 2,000,0002,000,000Repaint Watertower Place Tank n/a 10,378,5002,824,500 1,975,500 315,000 1,698,500 3,565,000Water Utility Fund Total 104,327,24529,950,000 29,314,000 9,124,900 26,097,945 9,840,400GRAND TOTAL 9 Capital Improvement Program City of Chanhassen, MN DEPARTMENT SUMMARY 2019 2023thru Total2019 2020 2021 2022 2023Department Major Equipment 5,535,5451,542,000 836,000 781,900 892,945 1,482,700 Municipal Buildings 666,70015,000 17,000 634,700 Park & Trail Improvements 2,230,000420,000 880,000 345,000 275,000 310,000 Sanitary Sewer Improvements 14,860,000495,000 405,000 395,000 13,030,000 535,000 Street Improvements 67,720,00023,158,000 24,553,000 6,253,000 11,103,000 2,653,000 Surface Water Management 5,435,0001,520,000 1,485,000 1,085,000 685,000 660,000 Water System Improvements 7,880,0002,800,000 1,155,000 265,000 95,000 3,565,000 29,950,000 29,314,000 9,124,900 26,097,945 9,840,400 104,327,245TOTAL 10 Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2019 2023thru Total2019 2020 2021 2022 2023Department Project # Priority Major Equipment EQ-004 200,045200,045Fire Dept.: SCBA Equipment n/a EQ-010 158,50035,500 30,000 30,400 31,300 31,300PPE: Turnout/Helmets n/a EQ-013 402,00082,200 85,600 75,500 87,500 71,200Computer/Network Equipment Purchases/Upgrades n/a EQ-014 59,0002,600 2,000 3,200 1,200 50,000Telecommunication Purchases/Upgrades n/a EQ-015 97,00031,000 33,000 33,000Light Duty Trucks: Community Dev.n/a EQ-016 683,000216,000 230,000 237,000Dump/Plow Truck Replacements/Additions n/a EQ-026 125,00025,000 25,000 25,000 25,000 25,000Audio/Visual Equipment n/a EQ-029 132,00047,000 85,000Light Duty Trucks: Public Works n/a EQ-048 434,40085,100 85,800 83,500 88,300 91,700Software Purchases n/a EQ-049 58,90022,000 21,900 3,000 5,000 7,000Computerized Records Retention System n/a EQ-054 1,522,000650,000 77,000 795,000Fire Vehicles n/a EQ-055 58,9002,300 26,000 2,300 2,300 26,000Aerial Photography for City GIS Datasets n/a EQ-062 61,00030,000 31,000Light Duty Trucks: Utilities n/a EQ-081 110,00055,000 55,000Storage Area Network (SAN)n/a EQ-084 25,0005,000 5,000 5,000 5,000 5,000Office Furniture n/a EQ-100 187,00035,000 38,000 36,000 42,000 36,000Light Duty Trucks - Parks n/a EQ-104 168,00070,000 98,000Mower Replacement - Park n/a EQ-106 131,00018,000 113,000Tractor Replacement - Park n/a EQ-115 112,000112,000Brush Chipper n/a EQ-118 291,000291,000Vactor Street Sweeper n/a EQ-124 95,00019,000 19,000 19,000 19,000 19,000Annual Skid Loader Trade In n/a EQ-127 46,00018,500 9,000 9,000 9,500Copier Replacements n/a EQ-132 32,00032,000Fleet Vehicles n/a EQ-137 80,00015,000 15,000 15,000 15,000 20,000Miscellaneous Fire Equipment/Hose Replacement n/a EQ-140 25,00025,000Recreation Center Revitalization Project n/a EQ-152 25,50018,300 7,200Security / Access Control Systems n/a EQ-154 18,00018,000Zero Turn Mower Replacement - Parks n/a EQ-157 43,00043,000Tar Kettle n/a EQ-158 44,30044,300Hot Box with Asphalt Premix Heater n/a EQ-159 47,00047,000Crack Sealer n/a EQ-160 7,0007,000Bobcat Trailer Replacement n/a EQ-161 15,00015,000Mailing Folder/Inserter n/a EQ-163 37,00037,000Compact Excavator n/a EQ-164 5,0001,000 1,000 1,000 1,000 1,000Annual Zero Turn Mower Replacement - Park n/a 5,535,5451,542,000 836,000 781,900 892,945 1,482,700Major Equipment Total Municipal Buildings MB-010 150,000150,000City Hall Remodel n/a MB-023 32,00015,000 17,000Citizen Survey n/a MB-026 100,000100,000Fire Department Building Improvements n/a MB-031 15,00015,000Senior Center Kitchen Update n/a MB-033 300,000300,000City Hall Roof Replacement n/a MB-034 69,70069,700Recreation Center Wall Replacement n/a 11 Total2019 2020 2021 2022 2023Department Project # Priority 666,70015,000 17,000 634,700Municipal Buildings Total Park & Trail Improvements PK&T-042 50,00010,000 10,000 10,000 10,000 10,000Picnic Tables/Park Benches n/a PK&T-043 75,00015,000 15,000 15,000 15,000 15,000Trees n/a PK&T-072 225,000150,000 75,000Tennis Court Refurbishment n/a PK&T-132 30,00030,000Lake Ann Lake Side Pavilion Roof Replacement n/a PK&T-138 600,000600,000Arboretum Trail and Hwy 41 Underpass Cost Share n/a PK&T-141 1,250,000245,000 255,000 245,000 250,000 255,000Park Equipment Replacement n/a 2,230,000420,000 880,000 345,000 275,000 310,000Park & Trail Improvements Total Sanitary Sewer Improvements SS-012 1,000,000200,000 200,000 200,000 200,000 200,000Inflow and Infiltration Abatement n/a SS-014 560,000160,000 75,000 75,000 250,000Sanitary Sewer Replacement n/a SS-017 600,000135,000 130,000 120,000 130,000 85,000Sanitary Lift Station Rehabilitation Program n/a SS-020 1,900,0001,900,0002010 MUSA Sanitary Lift Station n/a SS-024 10,800,00010,800,000Lower Bluff Creek Trunk Utility Improvements n/a 14,860,000495,000 405,000 395,000 13,030,000 535,000Sanitary Sewer Improvements Total Street Improvements ST-012 9,650,0002,550,000 2,200,000 2,700,000 2,200,000Annual Street Improvement Program n/a ST-018 1,765,000353,000 353,000 353,000 353,000 353,000Pavement Management n/a ST-032 30,000,0008,000,000 22,000,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-037 3,200,0003,200,000Market Blvd Improvements n/a ST-038 11,600,00011,600,000Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a ST-039 600,000600,000Enhanced Pedestrian Roadway Crossings n/a ST-040 10,750,00010,750,000Galpin Blvd Improvements-Hwy 5 N to City limits n/a ST-042 100,000100,000TH 41 Rehabilitation - Pioneer Trail to TH 5 n/a ST-043 30,00030,000Downtown Signal Controller Replacement n/a ST-044 25,00025,000TH 5 Corridor Study (West of Hwy 41)n/a 67,720,00023,158,000 24,553,000 6,253,000 11,103,000 2,653,000Street Improvements Total Surface Water Management SWMP-014 225,00075,000 75,000 75,000Property Acquisition n/a SWMP-019 1,310,000360,000 250,000 250,000 100,000 350,000Street Improvement Projects - Storm Water Mgmt n/a SWMP-024 1,125,000175,000 950,000Lower Bluff Creek TMDL Implementation n/a SWMP-032 720,00080,000 160,000 160,000 160,000 160,000Stormwater Pond Improvements n/a SWMP-045 275,00050,000 50,000 50,000 50,000 75,000Storm Water Infrastructure Maintenance/Replacement n/a SWMP-046 250,000250,000Lotus Lake Channels & Outfall Improvements n/a SWMP-048 100,00025,000 75,000Upper Riley Creek Channel Stabilization n/a SWMP-053 300,000300,000Rice Marsh Lake Iron Enhanced Sand Filter n/a SWMP-056 760,000760,000Pioneer Trail Flood Mitigation n/a SWMP-057 350,000350,000Downtown Water Reuse Project n/a SWMP-058 20,00020,000Lake Virginia TMDL Load Reduction n/a 5,435,0001,520,000 1,485,000 1,085,000 685,000 660,000Surface Water Management Total Water System Improvements W-024 2,800,000600,000 1,100,000 200,000 900,000Watermain Replacement n/a W-032 330,00050,000 55,000 65,000 95,000 65,000Well Rehabilitation Program n/a W-046 2,600,0002,600,000Low Zone 1 million gallon Storage Tank n/a 12 Total2019 2020 2021 2022 2023Department Project # Priority W-056 150,000150,000MUSA Trunk Watermain Oversizing n/a W-061 2,000,0002,000,000Repaint Watertower Place Tank n/a 7,880,0002,800,000 1,155,000 265,000 95,000 3,565,000Water System Improvements Total GRAND TOTAL 104,327,24529,950,000 29,314,000 9,124,900 26,097,945 9,840,400 13 This page intentionally left blank. 14 Major Equipment 15 This page intentionally left blank. 16 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2019 2023 thru Department Major Equipment Description This program is to provide additional and/or replacement SCBA air bottles, SCBA face masks, and upgrades to SCBA air packs as needed. Project #EQ-004 Priority n/a Justification Firefighting is a very rigorous and demanding activity that is performed in an environment of extremes. The periodic replacement and/or additions to SCBA equipment is required to maintain current quantities through replacement of damaged or destroyed equipment and to equip new firefighters. Budget Impact/Other There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Useful Life 20 years Project Name Fire Dept.: SCBA Equipment Category Fire Type Equipment Account #2 Account #1 400-4115-4705 Total Project Cost:$349,145 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 200,045200,045Equipment 200,045 200,045Total Prior 149,100 Total Total2019 2020 2021 2022 2023Funding Sources 200,045200,045Capital Replacement Equipment Fund 200,045 200,045Total Prior 149,100 Total 17 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2019 2023 thru Department Major Equipment Description This is for the purchase of PPE (turnout gear) to meet the NFPA 1851 standard, along with the replacement of turnout gear that has reached its average service life of 5 to 7 years. The department will also provide new members with turnout gear after they complete their probationary period. Project #EQ-010 Priority n/a Justification Turnout gear lasts approximately 5-7 years on average. Purchases in 2019 were increased due to higher than anticipated hiring. Budget Impact/Other There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Useful Life 5-7 years Project Name PPE: Turnout/Helmets Category Fire Type Equipment Account #2 Account #1 400-4105-4705 Total Project Cost:$428,150 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 158,50035,500 30,000 30,400 31,300 31,300Maintenance 35,500 30,000 30,400 31,300 31,300 158,500Total Prior 269,650 Total Total2019 2020 2021 2022 2023Funding Sources 158,50035,500 30,000 30,400 31,300 31,300Capital Replacement Equipment Fund 35,500 30,000 30,400 31,300 31,300 158,500Total Prior 269,650 Total 18 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description Funds the purchase of replacement user and network computer, printer, peripherals, and networking hardware. The replacement schedule was adopted in 1999 and is subject to modification by the MIS Coordinator with the approval of the City Manager and department heads. Project #EQ-013 Priority n/a Justification Budgeting and purchasing computer equipment through this project allows the City greater flexibility to direct equipment to where it is needed the most, rather than in individual budgets. The replacement schedule was developed by the MIS Coordinator in 1999 and approved by the 1999 Council appointed IT Task Force. Expenditures in the 2019 budget requests are for the replacement of 4 workstations, 15 desktop PC's, 5 laptop PC's and 12 tablets. Also included are the Engineering plotter and the Fountain Room projector. Most of the equipment being replaced will be recycled and re-issued to City staff. The oldest equipment in the inventory will be sold on the City public surplus auction site. Security related expenditures have been moved to the Security/Access Control Systems project. Budget Impact/Other Most items purchased for this account come with a 1 to 3 year warranty. Repairs to items are done by MIS staff after the warranty period expires. Spare parts or outside repairs are funded out of 101-1160-4530 (Repair & Maintenance-Equipment) or 101-1160-4300 (Consulting). Useful Life 3-8 years Project Name Computer/Network Equipment Purchases/Upgrades Category Administration Type Equipment Account #2 Account #1 400-4126-4703 Total Project Cost:$1,384,150 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 402,00082,200 85,600 75,500 87,500 71,200Office Equipment 82,200 85,600 75,500 87,500 71,200 402,000Total Prior 982,150 Total Total2019 2020 2021 2022 2023Funding Sources 402,00082,200 85,600 75,500 87,500 71,200Capital Replacement Equipment Fund 82,200 85,600 75,500 87,500 71,200 402,000Total Prior 982,150 Total 19 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This project funds the expansion and upgrades to the City telephone systems, excluding cellular equipment and service which remains an individual department budget item. The current City telephone system is a Mitel model 5000 and is located in the server room at City Hall. This system provides phone service for City Hall, the Library, Public Works, the Recreation Center, Fire Station 1 and the Water Treatment Plant. Project #EQ-014 Priority n/a Justification A central PBX system simplifies the management of phone services and allows for the integration of phone services with other City applications such as unified messaging and fax services. The PBX system was replaced with a Mitel 5000 in 2012. Additional IP and digital handsets will be ordered as replacements for existing Intertel digital phones at City Hall and the Fire Station. The conference phones for the small conference rooms, along with some headsets for existing phones are being replaced beginning in 2018. Budget Impact/Other Maintenance for the replacement telephone system will be funded out of the 1160-4300 services account. Useful Life 10 years Project Name Telecommunication Purchases/Upgrades Category Administration Type Equipment Account #2 Account #1 400-4101-4703 Total Project Cost:$160,550 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 59,0002,600 2,000 3,200 1,200 50,000Office Equipment 2,600 2,000 3,200 1,200 50,000 59,000Total Prior 101,550 Total Total2019 2020 2021 2022 2023Funding Sources 59,0002,600 2,000 3,200 1,200 50,000Capital Replacement Equipment Fund 2,600 2,000 3,200 1,200 50,000 59,000Total Prior 101,550 Total 20 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description These purchases are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program. 