Loading...
6 Site Plan Review, Waytek, Inc. '7 - ~ J - .J 1. L :r :r - ~ 1J - - f) CITY 0 F CHANHASSEN ~ PC DATE: 2/18/98 - CC DATE: 3/9/98 CASE #:-88-2 Site Plan (File 2) By: AI-Jafflv - STAFF REPORT PROPOSAL: Site Plan Review for a 24,638 Square Foot Office and Warehouse Addition to an Existing Building - (~..: -:4.!c..... LOCATION: Lots 3 and 4, Block I, Park One 3rd Addition - 7660 Quattro Drive APPLICANT: Swedenborg - Shaw Cont. Inc. 7685 Corporate Way Eden Prairie, MN 55344 (612)937-8214 Waytek Inc. 7660 Quattro Drive Chanhassen, MN 553 I 7 (6 I 2)949-0765 ACREAGE: 3.88 acres DENSITY: ADJACENT ZONING AND LAND USE: N - Residential - City of Eden Prairie and Railroad Tracks S - lOP, Office Industrial Building E - lOP, Office Industrial Building W - lOP, Office Industrial Building WATER AND SEWER: Available to the site. PHYSICAL CHARACTER.: The parcel consist of 2 lots that are proposed to be consolidated. The westerly lot contains an existing building. A 20 foo conservation easement extends on the northerly portion of the site. The northerly and southerly portion of the site contain mature tree and steep slopes. ,I 2000 LAND USE PLAN: Industrial Waytek Inc. March 9, 1998 Page 2 BACKGROUND On July 25, 1988, the Cily Council approved a site plan application for the construction of a 25,000 square foot office/warehouse facilily on Lot 3, Block I, Park One 3rd Addition. PROPOSAL/SUMMARY The applicant is requesting site plan approval for a 24,638 square foot office and warehouse addition to an existing building on Lots 3 and 4, Block I, Park OIle 3rd Addition. Waytek is a distributor for electrical wire supplies.~i: The site is zoned lOP, Industria1 Office Park, and bordered by railroad tracks and a residential development located in Eden prairie to the north, and industrial buildings to the east, west and south. The applicant owns Lots 3 and 4. Lot 3 contains the existing Waytek building. The intent is to combine the fwo lots and expand the existing building (consolidation of contiguous lots is an administrative process. No formal action is required), The area of the combined parcels is 3.88 acres. The site has full access from Quattro Drive. The site plan for Waytek is well developed. The expansion is proposed to utilize identical materials to those currently used. They consist of precast insulated concrete panels for the warehouse portion and rockface concrete masonry units for the office portion. The building is accentuated by a pronounced entrance with a pitched canopy and windows. Staff met with the applicant on several occasions to discuss the architectural desigu and type of materials used on the addition. Different altematives were investigated. We concluded that utilizing identical materials as the existing building was the most aesthetic option. Hence, the choice of materials, The north elevation of the building is completely screened by mature trees, a 20 foot conservation easement, and railroad tracks buffer the site from the residential neighburhood to the north. Since this elevation wi1\ not be seen. no architectural relief was required. The west elevation of the warehouse portion is also devoid of architectural relief for operational reasons, however, the applicant is proposing to plant 5 evergreens to breakup the wall. We believe this is an acceptable alternative. Mature trees protected by a 20 foot wide preservation easement exist to the north of the site and therefore, additional landscaping in that area is not required. New parking'for vehicles is proposed to be located along the east portion of the site. The majorily of the parking will be screened by existing vegetation along Qualtro Drive. Parking for the warehouse portioa and truck loading area is located along the west portion of the building. This is an existing parking lot and no changes are proposed on that portion of the site. Currently, there are two curb cuts into the site. The easterly driveway is an "Exit Only" driveway and has steep grades. The applicant is proposing to close off this driveway and introduce a new driveway along the east portion of the site. The applicant intends to preserve existing vegetation, Waytek Inc. March 9, 1998 Page 3 as well as add trees and shrubs along the east and southeast portion of the site. The overall landscaping materials of the site need to be increased to provide additional screening of the parking lot along the east portion of the site. The south edge of the site contains slopes as well as a naturally wooded area. This portion will remain undisturbed with the exception of the new curb cut area. We examined shifting the driveway slightly to the west to preserve additional mature trees, however, this option would require additional grading and will result