1c Approve Plans & Specs, Project 04-08A CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax 952.227.1110 Building Inspections Phone 952.227.1180 Fax 952.227.1190 Engineering Phone 952.227.1160 Fax 952.227.1170 Finance Phone: 952.227.1140 Fax 952.227.1110 Park & Recreation Phone 952.227.1120 Fax 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone 952.227.1300 Fax 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.ci.chanhassen.mn.us .i~ ---- MEMORANDUM TO: Todd Gerhardt, City Manager -<7 t? Paul Oehme, Dir. of Public Works/City Engineer ~~ ~ October 24, 2005 FROM: DATE: SUBJ: Approve Plans & Specifications; Authorize Advertisement for Bids for Well Nos. 10 & 11 - Project No. 04-08A REQUESTED ACTION Approve plans and specifications and authorize advertisement for bids for Well Nos. 10 & 11, Project No. 04-08A. BACKGROUND On August 22, 2005, Council approved a contract for engineering services for Well Nos. 10 and 11. On July 22,2005, a pump test report was competed for the wells. In May, 2004, in conjunction with the East Water Treatment Plant project, a Lotus Lake Well Siting Study was conducted. This study helped identify the near- and long-term water needs for the City. It also reinforced the need for a new well to help meet the current demands. The proposed well improvements are anticipated to meet the demands of the City until 2010. The new wells will be treated at the east water treatment plant. The electrical controls for the wells were included in the east water treatment plant contract so no new external panels will be required. Also, the raw waterrnains for the two wells were included in the treatment plant contract. The construction contract for Well Nos. 10 & 11 includes drilling and furnishing the pump equipment necessary for wells. Staff would like to have both wells operational by the time the east water treatment plant is operational so the plant does not have to be reset in the future due to changes in the chemistry of the raw water. Also, by having more water treated at the treatment plant, less untreated water will be distributed into the system for an average day demand event. The consultant has completed the plans and specifications for the two wells. A copy of the project documents is available in the Engineering Department. Funding for the project was identified in the 2004 CIP - W002&3, and was included in the 2005 water rate study. Funding of the project is planned for by using revenue bonds. c: Marcus Thomas, Bolton & Menk, Inc. g:\eng\public\04-08a well 10& 11 \bkgd 102405 apv ps auth add. doc The City 01 Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place 10 live work. and play I Capital Improvement Program City ofClumhossen, MN 2005 thru 2009 Contact I Trade-In Value Department Water System Improvements Type Improvement Useful Life Category Utilities Priority nla I I Pro;"" Project Name W-002 Well #10 Description I Construction of a municipal water supply well. Well siting and design to be done in 2005 with construction in 2006. The well is anticipated to be incorporated into the water treatment plant site design. Total Project Cost $636,000 I I I Justification I Needed to proVide for increased demand in the system due to city growth. Identified in both the 1998 Comprehensive Water Supply and Distribution Plan and the I 2003 Master Water Study. This well would draw from the Jordan aquifer and the water would be treated by the new treatment plant. I Expenditures 2005 2006 2007 2008 2009 Total Planning/Design 36,000 36,000 Construction 600,000 600,000 Total 36,000 600,000 636,000 I I I Funding Sources Revenue Bonds 2005 36,000 Total 36,000 2006 600,000 600,000 2007 2008 2009 Total 636,000 636,000 I I Operational Impact/Other I I This project will increase maintenance costs. I I I I 138 Page I of 18 I I Capital Improvement Program City ofChanhossen, MN 2005 thru 2009 I Contact W-003 Well #11 Department Water System Improvements Type Improvement Useful Life I I~Jm. Project Name Trade-In Value Category Utilities Priority n1a 1 DucriFwn J Construction of a municipal water supply well. Well siting and design to be done in 2005 with construction in 2006. Total Project Cost $561,000 I. 1 Justification I Needed to provide for increased demand in the system due to city growth. Identified in both the 1998 Comprehensive Water Supply and Distribution Plan and the 2003 Master Water Study. It will be more cost effective to design and construct wells 10 and 11 together. I I I Expenditures 2005 2006 2007 Planning/Design 36,000 Construction 525,000 Total 36,000 525,000 2008 2009 Total. 36,000 525,000 561,000 I I Funding Sources Revenue Bonds 2005 36,000 36,000 2006 525,000 525,000 2007 2008 2009 Total 561,000 561,000 I Total I I Operational Impact/Othe, I This project will increase maintenance costs. I I I I I 139 Page 2 of 18