Loading...
2020-2024 CIP 2020 - 2024 CapitalImprovementProgram 5 -YEAR PLAN MAJOR EQUIPMENT MUNICIPAL BUILDINGS PARK & TRAIL IMPROVEMENTS PLANNING STREET IMPROVEMENTS SEWER SURFACE WATER MANAGEMENT WATER 2020-2024 Capital Improvements Program Table of Contents Chapter 1: Policy Capital Improvements Fiscal Policy ....................................................................................1 Chapter 2: Tables I: Funding Source Summary........................................................................................5 II: Projects by Funding Source .....................................................................................6 III: Department Summary ............................................................................................10 IV: Projects by Department ..........................................................................................11 Chapter 3: Major Equipment Fire Dept.: SCBA Equipment ...........................................................................................17 PPE: Turnout/Helmets ......................................................................................................18 Computer Purchases/Upgrades ..........................................................................................19 Telecommunications Purchases/Upgrades .........................................................................20 Community Development: Light Duty Trucks .................................................................21 Dump/Plow Truck Replacements/Additions .....................................................................22 Audio/Visual Equipment ...................................................................................................23 Light Duty Trucks: Streets ................................................................................................24 Software Purchases ...........................................................................................................25 Computerized Records Retention System .........................................................................26 Fire Vehicles ......................................................................................................................27 Aerial Photography for City GIS Datasets .........................................................................28 Generator ............................................................................................................................29 Light Duty Trucks: Utilities ..............................................................................................30 Administration Vehicle Replacement ................................................................................31 Engineering Vehicle Replacement .....................................................................................32 Storage Area Network........................................................................................................33 CSO Truck .........................................................................................................................34 Office Furniture .................................................................................................................35 Snowblower SnowBlast Sicard ..........................................................................................36 Sweeper: Parks ..................................................................................................................37 Light Duty Trucks: Parks ..................................................................................................38 Mower Replacement: Parks ..............................................................................................39 Skid Loader: Streets ..........................................................................................................40 Tractor Replacement: Parks ..............................................................................................41 Brush Chipper ....................................................................................................................42 Annual Skid Loader Trade In ............................................................................................43 Copier Replacements .........................................................................................................44 Fleet Vehicles.....................................................................................................................45 Miscellaneous Fire Equipment/Hose Replacement ...........................................................46 Recreation Center Revitalization Project ...........................................................................47 Zero Turn Mower Replacement - Parks .............................................................................48 Hot Box with Asphalt Premix Heater ................................................................................49 Crack Sealer .......................................................................................................................50 Bobcat Trailer Replacement ..............................................................................................51 Mailing Folder/Inserter ......................................................................................................52 Annual Zero Turn Mower Replacement - Park .................................................................53 Vibratory Compactor .........................................................................................................54 Craig Loader plow & wing ................................................................................................55 M-B Broom ........................................................................................................................56 Generator Truck .................................................................................................................57 Compressor ........................................................................................................................58 Street Sweeper ...................................................................................................................59 Trailer Replacement ...........................................................................................................60 Weed Sprayer .....................................................................................................................61 Vehicle Replacement: Planning ........................................................................................62 Permitting/Planning Software Upgrade .............................................................................63 Chapter 4: Municipal Buildings City Hall Remodel .............................................................................................................67 Citizen Survey ....................................................................................................................68 Fire Department Building Improvements ..........................................................................69 City Hall Roof Replacement ..............................................................................................70 Recreation Center Wall Replacement ................................................................................71 Recreation Center Lobby Furniture ...................................................................................72 Chapter 5: Park & Trail Improvements Picnic Tables/Park Benches ...............................................................................................75 Trees ...................................................................................................................................76 Tennis Court Refurbishment .............................................................................................77 Chanhassen Nature Preserve Trail, Final Phase ................................................................78 Lake Ann Lake Side Pavilion Roof Replacement .............................................................79 Arboretum Trail and Hwy 41 Underpass Cost Share ........................................................80 Park Equipment Replacement ............................................................................................81 City Center Park Paver Replacement .................................................................................82 Chapter 6: Sanitary Sewer Improvements Inflow and Infiltration Abatement .....................................................................................85 Sanitary Lift Station Rehabilitation Program ....................................................................86 Chapter 7: Street Improvements Annual Street Improvement Program ................................................................................89 Pavement Management ......................................................................................................90 TH 101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)...................................................91 Lyman Blvd Improvements-Galpin Blvd to TH 41 ...........................................................92 Galpin Blvd Improvements-Hwy 5 N to City limits ..........................................................93 TH 41 Rehabilitation – Pioneer Trail to TH 5 ...................................................................94 Downtown Signal Controller Replacement .......................................................................95 Chapter 8: Surface Water Management Program Property Acquisition ..........................................................................................................99 Lower Bluff Creek TMDL Implementation ....................................................................100 Stormwater Pond Improvements ......................................................................................101 Storm Water Infrastructure Maintenance/Replacement ...................................................102 Lotus Lake Channels & Outfall Improvements ...............................................................103 Upper Riley Creek Channel Stabilization ........................................................................104 Rice Marsh Lake Iron Enhanced Sand Filter ...................................................................105 Chapter 9: Water System Improvements Well Rehabilitation Program ...........................................................................................109 Low Zone 1 million gallon Storage Tank ........................................................................110 Well #16 ...........................................................................................................................111 Powers Blvd Watermain Loop .........................................................................................112 Well #4 Re-roofing Project ..............................................................................................113 CAPITAL IMPROVEMENTS FISCAL POLICY GENERAL POLICY Chanhassen’s Capital Improvements Program reflects an assessment of the community’s needs and its ability to pay for major improvements. It is founded on the policy that reinvestment required for replacement, maintenance, or the increased efficiency of existing systems shall have priority over investments for expansion of existing systems or the provision of new services. FUNDING PRIORITIES Capital spending proposals will generally be funded on the following priority basis: 1.Those projects necessary for contributing to the public health and welfare. 2.Those projects which will help to maintain an existing system. 3. Those projects that will make an existing system more efficient. 4.Those projects representing the expansion of an existing system for new service or completely new public facility or service. FUNDING PRINCIPLES As a result, the following principles shall govern the implementation of the recommended Capital Improvements Program: 1.The City will make all capital improvements in accordance with the adopted Capital Improvements Program. 2.The City will develop a multi-year plan for Capital Improvements and update it annually. 3.The City will coordinate development of the Capital Improvements Program with development of the annual operating budget. Future optional costs associated with new capital improvements will be projected and included in operation budget forecasts. 1 2 Tables 3 This page intentionally left blank. 