Loading...
2020-05CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: January 27, 2020 RESOLUTION NO: MOTION BY: Campion SECONDED BY: 2020-05 Coleman RESOLUTION AUTHORIZING AWARD OF THE CONSTRUCTION CONTRACT FOR COUNTY STATE AID HIGHWAY (CSAH) 101 IMPROVEMENTS FROM PIONEER TRAIL TO FLYING CLOUD DRIVE (City Project 14-08) TO S.M. HENTGES & SONS INC., INCLUDING ALTERNATE #1, IN THE AMOUNT OF $1693889331.04. WHEREAS, the City of Chanhassen entered into a Joint Powers Agreement with Carver County effective October 23, 2018 for the design and construction on Highway 101 between Pioneer Trail (CSAH 14) and Flying Cloud Drive (CSAH 61); and WHEREAS, the Joint Powers Agreement stipulates that the City has agreed to be the lead agency for the project; and WHEREAS, the Joint Powers Agreement stipulates that the County agrees to procure the necessary funds from the State of Minnesota for the project via separate agreements and transfer the funds to the City as required for the project; and WHEREAS, the City has identified the CSAH 101 Improvements as City Proj ect 14-08; and WHEREAS, pursuant to an advertisement for bids for Project No. 14-08, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement; and WHEREAS, Bid Alternate #1 includes underground conduit, hand holes, and other preparatory items for an automatic de-icing system; and Bid Alternate #2 includes a complete automatic de-icing system; both of which would be fully funded, operated, and maintained by the County; and Summary of Bids Bidder Base Bid Alternate #I Alternate #2 S.M. Hentges & Sons, Inc. $16,226,331.04 $1625000.00 $1,400,000.00 Mathiowetz Construction $18,360,672.37 $931000.00 $15300,000.00 Meyer Contracting $20,111,127.86 $1035894.00 $1,4995022.00 Ames Construction $21,499,031.12 $183,338.00 $15524,038.00 Shafer Contracting $2208,481.75 $435,500.00 $1,715,500.00 RL Larson Excavating $23,551,148.34 $16800.00 $155009000.00 Engineer's Estimate $18,5591,194.25 $2755000.00 $1,2505000.00 WHEREAS, Bid Alternate #1 includes underground conduit, hand holes, and other preparatory items for an automatic de-icing system; and Bid Alternate #2 includes a complete automatic de-icing system; both of which would be fully funded, operated, and maintained by the County; and WHEREAS, the County concurred with the bid award, including Alternate #1, to S.M. Hentges & Sons, Inc. at their County Board Meeting on January 21, 2020; and WHEREAS, the lowest responsible bidder, S.M. Hentges & Sons Inc., is $2,332,863.21 (12.6%) below the Engineer's Estimate for the Base Bid. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Chanhassen, Minnesota, that the construction contract for CSAH 101 Improvements from Pioneer Trail to Flying Cloud Drive be awarded to S.M. Hentges & Sons Inc., including Alternate #1 , in the amount of $16,3 88,331.04. Passed and adopted by the Chanhassen City Council this 27h day of January, 2020. ATTEST: T dd Gerhardt, City Manager YES NO Ryan Campion Coleman McDonald 2 Elise Ryan, Mayor ABSENT Tj ornhom