Loading...
2002-93.• CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: October 28, 2002 RESOLUTION NO: 2002-93 MOTION BY: Bovle SECONDED BY: Labatt A RESOLUTION APPROVING A FINAL PLAT CREATING VILLAGES ON THE PONDS EIGHT ADDITION, VOP I, LLC WHEREAS, VOP I, LLC has requested a subdivision of the property located at the northeast corner of Main Street and Lake Drive into two lots of 63,183 and 18,015 square feet and two outlots of 32,677 and 58,656 square feet; and WHEREAS, the proposed subdivision complies with all requirements of the Chanhassen City Code; and WHEREAS, the Chanhassen Planning Commission held a public hearing on July 17, 1996, and found the plan consistent with the Chanhassen Comprehensive Plan and Chanhassen Zoning Ordinance and recommended approval of the subdivision. • NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby approves PUD #95-2 granting Final Plat approval for Villages on the Ponds 80' Addition, creating two lots and two outlots subject to the following conditions: 1. The development shall comply with the landscape plan submitted and approved as part of the site plan #2002-7 for Building C and the Bank Building. Should that development not be constructed, the landscaping shall comply with the Villages on the Ponds Development Design Standards as well as city ordinance requirements for site landscaping. 2. The development shall comply with the development design standards for Villages on the Ponds. 3. Fire lanes will be marked with the appropriate street signage and yellow curbing. Fire Marshal will determine fire lanes upon review of plans and final access routes and at that point determine exact placement of signs and yellow curbing. 4. Premises identification will be reviewed as specific buildings are being proposed. Chanhassen Fire Department/Fire Prevention Policy # 29-1992 will be used as basic criteria for numbering the buildings. Due to the complexity of this project, numbering on more than one side will be necessary as well as additional monument or directional e signage. 5. The lowest floor elevation of buildings adjacent to ponds and wetland shall be a minimum of 2 feet above the 100 -year high water level. 6. Connection to the public utility lines will incur hook-up charges against the lot. The 2002 sanitary sewer hook-up charge is $1,383 per unit. The 2002 water hook-up charge is $1,802 per unit. The 2002 SAC charge is $1,275 per unit. These charges will be collected at the time of building permit issuance. 7. Detailed storm sewer calculations for a 10 -year and 100 -year storm events along with ponding calculations based on Walker's PONDNET methodology along with pre and post -runoff conditions shall be submitted to City staff for review and approval. 8. The applicant shall pay water quality fees of $20,463 and water quantity fees of $15,099. The SWMP fees totaling $35,562 are payable at time of final plat recording. 9. The developer shall pay required administrative fees before the recording of the plat. These fees include $450.00 for final plat processing, $30.00 for plat filing, and $65.00 for GIS fees. 10. The applicant shall provide a copy of the covenants for review and approval by the City • and shall be filed at the County with the final plat documents. 11. The applicant shall be responsible for obtaining the necessary permits from the regulatory agencies such as the Minnesota Department of Health, MCES, Watershed District, Minnesota DNR, MPCA and MnDOT. 12. The applicant shall report to the City Engineer the location of any drain tiles found during construction. The applicant will comply with the City Engineer's direction as far as abandonment or relocation of the drain tile. 13. The applicant shall develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook (BMPH). Type H erosion control fencing will be required around the grading area. The site may also require additional erosion control fence on the slopes and/or temporary sediment basins. Wood fiber blankets shall be utilized on all slopes in excess of 3:1. Existing catch basins around the site perimeter must be protected from construction related sediment through the use of filter barriers (see City Detail Plate No. 5302). 14. Full park and trail fees shall be collected pursuant to city ordinance. 15. The developer shall work with the city to accomplish City goals for housing including • the provision of "affordable" housing. 16. The developer and future site users shall be required to incorporate street/plaza furniture, planting boxes, public art, bicycle racks, drinking fountains, etc. within the development and on individual site plans. Passed and adopted by the Chanhassen City Council this 28`h day October of 2002. ATTEST: d Gerhardt, City Clerk/Manager YES NO Jansen None Ayotte Peterson Labatt Boyle is inda C. Jansen, M y r ABSENT None