Loading...
Ordinance 681CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ORDINANCE NO.681 AN ORDINANCE AMENDING CHAPTER 4 OF THE CHANHASSEN CITY CODE LICENSE, PERMIT AND ADMINISTRATIVE FEES THE CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA ORDAINS: Section 1. Section 4-30(a)(3) of the Chanhassen City Code is amended as follows: (3) Fire suppression and fire alarm permit fees, and fees for other construction permits issued in accordance with the Minnesota State Fire Code, shall be as set forth in Table 1-A. When submittal of plans is required, a plan review fee equal to sixty-five (65) percent of the permit fee shall also be charged. TABLE 1-A Total Valuation Fee $1.00 to $1,000.00 $80.00 $1,001.00 to $25,000.00 $80.00 for the first $2,000.00 plus $16.50 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $476.00 for the first $25,000.00 plus $12.00 for each additional $50,000.00 $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $776.00 for the first $50,000.00 plus $8.50 for each additional $100,000.00 $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $1,201.00 for the first $100,000.00 plus $6.75 for each $500,000.00 additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $3,901.00 for the first $500,000.00 plus 5.50-for each additional $1,000,000.00 $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $6,651.00 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours $80.00 per hour 2. Reins ection fees $80.00 per hour 3. Inspections for which no fee is specifically indicated $80.00 per hour 4. Additional plan review required by changes, additions or revisions to plans $80.00 per hour 5. For use of outside consultants for plan checking and inspections, or both Actual costs Section 2. Section 4-30(a)(4) of the Chanhassen City Code is amended as follows: (4) HVAC (heating, ventilation and air conditioning), mechanical, plumbing and gas piping permit fees shall be as set forth in Table 1-B. When submittal of plans is required, a plan review fee equal to sixty-five (65) percent of the permit fee shall also be charged. TABLE 1-B Valuation Fee $0 to $1,000.00 3% of valuation, minimum $80.00 $1,001.00 to $80.00 for the first $1,000.00 plus 2.25% of the valuation $10,000.00 over $1,000.00 $10,001.00 to $282.50 for the first $10,000.00 plus 1.75% of the valuation $50,000.00 over $10,000.00 $50,001.00 and up $982.50 for the first $50,000.00 plus 1.5% of the valuation over $50,000.00 Section 3. Section 4-30(a)(5) of the Chanhassen City Code is amended as follows: (5) Industrial heating equipment permit fees shall be as set forth in Table 1-C. TABLE 1-C Valuation Fee $0 to $50,000.00 1.2% of valuation, minimum $80.00 $50,000 to $250,000.00 $600.00 for the first $50,000.00 plus .4% of the valuation over $50,000.00 $250,001.00 to $500,000.00 $1,400.00 for the first $250,000.00 plus .3% of the valuation over $250,000.00 $500,001.00 to $750,000.00 $2,150.00 for the first $500,000.00 plus .2% of the valuation over $500,000.00 $750,001.00 and up $2,650.00 for the first $750,000.00 plus .1% of the valuation over $750,000.00 Section 4. Section 4-30(a)(9) of the Chanhassen City Code is hereby deleted: Section 5. Section 4-30(c)(3) of the Chanhassen City Code is hereby amended as follows: (3) Surface Water Development Fees Development Type Per Acre Fee Parks/Open Space $5,020.00 Single -Family Residential $8,830.00 Medium Density Residential $10,600.00 High Density Residential $15,870.00 Industrial $22,900.00 Commercial $33,460.00 2 Fees are based on the developable land. Undeveloped areas such as wetlands and buffers placed into an outlot, public parks, and public right-of-way are exempt from these fees. Section 6. Section 4-30(c)(5) of the Chanhassen City Code is hereby amended as follows: (5) Sewer and water fees. Residential development: Shall pay a portion of the sewer and water hook-up fees (area trunk fees) at the time of final subdivision approval: $691.00/unit (sewer) and $2,562.00/unit (water). The remainder of the sewer and water hook-up fees shall