1c Approve Plans & Specs, Project 04-08A
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone 952.227.1100
Fax 952.227.1110
Building Inspections
Phone 952.227.1180
Fax 952.227.1190
Engineering
Phone 952.227.1160
Fax 952.227.1170
Finance
Phone: 952.227.1140
Fax 952.227.1110
Park & Recreation
Phone 952.227.1120
Fax 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone 952.227.1130
Fax 952.227.1110
Public Works
1591 Park Road
Phone 952.227.1300
Fax 952.227.1310
Senior Center
Phone 952.227.1125
Fax 952.227.1110
Web Site
www.ci.chanhassen.mn.us
.i~
----
MEMORANDUM
TO:
Todd Gerhardt, City Manager
-<7 t?
Paul Oehme, Dir. of Public Works/City Engineer ~~
~
October 24, 2005
FROM:
DATE:
SUBJ:
Approve Plans & Specifications; Authorize Advertisement for Bids
for Well Nos. 10 & 11 - Project No. 04-08A
REQUESTED ACTION
Approve plans and specifications and authorize advertisement for bids for Well Nos.
10 & 11, Project No. 04-08A.
BACKGROUND
On August 22, 2005, Council approved a contract for engineering services for Well
Nos. 10 and 11.
On July 22,2005, a pump test report was competed for the wells.
In May, 2004, in conjunction with the East Water Treatment Plant project, a Lotus
Lake Well Siting Study was conducted. This study helped identify the near- and
long-term water needs for the City. It also reinforced the need for a new well to help
meet the current demands. The proposed well improvements are anticipated to meet
the demands of the City until 2010. The new wells will be treated at the east water
treatment plant. The electrical controls for the wells were included in the east water
treatment plant contract so no new external panels will be required. Also, the raw
waterrnains for the two wells were included in the treatment plant contract. The
construction contract for Well Nos. 10 & 11 includes drilling and furnishing the
pump equipment necessary for wells. Staff would like to have both wells operational
by the time the east water treatment plant is operational so the plant does not have to
be reset in the future due to changes in the chemistry of the raw water. Also, by
having more water treated at the treatment plant, less untreated water will be
distributed into the system for an average day demand event.
The consultant has completed the plans and specifications for the two wells. A copy
of the project documents is available in the Engineering Department.
Funding for the project was identified in the 2004 CIP - W002&3, and was included
in the 2005 water rate study. Funding of the project is planned for by using revenue
bonds.
c: Marcus Thomas, Bolton & Menk, Inc.
g:\eng\public\04-08a well 10& 11 \bkgd 102405 apv ps auth add. doc
The City 01 Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place 10 live work. and play
I
Capital Improvement Program
City ofClumhossen, MN
2005 thru 2009
Contact
I
Trade-In Value
Department Water System Improvements
Type Improvement
Useful Life
Category Utilities
Priority nla
I
I Pro;""
Project Name
W-002
Well #10
Description I
Construction of a municipal water supply well. Well siting and design to be done in 2005 with construction in 2006. The well is anticipated to be incorporated into
the water treatment plant site design.
Total Project Cost $636,000
I
I
I
Justification I
Needed to proVide for increased demand in the system due to city growth. Identified in both the 1998 Comprehensive Water Supply and Distribution Plan and the I
2003 Master Water Study. This well would draw from the Jordan aquifer and the water would be treated by the new treatment plant.
I
Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design 36,000 36,000
Construction 600,000 600,000
Total 36,000 600,000 636,000
I
I
I
Funding Sources
Revenue Bonds
2005
36,000
Total 36,000
2006
600,000
600,000
2007
2008
2009
Total
636,000
636,000
I
I
Operational Impact/Other
I
I
This project will increase maintenance costs.
I
I
I
I
138
Page I of 18
I
I
Capital Improvement Program
City ofChanhossen, MN
2005 thru 2009
I
Contact
W-003
Well #11
Department Water System Improvements
Type Improvement
Useful Life
I
I~Jm.
Project Name
Trade-In Value
Category Utilities
Priority n1a
1
DucriFwn J
Construction of a municipal water supply well. Well siting and design to be done in 2005 with construction in 2006.
Total Project Cost $561,000
I.
1
Justification I
Needed to provide for increased demand in the system due to city growth. Identified in both the 1998 Comprehensive Water Supply and Distribution Plan and the
2003 Master Water Study. It will be more cost effective to design and construct wells 10 and 11 together.
I
I
I
Expenditures 2005 2006 2007
Planning/Design 36,000
Construction 525,000
Total 36,000 525,000
2008
2009
Total.
36,000
525,000
561,000
I
I
Funding Sources
Revenue Bonds
2005
36,000
36,000
2006
525,000
525,000
2007
2008
2009
Total
561,000
561,000
I
Total
I
I
Operational Impact/Othe, I
This project will increase maintenance costs.