4 Capital Improvement Program City of Chanhassen, MN FUNDING SOURCE SUMMARY 2020 thru 2024 TotalSource2020 2021 2022 2023 2024 Assessment/Revolving Assess Fund 17,855,0002,622,500 3,752,500 3,740,000 3,840,000 3,900,000 Cable TV Fund 142,00025,000 25,000 42,000 25,000 25,000 Capital Replacement Equipment Fund 6,674,2201,083,550 1,218,050 1,479,090 1,117,930 1,775,600 MSA 8,515,4001,716,500 3,162,100 145,600 3,345,600 145,600 Other Agency Contribution 46,919,00015,900,000 23,709,000 310,000 7,000,000 Park Dedication Fund 1,475,0001,375,000 25,000 25,000 25,000 25,000 Park Replacement Fund 1,260,000255,000 245,000 250,000 255,000 255,000 Sewer Utility Fund 4,848,4101,060,950 1,350,050 671,770 1,013,290 752,350 Street Pavement Management 1,500,000300,000 300,000 300,000 300,000 300,000 Surface Water Utility Fund 5,092,960677,450 1,208,050 1,028,170 1,064,290 1,115,000 Tax Levy 465,00093,000 93,000 93,000 93,000 93,000 Water Utility Fund 11,949,9102,668,950 2,173,550 812,770 1,414,290 4,880,350 27,777,900 37,261,300 8,897,400 19,493,400 13,266,900 106,696,900GRAND TOTAL 5 Capital Improvement Program City of Chanhassen, MN PROJECTS BY FUNDING SOURCE 2020 2024thru TotalSource Project # Priority 2020 2021 2022 2023 2024 Assessment/Revolving Assess Fund PK&T-072 75,00075,000Tennis Court Refurbishment n/a ST-012 17,620,0002,582,500 3,637,500 3,700,000 3,800,000 3,900,000Annual Street Improvement Program n/a ST-043 160,00040,000 40,000 40,000 40,000Downtown Signal Controller Replacement n/a 17,855,0002,622,500 3,752,500 3,740,000 3,840,000 3,900,000Assessment/Revolving Assess Fund Total Cable TV Fund EQ-026 125,00025,000 25,000 25,000 25,000 25,000Audio/Visual Equipment n/a MB-023 17,00017,000Citizen Survey n/a 142,00025,000 25,000 42,000 25,000 25,000Cable TV Fund Total Capital Replacement Equipment Fund EQ-004 350,000350,000Fire Dept.: SCBA Equipment n/a EQ-010 155,25030,000 30,400 31,300 31,300 32,250PPE: Turnout/Helmets n/a EQ-013 401,90082,700 92,300 79,300 76,300 71,300Computer/Network Equipment Purchases/Upgrades n/a EQ-014 61,2006,600 2,300 2,300 50,000Telecommunication Purchases/Upgrades n/a EQ-015 95,00031,000 64,000Light Duty Trucks: Community Dev.n/a EQ-016 1,256,000221,000 228,000 235,000 242,000 330,000Dump/Plow Truck Replacements/Additions n/a EQ-029 135,00050,000 36,000 49,000Light Duty Trucks: Streets n/a EQ-048 497,92088,250 98,350 100,490 104,030 106,800Software Purchases n/a EQ-049 40,10022,000 6,100 5,000 7,000Computerized Records Retention System n/a EQ-054 239,00030,000 65,000 144,000Fire Vehicles n/a EQ-055 40,0002,100 17,100 2,900 17,900Aerial Photography for City GIS Datasets n/a EQ-063 56,50029,500 27,000Administration Vehicle Replacement n/a EQ-065 45,60045,600Engineering Vehicle Replacement n/a EQ-081 55,00055,000Storage Area Network (SAN)n/a EQ-083 33,40033,400CSO Truck n/a EQ-084 25,0005,000 5,000 5,000 5,000 5,000Office Furniture n/a EQ-098 154,500154,500Snowblower SnowBlast Sicard n/a EQ-099 41,70041,700Sweeper - Parks n/a EQ-100 172,00043,000 36,000 46,000 47,000Light Duty Trucks - Parks n/a EQ-104 202,600101,000 18,600 83,000Mower Replacement - Park n/a EQ-105 240,400240,400Skid loader - Street Department n/a EQ-106 228,200123,400 104,800Tractor Replacement - Park n/a EQ-115 86,00086,000Brush Chipper n/a EQ-124 95,00019,000 19,000 19,000 19,000 19,000Annual Skid Loader Trade In n/a EQ-127 46,00018,500 9,000 9,000 9,500Copier Replacements n/a EQ-132 35,00035,000Fleet Vehicles n/a EQ-137 85,00015,000 15,000 15,000 20,000 20,000Miscellaneous Fire Equipment/Hose Replacement n/a EQ-140 50,00025,000 25,000Recreation Center Revitalization Project n/a EQ-154 18,00018,000Zero Turn Mower Replacement - Parks n/a EQ-158 44,30044,300Hot Box with Asphalt Premix Heater n/a 6 TotalSource Project # Priority 2020 2021 2022 2023 2024 EQ-159 47,00047,000Crack Sealer n/a EQ-164 5,0001,000 1,000 1,000 1,000 1,000Annual Zero Turn Mower Replacement - Park n/a EQ-165 59,00059,000Vibratory Compactor n/a EQ-166 46,30046,300Craig loader plow & wing n/a EQ-167 16,40016,400M-B Broom n/a EQ-169 29,90029,900Compressor n/a EQ-170 310,000310,000Street Sweeper n/a EQ-171 76,75036,000 7,400 33,350Trailer Replacement n/a EQ-172 9,9009,900Weed Sprayer n/a EQ-173 33,00033,000Vehicle Replacement - Planning n/a EQ-174 94,50094,500Permiting/Planning Software Upgrade n/a MB-010 150,000150,000City Hall Remodel n/a MB-026 218,90093,900 125,000Fire Department Building Improvements n/a MB-033 300,000300,000City Hall Roof Replacement n/a MB-034 65,50065,500Recreation Center Wall Replacement n/a MB-035 12,00012,000Recreation Center Lobby Furniture n/a PK&T-132 30,00030,000Lake Ann Lake Side Pavilion Roof Replacement n/a PK&T-142 165,000165,000City Center Park Paver Replacement n/a W-064 19,50019,500Well #4 Re-roofing Project n/a 6,674,2201,083,550 1,218,050 1,479,090 1,117,930 1,775,600Capital Replacement Equipment Fund Total MSA ST-012 3,333,0001,716,500 1,516,500 100,000Annual Street Improvement Program n/a ST-038 2,082,4001,645,600 145,600 145,600 145,600Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a ST-040 3,000,0003,000,000Galpin Blvd Imp-Hwy 5 N to City limits (PW176A) n/a ST-042 100,000100,000TH 41 Rehabilitation - Pioneer Trail to TH 5 n/a 8,515,4001,716,500 3,162,100 145,600 3,345,600 145,600MSA Total Other Agency Contribution ST-032 30,000,00015,000,000 15,000,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61) n/a ST-038 8,494,0008,494,000Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a ST-040 7,000,0007,000,000Galpin Blvd Imp-Hwy 5 N to City limits (PW176A)n/a SWMP-024 900,000900,000Lower Bluff Creek TMDL Implementation n/a SWMP-046 200,000200,000Lotus Lake Channels & Outfall Improvements n/a SWMP-048 75,00015,000 60,000Upper Riley Creek Channel Stabilization n/a SWMP-053 250,000250,000Rice Marsh Lake Iron Enhanced Sand Filter n/a 46,919,00015,900,000 23,709,000 310,000 7,000,000Other Agency Contribution Total Park Dedication Fund PK&T-042 50,00010,000 10,000 10,000 10,000 10,000Picnic Tables/Park Benches n/a PK&T-043 75,00015,000 15,000 15,000 15,000 15,000Treesn/a PK&T-099 150,000150,000Chanhassen Nature Preserve Trail, Final Phase n/a PK&T-138 1,200,0001,200,000Arboretum Trail and Hwy 41 Underpass Cost Share n/a 1,475,0001,375,000 25,000 25,000 25,000 25,000Park Dedication Fund Total Park Replacement Fund PK&T-141 1,260,000255,000 245,000 250,000 255,000 255,000Park Equipment Replacement n/a 7 TotalSource Project # Priority 2020 2021 2022 2023 2024 1,260,000255,000 245,000 250,000 255,000 255,000Park Replacement Fund Total Sewer Utility Fund EQ-048 66,96011,950 12,550 13,170 14,290 15,000Software Purchases n/a EQ-059 52,35052,350Generator n/a EQ-062 135,50021,500 44,000 70,000Light Duty Trucks: Utilities n/a EQ-160 3,6003,600Bobcat Trailer Replacement n/a EQ-161 5,0005,000Mailing Folder/Inserter n/a EQ-168 95,00095,000Generator Truck n/a SS-012 1,000,000200,000 200,000 200,000 200,000 200,000Inflow and Infiltration Abatement n/a SS-017 555,000130,000 120,000 130,000 85,000 90,000Sanitary Lift Station Rehabilitation Program n/a ST-012 1,685,000192,500 517,500 325,000 325,000 325,000Annual Street Improvement Program n/a ST-032 1,000,000500,000 500,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-040 250,000250,000Galpin Blvd Imp-Hwy 5 N to City limits (PW176A)n/a 4,848,4101,060,950 1,350,050 671,770 1,013,290 752,350Sewer Utility Fund Total Street Pavement Management ST-018 1,500,000300,000 300,000 300,000 300,000 300,000Pavement Management n/a 1,500,000300,000 300,000 300,000 300,000 300,000Street Pavement Management Total Surface Water Utility Fund EQ-048 66,96011,950 12,550 13,170 14,290 15,000Software Purchases n/a EQ-161 5,0005,000Mailing Folder/Inserter n/a ST-012 2,771,000185,500 785,500 600,000 600,000 600,000Annual Street Improvement Program n/a SWMP-014 150,00075,000 75,000Property Acquisition n/a SWMP-024 50,00050,000Lower Bluff Creek TMDL Implementation n/a SWMP-032 1,500,000300,000 300,000 300,000 300,000 300,000Stormwater Pond Improvements n/a SWMP-045 325,00050,000 50,000 50,000 75,000 100,000Storm Water Infrastructure Maintenance/Replacement n/a SWMP-046 150,00050,000 100,000Lotus Lake Channels & Outfall Improvements n/a SWMP-048 25,00010,000 15,000Upper Riley Creek Channel Stabilization n/a SWMP-053 50,00050,000Rice Marsh Lake Iron Enhanced Sand Filter n/a 5,092,960677,450 1,208,050 1,028,170 1,064,290 1,115,000Surface Water Utility Fund Total Tax Levy ST-018 465,00093,000 93,000 93,000 93,000 93,000Pavement Management n/a 465,00093,000 93,000 93,000 93,000 93,000Tax Levy Total Water Utility Fund EQ-048 66,96011,950 12,550 13,170 14,290 15,000Software Purchases n/a EQ-059 52,35052,350Generator n/a EQ-062 135,50021,500 44,000 70,000Light Duty Trucks: Utilities n/a EQ-160 3,6003,600Bobcat Trailer Replacement n/a EQ-161 5,0005,000Mailing Folder/Inserter n/a EQ-168 95,00095,000Generator Truck n/a ST-012 5,255,0001,550,000 1,605,000 700,000 700,000 700,000Annual Street Improvement Program n/a ST-032 1,000,000500,000 500,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-040 500,000500,000Galpin Blvd Imp-Hwy 5 N to City limits (PW176A)n/a W-032 307,00051,000 56,000 96,000 61,000 43,000Well Rehabilitation Program n/a 8 TotalSource Project # Priority 2020 2021 2022 2023 2024 W-046 2,600,0002,600,000Low Zone 1 million gallon Storage Tank n/a W-059 1,400,0001,400,000Well #16 n/a W-063 510,000510,000Powers Blvd Watermain Loop n/a W-064 19,50019,500Well #4 Re-roofing Project n/a 11,949,9102,668,950 2,173,550 812,770 1,414,290 4,880,350Water Utility Fund Total 106,696,90027,777,900 37,261,300 8,897,400 19,493,400 13,266,900GRAND TOTAL 9 Capital Improvement Program City of Chanhassen, MN DEPARTMENT SUMMARY 2020 2024thru Total2020 2021 2022 2023 2024Department Major Equipment 6,627,100774,000 1,078,200 1,550,800 1,133,800 2,090,300 Municipal Buildings 763,400243,900 202,500 17,000 300,000 Park & Trail Improvements 3,005,0001,795,000 345,000 275,000 310,000 280,000 Sanitary Sewer Improvements 1,555,000330,000 320,000 330,000 285,000 290,000 Street Improvements 86,215,40022,660,000 34,634,600 5,903,600 16,953,600 6,063,600 Surface Water Management 3,675,0001,375,000 625,000 725,000 450,000 500,000 Water System Improvements 4,856,000600,000 56,000 96,000 61,000 4,043,000 27,777,900 37,261,300 8,897,400 19,493,400 13,266,900 106,696,900TOTAL 10 Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2020 2024thru Total2020 2021 2022 2023 2024Department Project # Priority Major Equipment EQ-004 350,000350,000Fire Dept.: SCBA Equipment n/a EQ-010 155,25030,000 30,400 31,300 31,300 32,250PPE: Turnout/Helmets n/a EQ-013 401,90082,700 92,300 79,300 76,300 71,300Computer/Network Equipment Purchases/Upgrades n/a EQ-014 61,2006,600 2,300 2,300 50,000Telecommunication Purchases/Upgrades n/a EQ-015 95,00031,000 64,000Light Duty Trucks: Community Dev.n/a EQ-016 1,256,000221,000 228,000 235,000 242,000 330,000Dump/Plow Truck Replacements/Additions n/a EQ-026 125,00025,000 25,000 25,000 25,000 25,000Audio/Visual Equipment n/a EQ-029 135,00050,000 36,000 49,000Light Duty Trucks: Streets n/a EQ-048 698,800124,100 136,000 140,000 146,900 151,800Software Purchases n/a EQ-049 40,10022,000 6,100 5,000 7,000Computerized Records Retention System n/a EQ-054 239,00030,000 65,000 144,000Fire Vehicles n/a EQ-055 40,0002,100 17,100 2,900 17,900Aerial Photography for City GIS Datasets n/a EQ-059 104,700104,700Generatorn/a EQ-062 271,00043,000 88,000 140,000Light Duty Trucks: Utilities n/a EQ-063 56,50029,500 27,000Administration Vehicle Replacement n/a EQ-065 45,60045,600Engineering Vehicle Replacement n/a EQ-081 55,00055,000Storage Area Network (SAN)n/a EQ-083 33,40033,400CSO Truck n/a EQ-084 25,0005,000 5,000 5,000 5,000 5,000Office Furniture n/a EQ-098 154,500154,500Snowblower SnowBlast Sicard n/a EQ-099 41,70041,700Sweeper - Parks n/a EQ-100 172,00043,000 36,000 46,000 47,000Light Duty Trucks - Parks n/a EQ-104 202,600101,000 18,600 83,000Mower Replacement - Park n/a EQ-105 240,400240,400Skid loader - Street Department n/a EQ-106 228,200123,400 104,800Tractor Replacement - Park n/a EQ-115 86,00086,000Brush Chipper n/a EQ-124 95,00019,000 19,000 19,000 19,000 19,000Annual Skid Loader Trade In n/a EQ-127 46,00018,500 9,000 9,000 9,500Copier Replacements n/a EQ-132 35,00035,000Fleet Vehicles n/a EQ-137 85,00015,000 15,000 15,000 20,000 20,000Miscellaneous Fire Equipment/Hose Replacement n/a EQ-140 50,00025,000 25,000Recreation Center Revitalization Project n/a EQ-154 18,00018,000Zero Turn Mower Replacement - Parks n/a EQ-158 44,30044,300Hot Box with Asphalt Premix Heater n/a EQ-159 47,00047,000Crack Sealer n/a EQ-160 7,2007,200Bobcat Trailer Replacement n/a EQ-161 15,00015,000Mailing Folder/Inserter n/a EQ-164 5,0001,000 1,000 1,000 1,000 1,000Annual Zero Turn Mower Replacement - Park n/a EQ-165 59,00059,000Vibratory Compactor n/a EQ-166 46,30046,300Craig loader plow & wing n/a EQ-167 16,40016,400M-B Broom n/a EQ-168 190,000190,000Generator Truck n/a EQ-169 29,90029,900Compressorn/a EQ-170 310,000310,000Street Sweeper n/a EQ-171 76,75036,000 7,400 33,350Trailer Replacement n/a 11 Total2020 2021 2022 2023 2024Department Project # Priority EQ-172 9,9009,900Weed Sprayer n/a EQ-173 33,00033,000Vehicle Replacement - Planning n/a EQ-174 94,50094,500Permiting/Planning Software Upgrade n/a 6,627,100774,000 1,078,200 1,550,800 1,133,800 2,090,300Major Equipment Total Municipal Buildings MB-010 150,000150,000City Hall Remodel n/a MB-023 17,00017,000Citizen Survey n/a MB-026 218,90093,900 125,000Fire Department Building Improvements n/a MB-033 300,000300,000City Hall Roof Replacement n/a MB-034 65,50065,500Recreation Center Wall Replacement n/a MB-035 12,00012,000Recreation Center Lobby Furniture n/a 763,400243,900 202,500 17,000 300,000Municipal Buildings Total Park & Trail Improvements PK&T-042 50,00010,000 10,000 10,000 10,000 10,000Picnic Tables/Park Benches n/a PK&T-043 75,00015,000 15,000 15,000 15,000 15,000Trees n/a PK&T-072 75,00075,000Tennis Court Refurbishment n/a PK&T-099 150,000150,000Chanhassen Nature Preserve Trail, Final Phase n/a PK&T-132 30,00030,000Lake Ann Lake Side Pavilion Roof Replacement n/a PK&T-138 1,200,0001,200,000Arboretum Trail and Hwy 41 Underpass Cost Share n/a PK&T-141 1,260,000255,000 245,000 250,000 255,000 255,000Park Equipment Replacement n/a PK&T-142 165,000165,000City Center Park Paver Replacement n/a 3,005,0001,795,000 345,000 275,000 310,000 280,000Park & Trail Improvements Total Sanitary Sewer Improvements SS-012 1,000,000200,000 200,000 200,000 200,000 200,000Inflow and Infiltration Abatement n/a SS-017 555,000130,000 120,000 130,000 85,000 90,000Sanitary Lift Station Rehabilitation Program n/a 1,555,000330,000 320,000 330,000 285,000 290,000Sanitary Sewer Improvements Total Street Improvements ST-012 30,664,0006,227,000 8,062,000 5,325,000 5,525,000 5,525,000Annual Street Improvement Program n/a ST-018 1,965,000393,000 393,000 393,000 393,000 393,000Pavement Management n/a ST-032 32,000,00016,000,000 16,000,000TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)n/a ST-038 10,576,40010,139,600 145,600 145,600 145,600Lyman Blvd Improvements-Galpin Blvd to TH 41 n/a ST-040 10,750,00010,750,000Galpin Blvd Imp-Hwy 5 N to City limits (PW176A)n/a ST-042 100,000100,000TH 41 Rehabilitation - Pioneer Trail to TH 5 n/a ST-043 160,00040,000 40,000 40,000 40,000Downtown Signal Controller Replacement n/a 86,215,40022,660,000 34,634,600 5,903,600 16,953,600 6,063,600Street Improvements Total Surface Water Management SWMP-014 150,00075,000 75,000Property Acquisition n/a SWMP-024 950,000950,000Lower Bluff Creek TMDL Implementation n/a SWMP-032 1,500,000300,000 300,000 300,000 300,000 300,000Stormwater Pond Improvements n/a SWMP-045 325,00050,000 50,000 50,000 75,000 100,000Storm Water Infrastructure Maintenance/Replacement n/a SWMP-046 350,000250,000 100,000Lotus Lake Channels & Outfall Improvements n/a SWMP-048 100,00025,000 75,000Upper Riley Creek Channel Stabilization n/a SWMP-053 300,000300,000Rice Marsh Lake Iron Enhanced Sand Filter n/a 3,675,0001,375,000 625,000 725,000 450,000 500,000Surface Water Management Total 12 Total2020 2021 2022 2023 2024Department Project # Priority Water System Improvements W-032 307,00051,000 56,000 96,000 61,000 43,000Well Rehabilitation Program n/a W-046 2,600,0002,600,000Low Zone 1 million gallon Storage Tank n/a W-059 1,400,0001,400,000Well #16 n/a W-063 510,000510,000Powers Blvd Watermain Loop n/a W-064 39,00039,000Well #4 Re-roofing Project n/a 4,856,000600,000 56,000 96,000 61,000 4,043,000Water System Improvements Total GRAND TOTAL 106,696,90027,777,900 37,261,300 8,897,400 19,493,400 13,266,900 13 This page intentionally left blank. 