2020 - #607 2007 GMC Canyon 2022 - #611 2008 GMC Canyon 2023 - #612 2008 GMC Canyon Project #EQ-015 Priority n/a Justification These vehicles are used to provide building inspection services throughout the community. The average replacement age is over 13 years. Budget Impact/Other These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. Useful Life Unassigned Project Name Light Duty Trucks: Community Dev.Category Community Development Type Vehicles Account #2 Account #1 400-4107-4704 Total Project Cost:$270,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 97,00031,000 33,000 33,000Vehicles 31,000 33,000 33,000 97,000Total Prior 173,000 Total Total2019 2020 2021 2022 2023Funding Sources 97,00031,000 33,000 33,000Capital Replacement Equipment Fund 31,000 33,000 33,000 97,000Total Prior 173,000 Total 21 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description These purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow and sander. These vehicles are purchased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are typically required to be placed up to one year in advance of delivery. Replacement schedule is as follows: 2020 - #124 1998 Ford L8513 Dump/Plow Truck-with plow, wing and sander 2022 - #126 2000 Sterling L8513 Dump/Plow Truck-with plow, wing and sander 2023 - #127 2001 Sterling L8513 Dump/Plow Truck-with plow, wing and sander Project #EQ-016 Priority n/a Justification These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling snow. The average replacement age is 18.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the community creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule. Budget Impact/Other These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. Useful Life Unassigned Project Name Dump/Plow Truck Replacements/Additions Category Street Equipment Type Vehicles Account #2 Account #1 400-4108-4704 Total Project Cost:$2,052,800 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 683,000216,000 230,000 237,000Vehicles 216,000 230,000 237,000 683,000Total Prior 1,369,800 Total Total2019 2020 2021 2022 2023Funding Sources 683,000216,000 230,000 237,000Capital Replacement Equipment Fund 216,000 230,000 237,000 683,000Total Prior 1,369,800 Total 22 Capital Improvement Program City of Chanhassen, MN Contact Chelsea Petersen 2019 2023 thru Department Major Equipment Description Provides for the systematic maintenance and upgrading of audio/visual equipment. Project #EQ-026 Priority n/a Justification The original A/V equipment was purchased in 1989, with the upgrades in 1994, 2008 and 2012. Budget Impact/Other Future upgrades include expanding access to programming to those without access to cable, and continued enhancement of the live and broadcast experience. Useful Life Unassigned Project Name Audio/Visual Equipment Category Administration Type Equipment Account #2 Account #1 210-0000-4705 Total Project Cost:$325,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 125,00025,000 25,000 25,000 25,000 25,000Maintenance 25,000 25,000 25,000 25,000 25,000 125,000Total Prior 200,000 Total Total2019 2020 2021 2022 2023Funding Sources 125,00025,000 25,000 25,000 25,000 25,000Cable TV Fund 25,000 25,000 25,000 25,000 25,000 125,000Total Prior 200,000 Total 23 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description Provides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in the year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program. 2020 - #101 2004 Chevrolet 3/4 ton pickup, with plow 2021 - #130 2007 Chevrolet 3/4 ton pickup, with plow Project #EQ-029 Priority n/a Justification These vehicles are used for a variety of services throughout the community. The average replacement age is 14 years. These purchases are consistent with the Vehicle Replacement Program. Budget Impact/Other These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced. Useful Life Unassigned Project Name Light Duty Trucks: Public Works Category Street Equipment Type Vehicles Account #2 Account #1 400-4120-4704 Total Project Cost:$283,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 132,00047,000 85,000Vehicles 47,000 85,000 132,000Total Prior 151,000 Total Total2019 2020 2021 2022 2023Funding Sources 132,00047,000 85,000Capital Replacement Equipment Fund 47,000 85,000 132,000Total Prior 151,000 Total 24 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This project funds the purchase and renewal of major software programs for all City departments that are not associated with a specific, individual project. Smaller annual software support and license renewal fees are funded out of account 101-1160-4300. The major reoccurring software costs were moved to this account in 2010. Project #EQ-048 Priority n/a Justification The major portion of funds requested for this project are for Springbrook Software, ESRI, Laserfiche, Microsoft and Cartegraph software purchases and renewals. Those reoccurring costs were moved to this project in 2010. The City joined the Microsoft Enterprise Purchasing Agreement for the State of Minnesota in 2007. All Microsoft software is purchased and renewed under this agreement. Participating in the state agreement allows the City to spread the cost of the product over a period of three years. Products are purchased with Software Assurance to allow for upgrades when they are released. These costs are also spread over a three year period. The City is participating in a joint software licensing agreement with Carver County and several other cities for ESRI GIS software which is funded from this project. This allowed for unlimited GIS application licenses which are in use in every department at reduced cost. The asset management software purchased from Cartegraph was upgraded to a new version in 2017. Purchase costs were divided into 4 different funding sources with one quarter of those costs in this project. Budget Impact/Other Useful Life 3-6 years Project Name Software Purchases Category Administration Type Equipment Account #2 Account #1 400-4117-4703 Total Project Cost:$1,253,370 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 434,40085,100 85,800 83,500 88,300 91,700Office Equipment 85,100 85,800 83,500 88,300 91,700 434,400Total Prior 818,970 Total Total2019 2020 2021 2022 2023Funding Sources 434,40085,100 85,800 83,500 88,300 91,700Capital Replacement Equipment Fund 85,100 85,800 83,500 88,300 91,700 434,400Total Prior 818,970 25 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This project originally funded the purchase of an electronic records retention system in 2002. Laserfiche was the vendor chosen for the project. This project is now used to fund its add on modules and the replacement costs for associated scanning equipment, which have a useful life expectancy of 5 to 7 years. Additional client licenses are planned to accommodate additional users and project workflows in 2018. Additional software modules are proposed for later years to allow for improved integration with the City web site. Project #EQ-049 Priority n/a Justification This system allows for quick and simultaneous retrieval of documents from any computer on the City network. Both physical document storage space and the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access can be easily made available to the public from any internet capable computer or mobile device. The system was upgraded to the Laserfiche Avante platform in 2015. This upgrade included a new workflow engine, web enabled clients and improved auditing and scanning functions. Workflows for automating the scanning and importing of documents were started in 2015. Additional workflow will be created to manage property development records. The 10 user Public Portal starter module included with the Avante upgrade is planned to be upgraded to the standard 25 user module in 2019. Budget Impact/Other Hardware maintenance and repairs are funded out of the 101-1160-4300 services account. A proposed upgrade to 25 external users from the current 10 will add $2,000 to the 400-4117-4703 account. Useful Life 3-5 Years Project Name Computerized Records Retention System Category Administration Type Equipment Account #2 Account #1 400-4124-4703 Total Project Cost:$176,700 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 58,90022,000 21,900 3,000 5,000 7,000Office Equipment 22,000 21,900 3,000 5,000 7,000 58,900Total Prior 117,800 Total Total2019 2020 2021 2022 2023Funding Sources 58,90022,000 21,900 3,000 5,000 7,000Capital Replacement Equipment Fund 22,000 21,900 3,000 5,000 7,000 58,900Total Prior 117,800 Total 26 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2019 2023 thru Department Major Equipment Description Replacement of existing emergency response vehicles and major apparatus. This request outlines a schedule for existing vehicles. 