Ordinance 662CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
ORDINANCE NO.662
AN ORDINANCE AMENDING CHAPTER 1, GENERAL PROVISIONS, CHAPTER 2,
ADMINISTRATION, CHAPTER 7, BUILDING AND BUILDING REGULATIONS, AND
CHAPTER 19, WATER, SEWERS, AND SEWAGE DISPOSAL, OF THE
CHANHASSEN CITY CODE
THE CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA
ORDAINS:
Section 1. Section 1-2 of the Chanhassen City Code is amended to read as follows:
Street means a public right-of-way or a private right-of-way occupied by a roadway or in which a
future roadway will be constructed. (1) (7.5) (12) (18) (20)
Section 2. Section 2-16 to Section 2-17 of the Chanhassen City Code is amended to read
as follows:
Sec. 2-16 — 2-17. — Reserved.
Section 3. Section 2-19 of the Chanhassen City Code is amended to read as follows:
Sec. 2-19. — Reserved.
Section 4. Section 7-36(c) of the Chanhassen City Code is amended to read as follows:
(c) Earth work of more than 50 but less than 1,000 cubic yards of material in a 12-month
period may be approved by the city staff. The applicant shall submit the fee required by section
7-40 of this Code. Upon receipt of a completed application, the city staff shall review the
application within ten working days and shall notify the applicant of the decision by mail. The
city staff may impose such conditions as may be necessary to protect the public interest.
Bonding may be required in an amount sufficient to ensure site restoration should the applicant
default. Any applicant aggrieved by a decision may appeal the determination to the City
Council.
Section 5. Section 19-69 to Section 19-95 of the Chanhassen City Code is amended to
read as follows:
Sec. 19-69 - Administrative Approval of Deviations from this Article
1) The City Building Official may administratively approve a subsurface sewage treatment
system not meeting the requirements of this article if the following criteria are met:
a) The proposed subsurface sewage treatment system is a Type 1 septic system.
b) The proposed subsurface sewage treatment system meets all other State, County, and City
requirements.
c) The Building Official upon consultation with the Carver County Soil and Water
Conservation District, City Engineer, local watershed, and other applicable agencies
determines that there are no viable alternative locations or configurations meeting the
requirements of this article.
2) As part of the approval of a subsurface sewage treatment system not meeting the
requirements of this article, the City Building Official may place conditions on the approval
deemed necessary to minimize the extent or impact of the deviation from this article.
3) If the City Building Official does not approve a deviation from the standards of this article or
the applicant objects to the conditions placed upon an approved deviation, the applicant may
apply for a variance. Such variances shall be subject to the process detailed in Chapter 20,
Article II, Division 3 of the Chanhassen City Code.
Secs. 19-70—19-95. — Reserved.
Section 6. This ordinance shall be effective immediately upon its passage and
publication.
PASSED AND ADOPTED this r day of December, 2020 by the City Council of the
City of Chanhassen, Minnesota
4eather Johnston, terim City Manager Elise Ryan, Mayor
(Ordinance 662 published in the Chanhassen Villager on December 17, 2020)
CITY OF CHANHASSEN
CARVER AND BENNEPIN
COUNTIES, MINNESOTA
ORDINANCE NO. 662
AN ORDINANCE
AMENDING CHAPTER 1,
GENERAL PROVISIONS,
CHAPTER 2, ADMINISTRATION,
CHAPTER 7. BUILDING AND
AND SEWAUN VlbyuJA , yr
THE CHANHASSEN CITY CODE
THE CITY COUNCIL OF
THE CITY OF CHANHASSEN,
MINNESOTA ORDAINS:
Section 1. Section 1-2 of
the Chanhassen City Code is
amended to read as follows:
Street means a public right-
of-way or a private right-of-way
occupied by a roadway or in
which a future roadway will be
constructed. (1) (7.5) (12) (18) (20)
Section 2. Section 2-16 to
Section 2-17 of the Chanhassen
City Code is amended to read as
follows:
Sec. 2-16 2-17. Reserved.
Section 3. Section 2-19 of
the Chanhassen City Code is
amended to read as follows:
Sec. 2-19. Reserved.
Section 4. Section 7-Wc) of
the Chanhassen City Code is
amended to read as follows:
(c) Earth work of more than
50 but less than 1,000 cubic yards
of material in a 12-month period
may be approved by the city staff.
The applicant shall submit the fee
required by section 7-40 of this
Code. Upon receipt of a completed
application, the city staff shall
review the application within ten
working days and shall notify the
applieantof the decision by mail
The city staff may impose such
conditions as may be necessary
to protect the public interest.
Bonding may be required in an
amount sufficient to ensure site
restoration should the applicant
default. Any applicant aggrieved
by a decision may appeal the
determination to the City Council.
Section S. Section 19-69 to
Section 19.95 of the Chanhassen
City Code is amended to read as
follows:
Sec. 19-69 - Administrative
Approval of Deviations from this
Article
1) The City Building
Official may administratively
approve a subsurface sewage
treatment system not meeting the
requirements of this article if the
following criteria are met:
a) The proposed subsurface
sewage treatment system is a
Type 1 septic system.
b) The proposed subsurface
sewage treatment system meets
all other State, County, and City
requirements.
c) The Building Official
upon consultation with the
Carver County Soil and Water
Conservation District, City
Engineer, local watershed,
and other applicable agencies
determines that there are no
viable alternative locations
or configurations meeting the
requirements of this article.
2) As part of the approval
of a subsurface sewage
treatmentsystemnot meeting
the requirements of this article,
the City Building Official may
place conditions on the approval
deemedneCOSSarytominimi the
extent or impact of the deviation
from this article.
Affidavit of Publication
Southwest News Media
State of Minnesota)
)SS.
County of Carver )
Laurie A. Hartmann, being duly swom, on oath says that she is the General Manager the news-
papers known as the Chaska Herald and the Chanhassen Villager and has full knowledge of the
facts herein stated as follows.
(A) These newspapers have complied with the requirements constituting qualification as a legal
newspaper, as provided by Minnesota Statute 331A.02. 331A.07, and other applicable laws, as
amended.
(B) The printed public notice that is attached to this Affidavit and identified as No.
was published on the date or dates and in the newspaper stated in the attached Notice and said
Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of
the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both
inclusive, and is hereby acknowledged as being the kind and size of type used in the composition
and publication of the Notice:
abcdefghijklmnopqrstuvwxyz
�i
Laurie A. Hartmann
Subscribed and swom before me on
this I') iH day of , 2020
JYMMEJEANNETTEBARK
" OTARYPUBL'C- MINNESOTA
No ry rblic � ,{vC0IAISSIONEXPIRES 01(31123
RATE INFORMATION
Lowest classified rate paid by commercial users for comparable space.... $31.20 per column inch
Maximum rate allowed by law for the above matter.............. ...... .......... . $31.20 per column inch
Rate actually charged for the above matter._ .... _........ ......... .................. 514.03 per column inch
3)If the City Building Official
does not approve a deviation
from the standards of this
article or the applicant objects
to the conditions placed upon an
approved deviation, the applicant
may apply for a variance. Such
variances shall be subject to
the process detailed in Chapter
20, Article IL Division 3 of the
Chanhassen City Code.
Secs. 19-70 19.95. Reserved,
Section 6. This
ordinance shall be effective
immediately upon its passage
and publication.
PASSED AND ADOPTED
this 7th day of December, 2020 by
the City Council of the City of
Chanhassen, Minnesota
Heather Johnston,
Interim City Manager
Elise Ryan, Mayor
(Published in the Chanhassen
Villager on Thursday, December
17, 2020: No. 4966)