14 Major Equipment 15 This page intentionally left blank. 16 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2020 2024 thru Department Major Equipment Description This program is to provide additional and/or replacement SCBA air bottles, SCBA face masks, and upgrades to SCBA air packs as needed. Project #EQ-004 Priority n/a Justification Firefighting is a very rigorous and demanding activity that is performed in an environment of extremes. The periodic replacement and/or additions to SCBA equipment is required to maintain current quantities through replacement of damaged or destroyed equipment and to equip new firefighters. The current equipment has reached the NFPA compliance life cycle. Budget Impact/Other There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Useful Life 20 years Project Name Fire Dept.: SCBA Equipment Category Fire Type Equipment Account #2 Account #1 400-4115-4705 Total Project Cost:$499,100 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 350,000350,000Equipment 350,000 350,000Total Prior 149,100 Total Total2020 2021 2022 2023 2024Funding Sources 350,000350,000Capital Replacement Equipment Fund 350,000 350,000Total Prior 149,100 Total 17 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2020 2024 thru Department Major Equipment Description This is for the purchase of PPE (turnout gear) to meet the NFPA 1851 standard, along with the replacement of turnout gear that has reached its average service life of 5 to 7 years. The department will also provide new members with turnout gear after they complete their probationary period. Project #EQ-010 Priority n/a Justification Turnout gear lasts approximately 5-7 years on average. Purchases in 2019 were increased due to higher than anticipated hiring. Budget Impact/Other There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition. Useful Life 5-7 years Project Name PPE: Turnout/Helmets Category Fire Type Equipment Account #2 Account #1 400-4105-4705 Total Project Cost:$460,400 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 155,25030,000 30,400 31,300 31,300 32,250Maintenance 30,000 30,400 31,300 31,300 32,250 155,250Total Prior 305,150 Total Total2020 2021 2022 2023 2024Funding Sources 155,25030,000 30,400 31,300 31,300 32,250Capital Replacement Equipment Fund 30,000 30,400 31,300 31,300 32,250 155,250Total Prior 305,150 Total 18 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description Funds the purchase of replacement user and network computer, printer, peripherals, and networking hardware. The replacement schedule was adopted in 1999 and is subject to modification by the MIS Coordinator with the approval of the City Manager and department heads. Project #EQ-013 Priority n/a Justification Budgeting and purchasing computer equipment through this project allows the City greater flexibility to direct equipment to where it is needed the most, rather than in individual budgets. The replacement schedule was developed by the MIS Coordinator in 1999 and approved by the 1999 Council appointed IT Task Force. Expenditures in the 2020 budget requests are for the replacement of 1 backup server, 8 network switches, 16 desktop PC's, 4 laptop PC's, 8 tablets and the Senior Center projector. Most of the equipment being replaced will be recycled and re-issued to City staff. The oldest equipment in the inventory will be sold on the City public surplus auction site. Security related expenditures have been moved to the Security/Access Control Systems project. Budget Impact/Other Most items purchased for this account come with a 1 to 3 year warranty. Repairs to items are done by MIS staff after the warranty period expires. Spare parts or outside repairs are funded out of 101-1160-4530 (Repair & Maintenance-Equipment) or 101-1160-4300 (Consulting). Useful Life 3-8 years Project Name Computer/Network Equipment Purchases/Upgrades Category Administration Type Equipment Account #2 Account #1 400-4126-4703 Total Project Cost:$1,466,250 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 401,90082,700 92,300 79,300 76,300 71,300Office Equipment 82,700 92,300 79,300 76,300 71,300 401,900Total Prior 1,064,350 Total Total2020 2021 2022 2023 2024Funding Sources 401,90082,700 92,300 79,300 76,300 71,300Capital Replacement Equipment Fund 82,700 92,300 79,300 76,300 71,300 401,900Total Prior 1,064,350 Total 19 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This project funds the expansion and upgrades to the City telephone systems, excluding cellular equipment and service which remains an individual department budget item. The current City telephone system is a Mitel model 5000 and is located in the server room at City Hall. This system provides phone service for City Hall, the Library, Public Works, the Recreation Center, Fire Station 1 and the Water Treatment Plants. Project #EQ-014 Priority n/a Justification A central PBX system simplifies the management of phone services and allows for the integration of phone services with other City applications such as unified messaging and fax services. The PBX system was replaced with a Mitel 5000 in 2012. Additional IP handsets will be ordered as replacements for existing Intertel digital phones at City Hall and the Fire Station. The current call accounting software is going end of life in 2020 and will be replaced with an add on module to the Phone Manager application implemented in 2019. The system will reach its projected service life in 2022 at which time other options such as a hosted or hybrid solution will be evaluated. Budget Impact/Other Maintenance for the replacement telephone system will be funded out of the 1160-4300 services account. Useful Life 10 years Project Name Telecommunication Purchases/Upgrades Category Administration Type Equipment Account #2 Account #1 400-4101-4703 Total Project Cost:$165,350 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 61,2006,600 2,300 2,300 50,000Office Equipment 6,600 2,300 2,300 50,000 61,200Total Prior 104,150 Total Total2020 2021 2022 2023 2024Funding Sources 61,2006,600 2,300 2,300 50,000Capital Replacement Equipment Fund 6,600 2,300 2,300 50,000 61,200Total Prior 104,150 Total 20 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description These purchases are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program. 2021 - #607 2007 GMC Canyon 2022 - #611 2008 GMC Canyon 2022 - #612 2008 GMC Canyon Project #EQ-015 Priority n/a Justification These vehicles are used to provide building inspection services throughout the community. The life expectancy of these vehicles is 12 years and the average replacement age is over 13 years. Budget Impact/Other These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. Useful Life Unassigned Project Name Light Duty Trucks: Community Dev.Category Community Development Type Vehicles Account #2 Account #1 400-4107-4704 Total Project Cost:$268,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 95,00031,000 64,000Vehicles 31,000 64,000 95,000Total Prior 173,000 Total Total2020 2021 2022 2023 2024Funding Sources 95,00031,000 64,000Capital Replacement Equipment Fund 31,000 64,000 95,000Total Prior 173,000 Total 21 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description These purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow and sander. These vehicles are purchased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are typically required to be placed up to one year in advance of delivery. Replacement schedule is as follows: 2020 - #124 1998 Ford L8513 Dump/Plow Truck-with plow, wing and sander 2021 - #126 2001 Sterling L8513 Dump/Plow Truck-with plow, wing and sander 2022 - #127 2001 Sterling L8513 Dump/Plow Truck-with plow, wing and sander 2023 - #128 2003 Sterling L8513 Dump/Plow Truck-with plow, wing and sander 2024 - #104 2008 Mack GU713 with plow Project #EQ-016 Priority n/a Justification These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling snow. The average replacement age is 18.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the community creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule. Budget Impact/Other These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. Useful Life Unassigned Project Name Dump/Plow Truck Replacements/Additions Category Street Equipment Type Vehicles Account #2 Account #1 400-4108-4704 Total Project Cost:$2,625,800 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,256,000221,000 228,000 235,000 242,000 330,000Vehicles 221,000 228,000 235,000 242,000 330,000 1,256,000Total Prior 1,369,800 Total Total2020 2021 2022 2023 2024Funding Sources 1,256,000221,000 228,000 235,000 242,000 330,000Capital Replacement Equipment Fund 221,000 228,000 235,000 242,000 330,000 1,256,000Total Prior 1,369,800 Total 22 Capital Improvement Program City of Chanhassen, MN Contact Jacob Foster 2020 2024 thru Department Major Equipment Description Provides for the systematic maintenance and upgrading of audio/visual equipment. Project #EQ-026 Priority n/a Justification The original A/V equipment was purchased in 1989, with the upgrades in 1994, 2008 and 2012. Budget Impact/Other Future upgrades include expanding access to programming to those without access to cable, and continued enhancement of the live and broadcast experience. Useful Life Unassigned Project Name Audio/Visual Equipment Category Administration Type Equipment Account #2 Account #1 210-0000-4705 Total Project Cost:$350,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 125,00025,000 25,000 25,000 25,000 25,000Maintenance 25,000 25,000 25,000 25,000 25,000 125,000Total Prior 225,000 Total Total2020 2021 2022 2023 2024Funding Sources 125,00025,000 25,000 25,000 25,000 25,000Cable TV Fund 25,000 25,000 25,000 25,000 25,000 125,000Total Prior 225,000 Total 23 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description Provides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in the year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program. 2020 - #101 2004 Chevrolet 3/4 ton pickup, with plow 2021 - #130 2007 Chevrolet 3/4 ton pickup, with plow 2024 - #131 2010 GMC Sierra 2500, with plow Project #EQ-029 Priority n/a Justification These vehicles are used for a variety of services throughout the community. The average replacement age is 14 years. These purchases are consistent with the Vehicle Replacement Program. Budget Impact/Other These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced. Useful Life Unassigned Project Name Light Duty Trucks: Streets Category Street Equipment Type Vehicles Account #2 Account #1 400-4120-4704 Total Project Cost:$286,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 135,00050,000 36,000 49,000Vehicles 50,000 36,000 49,000 135,000Total Prior 151,000 Total Total2020 2021 2022 2023 2024Funding Sources 135,00050,000 36,000 49,000Capital Replacement Equipment Fund 50,000 36,000 49,000 135,000Total Prior 151,000 Total 24 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This project funds the purchase and renewal of major software programs for all City departments that are not associated with a specific, individual project. Smaller annual software support and license renewal fees are funded out of account 101-1160-4300. The major reoccurring software costs were moved to this account in 2010. Project #EQ-048 Priority n/a Justification The major portion of funds requested for this project are for BS&A, ESRI, Laserfiche, Microsoft and Cartegraph software purchases and renewals. The City joined the Microsoft Enterprise Purchasing Agreement for the State of Minnesota in 2007. All Microsoft software is purchased and renewed under this agreement. Participating in the state agreement allows the City to spread the cost of the product over a period of three years. Products are purchased with Software Assurance to allow for upgrades when they are released. These costs are also spread over a three year period. The City is participating in a joint software licensing agreement with Carver County and several other cities for ESRI GIS software which is funded from this project. This allowed for unlimited GIS application licenses which are in use in every department at reduced cost. The asset management software purchased from Cartegraph was upgraded to a new version in 2017. Purchase costs were divided into 4 different funding sources with one quarter of those costs in this project. Budget Impact/Other Useful Life 3-6 years Project Name Software Purchases Category Administration Type Equipment Account #2 700-7025-4703 Account #1 400-4117-4703 Total Project Cost:$1,602,870 Account #4 720-7025-4703 Account #3 701-7025-4703 Total2020 2021 2022 2023 2024Expenditures 698,800124,100 136,000 140,000 146,900 151,800Office Equipment 124,100 136,000 140,000 146,900 151,800 698,800Total Prior 904,070 Total Total2020 2021 2022 2023 2024Funding Sources 497,92088,250 98,350 100,490 104,030 106,800Capital Replacement Equipment Fund 66,96011,950 12,550 13,170 14,290 15,000Sewer Utility Fund 66,96011,950 12,550 13,170 14,290 15,000Surface Water Utility Fund 66,96011,950 12,550 13,170 14,290 15,000Water Utility Fund 124,100 136,000 140,000 146,900 151,800 698,800Total Prior 904,070 Total 25 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This project originally funded the purchase of an electronic records retention system in 2002. Laserfiche was the vendor chosen for the project. This project is now used to fund its add on modules and the replacement costs for associated scanning equipment, which have a useful life expectancy of 5 to 7 years. Additional client licenses are planned to accommodate additional users and project workflows in 2020. Additional software modules are proposed for later years to allow for improved integration with the City web site. Project #EQ-049 Priority n/a Justification This system allows for quick and simultaneous retrieval of documents from any computer on the City network. Both physical document storage space and the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access can be easily made available to the public from any internet capable computer or mobile device. The system was upgraded to the Laserfiche Avante platform in 2015. This upgrade included a new workflow engine, web enabled clients and improved auditing and scanning functions. Workflows for automating the scanning and importing of documents were started in 2015. Additional workflow will be created to manage property development records. The 10 user Public Portal starter module included with the Avante upgrade was upgraded to 25 users in 2019. An upgrade to the enterprise Public Forms is proposed in 2020 which will allow staff to create publicly accessible forms that will integrate with internal workflows. The primary wide format scanner in Engineering is also proposed for replacement in 2020. The replaced unit would be moved to the building department where the usage is less. Budget Impact/Other Hardware maintenance and repairs are funded out of the 101-1160-4300 services account. A proposed upgrade to Public Forms will add $1600 to the 400-4117-4703 account. Useful Life 3-5 Years Project Name Computerized Records Retention System Category Administration Type Equipment Account #2 Account #1 400-4124-4703 Total Project Cost:$179,900 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 40,10022,000 6,100 5,000 7,000Office Equipment 22,000 6,100 5,000 7,000 40,100Total Prior 139,800 Total Total2020 2021 2022 2023 2024Funding Sources 40,10022,000 6,100 5,000 7,000Capital Replacement Equipment Fund 22,000 6,100 5,000 7,000 40,100Total Prior 139,800 Total 26 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2020 2024 thru Department Major Equipment Description Replacement of existing emergency response vehicles and major apparatus. This request outlines a schedule for existing vehicles. 