2019 - Replace 1996 Toyne Engine 12 2021 - Replace 2005 Polaris Grass Response Replace 2013 Chevy Tahoe #203 2023 - Replace 2015 Chevy Tahoe #202 Replace 2015 Chevy Tahoe #204 Replace 1996 Toyne Engine 21 Project #EQ-054 Priority n/a Justification Vehicles are reaching or exceeding useful life standards outlined by NFPA for emergency response front line service. Major apparatus require a two year process to spec, order and manufacture. Budget Impact/Other These are considered front line response vehicles and impact response to fire incidents within the City and to mutual aid partners. Useful Life 10-15 years Project Name Fire Vehicles Category Fire Type Vehicles Account #2 Account #1 400-4135-4704 Total Project Cost:$3,493,500 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,522,000650,000 77,000 795,000Vehicles 650,000 77,000 795,000 1,522,000Total Prior 1,971,500 Total Total2019 2020 2021 2022 2023Funding Sources 1,522,000650,000 77,000 795,000Capital Replacement Equipment Fund 650,000 77,000 795,000 1,522,000Total Prior 1,971,500 Total 27 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This project funds the aerial photography for the integration with the City's existing GIS datasets. The City is participating with Carver County and several other cities and counties in a joint project to purchase services and data. An initial joint aerial flyover for high resolution orthographic imagery data was conducted in April of 2005 and was scheduled to be re-flown every three years. The schedule was revised as needed to accommodate budget changes and to allow for a collaborative project. The last county/city aerial flyover for high resolution photography was completed in 2016. The next flight will be done in 2019. The County has decided to cover the costs of all future orthographic layers. The City will need to fund for Planometrics, Pictometry, LiDAR, Contours and other specialty map layers in 2020. Project #EQ-055 Priority n/a Justification City Planners, Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents and contractors without repeated site visits. It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire department when conducting area searches. In 2008, Carver County chose a new vendor (Pictometry), which added a three dimensional view to mapping data. The Pictometry solution provides the ability for staff to view each side of buildings and includes a toolset which allows for accurate measurement of areas and lines. Enhanced map layers (Planometrics), created from the aerial data collected is also used by staff to measure and display hard surface coverage such as driveways, parking lots and others. Budget Impact/Other No operational impact is expected. Useful Life 2-3 years Project Name Aerial Photography for City GIS Datasets Category Administration Type Improvement Account #2 Account #1 400-0000-4752 Total Project Cost:$154,350 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 58,9002,300 26,000 2,300 2,300 26,000Maintenance 2,300 26,000 2,300 2,300 26,000 58,900Total Prior 95,450 Total Total2019 2020 2021 2022 2023Funding Sources 58,9002,300 26,000 2,300 2,300 26,000Capital Replacement Equipment Fund 2,300 26,000 2,300 2,300 26,000 58,900Total Prior 95,450 Total 28 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description This allows for replacement of existing vehicles in the Water and Sewer department. 2019 - #304 2005 Chevrolet 3/4 ton pickup 2020 - #305 2006 Chevrolet 3/4 ton pickup Project #EQ-062 Priority n/a Justification This replaces pickups in accordance with the vehicle replacement plan. Budget Impact/Other Useful Life Unassigned Project Name Light Duty Trucks: Utilities Category Utilities Type Vehicles Account #2 701-7025-4704 Account #1 700-7025-4704 Total Project Cost:$473,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 61,00030,000 31,000Vehicles 30,000 31,000 61,000Total Prior 412,000 Total Total2019 2020 2021 2022 2023Funding Sources 30,50015,000 15,500Sewer Utility Fund 30,50015,000 15,500Water Utility Fund 30,000 31,000 61,000Total Prior 412,000 Total 29 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This project funds the data storage equipment for the City storage area network, which is where the majority of all City electronic data is maintained. This storage are network (SAN) is a system comprised of numerous individual storage arrays, all managed from a single console. The SAN allows disk storage to be easily modified as storage needs change, without any downtime for users. This equipment also hosts the City's virtual network servers. Production storage arrays are located at City Hall in the main server room. Backup replication storage arrays are located in an auxiliary server room at the Public Works facility. Project #EQ-081 Priority n/a Justification The need for digital storage space for City documentation and applications is growing at a rate of approximately 1 Tb per year. Existing storage space became difficult to manage on individual physical network servers. Internal storage utilization is inefficient, and requires system downtime to reconfigure. Storage area network (SAN) technology allows for real time reconfiguration as well as the ability to make real time copies for redundancy and for daytime backup processes. The majority of the City physical network servers were virtualized and integrated into just three host servers which utilize this storage. A Compellent storage array was installed in 2016 and is now the production storage array. A new Compellent array is proposed for 2019 which will become the production storage array. The existing Compellent array will be moved to Public Works to replace the two older Equallogic arrays, one of which will reach end of service life in November of 2018. Budget Impact/Other New arrays will be purchased with 5 years of warranty support. Software and hardware support for the storage arrays beyond 5 years will be funded out of the MIS services account 101-1160-4220. Useful Life 5-7 years Project Name Storage Area Network (SAN)Category Administration Type Improvement Account #2 Account #1 400-4147-4703 Total Project Cost:$293,600 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 110,00055,000 55,000Equipment 55,000 55,000 110,000Total Prior 183,600 Total Total2019 2020 2021 2022 2023Funding Sources 110,00055,000 55,000Capital Replacement Equipment Fund 55,000 55,000 110,000Total Prior 183,600 Total 30 Capital Improvement Program City of Chanhassen, MN Contact Chelsea Petersen 2019 2023 thru Department Major Equipment Description Provide for office furniture and chair replacements. Project #EQ-084 Priority n/a Justification This item will allow items to be replaced as they wear out or needs change. Budget Impact/Other Useful LifeProject Name Office Furniture Category Administration Type Unassigned Account #2 Account #1 400-0000-4703 Total Project Cost:$80,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 25,0005,000 5,000 5,000 5,000 5,000Office Equipment 5,000 5,000 5,000 5,000 5,000 25,000Total Prior 55,000 Total Total2019 2020 2021 2022 2023Funding Sources 25,0005,000 5,000 5,000 5,000 5,000Capital Replacement Equipment Fund 5,000 5,000 5,000 5,000 5,000 25,000Total Prior 55,000 Total 31 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description Provides for scheduled replacement of light duty trucks in the parks department. These vehicles are purchased using the State of Minnesota purchasing contract. Project #EQ-100 Priority n/a Justification 2019 - #403 2006 Chevrolet 4x4 2020 - #401 2004 Chevrolet 4x4 with plow 2021 - #402 2004 Chevrolet 4x4 2022 - #408 2008 Chevrolet 4x4 with plow 2023 - #411 2010 GMC Sierra 4x4 Budget Impact/Other Useful LifeProject Name Light Duty Trucks - Parks Category Park Type Vehicles Account #2 Account #1 400-4120-4704 Total Project Cost:$359,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 187,00035,000 38,000 36,000 42,000 36,000Vehicles 35,000 38,000 36,000 42,000 36,000 187,000Total Prior 172,000 Total Total2019 2020 2021 2022 2023Funding Sources 187,00035,000 38,000 36,000 42,000 36,000Capital Replacement Equipment Fund 35,000 38,000 36,000 42,000 36,000 187,000Total Prior 172,000 Total 32 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description 2019 - 2003 Toro 4000D (#454) 2020 - 2009 Toro Groundsmaster 5900 (#450) Project #EQ-104 Priority n/a Justification The City had 4 high-production grounds mowers. Each machine is used daily during the growing season and needs to be in good working condition. In 2012, the City replaced two 325D mowers with one large Toro 4000 mower. It is anticipated that staff will be able to mow just as much with one large mower. Budget Impact/Other Useful LifeProject Name Mower Replacement - Park Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$478,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 168,00070,000 98,000Equipment 70,000 98,000 168,000Total Prior 310,000 Total Total2019 2020 2021 2022 2023Funding Sources 168,00070,000 98,000Capital Replacement Equipment Fund 70,000 98,000 168,000Total Prior 310,000 Total 33 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description These tractors are used for ball field maintenance, maintaining skating rinks and sweeping trails. 2019 - 1997 John Deere 455 (#468) 2021 - 2001 John Deere 5520 with snowblower (#471) Project #EQ-106 Priority n/a Justification These tractors are used for maintenance and upkeep of baseball fields, skating rinks and trails. These tractors will be at least 20 years old before they are replaced. Budget Impact/Other Useful LifeProject Name Tractor Replacement - Park Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$147,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 131,00018,000 113,000Equipment 18,000 113,000 131,000Total Prior 16,000 Total Total2019 2020 2021 2022 2023Funding Sources 131,00018,000 113,000Capital Replacement Equipment Fund 18,000 113,000 131,000Total Prior 16,000 Total 34 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description This item is to replace the brush and tree limb chipper. This unit will be 18 years old when it is replaced. This unit is used heavily year round by all the public works departments and needs to be in good working condition. 2021 - #147 1999 Vermeer 1800A Brush Chipper Project #EQ-115 Priority n/a Justification To keep equipment in good repair. This purchase is consistent with the vehicle replacement program. Budget Impact/Other Useful LifeProject Name Brush Chipper Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$112,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 112,000112,000Equipment 112,000 112,000Total Total2019 2020 2021 2022 2023Funding Sources 112,000112,000Capital Replacement Equipment Fund 112,000 112,000Total 35 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description This purchase is for a vacuum street sweeper. A loader would be sold in conjunction with this purchase (#140 - 1987 caterpillar 936 with 8,400 hours). The estimated value of the loader is $30,000. The trade in value of the loader will be used to offset the purchase of the sweeper. Project #EQ-118 Priority n/a Justification The street department sweeps all the streets at least once a year starting as soon as weather permits in the spring. The vactor sweeper is necessary to pick up debris and fine particulates that street sweepers cannot pick up. The vactor street sweeper would help meet the City's storm water MS4 permit requirement. This vactor sweeper will be used more often in the downtown and around impaired water bodies to help keep street debris from entering these features. It is one of the most cost effective best management practices available to municipalities. Budget Impact/Other Useful LifeProject Name Vactor Street Sweeper Category Street Equipment Type Equipment Account #2 Account #1 720-7025-4705 Total Project Cost:$291,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 291,000291,000Equipment 291,000 291,000Total Total2019 2020 2021 2022 2023Funding Sources 30,00030,000Other Agency Contribution 261,000261,000Surface Water Utility Fund 291,000 291,000Total 36 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description The item would fund the annual trade in of skid loaders. S570 Bobcat Skidloader (#149) T590 Bobcat Skidloader (#413) S630 Bobcat Skidloader (#150) T750 Bobcat Skidloader (#318) Project #EQ-124 Priority n/a Justification Due to the state bid pricing, the City is able to trade our skid loaders annually for approximately $14.00 per hour. Trading in newer machines guarantees there will be no other expenses except oil changes and grease jobs because the machine will always have a warranty. This approach is also a better life cycle cost over keeping the machines for 15 years. There is no guarantee on the state bid pricing or the trade in price, so staff will be pricing annually to determine if it is a good deal or if we should hold on to the machine for an extended period. Budget Impact/Other Useful LifeProject Name Annual Skid Loader Trade In Category Street Equipment Type Equipment Account #2 701-7025-4705 Account #1 700-7025-4705 Total Project Cost:$166,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 95,00019,000 19,000 19,000 19,000 19,000Equipment 19,000 19,000 19,000 19,000 19,000 95,000Total Prior 71,000 Total Total2019 2020 2021 2022 2023Funding Sources 76,00019,000 19,000 19,000 19,000Capital Replacement Equipment Fund 9,5009,500Sewer Utility Fund 9,5009,500Water Utility Fund 19,000 19,000 19,000 19,000 19,000 95,000Total Prior 71,000 Total 37 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This item funds the replacement of departmental copiers. Copiers were previously part of individual department budgets but were moved to the MIS CIP budget by the Finance Director in 2012. Project #EQ-127 Priority n/a Justification The City has 4 multifunction departmental copiers located in City Hall and the Public Works Facility. The three copiers located at City Hall were replaced in 2013 and are under a shared maintenance plan. A new color copier was purchased in 2016 to replace the existing black and white copier and a color printer located at the Public Works Facility. Replacement units will be ordered one per year beginning in 2020. Dept Item Year Purchased Administration Konica Bizhub C754 2013 Building Konica Bizhub C454 2013 Engineering Konica Bizhub C454 2013 Public Works Konica Bizhub 250 2016 Budget Impact/Other Maintenance and supplies are funded from account 101-117-4110, city office supplies. Useful Life 5-7 years Project Name Copier Replacements Category Administration Type Equipment Account #2 Account #1 400-4109-4703 Total Project Cost:$69,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 46,00018,500 9,000 9,000 9,500Equipment 18,500 9,000 9,000 9,500 46,000Total Prior 23,000 Total Total2019 2020 2021 2022 2023Funding Sources 46,00018,500 9,000 9,000 9,500Capital Replacement Equipment Fund 18,500 9,000 9,000 9,500 46,000Total Prior 23,000 Total 38 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description The vehicles in the fleet department are used for picking up parts, delivering vehicles for service and other public works related travel. 