2002-66• CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: July 30, 2002 RESOLUTION NO: 2002-66
MOTION BY: Peterson SECONDED BY: Bovle
A RESOLUTION APPROVING CHANGE ORDER NO. 1
CHANHASSEN LIBRARY PROJECT
WHEREAS, on February 11, 2002, the City Council approved plans and specifications on
the above-mentioned project; and
WHEREAS, the attached change order provides a breakdown of costs associated with each
change order item.
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
approves Change Order No. 1 for the Chanhassen Library Project in the amount of $52,508.
Passed and adopted by the Chanhassen City Council this 22nd day of July 2002.
ATTEST:
•
A"_xxf
T d Gerhardt, City Manager
YES
Jansen
Ayotte
Labatt
Boyle
Peterson
0
Linda C. Jansen, Mayor
NO ABSENT
None
None
•
•
Change Order
Project: Chanhassen Public Library
690 City Center Dr.
Chanhassen, MN 55317
Contractor: Kraus Anderson Const'n Co
2500 Minnehaha Ave
Mpls, MN 55404
The Contract is changed as follows:
■ Contractor
■ Owner
■ Architect
in M + E Consults
in Structural Consults
C�zv
MS&R
Change Order Number: 1
Date: 18 June, 2002
Architect's Project No.: 2001021.00
Contract Date: 28 May 2002
Contract For: General Construction
PR 1.2 Modification to interior door add $268.00
PR 1.3 Change countertops to solid surface add $3,885.00
PR 1.5 Change tile base to carpet base add $101.00
PR 1.7 Delete clearstory entry deduct $25,076.00
PR 1.8 Take Bid Alternate #9 sidewalk on east side of parking deck add $3,500.00
PR 1.11 Additional VAV boxes add $3,675.00
PR 1.12 Change water service from 6" to 8" dia add $554.00
PR 1.13 Change to sanitary waste line deduct $33.00
PR 1.14 Change cover to hot water radiation deduct $1.400.00
Subtotal this page -.58;226.00"
p east`
Not valid until signed by the Owner, Architect and Contractor
The original Contract Sum was.............................................................................................$4,865,000.00
Net Change by previously authorized Change Orders........................................................................ $00.00
The Contract Sinn prior to this Change Order was................................................................. $4,865,000.00
The Contract Sum will be increased by this Change Order in the amount of ............................... $67;316:-00 _SL;S�C`<•t
The new Contract Sum including this Change Order ivill be .................................................$4;932;316:00
The Contract Time will be increased by........................................................................................... b Days
The date of Substantial Completion, resulting from this Change Order is...............................22 June, 2003
Archite tl Contractor Owner
Meyer, cherer & Roc •c stle, Ltd. Kraus A 'derson Construction Co. City of Chanhassen
119 N n treet 2500 iq�}�/ ehaha Ave 90 City Center Dr
Minnea ,o�is, MN 55401 Mpls MN ' 4 �� Chanhassen, MN 55317
By–�— ----- By By
--__-- Date .9 %i/ D Z Date-----------_—
1
Date----��=�'–• � ��Z (� —
I �
l
L:\2001021 CFIA\d oc\2001021 cool .doc
•
0
June 18, 2002
Chanhassen Public Library
Continuation Of Change Order Number 1
The Contract changes are continued as follows:
PR 1.19 Change in electrical service
YX....1' 'u�...nb.. .,.al¢rncorl•,ro•.. ,.,cn.,: �•,r::.�, ,..._.
PR 1.SK 113 & 114 Add two masonry monument sign bases
PR 1.SK 115 & 116 Add sliding grille
PR 1.SK 117 Add parking barrier
PR 1.SK 118 Relocate engine heater posts for city vehicles
• PR 1.SK 120, 121, 122 & 123 Add the fireplace
PR 2.SK 130, 131, 132, 133 & 134 Modifications to site utilities
PR 2.SK 125 Add stairs to sidewalk btwn ramp and city hall
PR 2.SK 125 Add railings to stairs
PR 2.SK 125 Railing painting
PR 2. Miscellaneous Six month rental for barricade and flasher
SCO 1 Change to precast piers to support parking lighting
ASI 1 Modifications to parking deck stairs
Subtotal page two
Total Changc Ordcr both pagcs
L:UOO 1021 CHA\doc\2001021 cool .doc
MS&R
add
$9,157.00
A4W
add
$14,308.00
add
$7,196.00
add
$7,901.00
add
$6,691.00•
add
$11,790.00
add
$3,855.00
add
$1,665.00
add
$936.00
add
$335.00
add
$421.00
add
$971.00
add
$1.808.00
S67,316.00