2021 - Replace 2005 Polaris Grass Response 2022 - Replace 2013 Chevy Tahoe #203 2024 - Replace 2015 Chevy Tahoe #202 Replace 2015 Chevy Tahoe #204 2026 - Replace 1996 Toyne Engine 21 Project #EQ-054 Priority n/a Justification Vehicles are reaching or exceeding useful life standards outlined by NFPA for emergency response front line service. Major apparatus require a two year process to spec, order and manufacture. Budget Impact/Other These are considered front line response vehicles and impact response to fire incidents within the City and to mutual aid partners. Useful Life 10-15 years Project Name Fire Vehicles Category Fire Type Vehicles Account #2 Account #1 400-4135-4704 Total Project Cost:$2,860,500 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 239,00030,000 65,000 144,000Vehicles 30,000 65,000 144,000 239,000Total Prior 2,621,500 Total Total2020 2021 2022 2023 2024Funding Sources 239,00030,000 65,000 144,000Capital Replacement Equipment Fund 30,000 65,000 144,000 239,000Total Prior 2,621,500 Total 27 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This project funds the aerial photography for the integration with the City's existing GIS datasets. The City is participating with Carver County and several other cities and counties in a joint project to purchase services and data. An initial joint aerial flyover for high resolution orthographic imagery data was conducted in April of 2005 and was scheduled to be re-flown every three years. The schedule was revised as needed to accommodate budget changes and to allow for a collaborative project. The last county/city aerial flyover for high resolution photography was completed in 2016. The next flight will be done in 2020. The County has decided to cover the costs of all future orthographic layers. The City will need to fund for Planometrics, Pictometry, LiDAR, Contours and other specialty map layers in 2021. Project #EQ-055 Priority n/a Justification City Planners, Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents and contractors without repeated site visits. It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire department when conducting area searches. In 2008, Carver County chose a new vendor (Pictometry), which added a three dimensional view to mapping data. The Pictometry solution provides the ability for staff to view each side of buildings and includes a toolset which allows for accurate measurement of areas and lines. Enhanced map layers (Planometrics), created from the aerial data collected is also used by staff to measure and display hard surface coverage such as driveways, parking lots and others. Budget Impact/Other No operational impact is expected. Useful Life 2-3 years Project Name Aerial Photography for City GIS Datasets Category Administration Type Improvement Account #2 Account #1 400-0000-4752 Total Project Cost:$137,750 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 40,0002,100 17,100 2,900 17,900Maintenance 2,100 17,100 2,900 17,900 40,000Total Prior 97,750 Total Total2020 2021 2022 2023 2024Funding Sources 40,0002,100 17,100 2,900 17,900Capital Replacement Equipment Fund 2,100 17,100 2,900 17,900 40,000Total Prior 97,750 Total 28 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2024 - #325 1999 Cat generator Project #EQ-059 Priority n/a Justification This replaces the existing generator in compliance with the equipment replacement plan. Budget Impact/Other Useful Life Unassigned Project Name Generator Category Utilities Type Equipment Account #2 7017025-4705 Account #1 700-7025-4705 Total Project Cost:$114,700 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 104,700104,700Equipment 104,700 104,700Total Prior 10,000 Total Total2020 2021 2022 2023 2024Funding Sources 52,35052,350Sewer Utility Fund 52,35052,350Water Utility Fund 104,700 104,700Total Prior 10,000 Total 29 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description This allows for replacement of existing vehicles in the Water and Sewer department. 2020 - #305 2006 Chevrolet 3/4 ton pickup 2023 - #307 2017 Chevrolet Equinox - #308 2013 GMC Sierra - #309 2003 Ford Step Van 2024 - #302 2012 Ford 3/4 ton pickup Project #EQ-062 Priority n/a Justification This replaces pickups in accordance with the vehicle replacement plan. Budget Impact/Other Useful Life Unassigned Project Name Light Duty Trucks: Utilities Category Utilities Type Vehicles Account #2 701-7025-4704 Account #1 700-7025-4704 Total Project Cost:$713,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 271,00043,000 88,000 140,000Vehicles 43,000 88,000 140,000 271,000Total Prior 442,000 Total Total2020 2021 2022 2023 2024Funding Sources 135,50021,500 44,000 70,000Sewer Utility Fund 135,50021,500 44,000 70,000Water Utility Fund 43,000 88,000 140,000 271,000Total Prior 442,000 Total 30 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description This allows for replacement of an existing vehicles for City Hall. 2021 - 2010 Chev Colorado 4x4 Crew Cab (#002) 2022 - 2010 Chev Impala 4 door Sedan (#001) Project #EQ-063 Priority n/a Justification This replaces the vehicles in accordance with the vehicle replacement plan. Budget Impact/Other Useful Life Unassigned Project Name Administration Vehicle Replacement Category Administration Type Vehicles Account #2 Account #1 400-0000-4704 Total Project Cost:$81,500 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 56,50029,500 27,000Vehicles 29,500 27,000 56,500Total Prior 25,000 Total Total2020 2021 2022 2023 2024Funding Sources 56,50029,500 27,000Capital Replacement Equipment Fund 29,500 27,000 56,500Total Prior 25,000 Total 31 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2024 - #501 2010 Chevrolet Silverado Project #EQ-065 Priority n/a Justification This replacement is in accordance with the vehicle replacement plan. Budget Impact/Other Useful Life Unassigned Project Name Engineering Vehicle Replacement Category Street Equipment Type Vehicles Account #2 Account #1 400-0000-4704 Total Project Cost:$105,600 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 45,60045,600Vehicles 45,600 45,600Total Prior 60,000 Total Total2020 2021 2022 2023 2024Funding Sources 45,60045,600Capital Replacement Equipment Fund 45,600 45,600Total Prior 60,000 Total 32 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This project funds the data storage equipment for the City storage area network, which is where the majority of all City electronic data is maintained. This storage are network (SAN) is a system comprised of numerous individual storage arrays, all managed from a single console. The SAN allows disk storage to be easily modified as storage needs change, without any downtime for users. This equipment also hosts the City's virtual network servers. A primary production storage array is located at City Hall in the main server room. Backup replication storage arrays are located in an auxiliary server room at the Public Works facility. Project #EQ-081 Priority n/a Justification The need for digital storage space for City documentation and applications is growing at a rate of approximately 1 Tb per year. Existing storage space became difficult to manage on individual physical network servers. Internal storage utilization is inefficient, and requires system downtime to reconfigure. Storage area network (SAN) technology allows for real time reconfiguration as well as the ability to make real time copies for redundancy and for daytime backup processes. The majority of the City physical network servers were virtualized and integrated into just three host servers which utilize this storage. A Compellent storage array was installed in 2016 as the production storage array. A new Compellent array replaced this array in 2019. The older Compellent array then replaced the two older replication Equallogic arrays at the Public Works building. This array is recommended for replacement in 2022. At that time other options, such as a converged platform will be evaluated. Budget Impact/Other New arrays will be purchased with 5 years of warranty support. Software and hardware support for the storage arrays beyond 5 years will be funded out of the MIS services account 101-1160-4220. Useful Life 5-7 years Project Name Storage Area Network (SAN)Category Administration Type Improvement Account #2 Account #1 400-4147-4703 Total Project Cost:$293,600 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 55,00055,000Equipment 55,000 55,000Total Prior 238,600 Total Total2020 2021 2022 2023 2024Funding Sources 55,00055,000Capital Replacement Equipment Fund 55,000 55,000Total Prior 238,600 Total 33 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description This allows for replacement of an existing CSO truck. 2022 - #702 2016 GMC Sierra Project #EQ-083 Priority n/a Justification This replaces a vehicle in accordance with the vehicle replacement plan. Budget Impact/Other Useful LifeProject Name CSO Truck Category Administration Type Vehicles Account #2 Account #1 400-4129-4704 Total Project Cost:$93,400 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 33,40033,400Vehicles 33,400 33,400Total Prior 60,000 Total Total2020 2021 2022 2023 2024Funding Sources 33,40033,400Capital Replacement Equipment Fund 33,400 33,400Total Prior 60,000 Total 34 Capital Improvement Program City of Chanhassen, MN Contact Jacob Foster 2020 2024 thru Department Major Equipment Description Provide for office furniture and chair replacements. Project #EQ-084 Priority n/a Justification This item will allow items to be replaced as they wear out or needs change. Budget Impact/Other Useful LifeProject Name Office Furniture Category Administration Type Unassigned Account #2 Account #1 400-0000-4703 Total Project Cost:$85,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 25,0005,000 5,000 5,000 5,000 5,000Office Equipment 5,000 5,000 5,000 5,000 5,000 25,000Total Prior 60,000 Total Total2020 2021 2022 2023 2024Funding Sources 25,0005,000 5,000 5,000 5,000 5,000Capital Replacement Equipment Fund 5,000 5,000 5,000 5,000 5,000 25,000Total Prior 60,000 Total 35 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description #142 - 1989 Snowblower SnowBlast Sicard Project #EQ-098 Priority n/a Justification This replaces the snowblower in accordance with the vehicle replacement plan. Budget Impact/Other Useful LifeProject Name Snowblower SnowBlast Sicard Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$154,500 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 154,500154,500Equipment 154,500 154,500Total Total2020 2021 2022 2023 2024Funding Sources 154,500154,500Capital Replacement Equipment Fund 154,500 154,500Total 36 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 1999 Tenant Sweeper (#470) Project #EQ-099 Priority n/a Justification This replaces the sweeper in compliance with the equipment replacement plan. Budget Impact/Other Useful LifeProject Name Sweeper - Parks Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$41,700 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 41,70041,700Equipment 41,700 41,700Total Total2020 2021 2022 2023 2024Funding Sources 41,70041,700Capital Replacement Equipment Fund 41,700 41,700Total 37 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description Provides for scheduled replacement of light duty trucks in the parks department. These vehicles are purchased using the State of Minnesota purchasing contract. Project #EQ-100 Priority n/a Justification 2021 - #401 2004 Chevrolet 4x4 with plow 2022 - #402 2004 Chevrolet 4x4 2023 - #408 2008 Chevrolet 4x4 with plow 2024 - #411 2010 GMC Sierra 4x4 2025 - #419 2012 Chevrolet 4x4 with plow - #420 2012 Chevrolet 4x4 with plow - #406 2008 Ford F450 with plow Budget Impact/Other Useful LifeProject Name Light Duty Trucks - Parks Category Park Type Vehicles Account #2 Account #1 400-4120-4704 Total Project Cost:$569,300 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 172,00043,000 36,000 46,000 47,000Vehicles 43,000 36,000 46,000 47,000 172,000Total Prior 207,000 Total Future 190,300 Total Total2020 2021 2022 2023 2024Funding Sources 172,00043,000 36,000 46,000 47,000Capital Replacement Equipment Fund 43,000 36,000 46,000 47,000 172,000Total Prior 207,000 Total Future 190,300 Total 38 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2021 - 2009 Toro Groundsmaster 5900 (#450) 2023 - 2008 72" Exmark (#481) 2024 - 2012 Toro Groundsmaster 4000D (#451) Project #EQ-104 Priority n/a Justification The City had 4 high-production grounds mowers. Each machine is used daily during the growing season and needs to be in good working condition. In 2012, the City replaced two 325D mowers with one large Toro 4000 mower. It is anticipated that staff will be able to mow just as much with one large mower. Budget Impact/Other Useful LifeProject Name Mower Replacement - Park Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$582,600 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 202,600101,000 18,600 83,000Equipment 101,000 18,600 83,000 202,600Total Prior 380,000 Total Total2020 2021 2022 2023 2024Funding Sources 202,600101,000 18,600 83,000Capital Replacement Equipment Fund 101,000 18,600 83,000 202,600Total Prior 380,000 Total 39 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 1996 John Deere 544G Loader (#146) Project #EQ-105 Priority n/a Justification This replaces the loader in accordance with the vehicle replacement plan. Budget Impact/Other Useful LifeProject Name Skid loader - Street Department Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$283,400 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 240,400240,400Equipment 240,400 240,400Total Prior 43,000 Total Total2020 2021 2022 2023 2024Funding Sources 240,400240,400Capital Replacement Equipment Fund 240,400 240,400Total Prior 43,000 Total 40 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description These tractors are used for ball field maintenance, maintaining skating rinks and sweeping trails. 