2021 - #155 2002 Chevrolet 1/2 ton pickup Project #EQ-132 Priority n/a Justification These vehicles will average 19 years old when they are replaced. They are becoming rusty and unreliable. Budget Impact/Other Useful LifeProject Name Fleet Vehicles Category Public Works Type Vehicles Account #2 Account #1 400-4120-4704 Total Project Cost:$62,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 32,00032,000Vehicles 32,000 32,000Total Prior 30,000 Total Total2019 2020 2021 2022 2023Funding Sources 32,00032,000Capital Replacement Equipment Fund 32,000 32,000Total Prior 30,000 Total 39 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2019 2023 thru Department Major Equipment Description Specialized fire department emergency response equipment with a service life of more than 5 years. Equipment included with this project: Air Monitoring, Thermal Imaging, Positive Pressure Ventilation Fans, Hose Replacement, Nozzles and Appliances. Project #EQ-137 Priority n/a Justification The fire department utilizes specific, specialized equipment to perform specific fire ground and emergency response work. Expenditures will be used annually to replace aging equipment on fire department apparatus. Budget Impact/Other Useful LifeProject Name Miscellaneous Fire Equipment/Hose Replacement Category Fire Type Equipment Account #2 Account #1 400-4127-4705 Total Project Cost:$135,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 80,00015,000 15,000 15,000 15,000 20,000Equipment 15,000 15,000 15,000 15,000 20,000 80,000Total Prior 55,000 Total Total2019 2020 2021 2022 2023Funding Sources 80,00015,000 15,000 15,000 15,000 20,000Capital Replacement Equipment Fund 15,000 15,000 15,000 15,000 20,000 80,000Total Prior 55,000 Total 40 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Major Equipment Description Purchase of new fitness center equipment, replacement carpet, countertops, window treatments throughout the facility, failing tables and chairs need replacement, upgrades are required to the fitness center audio system for participants and a digital lobby information system is needed to improve customer experience at the Chanhassen Recreation Center. Project #EQ-140 Priority n/a Justification The Recreation Center is entering its 20th Anniversary. Due to age, usage and wear; a number of items require replacement or upgrades at this time. 2023 - window treatments for Lake Susan and Lotus Lake Rooms, replacement countertops for locker rooms, ten padded chairs and five, eight foot tables and one stair climber and two elliptical machines for fitness center 2024 - window treatments for fitness center, studio and Conference Room, ten padded chairs, four, six foot tables and a five foot round table and one elliptical machine, one treadmill and one recumbent bike for fitness center Budget Impact/Other Reduced repair costs and increased customer experience at the Recreation Center. Useful LifeProject Name Recreation Center Revitalization Project Category Park Type Improvement Account #2 Account #1 400-4125-4706 Total Project Cost:$125,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 25,00025,000Maintenance 25,000 25,000Total Prior 75,000 Total Future 25,000 Total Total2019 2020 2021 2022 2023Funding Sources 25,00025,000Capital Replacement Equipment Fund 25,000 25,000Total Prior 75,000 Total Future 25,000 Total 41 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2019 2023 thru Department Major Equipment Description This project funds the expansion of the security and access control systems in all City buildings with the exception of the Water Treatment Plants which come out of an enterprise fund. An access control system was installed in City Hall and Fire Station 1 in 2015. The project also included software and hardware conversions for the system originally installed at the Public Works facility. All access control systems are now on one central control system, including the Water Treatment plants. Project #EQ-152 Priority n/a Justification The access control system allows for more efficient control of City building access through the use of proximity cards and readers and greatly reduces the need for issuing and re-issuing keys as staff and vendor needs change. Additional readers were installed at City Hall and the Fire Stations to allow access to Carver County Sheriffs staff utilizing their county issued badges. Combined with the network of surveillance cameras, the system provides the means to secure and document security events or issues. Four interior cameras will be placed at the Recreation Center with newer higher resolution cameras. An additional camera is proposed to cover the NE corner of Public Works. One interior camera is proposed for Fire Station 2 and three exterior cameras are proposed for Fire Station 1. Budget Impact/Other Maintenance for the security system will be funded out of the 101-1160-4300 services account. Useful Life 10 years Project Name Security / Access Control Systems Category Administration Type Equipment Account #2 Account #1 400-4148-4703 Total Project Cost:$38,600 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 25,50018,300 7,200Equipment 18,300 7,200 25,500Total Prior 13,100 Total Total2019 2020 2021 2022 2023Funding Sources 25,50018,300 7,200Capital Replacement Equipment Fund 18,300 7,200 25,500Total Prior 13,100 Total 42 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description 2020 - 2005 Toro 597D 60" Z-Master Zero Turn Mower (#462) Project #EQ-154 Priority n/a Justification These mowers have extensive hours and are starting to need expensive repairs. Budget Impact/Other Useful LifeProject Name Zero Turn Mower Replacement - Parks Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$34,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 18,00018,000Equipment 18,000 18,000Total Prior 16,000 Total Total2019 2020 2021 2022 2023Funding Sources 18,00018,000Capital Replacement Equipment Fund 18,000 18,000Total Prior 16,000 Total 43 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description #157 - 2008 Stepp SBF300 tar kettle for tack oil when blacktopping Project #EQ-157 Priority n/a Justification This machine has a weak engine that is burning oil and the kettle is rusting from the burner. This machine is used for street pothole patching. Budget Impact/Other Useful LifeProject Name Tar Kettle Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$43,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 43,00043,000Equipment 43,000 43,000Total Total2019 2020 2021 2022 2023Funding Sources 43,00043,000Capital Replacement Equipment Fund 43,000 43,000Total 44 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description The 2009 hot box is used for pothole patching. #158 - 2009 Hot Box with Asphalt Premix Heater Project #EQ-158 Priority n/a Justification The hot box is worn from years of use. Budget Impact/Other Useful LifeProject Name Hot Box with Asphalt Premix Heater Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$44,300 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 44,30044,300Equipment 44,300 44,300Total Total2019 2020 2021 2022 2023Funding Sources 44,30044,300Capital Replacement Equipment Fund 44,300 44,300Total 45 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description The crack sealing machine is used to blow out the cracks in streets and trails and fill the cracks with a sealer to stop the crack from getting larger. #153 - 2003 Stepp Crack Sealer Project #EQ-159 Priority n/a Justification The 2003 Stepp crack sealer will be 19 years old. This machine should be replaced due to the rust from the burner in the material tank. Budget Impact/Other Useful LifeProject Name Crack Sealer Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$47,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 47,00047,000Equipment 47,000 47,000Total Total2019 2020 2021 2022 2023Funding Sources 47,00047,000Capital Replacement Equipment Fund 47,000 47,000Total 46 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description #3B - 2003 Felling Bobcat Trailer Project #EQ-160 Priority n/a Justification This trailer is 19 years old and the rating is not enough for the load they are hauling. Budget Impact/Other Useful LifeProject Name Bobcat Trailer Replacement Category Public Works Type Equipment Account #2 701-7025-4705 Account #1 700-7025-4705 Total Project Cost:$7,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 7,0007,000Equipment 7,000 7,000Total Total2019 2020 2021 2022 2023Funding Sources 3,5003,500Sewer Utility Fund 3,5003,500Water Utility Fund 7,000 7,000Total 47 Capital Improvement Program City of Chanhassen, MN Contact Greg Sticha 2019 2023 thru Department Major Equipment Description This is a replacement of the existing folder/inserter machine. This machine is used monthly for all City utility statements and on an as needed basis for other city-wide mailings. Project #EQ-161 Priority n/a Justification The existing machine was purchased in 2010 and is starting to need more frequent repairs resulting in periods of down time. The average life expectancy of this type of machine is 7 years, replacing it in 2020 will give us approximately 10 years of use from it. Budget Impact/Other Useful LifeProject Name Mailing Folder/Inserter Category Finance Type Equipment Account #2 701-7025-4703 Account #1 700-7025-4703 Total Project Cost:$15,000 Account #4 Account #3 720-7025-4703 Total2019 2020 2021 2022 2023Expenditures 15,00015,000Equipment 15,000 15,000Total Total2019 2020 2021 2022 2023Funding Sources 5,0005,000Sewer Utility Fund 5,0005,000Surface Water Utility Fund 5,0005,000Water Utility Fund 15,000 15,000Total 48 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description Bobcat E55 Mini Excavator Project #EQ-163 Priority n/a Justification This machine will be used for various projects, digging, tilling and grading. This machine is compact for use in tight spaces and light weight for less disturbance for easy restoration. This machine will replace the 1996 Caterpillar dozer. The dozer will be traded in for the mini excavator. The trade in value of the dozer is estimated at $27,000. This trade in value will be used to offset the purchase of the excavator. Budget Impact/Other Useful LifeProject Name Compact Excavator Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$37,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 37,00037,000Equipment 37,000 37,000Total Total2019 2020 2021 2022 2023Funding Sources 37,00037,000Capital Replacement Equipment Fund 37,000 37,000Total 49 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Major Equipment Description 2018 Toro 5000 Zero Turn Mower - #482 Project #EQ-164 Priority n/a Justification Due to the state bid pricing, the City is able to trade this mower annually for less than the average cost of keeping the mower and replacing it at the end of its life expectancy. Trading in newer machines guarantee there will be no other expenses except for oil changes and grease jobs because the machine will always be under warranty. Budget Impact/Other Useful LifeProject Name Annual Zero Turn Mower Replacement - Park Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$5,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 5,0001,000 1,000 1,000 1,000 1,000Equipment 1,000 1,000 1,000 1,000 1,000 5,000Total Total2019 2020 2021 2022 2023Funding Sources 5,0001,000 1,000 1,000 1,000 1,000Capital Replacement Equipment Fund 1,000 1,000 1,000 1,000 1,000 5,000Total 50 Municipal Buildings 51 This page intentionally left blank. 