be collected with the building permit at the rate in effect at that time. Parcels previously assessed trunk hook-up fees are exempt. Residential trunk hook-up fees are based per unit. $1,611.00/unit, or $2,302.00/unit if a portion of the sewer hook-up Sanitary Sewer fee was not paid at the time of final subdivision approval --(Lake Ann Interce tor—$1,971.00/unit and subtrunk $2,068.00/unit)* Water $5,979.00/unit, or $8,542.00 if a portion of the water hookup fee was not paid at the time of final subdivision approval SAC As established by the Metropolitan Council and $75.00 city SAC *Parcels within the Lake Ann Sewer District will be subject to the Lake Ann Trunk sewer tees in addition to the sewer trunk hook-up fees. Commercial, industrial and institutional development: Sewer and water trunk hook-up fees (area trunk fees). Fee is paid at the time of building permit. Parcels previously assessed trunk hook-up fees are exempt. Trunk hook-up fees are based on the number of sanitary access charge (SAC) units assigned by Metropolitan Council for office or industrial/commercial buildings. Sanitary Sewer $2,302.00/unit—(Lake Ann Interceptor—$1,971.00/unit and subtrunk Y Q) nco Water $8,542.00/unit SAC As established by the Metropolitan Council and $75.00 city SAC surcharge *Parcels within the Lake Ann Sewer District will be subject to the Lake Ann Trunk sewer fees in addition to the sewer trunk hook-up fees. All development: Lateral connection charges: If the lot or tract of land, or portion thereof, to be served by a lateral connection that has not been assessed for the cost of construction, then the applicant shall pay the following lateral connection: Sewer lateral connection charge ..... $7,980.00 Water lateral connection charge ..... $10,541.00 Section 7. Section 4-45 of the Chanhassen City Code is hereby amended as follows: Sec 4-45 Water and Sewage Rates. Utility rates are established for each 1,000 gallons of usage: Water: Residential / Irrigation Fixed Charge (minimum water charge per quarter) $15.81 per quarter 0 to 15,000 gallons per quarter $2.31 per 1,000 gallons 15,001 to 30,000 gallons per quarter $3.57 per 1,000 gallons 30,001 to 60,000 gallons per quarter $4.24 per 1,000 gallons 60,001 to 90,000 gallons per quarter $4.73 per 1,000 gallons 90,001+ gallons per quarter $5.78 per 1,000 gallons Commercial Fixed Charge (minimum water charge per quarter) $15.81 per quarter 0 to 51,000 gallons per quarter $2.31 per 1,000 gallons 51,001 to 99,000 gallons per quarter $3.57 per 1,000 gallons 99,001 to 150,000 gallons per quarter $4.24 per 1,000 gallons 150,001+ gallons per quarter $4.73 per 1,000 gallons Multi -family properties — uniform water rate $2.98 per 1,000 gallons Bulk sales to contractors, landscapers, etc. at City fill stations or other designated locations $7 47 per 1,000 gallons Sewage: Residential based on winter quarter usage $5.97 per 1,000 gallons Commercial based on actual quarterly usage $5.97 per 1,000 gallons Minimum sewage charge per quarter (for amounts up to 6,000 gallons perquarter) $36.73 per quarter Section 8. Section 4-50 of the Chanhassen City Code is hereby amended as follows: Surface water management fees: Classification Land Use Utility Factor 1 Single-family and rural residential Not Applicable 2 Agricultural Not Applicable 3 Undeveloped Not Applicable 4 Medium density residential 2.22 4 Classification Land Use Utility Factor 5 High density residential, industrial, office, institutions (churches, schools, government buildings, hospitals) 3.30 6 Business/commercial 4.23 7 Parks, cemeteries, golf courses, arboretum 0.46 8 Parking lots as a principal use 6.14 The surface water management user fee for each tax parcel classified 1, 2 and 3 shall be $22.52 per quarter. The surface water management user fee for each tax parcel classified 4 through 8 shall be calculated for each quarter as follows: $43.88 multiplied by the utility factor multiplied by the acreage of the parcel. Section 9. This ordinance shall be effective January 1, 2021 after