2023 - 2001 John Deere 5520 with snowblower (#471) - 2001 Erksine Tractor/snowblower (#480) 2024 - 1997 Toro Workman (#475) - 2001 John Deere 455 Tractor (#472) - 2004 John Deere 5520 Tractor/Blower (#474) Project #EQ-106 Priority n/a Justification These tractors are used for maintenance and upkeep of baseball fields, skating rinks and trails. These tractors will be at least 20 years old before they are replaced. Budget Impact/Other Useful LifeProject Name Tractor Replacement - Park Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$262,200 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 228,200123,400 104,800Equipment 123,400 104,800 228,200Total Prior 34,000 Total Total2020 2021 2022 2023 2024Funding Sources 228,200123,400 104,800Capital Replacement Equipment Fund 123,400 104,800 228,200Total Prior 34,000 Total 41 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description This item is to replace the brush and tree limb chipper. This unit will be 18 years old when it is replaced. This unit is used heavily year round by all the public works departments and needs to be in good working condition. 2021 - #147 1999 Vermeer 1800A Brush Chipper Project #EQ-115 Priority n/a Justification To keep equipment in good repair. This purchase is consistent with the vehicle replacement program. Budget Impact/Other Useful LifeProject Name Brush Chipper Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$86,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 86,00086,000Equipment 86,000 86,000Total Total2020 2021 2022 2023 2024Funding Sources 86,00086,000Capital Replacement Equipment Fund 86,000 86,000Total 42 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description The item would fund the annual trade in of skid loaders. S570 Bobcat Skidloader (#149) T590 Bobcat Skidloader (#413) S630 Bobcat Skidloader (#150) T750 Bobcat Skidloader (#318) Project #EQ-124 Priority n/a Justification Due to the state bid pricing, the City is able to trade our skid loaders annually for approximately $14.00 per hour. Trading in newer machines guarantees there will be no other expenses except oil changes and grease jobs because the machine will always have a warranty. This approach is also a better life cycle cost over keeping the machines for 15 years. There is no guarantee on the state bid pricing or the trade in price, so staff will be pricing annually to determine if it is a good deal or if we should hold on to the machine for an extended period. Budget Impact/Other Useful LifeProject Name Annual Skid Loader Trade In Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$185,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 95,00019,000 19,000 19,000 19,000 19,000Equipment 19,000 19,000 19,000 19,000 19,000 95,000Total Prior 90,000 Total Total2020 2021 2022 2023 2024Funding Sources 95,00019,000 19,000 19,000 19,000 19,000Capital Replacement Equipment Fund 19,000 19,000 19,000 19,000 19,000 95,000Total Prior 90,000 Total 43 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This item funds the replacement of departmental copiers. Copiers were previously part of individual department budgets but were moved to the MIS CIP budget by the Finance Director in 2012. Project #EQ-127 Priority n/a Justification The City has 4 multifunction departmental copiers located in City Hall and the Public Works Facility. The three copiers located at City Hall were replaced in 2013 and are under a shared maintenance plan. A new color copier was purchased in 2016 to replace the existing black and white copier and a color printer located at the Public Works Facility. Replacement units will be ordered when maintenance becomes an issue. Dept Item Year Purchased Administration Konica Bizhub C754 2013 Building Konica Bizhub C454 2013 Engineering Konica Bizhub C454 2013 Public Works Konica Bizhub 250 2016 Budget Impact/Other Maintenance and supplies are funded from account 101-117-4110, city office supplies. Useful Life 5-7 years Project Name Copier Replacements Category Administration Type Equipment Account #2 Account #1 400-4109-4703 Total Project Cost:$69,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 46,00018,500 9,000 9,000 9,500Equipment 18,500 9,000 9,000 9,500 46,000Total Prior 23,000 Total Total2020 2021 2022 2023 2024Funding Sources 46,00018,500 9,000 9,000 9,500Capital Replacement Equipment Fund 18,500 9,000 9,000 9,500 46,000Total Prior 23,000 Total 44 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description The vehicles in the fleet department are used for picking up parts, delivering vehicles for service and other public works related travel. 2021 - #155 2002 Chevrolet 1/2 ton pickup Project #EQ-132 Priority n/a Justification These vehicles will average 19 years old when they are replaced. They are becoming rusty and unreliable. Budget Impact/Other Useful LifeProject Name Fleet Vehicles Category Public Works Type Vehicles Account #2 Account #1 400-4120-4704 Total Project Cost:$65,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 35,00035,000Vehicles 35,000 35,000Total Prior 30,000 Total Total2020 2021 2022 2023 2024Funding Sources 35,00035,000Capital Replacement Equipment Fund 35,000 35,000Total Prior 30,000 Total 45 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2020 2024 thru Department Major Equipment Description Specialized fire department emergency response equipment with a service life of more than 5 years. Equipment included with this project: Air Monitoring, Thermal Imaging, Positive Pressure Ventilation Fans, Hose Replacement, Nozzles and Appliances. Project #EQ-137 Priority n/a Justification The fire department utilizes specific, specialized equipment to perform specific fire ground and emergency response work. Expenditures will be used annually to replace aging equipment on fire department apparatus. Budget Impact/Other Useful LifeProject Name Miscellaneous Fire Equipment/Hose Replacement Category Fire Type Equipment Account #2 Account #1 400-4127-4705 Total Project Cost:$155,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 85,00015,000 15,000 15,000 20,000 20,000Equipment 15,000 15,000 15,000 20,000 20,000 85,000Total Prior 70,000 Total Total2020 2021 2022 2023 2024Funding Sources 85,00015,000 15,000 15,000 20,000 20,000Capital Replacement Equipment Fund 15,000 15,000 15,000 20,000 20,000 85,000Total Prior 70,000 Total 46 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Major Equipment Description Purchase of new fitness center equipment, replacement carpet, countertops, window treatments throughout the facility, failing tables and chairs need replacement, upgrades are required to the fitness center audio system for participants and a digital lobby information system is needed to improve customer experience at the Chanhassen Recreation Center. Project #EQ-140 Priority n/a Justification The Recreation Center is entering its 20th Anniversary. Due to age, usage and wear; a number of items require replacement or upgrades at this time. 2023 - window treatments for Lake Susan and Lotus Lake Rooms, replacement countertops for locker rooms, ten padded chairs and five, eight foot tables and one stair climber and two elliptical machines for fitness center 2024 - window treatments for fitness center, studio and Conference Room, ten padded chairs, four, six foot tables and a five foot round table and one elliptical machine, one treadmill and one recumbent bike for fitness center Budget Impact/Other Reduced repair costs and increased customer experience at the Recreation Center. Useful LifeProject Name Recreation Center Revitalization Project Category Park Type Improvement Account #2 Account #1 400-4125-4706 Total Project Cost:$125,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 50,00025,000 25,000Maintenance 25,000 25,000 50,000Total Prior 75,000 Total Total2020 2021 2022 2023 2024Funding Sources 50,00025,000 25,000Capital Replacement Equipment Fund 25,000 25,000 50,000Total Prior 75,000 Total 47 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2021 - 2005 Toro 597D 60" Z-Master Zero Turn Mower (#462) Project #EQ-154 Priority n/a Justification These mowers have extensive hours and are starting to need expensive repairs. Budget Impact/Other Useful LifeProject Name Zero Turn Mower Replacement - Parks Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$34,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 18,00018,000Equipment 18,000 18,000Total Prior 16,000 Total Total2020 2021 2022 2023 2024Funding Sources 18,00018,000Capital Replacement Equipment Fund 18,000 18,000Total Prior 16,000 Total 48 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description The 2009 hot box is used for pothole patching. #158 - 2009 Hot Box with Asphalt Premix Heater Project #EQ-158 Priority n/a Justification The hot box is worn from years of use. Budget Impact/Other Useful LifeProject Name Hot Box with Asphalt Premix Heater Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$44,300 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 44,30044,300Equipment 44,300 44,300Total Total2020 2021 2022 2023 2024Funding Sources 44,30044,300Capital Replacement Equipment Fund 44,300 44,300Total 49 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description The crack sealing machine is used to blow out the cracks in streets and trails and fill the cracks with a sealer to stop the crack from getting larger. #153 - 2003 Stepp Crack Sealer Project #EQ-159 Priority n/a Justification The 2003 Stepp crack sealer will be 19 years old. This machine should be replaced due to the rust from the burner in the material tank. Budget Impact/Other Useful LifeProject Name Crack Sealer Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$47,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 47,00047,000Equipment 47,000 47,000Total Total2020 2021 2022 2023 2024Funding Sources 47,00047,000Capital Replacement Equipment Fund 47,000 47,000Total 50 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description #3B - 2003 Felling Bobcat Trailer Project #EQ-160 Priority n/a Justification This trailer is 19 years old and the rating is not enough for the load they are hauling. Budget Impact/Other Useful LifeProject Name Bobcat Trailer Replacement Category Public Works Type Equipment Account #2 701-7025-4705 Account #1 700-7025-4705 Total Project Cost:$7,200 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 7,2007,200Equipment 7,200 7,200Total Total2020 2021 2022 2023 2024Funding Sources 3,6003,600Sewer Utility Fund 3,6003,600Water Utility Fund 7,200 7,200Total 51 Capital Improvement Program City of Chanhassen, MN Contact Greg Sticha 2020 2024 thru Department Major Equipment Description This is a replacement of the existing folder/inserter machine. This machine is used monthly for all City utility statements and on an as needed basis for other city-wide mailings. Project #EQ-161 Priority n/a Justification The existing machine was purchased in 2010 and is starting to need more frequent repairs resulting in periods of down time. The average life expectancy of this type of machine is 7 years, replacing it in 2020 will give us approximately 10 years of use from it. Budget Impact/Other Useful LifeProject Name Mailing Folder/Inserter Category Finance Type Equipment Account #2 701-7025-4703 Account #1 700-7025-4703 Total Project Cost:$15,000 Account #4 Account #3 720-7025-4703 Total2020 2021 2022 2023 2024Expenditures 15,00015,000Equipment 15,000 15,000Total Total2020 2021 2022 2023 2024Funding Sources 5,0005,000Sewer Utility Fund 5,0005,000Surface Water Utility Fund 5,0005,000Water Utility Fund 15,000 15,000Total 52 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2018 Toro 5000 Zero Turn Mower - #482 Project #EQ-164 Priority n/a Justification Due to the state bid pricing, the City is able to trade this mower annually for less than the average cost of keeping the mower and replacing it at the end of its life expectancy. Trading in newer machines guarantee there will be no other expenses except for oil changes and grease jobs because the machine will always be under warranty. Budget Impact/Other Useful LifeProject Name Annual Zero Turn Mower Replacement - Park Category Park Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$6,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 5,0001,000 1,000 1,000 1,000 1,000Equipment 1,000 1,000 1,000 1,000 1,000 5,000Total Prior 1,000 Total Total2020 2021 2022 2023 2024Funding Sources 5,0001,000 1,000 1,000 1,000 1,000Capital Replacement Equipment Fund 1,000 1,000 1,000 1,000 1,000 5,000Total Prior 1,000 Total 53 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 1995 Caterpillar vibratory compactor (#152) Project #EQ-165 Priority n/a Justification This replaces the vibratory compactor in compliance with the equipment replacement plan. Budget Impact/Other Useful LifeProject Name Vibratory Compactor Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$59,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 59,00059,000Equipment 59,000 59,000Total Total2020 2021 2022 2023 2024Funding Sources 59,00059,000Capital Replacement Equipment Fund 59,000 59,000Total 54 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description This attachment goes with the John Deere loader (#146). Project #EQ-166 Priority n/a Justification This replacement is in compliance with the equipment replacement plan. Budget Impact/Other Useful LifeProject Name Craig loader plow & wing Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$46,300 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 46,30046,300Equipment 46,300 46,300Total Total2020 2021 2022 2023 2024Funding Sources 46,30046,300Capital Replacement Equipment Fund 46,300 46,300Total 55 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description This attachment is used with the John Deere tractor, unit #141. 