52 Capital Improvement Program Cit of Chanhassen, MN Contact Chelsea Petersen 2019 2023 thru Department Municipal Buildings Description This project will remodel and refurbish areas of City Hall that need paint, carpet or storage areas added. Project #MB-010 Priority n/a Justification The entry and front reception area of City Hall need security improvements for employee safety and reconfiguration for a better customer service experience for residents. Budget Impact/Other Useful LifeProject Name City Hall Remodel Category Administration Type Improvement Account #2 Account #1 400-4148-4xxx Total Project Cost:$190,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 150,000150,000Maintenance 150,000 150,000Total Prior 40,000 Total Total2019 2020 2021 2022 2023Funding Sources 150,000150,000Capital Replacement Equipment Fund 150,000 150,000Total Prior 40,000 Total 53 Capital Improvement Program Cit of Chanhassen, MN Contact Chelsea Petersen 2019 2023 thru Department Municipal Buildings Description The City will conduct a triennial survey of residents. Project #MB-023 Priority n/a Justification The City will use the feedback to monitor and respond to residents values and concerns. Budget Impact/Other Useful LifeProject Name Citizen Survey Category Administration Type Improvement Account #2 Account #1 210-0000-4300 Total Project Cost:$60,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 32,00015,000 17,000Study 15,000 17,000 32,000Total Prior 28,000 Total Total2019 2020 2021 2022 2023Funding Sources 32,00015,000 17,000Cable TV Fund 15,000 17,000 32,000Total Prior 28,000 Total 54 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2019 2023 thru Department Municipal Buildings Description This project would renovate the main fire station. Project #MB-026 Priority n/a Justification The fire department is utilized for several public events such as; elections, open house, Lion's breakfast, and official fire department ceremonies. City employees frequent the kitchen and work out areas on a regular basis as well. Budget Impact/Other Useful LifeProject Name Fire Department Building Improvements Category Fire Type Maintenance Account #2 Account #1 400-4003-4xxx Total Project Cost:$303,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 100,000100,000Maintenance 100,000 100,000Total Prior 203,000 Total Total2019 2020 2021 2022 2023Funding Sources 100,000100,000Capital Replacement Equipment Fund 100,000 100,000Total Prior 203,000 Total 55 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Municipal Buildings Description Additional counter space is needed as well as more storage, cabinets and built in recycling. The dishwasher, refrigerator and sink also need to be replaced. Project #MB-031 Priority n/a Justification The senior center and kitchen is over 15 years old and the countertops and equipment are aging. With additional programs and participants the current kitchen is used daily and is not meeting current needs. There will be no renovation costs as we will be adding new space and storage. Budget Impact/Other Useful LifeProject Name Senior Center Kitchen Update Category Park Type Improvement Account #2 Account #1 400-4130-4xxx Total Project Cost:$15,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 15,00015,000Improvement 15,000 15,000Total Total2019 2020 2021 2022 2023Funding Sources 15,00015,000Capital Replacement Equipment Fund 15,000 15,000Total 56 Capital Improvement Program City of Chanhassen, MN Contact Chelsea Petersen 2019 2023 thru Department Municipal Buildings Description The City Hall roof is in need of replacement. Project #MB-033 Priority n/a Justification The oldest section of roof is 30 years old and has had minimal improvements. This project will replace the City Hall roof in three sections, as the building was built and expanded in three segments. Budget Impact/Other Useful LifeProject Name City Hall Roof Replacement Category Administration Type Maintenance Account #2 Account #1 400-4148-4702 Total Project Cost:$300,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 300,000300,000Maintenance 300,000 300,000Total Total2019 2020 2021 2022 2023Funding Sources 300,000300,000Capital Replacement Equipment Fund 300,000 300,000Total 57 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Municipal Buildings Description This request is to replace the 3 moveable walls in the rooms at the Recreation Center. Project #MB-034 Priority n/a Justification The current walls are original to the building. They are showing significant wear and have damage on each side. The floor seals are not working correctly, which causes a great deal of noise coming from adjoining rooms. The internal wall mechanisms are plastic and a repair company is called several times each year to keep them functional. The walls are moved daily and are crucial to the Rec Center operations. Customers and program participants have complained about the impact on meetings and activities caused by noise from neighboring rooms. Budget Impact/Other Useful LifeProject Name Recreation Center Wall Replacement Category Park Type Maintenance Account #2 Account #1 Total Project Cost:$69,700 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 69,70069,700Maintenance 69,700 69,700Total Total2019 2020 2021 2022 2023Funding Sources 69,70069,700Capital Replacement Equipment Fund 69,700 69,700Total 58 Park & Trail Improvements 59 This page intentionally left blank. 60 Capital Improvement Program Cit of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Park & Trail Improvements Description Purchase of picnic tables and park benches. Project #PK&T-042 Priority n/a Justification New tables and benches are needed annually to replace old stock and meet new needs. Budget Impact/Other Useful Life 30 Years Project Name Picnic Tables/Park Benches Category Park Type Improvement Account #2 Account #1 410-000-4705 Total Project Cost:$156,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 50,00010,000 10,000 10,000 10,000 10,000Equipment 10,000 10,000 10,000 10,000 10,000 50,000Total Prior 106,000 Total Total2019 2020 2021 2022 2023Funding Sources 50,00010,000 10,000 10,000 10,000 10,000Park Dedication Fund 10,000 10,000 10,000 10,000 10,000 50,000Total Prior 106,000 Total 61 Capital Improvement Program Cit of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Park & Trail Improvements Description Annual tree planting program. This program is proposed to be accelerated to mitigate the affects of Emerald Ash Borer. Project #PK&T-043 Priority n/a Justification Parklands and other City properties experience tree loss annually, due to storm damage, disease, stress, etc. Budget Impact/Other Useful Life 50 Years Project Name Trees Category Park Type Improvement Account #2 Account #1 410-0000-4701 Total Project Cost:$245,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 75,00015,000 15,000 15,000 15,000 15,000Land Improvement 15,000 15,000 15,000 15,000 15,000 75,000Total Prior 170,000 Total Total2019 2020 2021 2022 2023Funding Sources 75,00015,000 15,000 15,000 15,000 15,000Park Dedication Fund 15,000 15,000 15,000 15,000 15,000 75,000Total Prior 170,000 Total 62 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Park & Trail Improvements Description Crack seal and resurface tennis courts. 2019 - Lake Susan Park, Meadow Green Park, North Lotus Lake Park, South Lotus Lake Park and the Chanhassen Recreation Center 2021 - City Center Park and Lake Ann Park Project #PK&T-072 Priority n/a Justification Tennis courts offered are kept in playable condition through patching and resurfacing on a six to ten year cycle. Budget Impact/Other Maintenance and operations costs. Useful Life 25 years Project Name Tennis Court Refurbishment Category Park Type Improvement Account #2 Account #1 601-0000-4706 Total Project Cost:$425,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 225,000150,000 75,000Maintenance 150,000 75,000 225,000Total Prior 200,000 Total Total2019 2020 2021 2022 2023Funding Sources 225,000150,000 75,000Assessment/Revolving Assess Fund 150,000 75,000 225,000Total Prior 200,000 Total 63 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Park & Trail Improvements Description Reconstruction of the roof at the Lake Side Pavilion at Lake Ann Park. Project #PK&T-132 Priority n/a Justification The roof is 25 years old and is in need of replacement. Budget Impact/Other Maintenance costs will be reduced. Useful LifeProject Name Lake Ann Lake Side Pavilion Roof Replacement Category Park Type Maintenance Account #2 Account #1 400-0000-4702 Total Project Cost:$30,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 30,00030,000Maintenance 30,000 30,000Total Total2019 2020 2021 2022 2023Funding Sources 30,00030,000Capital Replacement Equipment Fund 30,000 30,000Total 64 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Park & Trail Improvements Description A ten foot wide bituminous pedestrian trail located on the south side of State Highway 5, from Century Boulevard to the Minnesota Landscape Arboretum entry road. The project will also include a pedestrian underpass at State Highway 41. Carver County is the lead agency on the project. This funding allocation is the City's share of the local match for a transportation enhancement grant. Project #PK&T-138 Priority n/a Justification Completing a pedestrian/bicycle trail route to the Arboretum has been a long range goal for the City, Carver County and the Arboretum. The public will have access to the first pedestrian trail to the Arboretum from the east. Budget Impact/Other Additional trail maintenance duties will be added to the weekly park maintenance department schedule. Useful LifeProject Name Arboretum Trail and Hwy 41 Underpass Cost Share Category Park Type Improvement Account #2 Account #1 410-0000-4710 Total Project Cost:$600,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 600,000600,000Construction 600,000 600,000Total Total2019 2020 2021 2022 2023Funding Sources 600,000600,000Park Dedication Fund 600,000 600,000Total 65 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2019 2023 thru Department Park & Trail Improvements Description Replace existing park equipment that has reached its useful life expectancy. 