its passage and publication. PASSED AND ADOPTED this 13t" day of December, 2021 by the City Council of the City of Chanhassen, Minnesota. Kim M uw s C erk Elise Ryan, Mayor Ordinance 681 published in the Chanhassen Villager on December 23, 2021) CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA SUMMARY OF ORDINANCE NO.681 AN ORDINANCE AMENDING CHAPTER 4 OF THE CHANHASSEN CITY CODE LICENSE, PERMIT AND ADMINISTRATIVE FEES The purpose of this ordinance is to amend the following sections of Chapter 4 of the Chanhassen City Code: • Section 4-30 Fees Set o Section 4-30(a)(3) Building Permit and Fire Prevention Fees (includes Table 1-A) o Section 4-30(a)(4) HVAC (heating, ventilation and air conditioning), Mechanical, Plumbing and Gas Piping Permit Fees (Table 1-B) o Section 4-30(a)(5) Industrial Heating Equipment Permit Fees (Table 1-C) o Section 4-30(a)(9) Technology Fee o Section 4-30(c)(3) Surface Water Development Fees o Section 4-30(c)(5) Sewer and Water Fees • Section 4-45 Water and Sewage Rates • Section 4-50 Fees Set — Surface Water Management Fees A printed copy of Ordinance No. 681 is available for inspection by any person during regular office hours at the office of the City Clerk. PASSED, ADOPTED, AND APPROVED FOR PUBLICATION this 13'h day of December, 2021, by the City Council of the City of Chanhassen. (Published in the Chanhassen Villager on December 23, 2021) Affidavit of Publication Southwest News Media CITY OFCHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA SUMMARY OF State of Minnesota) ORDINANCE NO.681 AN ORDINANCE )SS. AMENDING CHAPTER 4 OF THE County of Carver C) CHANHASSEN CITY CODE LICENSE, PERMIT AND ADMINISTRATIVE FEES Thepurposeof thisordinance Vera Kehl, being duly sworn on oath says that she is an authorized employee for the newspapers is to amend the following sections known as the Chaska Herald and the Chanhassen Villager and has full knowledge of the facts of Chapter 4 of the Chanhassen herein stated as follows: City Code: • Section 4-30 Fees Set oSection 4 - 3 0 (a) (A) These newspapers have complied with the requirements constituting qualification as a legal (3) Building Permit and Fire newspaper, as provided by Minnesota Statute 331A.02, 331A.07, and other applicable laws, as Prevention Fees (includes Table amended. 1-A) oSection 4-30(a)(4) (B) The printed public notice that is attached to this Affidavit and identified as No. g13-q HVAC (heating, ventilation and air conditioning), Mechanical, was published on the date or dates and in the newspaper stated in the attached Notice and said Plumbing and Gas Piping Permit Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of Fees (Table 1-B) the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both oSection 4-30(a)(5} inclusive, and is hereby acknowledged as being the kind and size of e used in the composition y g g type p Industrial Heating Equipment and publication of the Notice: Permit Fees (Table 1-C) oSection 4-30(a)(9) abcdefghijklmnopgrstuvwxyz Technology Fee oSection 4-30(c)(3) Surface Water Development Fees o Section By;��(�{�� 4-30(c)(5) Sewer and Water Fees Vera Kehl • Section 4-45 Water and Sewage Rates • Section 4-50 Fees Set - Surface Water Management Fees Subscribed and sworn before me on A printed copy of Ordinance No. 681 is available for inspection r� by any person during regular it b</ office hours at the office of the this day of 2 1 LAURIE A HARTMANN City Clerk. PASSED, ADOPTED, AND i. NOTARY PUBLIC MINNESOTA APPROVED FOR PUBLICATION / MY COMMISSION EXPiRCS 01 /31 /25 this 13th day of December, 2021, by the City Council of the City of Chanhassen. Public Vblished in the Chanhassen illager on Thursday, December 23 2021; No. 4139) RATE INFORMATION Lowest classified rate paid by commercial users for comparable space.... $31.20 per column inch Maximum rate allowed by law for the above matter ................................. $31.20 per column inch Rate actually charged for the above matter ............................................... $14.74 per column inch