2006 M-B Broom Project #EQ-167 Priority n/a Justification This replacement is in accordance with the equipment replacement plan. Budget Impact/Other Useful LifeProject Name M-B Broom Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$16,400 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 16,40016,400Equipment 16,400 16,400Total Total2020 2021 2022 2023 2024Funding Sources 16,40016,400Capital Replacement Equipment Fund 16,400 16,400Total 56 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 1998 Ford L8513 Generator truck with generator (#311) Project #EQ-168 Priority n/a Justification This replaces the generator truck and the generator in accordance with the vehicle replacement plan. Budget Impact/Other Useful LifeProject Name Generator Truck Category Utilities Type Equipment Account #2 701-7025-4704 Account #1 700-7025-4704 Total Project Cost:$190,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 190,000190,000Vehicles 190,000 190,000Total Total2020 2021 2022 2023 2024Funding Sources 95,00095,000Sewer Utility Fund 95,00095,000Water Utility Fund 190,000 190,000Total 57 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 1993 Sullair Compressor (#137) Project #EQ-169 Priority n/a Justification This replaces the compressor in accordance with the equipment replacement plan. Budget Impact/Other Useful LifeProject Name Compressor Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$29,900 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 29,90029,900Equipment 29,900 29,900Total Total2020 2021 2022 2023 2024Funding Sources 29,90029,900Capital Replacement Equipment Fund 29,900 29,900Total 58 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2003 Elgin Sweeper (#136) Project #EQ-170 Priority n/a Justification The life expectancy is 15 years and this sweeper will be 18 years old in 2021. Budget Impact/Other Useful LifeProject Name Street Sweeper Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$310,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 310,000310,000Equipment 310,000 310,000Total Total2020 2021 2022 2023 2024Funding Sources 310,000310,000Capital Replacement Equipment Fund 310,000 310,000Total 59 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2021 - 2000 Towmaster Tri Axel (#1G) 2023 - 2009 Felling Tandem Axel (#1A) 2024 - 2010 Felling Tandem Axel (#1F) - 2008 Felling Tandem Axel (#1H) Project #EQ-171 Priority n/a Justification Life expectancy for the trailers is 12 years. Budget Impact/Other Useful LifeProject Name Trailer Replacement Category Street Equipment Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$76,750 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 76,75036,000 7,400 33,350Equipment 36,000 7,400 33,350 76,750Total Total2020 2021 2022 2023 2024Funding Sources 76,75036,000 7,400 33,350Capital Replacement Equipment Fund 36,000 7,400 33,350 76,750Total 60 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 1996 Weed Sprayer, 300 gallon Project #EQ-172 Priority n/a Justification This replaces the existing weed sprayer in compliance with the equipment replacement plan. Budget Impact/Other Useful LifeProject Name Weed Sprayer Category Public Works Type Equipment Account #2 Account #1 400-0000-4705 Total Project Cost:$9,900 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 9,9009,900Equipment 9,900 9,900Total Total2020 2021 2022 2023 2024Funding Sources 9,9009,900Capital Replacement Equipment Fund 9,900 9,900Total 61 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Major Equipment Description 2010 Grand Caravan (#802) Project #EQ-173 Priority n/a Justification This replaces the vehicle in accordance with the vehicle replacement plan. Budget Impact/Other Useful LifeProject Name Vehicle Replacement - Planning Category Community Development Type Vehicles Account #2 Account #1 400-0000-4704 Total Project Cost:$33,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 33,00033,000Vehicles 33,000 33,000Total Total2020 2021 2022 2023 2024Funding Sources 33,00033,000Capital Replacement Equipment Fund 33,000 33,000Total 62 Capital Improvement Program City of Chanhassen, MN Contact Richard Rice 2020 2024 thru Department Major Equipment Description This project funds the implementation of a new software suite which will initially replace the current Springbrook building permit application and adds a land management component for processing all city developments. The requested vendor has additional software modules that can be implemented at a later date. Project #EQ-174 Priority n/a Justification The current version of Springbrook software modules is at an end of development so no new features are being added. There has been increasing requests for online permitting and Springbrook does not offer this option. A vendor switch is required for mobile applications. While Springbrook's parent company Accella does offer an online permit module there are issues integrating it with the Springbrook financial modules. This project also includes a Microsoft SQL database license which is a requirement for the BS&A application software. Budget Impact/Other Annual licensing and support fees to be funded in account 400-4117-4703 after initial one year warranty has expired. Useful LifeProject Name Permiting/Planning Software Upgrade Category Finance Type Equipment Account #2 Account #1 400-0000-4703 Total Project Cost:$94,500 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 94,50094,500Office Equipment 94,500 94,500Total Total2020 2021 2022 2023 2024Funding Sources 94,50094,500Capital Replacement Equipment Fund 94,500 94,500Total 63 This page intentionally left blank. 64 Municipal Buildings 65 This page intentionally left blank. 66 Capital Improvement Program City of Chanhassen, MN Contact Jacob Foster 2020 2024 thru Department Municipal Buildings Description This project will remodel and refurbish areas of City Hall that need paint, carpet or storage areas added. Project #MB-010 Priority n/a Justification The entry and front reception area of City Hall need security improvements for employee safety and reconfiguration for a better customer service experience for residents. Budget Impact/Other Useful LifeProject Name City Hall Remodel Category Administration Type Improvement Account #2 Account #1 400-4148-4xxx Total Project Cost:$190,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 150,000150,000Maintenance 150,000 150,000Total Prior 40,000 Total Total2020 2021 2022 2023 2024Funding Sources 150,000150,000Capital Replacement Equipment Fund 150,000 150,000Total Prior 40,000 Total 67 Capital Improvement Program City of Chanhassen, MN Contact Jacob Foster 2020 2024 thru Department Municipal Buildings Description The City will conduct a triennial survey of residents. Project #MB-023 Priority n/a Justification The City will use the feedback to monitor and respond to residents values and concerns. Budget Impact/Other Useful LifeProject Name Citizen Survey Category Administration Type Improvement Account #2 Account #1 210-0000-4300 Total Project Cost:$60,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 17,00017,000Study 17,000 17,000Total Prior 43,000 Total Total2020 2021 2022 2023 2024Funding Sources 17,00017,000Cable TV Fund 17,000 17,000Total Prior 43,000 Total 68 Capital Improvement Program City of Chanhassen, MN Contact Don Johnson 2020 2024 thru Department Municipal Buildings Description This project would renovate the main fire station. 2020 - Convert three offices to bedrooms - Convert conference room into multiple user work space - Add beds and furniture - Update two main floor bathrooms 2021 - Update men's and women's locker rooms Project #MB-026 Priority n/a Justification The fire department is utilized for several public events such as; elections, open house, Lion's breakfast, and official fire department ceremonies. City employees frequent the kitchen and work out areas on a regular basis as well. In 2020, the office spaces will need to be converted to bedrooms to accommodate an overnight duty crew program. A conference room will also be converted to a combined supervisor work space. The male and female basement locker rooms would be fully renovated in 2021 to accommodate the overnight duty crews. Budget Impact/Other Useful LifeProject Name Fire Department Building Improvements Category Fire Type Maintenance Account #2 Account #1 400-4003-4xxx Total Project Cost:$421,900 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 218,90093,900 125,000Maintenance 93,900 125,000 218,900Total Prior 203,000 Total Total2020 2021 2022 2023 2024Funding Sources 218,90093,900 125,000Capital Replacement Equipment Fund 93,900 125,000 218,900Total Prior 203,000 Total 69 Capital Improvement Program City of Chanhassen, MN Contact Jacob Foster 2020 2024 thru Department Municipal Buildings Description The City Hall roof is in need of replacement. Project #MB-033 Priority n/a Justification The oldest section of roof is 30 years old and has had minimal improvements. This project will replace the City Hall roof in three sections, as the building was built and expanded in three segments. Budget Impact/Other Useful LifeProject Name City Hall Roof Replacement Category Administration Type Maintenance Account #2 Account #1 400-4148-4702 Total Project Cost:$300,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 300,000300,000Maintenance 300,000 300,000Total Total2020 2021 2022 2023 2024Funding Sources 300,000300,000Capital Replacement Equipment Fund 300,000 300,000Total 70 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Municipal Buildings Description This request is to replace the three moveable walls at the Recreation Center. Project #MB-034 Priority n/a Justification The current walls are original to the building. They are showing significant wear and have damage on each side. The floor seals are not working correctly, which causes a great deal of noise coming from adjoining rooms. The internal wall mechanisms are plastic and a repair company is called several times yearly to keep them functional. The walls are moved daily and are crucial to the Rec Center operations. Customers and program participants have complained about the impact on meetings and activities. Budget Impact/Other Without functioning walls, the Rec Center would no longer be able to offer larger programs and rentals for the community. Useful LifeProject Name Recreation Center Wall Replacement Category Park Type Maintenance Account #2 Account #1 Total Project Cost:$65,500 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 65,50065,500Maintenance 65,500 65,500Total Total2020 2021 2022 2023 2024Funding Sources 65,50065,500Capital Replacement Equipment Fund 65,500 65,500Total 71 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Municipal Buildings Description Purchase new lobby furniture for the Recreation Center. Project #MB-035 Priority n/a Justification The existing furniture in the lobby is stained and torn from 11 years of use. The furniture is in need of replacement. The lobby is not aesthetically pleasing to Rec Center users. Budget Impact/Other Useful LifeProject Name Recreation Center Lobby Furniture Category Park Type Maintenance Account #2 Account #1 Total Project Cost:$12,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 12,00012,000Maintenance 12,000 12,000Total Total2020 2021 2022 2023 2024Funding Sources 12,00012,000Capital Replacement Equipment Fund 12,000 12,000Total 72 Park & Trail Improvements 73 This page intentionally left blank. 74 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description Purchase of picnic tables and park benches. Project #PK&T-042 Priority n/a Justification New tables and benches are needed annually to replace old stock and meet new needs. Budget Impact/Other Useful Life 30 Years Project Name Picnic Tables/Park Benches Category Park Type Improvement Account #2 Account #1 410-000-4705 Total Project Cost:$166,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 50,00010,000 10,000 10,000 10,000 10,000Equipment 10,000 10,000 10,000 10,000 10,000 50,000Total Prior 116,000 Total Total2020 2021 2022 2023 2024Funding Sources 50,00010,000 10,000 10,000 10,000 10,000Park Dedication Fund 10,000 10,000 10,000 10,000 10,000 50,000Total Prior 116,000 Total 75 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description Annual tree planting program. This program is proposed to be accelerated to mitigate the affects of Emerald Ash Borer. Project #PK&T-043 Priority n/a Justification Parklands and other City properties experience tree loss annually, due to storm damage, disease, stress, etc. Budget Impact/Other Useful Life 50 Years Project Name Trees Category Park Type Improvement Account #2 Account #1 410-0000-4701 Total Project Cost:$260,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 75,00015,000 15,000 15,000 15,000 15,000Land Improvement 15,000 15,000 15,000 15,000 15,000 75,000Total Prior 185,000 Total Total2020 2021 2022 2023 2024Funding Sources 75,00015,000 15,000 15,000 15,000 15,000Park Dedication Fund 15,000 15,000 15,000 15,000 15,000 75,000Total Prior 185,000 Total 76 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description Crack seal and resurface tennis courts. 