2019 - Herman Field Park Playground, Prairie Knoll Park Playground and Sunset Ridge Park Playground 2020 - Curry Farms Park Basketball Court & Trail, Lake Ann Beach Playground, Powers Blvd Pipe Rail Fence, Rice Marsh Lake Park Backstop and Ballfield Benches, Meadow Green Park Backstop and Ballfield Benches and South Lotus Lake Park Playground 2021 - Carver Beach Park Playground, Lake Susan Park Basketball Court, Pheasant Hills Park Playground, Roundhouse Park Structure and Stone Creek Park Playground 2022 - Bandimere Park Playground and North Lotus Park Hockey Rink 2023 - Carver Beach Playground, Power Hill Park Playground and Sugarbush Park Playground Project #PK&T-141 Priority n/a Justification Existing playground equipment has reached its useful life expectancy of 25 years. Budget Impact/Other Useful LifeProject Name Park Equipment Replacement Category Park Type Equipment Account #2 Account #1 401-0000-4xxx Total Project Cost:$1,250,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,250,000245,000 255,000 245,000 250,000 255,000Equipment 245,000 255,000 245,000 250,000 255,000 1,250,000Total Total2019 2020 2021 2022 2023Funding Sources 1,250,000245,000 255,000 245,000 250,000 255,000Park Replacement Fund 245,000 255,000 245,000 250,000 255,000 1,250,000Total 66 Sanitary Sewer Improvements 67 This page intentionally left blank. 68 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Sanitary Sewer Improvements Description This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration Report and aspects of the program are included in the annual street project. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. Project #SS-012 Priority n/a Justification City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Budget Impact/Other The efforts may decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund for those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems. Useful Life Unassigned Project Name Inflow and Infiltration Abatement Category Utilities Type Improvement Account #2 Account #1 701-70xx-4751 Total Project Cost:$2,500,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,000,000200,000 200,000 200,000 200,000 200,000Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000Total Prior 1,500,000 Total Total2019 2020 2021 2022 2023Funding Sources 1,000,000200,000 200,000 200,000 200,000 200,000Sewer Utility Fund 200,000 200,000 200,000 200,000 200,000 1,000,000Total Prior 1,500,000 Total 69 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Sanitary Sewer Improvements Description Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street. Project #SS-014 Priority n/a Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects. Budget Impact/Other This project will decrease maintenance costs. Useful Life Unassigned Project Name Sanitary Sewer Replacement Category Utilities Type Improvement Account #2 Account #1 701-7025-4751 Total Project Cost:$2,220,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 560,000160,000 75,000 75,000 250,000Construction 160,000 75,000 75,000 250,000 560,000Total Prior 1,660,000 Total Total2019 2020 2021 2022 2023Funding Sources 560,000160,000 75,000 75,000 250,000Sewer Utility Fund 160,000 75,000 75,000 250,000 560,000Total Prior 1,660,000 Total 70 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Sanitary Sewer Improvements Description The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The City currently maintains 32 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years are as follows: 2019 - #18 & #28 2020 - #13 & #22 2021 - #2 2022 - #17 2023 - #1 Project #SS-017 Priority n/a Justification Reduce emergency calls and potential sewer backups. Budget Impact/Other Useful Life Unassigned Project Name Sanitary Lift Station Rehabilitation Program Category Utilities Type Improvement Account #2 Account #1 701-7025-4751 Total Project Cost:$1,230,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 600,000135,000 130,000 120,000 130,000 85,000Maintenance 135,000 130,000 120,000 130,000 85,000 600,000Total Prior 630,000 Total Total2019 2020 2021 2022 2023Funding Sources 600,000135,000 130,000 120,000 130,000 85,000Sewer Utility Fund 135,000 130,000 120,000 130,000 85,000 600,000Total Prior 630,000 Total 71 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Sanitary Sewer Improvements Description This lift station will be located on Powers Boulevard south of TH 212 to service the future 2010 MUSA and will also be used to service the area of the City south of Pioneer Trail. The project needs to be constructed before this area starts to develop and is contingent on when that happens. Project #SS-020 Priority n/a Justification Required for future development of the 2010 and 2015 MUSA's. The cost for this improvement will be paid for by future developments with future connection fees and development assessments. Budget Impact/Other Useful LifeProject Name 2010 MUSA Sanitary Lift Station Category Utilities Type Improvement Account #2 Account #1 701-7025-4702 Total Project Cost:$1,900,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,900,0001,900,000Construction 1,900,000 1,900,000Total Total2019 2020 2021 2022 2023Funding Sources 950,000950,000Developer Assessments 950,000950,000Sewer Utility Fund 1,900,000 1,900,000Total 72 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Sanitary Sewer Improvements Description This project will help pay for trunk sewer, lift station and water main below the bluff along Flying Cloud Drive. The project primarily will help pay for lift station improvements and watermain oversizing necessary to service future development along Flying Cloud Drive. This project will be development driven and may be constructed along with a development of a standalone City project. This project has been budgeted through the utility rate study and paid for with hookup charges. Project #SS-024 Priority n/a Justification To provide sewer service to the Lower Bluff Creek Sewer District. Budget Impact/Other Useful LifeProject Name Lower Bluff Creek Trunk Utility Improvements Category Utilities Type Improvement Account #2 700-7025-4751 Account #1 701-7025-4751 Total Project Cost:$10,800,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 10,800,00010,800,000Construction 10,800,000 10,800,000Total Total2019 2020 2021 2022 2023Funding Sources 7,900,0007,900,000Developer Assessments 1,800,0001,800,000Sewer Utility Fund 1,100,0001,100,000Water Utility Fund 10,800,000 10,800,000Total 73 This page intentionally left blank. 74 Street Improvements 75 This page intentionally left blank. 76 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas: 2019 - Orchard Lane area MSA - Lake Drive East and Dakota Ave (TH 5 to Lake Drive East) 2020 - MSA - Minnewashta Parkway overlay and trail and Lake Lucy (TH 41 to Galpin Blvd) 2021 - Stone Creek, Meadow Lane, Saddlebrook, Kurvers Point, Lake Lucy east of Powers Blvd, Vineland Court and Troendle Circle area MSA - Lake Drive (Dakota Ave to Great Plains) and Great Plains (south of TH 5) 2023 - Creekview area Funding from this program also funds annual trail and parking lot improvement projects. Project #ST-012 Priority n/a Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that major maintenance is required. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Budget Impact/Other This project may decrease maintenance costs. Useful Life Unassigned Project Name Annual Street Improvement Program Category Streets/Highways Type Improvement Account #2 Account #1 601-xxxx-4751 Total Project Cost:$33,130,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 9,650,0002,550,000 2,200,000 2,700,000 2,200,000Construction 2,550,000 2,200,000 2,700,000 2,200,000 9,650,000Total Prior 23,480,000 Total Total2019 2020 2021 2022 2023Funding Sources 6,550,0001,850,000 300,000 2,200,000 2,200,000Assessment/Revolving Assess Fund 3,100,000700,000 1,900,000 500,000MSA 2,550,000 2,200,000 2,700,000 2,200,000 9,650,000Total Prior 23,480,000 Total 77 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description This project will provide maintenance such as crack sealing, seal-coating, pothole patching, replacement of curb and gutter and sidewalk repairs for City streets. Also included in this project are trails and City parking lot rehabilitations. Seal-coat projects will be determined annually based on the pavement condition index as generated by the pavement management program. The street department uses this funding source to pay for bituminous material for annual street patching. Project #ST-018 Priority n/a Justification This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures. Budget Impact/Other These improvements will cost effectively prolong the life of the street so major improvements such as reconstruction projects can be delayed. Useful Life 7-10 years Project Name Pavement Management Category Streets/Highways Type Maintenance Account #2 Account #1 420-0000-4751 Total Project Cost:$5,038,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,765,000353,000 353,000 353,000 353,000 353,000Maintenance 353,000 353,000 353,000 353,000 353,000 1,765,000Total Prior 3,273,000 Total Total Prior 3,273,000 Total 78 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description This project will reconstruct TH 101 from Pioneer Trail (CSAH 14) to Flying Cloud Drive (CSAH 61). This is the last section of TH 101 that needs improvements from TH 5 into the City of Shakopee. The improvements are proposed to improve safety, mobility and to plan for future growth in the region. The project is consistent with the 2007 TH 101 corridor scoping study. State and Carver County funds will be used to pay for most of the improvements. The City contribution to the project is anticipated to help pay for some environmental work, watermain improvements, corridor landscaping, trails and storm sewer improvements. The tentative schedule is to complete final design and right of way acquisition in 2019 and construction would commence in 2020. Project #ST-032 Priority n/a Justification To improve safety and mobility on TH 101. The project also plans for growth in the region. Budget Impact/Other The City would be responsible for the future maintenance of the trunk watermain and trails. Useful LifeProject Name TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)Category Streets/Highways Type Improvement Account #2 Account #1 605-0000 Total Project Cost:$32,710,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 2,000,0002,000,000Planning/Design 6,000,0006,000,000Land Acquisition 22,000,00022,000,000Construction 8,000,000 22,000,000 30,000,000Total Prior 2,710,000 Total Total2019 2020 2021 2022 2023Funding Sources 27,950,0007,500,000 20,450,000Other Agency Contribution 750,000750,000Sewer Utility Fund 500,000500,000State Funds 800,000800,000Water Utility Fund 8,000,000 22,000,000 30,000,000Total Prior 2,710,000 Total 79 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description This project would make improvements to Market Blvd from West 78th Street to Highway 5. A corridor study was completed in 2016 that identified safety and mobility needs. A feasibility study will be completed prior to construction. Project #ST-037 Priority n/a Justification As the downtown continues to develop, more traffic is anticipated to use Market Blvd. To improve safety, mobility and continuity of the corridor, the roadway is expected to need improvements. Budget Impact/Other Useful Life 30 Years Project Name Market Blvd Improvements Category Streets/Highways Type Improvement Account #2 Account #1 601-0000-4752 Total Project Cost:$3,240,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 3,200,0003,200,000Construction 3,200,000 3,200,000Total Prior 40,000 Total Total2019 2020 2021 2022 2023Funding Sources 2,600,0002,600,000Assessment/Revolving Assess Fund 600,000600,000MSA 3,200,000 3,200,000Total Prior 40,000 Total 80 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description This project will upgrade Lyman Blvd to current design standards. The project will construct three round-a-bouts at the TH 41, Peavey Road and Norex Drive intersections. Project #ST-038 Priority n/a Justification To improve safety and mobility along the corridor and to replace the deficient pavement section. Budget Impact/Other Useful Life 50 Years