2021 - City Center Park and Lake Ann Park Project #PK&T-072 Priority n/a Justification Tennis courts offered are kept in playable condition through patching and resurfacing on a six to ten year cycle. Budget Impact/Other Maintenance and operations costs. Useful Life 25 years Project Name Tennis Court Refurbishment Category Park Type Improvement Account #2 Account #1 601-0000-4706 Total Project Cost:$425,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 75,00075,000Maintenance 75,000 75,000Total Prior 350,000 Total Total2020 2021 2022 2023 2024Funding Sources 75,00075,000Assessment/Revolving Assess Fund 75,000 75,000Total Prior 350,000 Total 77 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description A 900 foot section of eight foot wide bituminous trail, located at the perimeter of Lot 2, Block 1 Arboretum Business Park 7th Addition. Project #PK&T-099 Priority n/a Justification This section of trail is the final phase of a two mile trail loop around the Chanhassen Native Preserve. The trail project was initiated in 1995. Budget Impact/Other Maintenance and operation costs. Will need to be included in the pavement management program. Useful LifeProject Name Chanhassen Nature Preserve Trail, Final Phase Category Park Type Improvement Account #2 Account #1 410-0000-4710 Total Project Cost:$150,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 150,000150,000Construction 150,000 150,000Total Total2020 2021 2022 2023 2024Funding Sources 150,000150,000Park Dedication Fund 150,000 150,000Total 78 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description Reconstruction of the roof at the Lake Side Pavilion at Lake Ann Park. Project #PK&T-132 Priority n/a Justification The roof is 25 years old and is in need of replacement. Budget Impact/Other Maintenance costs will be reduced. Useful LifeProject Name Lake Ann Lake Side Pavilion Roof Replacement Category Park Type Maintenance Account #2 Account #1 400-0000-4702 Total Project Cost:$30,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 30,00030,000Maintenance 30,000 30,000Total Total2020 2021 2022 2023 2024Funding Sources 30,00030,000Capital Replacement Equipment Fund 30,000 30,000Total 79 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description A ten foot wide bituminous pedestrian trail located on the south side of State Highway 5, from Century Boulevard to the Minnesota Landscape Arboretum entry road. The project will also include a pedestrian underpass at State Highway 41. Carver County is the lead agency on the project. This funding allocation is the City's share of the local match for a transportation enhancement grant. Project #PK&T-138 Priority n/a Justification Completing a pedestrian/bicycle trail route to the Arboretum has been a long range goal for the City, Carver County and the Arboretum. The public will have access to the first pedestrian trail to the Arboretum from the east. Budget Impact/Other Additional trail maintenance duties will be added to the weekly park maintenance department schedule. Useful LifeProject Name Arboretum Trail and Hwy 41 Underpass Cost Share Category Park Type Improvement Account #2 Account #1 410-0000-4710 Total Project Cost:$1,200,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,200,0001,200,000Construction 1,200,000 1,200,000Total Total2020 2021 2022 2023 2024Funding Sources 1,200,0001,200,000Park Dedication Fund 1,200,000 1,200,000Total 80 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description Replace existing park equipment that has reached its useful life expectancy. 2020 - Curry Farms Park (basketball court & trail), Lake Ann Beach (playground), Powers Blvd (pipe rail fence), Power Hill Park (playground), Rice Marsh Lake Park (backstop and ballfield benches) and Meadow Green Park (backstop and ballfield Benches) 2021 - Carver Beach Park (playground), Lake Susan Park (basketball court), Pheasant Hills Park (playground), Roundhouse Park (structure) and Stone Creek Park (playground) 2022 - Bandimere Park (playground) and North Lotus Park (hockey rink) 2023 - Carver Beach Playground (playground), Sugarbush Park (playground) and South Lotus Lake Park (playground) 2024 - Lake Ann Park (playground), Meadow Green Park (playground) and Lake Ann Park (batting cages) Project #PK&T-141 Priority n/a Justification Existing playground equipment has reached its useful life expectancy of 25 years. Budget Impact/Other Useful LifeProject Name Park Equipment Replacement Category Park Type Equipment Account #2 Account #1 401-0000-4xxx Total Project Cost:$1,505,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,260,000255,000 245,000 250,000 255,000 255,000Equipment 255,000 245,000 250,000 255,000 255,000 1,260,000Total Prior 245,000 Total Total2020 2021 2022 2023 2024Funding Sources 1,260,000255,000 245,000 250,000 255,000 255,000Park Replacement Fund 255,000 245,000 250,000 255,000 255,000 1,260,000Total Prior 245,000 Total 81 Capital Improvement Program City of Chanhassen, MN Contact Todd Hoffman 2020 2024 thru Department Park & Trail Improvements Description Replace dilapidated pavers in main walkways at City Center Park in vicinity of library. The existing concrete pavers will be replaced with a clay paver product for extended reliability. Project #PK&T-142 Priority n/a Justification Existing pavers in critical walkway corridors have deteriorated and no longer provide a safe walking surface. Paver replacements will be limited to the 5,000 square feet in the poorest condition. This project will replace approximately 20% of the entire plaza, additional sections will need to be replaced over time. Budget Impact/Other This will reduce maintenance and operational costs and increase safety. Useful LifeProject Name City Center Park Paver Replacement Category Park Type Maintenance Account #2 Account #1 400-0000-4706 Total Project Cost:$165,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 165,000165,000Maintenance 165,000 165,000Total Total2020 2021 2022 2023 2024Funding Sources 165,000165,000Capital Replacement Equipment Fund 165,000 165,000Total 82 Sanitary Sewer Improvements 83 This page intentionally left blank. 84 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Sanitary Sewer Improvements Description This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration Report and aspects of the program are included in the annual street project. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. Project #SS-012 Priority n/a Justification City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Budget Impact/Other The efforts may decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund for those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems. Useful Life Unassigned Project Name Inflow and Infiltration Abatement Category Utilities Type Improvement Account #2 Account #1 701-70xx-4751 Total Project Cost:$2,700,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,000,000200,000 200,000 200,000 200,000 200,000Maintenance 200,000 200,000 200,000 200,000 200,000 1,000,000Total Prior 1,700,000 Total Total2020 2021 2022 2023 2024Funding Sources 1,000,000200,000 200,000 200,000 200,000 200,000Sewer Utility Fund 200,000 200,000 200,000 200,000 200,000 1,000,000Total Prior 1,700,000 Total 85 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Sanitary Sewer Improvements Description The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The City currently maintains 32 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years are as follows: 2020 - #13 & #22 2021 - #2 2022 - #17 2023 - #1 2024 - #6 Project #SS-017 Priority n/a Justification Reduce emergency calls and potential sewer backups. Budget Impact/Other Useful Life Unassigned Project Name Sanitary Lift Station Rehabilitation Program Category Utilities Type Improvement Account #2 Account #1 701-7025-4751 Total Project Cost:$1,320,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 555,000130,000 120,000 130,000 85,000 90,000Maintenance 130,000 120,000 130,000 85,000 90,000 555,000Total Prior 765,000 Total Total2020 2021 2022 2023 2024Funding Sources 555,000130,000 120,000 130,000 85,000 90,000Sewer Utility Fund 130,000 120,000 130,000 85,000 90,000 555,000Total Prior 765,000 Total 86 Street Improvements 87 This page intentionally left blank. 88 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description Annual project to rehabilitate and reconstruct streets in the City. The following streets are scheduled to be completed in 2020, future areas will be determined by available funds and condition of the streets. 2020 - Minnewashta Parkway (MSA, 2020 & 2021) and Lake Lucy-TH41 to Galpin Blvd (MSA) - Krvers Point, Willow View, Twin Maple and Basswood - Stone Creek Drive, Boulder Road, Stone Creek Ct, Stone Creek Ln, etc. - Hidden Lane, Hidden Circle, Hidden Court, Marsh Drive, Sinnen Circle and Dakota Lane - Lake Lucy, Nez Perce, Vineland Court and Troendle Circle - Brendan Court Project #ST-012 Priority n/a Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that major maintenance is required. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Budget Impact/Other This project may decrease maintenance costs. Useful Life Unassigned Project Name Annual Street Improvement Program Category Streets/Highways Type Improvement Account #2 Account #1 601-xxxx-4751 Total Project Cost:$56,694,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 30,664,0006,227,000 8,062,000 5,325,000 5,525,000 5,525,000Construction 6,227,000 8,062,000 5,325,000 5,525,000 5,525,000 30,664,000Total Prior 26,030,000 Total Total2020 2021 2022 2023 2024Funding Sources 17,620,0002,582,500 3,637,500 3,700,000 3,800,000 3,900,000Assessment/Revolving Assess Fund 3,333,0001,716,500 1,516,500 100,000MSA 1,685,000192,500 517,500 325,000 325,000 325,000Sewer Utility Fund 2,771,000185,500 785,500 600,000 600,000 600,000Surface Water Utility Fund 5,255,0001,550,000 1,605,000 700,000 700,000 700,000Water Utility Fund 6,227,000 8,062,000 5,325,000 5,525,000 5,525,000 30,664,000Total Prior 26,030,000 Total 89 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description This project will provide maintenance such as crack sealing, seal-coating, pothole patching, replacement of curb and gutter and sidewalk repairs for City streets. Also included in this project are trails and City parking lot rehabilitations. Seal-coat projects will be determined annually based on the pavement condition index as generated by the pavement management program. The street department uses this funding source to pay for bituminous material for annual street patching. Project #ST-018 Priority n/a Justification This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures. Budget Impact/Other These improvements will cost effectively prolong the life of the street so major improvements such as reconstruction projects can be delayed. Useful Life 7-10 years Project Name Pavement Management Category Streets/Highways Type Maintenance Account #2 Account #1 420-0000-4751 Total Project Cost:$5,591,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,965,000393,000 393,000 393,000 393,000 393,000Maintenance 393,000 393,000 393,000 393,000 393,000 1,965,000Total Prior 3,626,000 Total Total2020 2021 2022 2023 2024Funding Sources 1,500,000300,000 300,000 300,000 300,000 300,000Street Pavement Management 465,00093,000 93,000 93,000 93,000 93,000Tax Levy 393,000 393,000 393,000 393,000 393,000 1,965,000Total Prior 3,626,000 Total 90 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description This project will reconstruct TH 101 from Pioneer Trail (CSAH 14) to Flying Cloud Drive (CSAH 61). This is the last section of TH 101 that needs improvements from TH 5 into the City of Shakopee. The improvements are proposed to improve safety, mobility and to plan for future growth in the region. The project is consistent with the 2007 TH 101 corridor scoping study. State and Carver County funds will be used to pay for most of the improvements. The City contribution to the project is anticipated to help pay for some environmental work, watermain improvements, corridor landscaping, trails and storm sewer improvements. The tentative schedule is to complete final design and right of way acquisition in 2019 and construction would commence in 2020. Project #ST-032 Priority n/a Justification To improve safety and mobility on TH 101. The project also plans for growth in the region. Budget Impact/Other The City would be responsible for the future maintenance of the trunk watermain and trails. Useful LifeProject Name TH101 Imp-Pioneer Tr to Flying Cloud Dr (CSAH 61)Category Streets/Highways Type Improvement Account #2 Account #1 605-0000 Total Project Cost:$38,710,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 32,000,00016,000,000 16,000,000Construction 16,000,000 16,000,000 32,000,000Total Prior 6,710,000 Total Total2020 2021 2022 2023 2024Funding Sources 30,000,00015,000,000 15,000,000Other Agency Contribution 1,000,000500,000 500,000Sewer Utility Fund 1,000,000500,000 500,000Water Utility Fund 16,000,000 16,000,000 32,000,000Total Prior 6,710,000 Total 91 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description This project will upgrade Lyman Blvd to current design standards. The project will construct three round-a-bouts at the TH 41, Peavey Road and Norex Drive intersections. Project #ST-038 Priority n/a Justification To improve safety and mobility along the corridor and to replace the deficient pavement section. Budget Impact/Other Useful Life 50 Years Project Name Lyman Blvd Improvements-Galpin Blvd to TH 41 Category Streets/Highways Type Improvement Account #2 Account #1 Total Project Cost:$10,722,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 10,576,40010,139,600 145,600 145,600 145,600Construction 10,139,600 145,600 145,600 145,600 10,576,400Total Future 145,600 Total Total2020 2021 2022 2023 2024Funding Sources 2,082,4001,645,600 145,600 145,600 145,600MSA 8,494,0008,494,000Other Agency Contribution 10,139,600 145,600 145,600 145,600 10,576,400Total Future 145,600 Total 92 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description The project will reconstruct Galpin Blvd from 78th Street north to the City limits. The street is proposed to have geometric improvements made to conform to current design standards and urbanized to have concrete curb and gutter. Turn lanes will be constructed and trail improvements made. This section of Galpin Blvd is on Carver County's turnback list for roadways to be jurisdictionally transferred to the local agency. Once Galpin Blvd is reconstructed the City would be responsible for operations and future maintenance. Project #ST-040 Priority n/a Justification The pavement of Galpin Blvd has reached its life expectancy. The roadway at this time should be reconstructed and designed to current standards. The project is also planned for growth in the area. Budget Impact/Other The project will require the City to have operational and maintenance over this section of Galpin Blvd. Useful LifeProject Name Galpin Blvd Imp-Hwy 5 N to City limits (PW176A)Category Streets/Highways Type Improvement Account #2 Account #1 601-6040-4751 Total Project Cost:$10,840,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 10,750,00010,750,000Construction 10,750,000 10,750,000Total Prior 90,000 Total Total2020 2021 2022 2023 2024Funding Sources 3,000,0003,000,000MSA 7,000,0007,000,000Other Agency Contribution 250,000250,000Sewer Utility Fund 500,000500,000Water Utility Fund 10,750,000 10,750,000Total Prior 90,000 Total 93 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description The State of Minnesota is planning to resurface TH 41. In conjunction with the roadway project, the signal at 82nd Street will be replaced. The City is responsible for the eastern leg of the signal. Project #ST-042 Priority n/a Justification Budget Impact/Other Useful LifeProject Name TH 41 Rehabilitation - Pioneer Trail to TH 5 Category Streets/Highways Type Maintenance Account #2 Account #1 Total Project Cost:$100,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 100,000100,000Maintenance 100,000 100,000Total Total2020 2021 2022 2023 2024Funding Sources 100,000100,000MSA 100,000 100,000Total 94 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Street Improvements Description This project will replace the signal controllers for the downtown signals. The controllers are 26 years old and have reached their life expectancy. The new controllers are more technically capable and allow for better pedestrian crossing options. Project #ST-043 Priority n/a Justification To improve traffic flow and enhance pedestrian crossing timing. Budget Impact/Other Useful LifeProject Name Downtown Signal Controller Replacement Category Streets/Highways Type Improvement Account #2 Account #1 601-0000-4706 Total Project Cost:$160,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 160,00040,000 40,000 40,000 40,000Improvement 40,000 40,000 40,000 40,000 160,000Total Total2020 2021 2022 2023 2024Funding Sources 160,00040,000 40,000 40,000 40,000Assessment/Revolving Assess Fund 40,000 40,000 40,000 40,000 160,000Total 95 This page intentionally left blank. 