Project Name Lyman Blvd Improvements-Galpin Blvd to TH 41 Category Streets/Highways Type Improvement Account #2 Account #1 Total Project Cost:$11,600,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 11,600,00011,600,000Construction 11,600,000 11,600,000Total Total2019 2020 2021 2022 2023Funding Sources 1,000,0001,000,000Cash Reserves 1,500,0001,500,000MSA 9,100,0009,100,000Other Agency Contribution 11,600,000 11,600,000Total 81 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description This project would install an enhanced pedestrian crossing at Powers Blvd and Lake Lucy Road. A study will be completed in 2018 to justify the enhancement. Typically these crossings include a push button actuated rapid flash system. Carver County is expected to participate in funding the projects. Project #ST-039 Priority n/a Justification For increased pedestrian safety. Budget Impact/Other The city would need to own, operate and maintain the system. Useful LifeProject Name Enhanced Pedestrian Roadway Crossings Category Streets/Highways Type Improvement Account #2 Account #1 601-xxxx-4751 Total Project Cost:$900,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 600,000600,000Construction 600,000 600,000Total Prior 300,000 Total Total2019 2020 2021 2022 2023Funding Sources 300,000300,000MSA 300,000300,000Other Agency Contribution 600,000 600,000Total Prior 300,000 Total 82 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description The project will reconstruct Galpin Blvd from 78th Street north to the City limits. The street is proposed to have geometric improvements made to conform to current design standards and urbanized to have concrete curb and gutter. Turn lanes will be constructed and trail improvements made. This section of Galpin Blvd is on Carver County's turnback list for roadways to be jurisdictionally transferred to the local agency. Once Galpin Blvd is reconstructed the City would be responsible for operations and future maintenance. Project #ST-040 Priority n/a Justification The pavement of Galpin Blvd has reached its life expectancy. The roadway at this time should be reconstructed and designed to current standards. The project is also planned for growth in the area. Budget Impact/Other The project will require the City to have operational and maintenance over this section of Galpin Blvd. Useful LifeProject Name Galpin Blvd Improvements-Hwy 5 N to City limits Category Streets/Highways Type Improvement Account #2 Account #1 601-6040-4751 Total Project Cost:$10,840,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 10,750,00010,750,000Construction 10,750,000 10,750,000Total Prior 90,000 Total Total2019 2020 2021 2022 2023Funding Sources 3,000,0003,000,000MSA 7,000,0007,000,000Other Agency Contribution 250,000250,000Sewer Utility Fund 500,000500,000Water Utility Fund 10,750,000 10,750,000Total Prior 90,000 Total 83 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description The State of Minnesota is planning to resurface TH 41. In conjunction with the roadway project, the signal at 82nd Street will be replaced. The City is responsible for the eastern leg of the signal. Project #ST-042 Priority n/a Justification Budget Impact/Other Useful LifeProject Name TH 41 Rehabilitation - Pioneer Trail to TH 5 Category Streets/Highways Type Maintenance Account #2 Account #1 Total Project Cost:$100,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 100,000100,000Maintenance 100,000 100,000Total Total2019 2020 2021 2022 2023Funding Sources 100,000100,000MSA 100,000 100,000Total 84 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description This project will replace the signal controllers for the downtown signals. The controllers are 26 years old and have reached their life expectancy. The new controllers are more technically capable and allow for better pedestrian crossing options. Project #ST-043 Priority n/a Justification To improve traffic flow and enhance pedestrian crossing timing. Budget Impact/Other Useful LifeProject Name Downtown Signal Controller Replacement Category Streets/Highways Type Improvement Account #2 Account #1 Total Project Cost:$30,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 30,00030,000Improvement 30,000 30,000Total Total2019 2020 2021 2022 2023Funding Sources 30,00030,000Street Pavement Management 30,000 30,000Total 85 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Street Improvements Description Carver County and MnDOT are asking the local agencies to participate in a corridor study of TH 5 and other County roads west of TH 41. The primary purpose of this study is to provide for short-, mid- and long-term transportation improvements along TH 5. The proposed project will include reviewing traffic and design needs, access management, safety, connectivity to other major highways in the area, bicycle/trail and pedestrian connections, storm water requirements and environmental screening and documentation. As part of the project process, public communication, public engagement, consensus, and decision-making will be required. The study will take about 18 months to complete. Once the study is complete, Carver County plans to seek funding for improvements to the corridor. Carver County is planning to study other corridors in the TH 5 area, but Chanhassen would only participate in the TH 5 study area from TH 41 to Minnewashta Parkway and TH 41 south of TH 5 to 82nd Street. A joint powers agreement will need to be approved by the City Council before this project is authorized. Project #ST-044 Priority n/a Justification To help plan for future improvements to TH 5. Budget Impact/Other Useful LifeProject Name TH 5 Corridor Study (West of Hwy 41)Category Streets/Highways Type Improvement Account #2 Account #1 Total Project Cost:$25,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 25,00025,000Study 25,000 25,000Total Total2019 2020 2021 2022 2023Funding Sources 25,00025,000Assessment/Revolving Assess Fund 25,000 25,000Total 86 Surface Water Management Improvements 87 This page intentionally left blank. 88 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans. Project #SWMP-014 Priority n/a Justification Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans. Budget Impact/Other Citywide. No map. Useful Life Unassigned Project Name Property Acquisition Category SWMP Type Improvement Account #2 Account #1 720-7025-4701 Total Project Cost:$875,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 225,00075,000 75,000 75,000Land Acquisition 75,000 75,000 75,000 225,000Total Prior 650,000 Total Total2019 2020 2021 2022 2023Funding Sources 225,00075,000 75,000 75,000Surface Water Utility Fund 75,000 75,000 75,000 225,000Total Prior 650,000 Total 89 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Project #SWMP-019 Priority n/a Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map Useful Life Unassigned Project Name Street Improvement Projects - Storm Water Mgmt Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$3,335,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,310,000360,000 250,000 250,000 100,000 350,000Construction 360,000 250,000 250,000 100,000 350,000 1,310,000Total Prior 2,025,000 Total Total2019 2020 2021 2022 2023Funding Sources 1,310,000360,000 250,000 250,000 100,000 350,000Surface Water Utility Fund 360,000 250,000 250,000 100,000 350,000 1,310,000Total Prior 2,025,000 Total 90 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description The Bluff Creek Total Maximum Daily Load (TMDL) report identified the lower reach of Bluff Creek (south of Pioneer Trail) as the primary source of total suspended solids (TSS). During the calibration time period (6/25 to 11/17) TSS loads at the TH 101/CR 61 "Y" exceeded the TSS load at Pioneer by more than 400% - 41,280 lbs to 9,900 lbs. In addition to the turbidity issues, there exists a discontinuity between the lower reach and the upper reach resulting from a severe drop in elevation at the downstream end of the culvert under the Hennepin County Regional Trail. These findings are consistent with the Bluff Creek Natural Resource Management Plan. Both indicate that the numerous escarpments and gullies tributary to and contained within the Bluff Creek channel are the primary source of sediment to Bluff Creek. This project will decrease sediment load to Bluff Creek, improve the fish assemblage within Bluff Creek and will assist Chanhassen in meeting their Waste Load Allocation (WLA) for Bluff Creek, the Minnesota River and the Metro Mississippi Watershed. Riley-Purgatory-Bluff Creek Watershed District has expressed their interest in partnering with Chanhassen on this project. Project #SWMP-024 Priority n/a Justification 2019 - Source Volume Reduction and Rate Control 2020 - TH 101 Stormwater Improvements, including Chloride Management Budget Impact/Other Useful Life Unassigned Project Name Lower Bluff Creek TMDL Implementation Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$2,400,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 1,125,000175,000 950,000Construction 175,000 950,000 1,125,000Total Prior 1,275,000 Total Total2019 2020 2021 2022 2023Funding Sources 1,000,000100,000 900,000Other Agency Contribution 125,00075,000 50,000Surface Water Utility Fund 175,000 950,000 1,125,000Total Prior 1,275,000 Total 91 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description This project will provide inspection and cleaning of City stormwater ponds. This work may include sediment removal, placement of blanket, rip- rap or other erosion control BMP's, vegetation management and assessment, repair and replacement of inlet and outlet structures. Project #SWMP-032 Priority n/a Justification There are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban Runoff Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal Separate Storm Sewer System permit. The project will also minimize flooding potential. Budget Impact/Other This will require an input of other public works staff hours. Useful LifeProject Name Stormwater Pond Improvements Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$1,160,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 720,00080,000 160,000 160,000 160,000 160,000Maintenance 80,000 160,000 160,000 160,000 160,000 720,000Total Prior 440,000 Total Total2019 2020 2021 2022 2023Funding Sources 720,00080,000 160,000 160,000 160,000 160,000Surface Water Utility Fund 80,000 160,000 160,000 160,000 160,000 720,000Total Prior 440,000 Total 92 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description This project is an annual maintenance budget used to maintain or replace failing or deficient public storm water infrastructure and have a construction cost less than $75,000. In some instances public works staff can complete the work in house and pay for materials out of this fund. Other times a contractor may be needed to complete the work. Project #SWMP-045 Priority n/a Justification Every year the City replaces culverts, storm water structures and pipe throughout the City that have failed. These replacements are unforeseen and are typically noticed only after they have failed. Often these failures result in public safety issues or pose a potential threat to private property or other City infrastructure. Budget Impact/Other These activities will likely involve the utilization of public works labor. Useful LifeProject Name Storm Water Infrastructure Maintenance/Replacement Category SWMP Type Improvement Account #2 Account #1 720-7025-xxxx Total Project Cost:$525,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 275,00050,000 50,000 50,000 50,000 75,000Construction 50,000 50,000 50,000 50,000 75,000 275,000Total Prior 250,000 Total Total2019 2020 2021 2022 2023Funding Sources 275,00050,000 50,000 50,000 50,000 75,000Surface Water Utility Fund 50,000 50,000 50,000 50,000 75,000 275,000Total Prior 250,000 Total 93 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description Stabilization of deeply incised outfalls and channels draining to Lotus Lake. Project #SWMP-046 Priority n/a Justification This work was identified in the 2007 feasibility study and in the 2015 RPBCWD gully inventory. Channels and outfalls are rapidly eroding and exhibit substantial undercutting of the embankments. This erosion is impacting property adjacent and resulting in the deposition of significant amounts of sediment into Lotus Lake. Over time, the erosion will begin to impact nearby sanitary sewer utilities. 2021 - W. Central Lotus Lake Channel Restoration, Phase II 2024 - Lotus Lake Outfall Improvements Budget Impact/Other Long term maintenance will be required including vegetation management. Useful LifeProject Name Lotus Lake Channels & Outfall Improvements Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$275,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 250,000250,000Maintenance 250,000 250,000Total Prior 25,000 Total Total2019 2020 2021 2022 2023Funding Sources 200,000200,000Other Agency Contribution 50,00050,000Surface Water Utility Fund 250,000 250,000Total Prior 25,000 Total 94 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description Stabilization of in and near stream bank undercutting, escarpment and gully erosion. Project #SWMP-048 Priority n/a Justification As part of the approval for the Public Works Facility, Riley Creek adjacent to the facility was to be stabilized. In 2013, a visual assessment of the upper Riley Creek Corridor from Lake Ann to Lake Susan was evaluated. This assessment revealed significant in and near stream erosion issues resulting in sediment deposition into Riley Creek and, subsequently, into Lake Susan. Budget Impact/Other During construction, some of the City expense will involve in-kind labor. This would likely involve the use of City staff and equipment for hauling materials. Useful LifeProject Name Upper Riley Creek Channel Stabilization Category SWMP Type Unassigned Account #2 Account #1 720-7025-4xxx Total Project Cost:$132,500 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 100,00025,000 75,000Maintenance 25,000 75,000 100,000Total Prior 32,500 Total Total2019 2020 2021 2022 2023Funding Sources 75,00015,000 60,000Other Agency Contribution 25,00010,000 15,000Surface Water Utility Fund 25,000 75,000 100,000Total Prior 32,500 Total 95 Capital Improvement Program Cit of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description Installation of an iron filing enhanced sand filter within Rice Marsh Lake Park. Project #SWMP-053 Priority n/a Justification Neither Rice Marsh Lake nor Lake Riley meet MPCA standards for total phosphorous, chlorophyll-a or secchi disc depth readings. This watershed contributes the largest total phosphorous load to Rice Marsh Lake at 232 lbs (or 32% of the entire watershed load to Rice Marsh Lake) and is only one of two watershed with a load greater than 100 lbs/year. This project, once complete, could reduce the load to Rice Marsh Lake by as much as 115 lbs/year (≈50%). Budget Impact/Other This filtration feature will require some annual maintenance and will require an input of iron in approximately 25 years. Useful LifeProject Name Rice Marsh Lake Iron Enhanced Sand Filter Category SWMP Type Improvement Account #2 Account #1 720-7025-4xxx Total Project Cost:$300,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 300,000300,000Construction 300,000 300,000Total Total2019 2020 2021 2022 2023Funding Sources 250,000250,000Other Agency Contribution 50,00050,000Surface Water Utility Fund 300,000 300,000Total 96 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description This project will help reduce the flooding potential of properties west of Highway 101 and north of Pioneer Trail. After large rain events the wetland and backyards of properties in this area flood and the water does not subside for several days. The area is mostly drained by a very old concrete farm tile which is in very poor condition. This project would abandon the old farm tile and replace the tile with new storm sewer pipe. The proposed storm sewer system will need to be modeled to reduce flooding potential. Some of the drainage is from Carver County roadways. Project #SWMP-056 Priority n/a Justification To reduce flooding potential to residential structures. Budget Impact/Other The City would be responsible for owning and maintaining the storm sewer. Useful LifeProject Name Pioneer Trail Flood Mitigation Category SWMP Type Improvement Account #2 Account #1 Total Project Cost:$760,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 760,000760,000Construction 760,000 760,000Total Total2019 2020 2021 2022 2023Funding Sources 685,000685,000Other Agency Contribution 75,00075,000Surface Water Utility Fund 760,000 760,000Total 97 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description The City is considering improvements to Market Blvd in the future. The storm water pond at the northwest corner of Highway 5 and Market Blvd has been identified as a viable water reuse resource for irrigation. It is estimated that all of the City's downtown irrigation areas could be switched to the surface water source plus other private irrigation systems. A study will need to be completed to document the reuse potential of this pond. The study is proposed to be completed by another agency. Project #SWMP-057 Priority n/a Justification This project will reduce the amount of potable treated water which will help postpone the potential for drilling new wells as the City grows. Water reuse is also identified as a best management strategy in the City's MS4 permit. Budget Impact/Other Some operational staff time will be expected in the spring and the fall. Useful LifeProject Name Downtown Water Reuse Project Category SWMP Type Improvement Account #2 Account #1 Total Project Cost:$350,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 350,000350,000Construction 350,000 350,000Total Total2019 2020 2021 2022 2023Funding Sources 250,000250,000Other Agency Contribution 50,00050,000Surface Water Utility Fund 50,00050,000Water Utility Fund 350,000 350,000Total 98 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Surface Water Management Description 2019 - Lake Minnewashta erosion & channelization stabilization project Project #SWMP-058 Priority n/a Justification Lake Minnewashta and Lake St. Joe are located in the Lake Virginia subwatershed. Lake Virginia is an impaired water body. Stormwater improvement projects in the subwatershed show progress towards meeting the City's Waste Load Allocation. Budget Impact/Other Useful LifeProject Name Lake Virginia TMDL Load Reduction Category SWMP Type Improvement Account #2 Account #1 Total Project Cost:$20,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 20,00020,000Improvement 20,000 20,000Total Total2019 2020 2021 2022 2023Funding Sources 10,00010,000Other Agency Contribution 10,00010,000Surface Water Utility Fund 20,000 20,000Total 99 This page intentionally left blank. 100 Water System Improvements 101 This page intentionally left blank. 102 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Water System Improvements Description Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution system for street rehabilitation projects. Project #W-024 Priority n/a Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. Budget Impact/Other These projects will decrease maintenance costs. Useful Life Unassigned Project Name Watermain Replacement Category Utilities Type Improvement Account #2 Account #1 700-7025-4751 Total Project Cost:$6,200,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 2,800,000600,000 1,100,000 200,000 900,000Construction 600,000 1,100,000 200,000 900,000 2,800,000Total Prior 3,400,000 Total Total2019 2020 2021 2022 2023Funding Sources 2,800,000600,000 1,100,000 200,000 900,000Water Utility Fund 600,000 1,100,000 200,000 900,000 2,800,000Total Prior 3,400,000 Total 103 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Water System Improvements Description This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years. It is recommended that the following pumps and motors be pulled and inspected for wear: 2019 - Well #4 2020 - Well #3 2021 - Well #9 2022 - Well #10 2023 - Well #2 Project #W-032 Priority n/a Justification Performing regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system. Budget Impact/Other Useful Life Unassigned Project Name Well Rehabilitation Program Category Utilities Type Improvement Account #2 Account #1 700-7025-4530 Total Project Cost:$893,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 330,00050,000 55,000 65,000 95,000 65,000Maintenance 50,000 55,000 65,000 95,000 65,000 330,000Total Prior 563,000 Total Total2019 2020 2021 2022 2023Funding Sources 330,00050,000 55,000 65,000 95,000 65,000Water Utility Fund 50,000 55,000 65,000 95,000 65,000 330,000Total Prior 563,000 Total 104 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Water System Improvements Description This tank is needed to meet the peak day irrigation demand and potential emergency demand for the growth of the community. It is needed in the low zone pressure area to service the growth area south of Lyman Boulevard. The location of the tank is proposed on the Public Works Building side on the ease site of Audubon. This tank is dependent on development. Staff plans to evaluate the need for this tank annually and adjust the construction date accordingly. Project #W-046 Priority n/a Justification To meet peak irrigation and emergency water demands for the growing community as identified in the 2008 water comprehensive plan. Budget Impact/Other Useful LifeProject Name Low Zone 1 million gallon Storage Tank Category Utilities Type Improvement Account #2 Account #1 700-7025-4751 Total Project Cost:$2,600,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 2,600,0002,600,000Construction 2,600,000 2,600,000Total Total2019 2020 2021 2022 2023Funding Sources 2,600,0002,600,000Water Utility Fund 2,600,000 2,600,000Total 105 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Water System Improvements Description This project pays for the oversizing of lateral watermains for future developments and is development driven. Payment for this project will be from the Trunk Water fund which is funded by development hook-up charges. The infrastructure will most likely be constructed with a development project. Project #W-056 Priority n/a Justification This project is necessary to support growth in the City and to ensure proper water pressure and fire flows. Budget Impact/Other Useful LifeProject Name MUSA Trunk Watermain Oversizing Category Utilities Type Improvement Account #2 Account #1 700-7025-4xxx Total Project Cost:$200,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 150,000150,000Construction 150,000 150,000Total Prior 50,000 Total Total2019 2020 2021 2022 2023Funding Sources 150,000150,000Water Utility Fund 150,000 150,000Total Prior 50,000 Total 106 Capital Improvement Program City of Chanhassen, MN Contact Paul Oehme 2019 2023 thru Department Water System Improvements Description This project will remove the existing paint and repaint the interior and exterior surface of the tower. The tank was constructed in 1995 and the expected life expectancy of a tank coating is 20 years. Project #W-061 Priority n/a Justification An inspection report will be drafted prior to construction to justify the work. Budget Impact/Other Useful LifeProject Name Repaint Watertower Place Tank Category Utilities Type Maintenance Account #2 Account #1 Total Project Cost:$2,000,000 Account #4 Account #3 Total2019 2020 2021 2022 2023Expenditures 2,000,0002,000,000Maintenance 2,000,000 2,000,000Total Total2019 2020 2021 2022 2023Funding Sources 2,000,0002,000,000Water Utility Fund 2,000,000 2,000,000Total 107 This page intentionally left blank. 108