96 Surface Water Management Improvements 97 This page intentionally left blank. 98 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans. Project #SWMP-014 Priority n/a Justification Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans. Budget Impact/Other Citywide. No map. Useful Life Unassigned Project Name Property Acquisition Category SWMP Type Improvement Account #2 Account #1 720-7025-4701 Total Project Cost:$875,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 150,00075,000 75,000Land Acquisition 75,000 75,000 150,000Total Prior 725,000 Total Total2020 2021 2022 2023 2024Funding Sources 150,00075,000 75,000Surface Water Utility Fund 75,000 75,000 150,000Total Prior 725,000 Total 99 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description The Bluff Creek Total Maximum Daily Load (TMDL) report identified the lower reach of Bluff Creek (south of Pioneer Trail) as the primary source of total suspended solids (TSS). During the calibration time period (6/25 to 11/17) TSS loads at the TH 101/CR 61 "Y" exceeded the TSS load at Pioneer by more than 400% - 41,280 lbs to 9,900 lbs. In addition to the turbidity issues, there exists a discontinuity between the lower reach and the upper reach resulting from a severe drop in elevation at the downstream end of the culvert under the Hennepin County Regional Trail. These findings are consistent with the Bluff Creek Natural Resource Management Plan. Both indicate that the numerous escarpments and gullies tributary to and contained within the Bluff Creek channel are the primary source of sediment to Bluff Creek. This project will decrease sediment load to Bluff Creek, improve the fish assemblage within Bluff Creek and will assist Chanhassen in meeting their Waste Load Allocation (WLA) for Bluff Creek, the Minnesota River and the Metro Mississippi Watershed. Riley-Purgatory-Bluff Creek Watershed District has expressed their interest in partnering with Chanhassen on this project. Project #SWMP-024 Priority n/a Justification 2019 - Source Volume Reduction and Rate Control 2020 - TH 101 Stormwater Improvements, including Chloride Management Budget Impact/Other Useful Life Unassigned Project Name Lower Bluff Creek TMDL Implementation Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$2,400,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 950,000950,000Construction 950,000 950,000Total Prior 1,450,000 Total Total2020 2021 2022 2023 2024Funding Sources 900,000900,000Other Agency Contribution 50,00050,000Surface Water Utility Fund 950,000 950,000Total Prior 1,450,000 Total 100 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description This project will provide inspection and cleaning of City stormwater ponds. This work may include sediment removal, placement of blanket, rip- rap or other erosion control BMP's, vegetation management and assessment, repair and replacement of inlet and outlet structures. Project #SWMP-032 Priority n/a Justification There are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban Runoff Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal Separate Storm Sewer System permit. The project will also minimize flooding potential. Budget Impact/Other This will require an input of other public works staff hours. Useful LifeProject Name Stormwater Pond Improvements Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$2,020,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,500,000300,000 300,000 300,000 300,000 300,000Maintenance 300,000 300,000 300,000 300,000 300,000 1,500,000Total Prior 520,000 Total Total2020 2021 2022 2023 2024Funding Sources 1,500,000300,000 300,000 300,000 300,000 300,000Surface Water Utility Fund 300,000 300,000 300,000 300,000 300,000 1,500,000Total Prior 520,000 Total 101 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description This project is an annual maintenance budget used to maintain or replace failing or deficient public storm water infrastructure. In some instances public works staff can complete the work in house and pay for materials out of this fund. Other times a contractor may be needed to complete the work. Project #SWMP-045 Priority n/a Justification Every year the City replaces culverts, storm water structures and pipe throughout the City that have failed. These replacements are unforeseen and are typically noticed only after they have failed. Often these failures result in public safety issues or pose a potential threat to private property or other City infrastructure. Budget Impact/Other These activities will likely involve the utilization of public works labor. Useful LifeProject Name Storm Water Infrastructure Maintenance/Replacement Category SWMP Type Improvement Account #2 Account #1 720-7025-xxxx Total Project Cost:$625,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 325,00050,000 50,000 50,000 75,000 100,000Construction 50,000 50,000 50,000 75,000 100,000 325,000Total Prior 300,000 Total Total2020 2021 2022 2023 2024Funding Sources 325,00050,000 50,000 50,000 75,000 100,000Surface Water Utility Fund 50,000 50,000 50,000 75,000 100,000 325,000Total Prior 300,000 Total 102 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description Stabilization of deeply incised outfalls and channels draining to Lotus Lake. Project #SWMP-046 Priority n/a Justification This work was identified in the 2007 feasibility study and in the 2015 RPBCWD gully inventory. Channels and outfalls are rapidly eroding and exhibit substantial undercutting of the embankments. This erosion is impacting property adjacent and resulting in the deposition of significant amounts of sediment into Lotus Lake. Over time, the erosion will begin to impact nearby sanitary sewer utilities. 2021 - W. Central Lotus Lake Channel Restoration, Phase II 2024 - Lotus Lake Outfall Improvements Budget Impact/Other Long term maintenance will be required including vegetation management. Useful LifeProject Name Lotus Lake Channels & Outfall Improvements Category SWMP Type Improvement Account #2 Account #1 720-7025-4751 Total Project Cost:$375,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 350,000250,000 100,000Maintenance 250,000 100,000 350,000Total Prior 25,000 Total Total2020 2021 2022 2023 2024Funding Sources 200,000200,000Other Agency Contribution 150,00050,000 100,000Surface Water Utility Fund 250,000 100,000 350,000Total Prior 25,000 Total 103 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description Stabilization of in and near stream bank undercutting, escarpment and gully erosion. Project #SWMP-048 Priority n/a Justification As part of the approval for the Public Works Facility, Riley Creek adjacent to the facility was to be stabilized. In 2013, a visual assessment of the upper Riley Creek Corridor from Lake Ann to Lake Susan was evaluated. This assessment revealed significant in and near stream erosion issues resulting in sediment deposition into Riley Creek and, subsequently, into Lake Susan. Budget Impact/Other During construction, some of the City expense will involve in-kind labor. This would likely involve the use of City staff and equipment for hauling materials. Useful LifeProject Name Upper Riley Creek Channel Stabilization Category SWMP Type Unassigned Account #2 Account #1 720-7025-4xxx Total Project Cost:$132,500 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 100,00025,000 75,000Maintenance 25,000 75,000 100,000Total Prior 32,500 Total Total2020 2021 2022 2023 2024Funding Sources 75,00015,000 60,000Other Agency Contribution 25,00010,000 15,000Surface Water Utility Fund 25,000 75,000 100,000Total Prior 32,500 Total 104 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Surface Water Management Description Installation of an iron filing enhanced sand filter within Rice Marsh Lake Park. Project #SWMP-053 Priority n/a Justification Neither Rice Marsh Lake nor Lake Riley meet MPCA standards for total phosphorous, chlorophyll-a or secchi disc depth readings. This watershed contributes the largest total phosphorous load to Rice Marsh Lake at 232 lbs (or 32% of the entire watershed load to Rice Marsh Lake) and is only one of two watershed with a load greater than 100 lbs/year. This project, once complete, could reduce the load to Rice Marsh Lake by as much as 115 lbs/year (≈50%). Budget Impact/Other This filtration feature will require some annual maintenance and will require an input of iron in approximately 25 years. Useful LifeProject Name Rice Marsh Lake Iron Enhanced Sand Filter Category SWMP Type Improvement Account #2 Account #1 720-7025-4xxx Total Project Cost:$300,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 300,000300,000Construction 300,000 300,000Total Total2020 2021 2022 2023 2024Funding Sources 250,000250,000Other Agency Contribution 50,00050,000Surface Water Utility Fund 300,000 300,000Total 105 This page intentionally left blank. 106 Water System Improvements 107 This page intentionally left blank. 108 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Water System Improvements Description This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years. It is recommended that the following pumps and motors be pulled and inspected for wear: 2020 - Well #4 2021 - Well #3 2022 - Well #10 2023 - Well #2 2024 - Well #12 Project #W-032 Priority n/a Justification Performing regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system. Budget Impact/Other Useful Life Unassigned Project Name Well Rehabilitation Program Category Utilities Type Improvement Account #2 Account #1 700-7025-4530 Total Project Cost:$920,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 307,00051,000 56,000 96,000 61,000 43,000Maintenance 51,000 56,000 96,000 61,000 43,000 307,000Total Prior 613,000 Total Total2020 2021 2022 2023 2024Funding Sources 307,00051,000 56,000 96,000 61,000 43,000Water Utility Fund 51,000 56,000 96,000 61,000 43,000 307,000Total Prior 613,000 Total 109 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Water System Improvements Description This tank is needed to meet the peak day irrigation demand and potential emergency demand for the growth of the community. It is needed in the low zone pressure area to service the growth area south of Lyman Boulevard. The location of the tank is proposed on the Public Works Building site on the east side of Audubon. This tank is dependent on development. Staff plans to evaluate the need for this tank annually and adjust the construction date accordingly. Project #W-046 Priority n/a Justification To meet peak irrigation and emergency water demands for the growing community as identified in the 2008 water comprehensive plan. Budget Impact/Other Useful LifeProject Name Low Zone 1 million gallon Storage Tank Category Utilities Type Improvement Account #2 Account #1 700-7025-4751 Total Project Cost:$2,600,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 2,600,0002,600,000Construction 2,600,000 2,600,000Total Total2020 2021 2022 2023 2024Funding Sources 2,600,0002,600,000Water Utility Fund 2,600,000 2,600,000Total 110 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Water System Improvements Description This well is proposed to meet the water needs of the growing community. This project is needed dependent on growth, summer water usage and aquifer levels. Project #W-059 Priority n/a Justification To meet the growing water needs of the City planned for in the 2008 water comprehensive plan. Budget Impact/Other Useful LifeProject Name Well #16 Category Utilities Type Improvement Account #2 Account #1 Total Project Cost:$1,400,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total2020 2021 2022 2023 2024Funding Sources 1,400,0001,400,000Water Utility Fund 1,400,000 1,400,000Total 111 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Water System Improvements Description Horizontal directional drill approximately 1,000 LF of HDPE watermain to complete watermain loop disrupted by a line break. Project #W-063 Priority n/a Justification Repairing the watermain loop will provide adequate fire flows, improve reliability and serviceability, and improve water quality. Budget Impact/Other Useful LifeProject Name Powers Blvd Watermain Loop Category Utilities Type Improvement Account #2 Account #1 700-7025-4xxx Total Project Cost:$510,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 510,000510,000Construction 510,000 510,000Total Total2020 2021 2022 2023 2024Funding Sources 510,000510,000Water Utility Fund 510,000 510,000Total 112 Capital Improvement Program City of Chanhassen, MN Contact Charlie Howley 2020 2024 thru Department Water System Improvements Description The roof of the structure housing well #4 is leaking and in need of replacement. The multi-use structure is shared by the Parks and Utility departments. It houses bathrooms for Lake Ann Park and a drinking water fountain for public use in addition to serving as the well house for deep well #4. The roofline also shelters a rental pavilion. Project #W-064 Priority n/a Justification The existing roofing material is 39 year old wood shakes. The roof will be replaced with a pre-finished standing seam steel roof. Budget Impact/Other Useful LifeProject Name Well #4 Re-roofing Project Category Utilities Type Maintenance Account #2 Account #1 700-7025-4706 Total Project Cost:$39,000 Account #4 Account #3 Total2020 2021 2022 2023 2024Expenditures 39,00039,000Construction 39,000 39,000Total Total2020 2021 2022 2023 2024Funding Sources 19,50019,500Capital Replacement Equipment Fund 19,50019,500Water Utility Fund 39,000 39,000Total 113 This page intentionally left blank. 114