in a steeper driveway. Trash storage plans have not been shown. The applicant must submit plans for staff review and approval. Public utilities are available to the site from Quattro Drive. The proposed building meets the setback requirements of the Zoning Ordinance. Staff regards the project as a reasonable use of the land. The overall design is sensitive to the image of the industrial park and meets the standards established in the ordinance. Based upon the foregoing, staffis recommending approval of the site plan, without variances, with conditions outlined in the staff report. SITE PLAN/ARCHITECTURE The site is located to the north of Quattro Drive. The site plan is fairly straight forward. Access is gained from Quattro Drive. New parking will be located to the east of the site. The truck loading area will remain west of the building. The truck loading area is completely screened from off-site views by the existing mature trees. Building architecture meets the site plan ordinance requirements. The expansion is proposed to utilize identical materials to those currently used. They consist of precast insulated concrete panels for the warehouse portion and rockface concrete masonry units for the office portion. The building is accentuated by a pronounced entrance with a pitched canopy and windows. Staff met with the applicant on several occasions to discuss the architectural design and type of materials used on the addition. Different alternatives were investigated. We concluded that utilizing identical materials as the existing building was the most aesthetic option. Hence, the choice of materials. The north elevation of the building is completely screened by mature trees, a 20 foot conservation easement, and railroad tracks buffer the site from the residential neighborhood to the north. Since this elevation will not be seen, no architectural relief was required. The west elevation of the warehouse portion is also devoid of architectural relief for operational reasons, however, the applicant is proposing to plant 5 evergreens to breakup the wall. We believe this is an acceptable alternative. Rooftop equipment is not shown on the plans. All units shall be painted with a color matching the roof color, rather than using fencing for screening. Staff feels that this is an acceptable proposal. The rooftop equipment will not be seen from Quattro Drive due to the setback and elevation of the building in relation to the street nor will it be visible from the north due to the existence of mature trees which form a barrier between the residential area located in the City of Eden Prairie and the subject site. The applicant has not shown where the trash enclosure will be located. The trash enclosures should be shown on the site plan and must be screened. Waytek Inc. March 9, 1998 Page 4 SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: (1) Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas; (4) Creation ofa harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; c. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light Waytek Inc. March 9, 1998 Page 5 and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the comprehensive plan, the zoning ordinance, and the site plan review requirements. The site design is compatible with the surrounding development. It is functional and harmonious with the approved development for this area. P ARKING/INTERNAL CIRCULA nON Parking requirements for the office portion of the building is 4.5 parking stalls per 1000 square feet which amounts to 36 parking stalls. The warehouse and shipping area have a total area of 14,500 square feet which translates to 26 parking stalls as the ordinance requires 1 parking stall per 1000 square feet. The total required parking stalls is 62. The applicant is proposing 71 parking stalls which meets the minimum requirements of the ordinance (The calculations include existing and proposed parking). P ARKING TABLE USE AREA PARKING TOTAL Office Warehouse/ shipping 7,998 s.t: 32,760 s.f. 4.5 stall/I 000 s.f. 1 stallll ,000 s.f. for the first 10,000 s.f. 1 stall/2,000 s.t: for the addition area 36 14 12 Required total Provided total 62 stalls 71 stalls Based on this analysis, staff concludes that parking requirements have been satisfied. Accessible parking. The building code requires one, eight foot wide, accessible parking stall for each 25 parking spaces. Three spaces are required. The applicant is providing 4. An access aisle must be provided for each stall. Accessible stalls may share an access aisle. A shared van access aisle must be eight feet wide and signed "access aisle, no parking." Other required access aisles may be 5 feet wide. One van accessible space is required. A curb ramp or ramps complying with CAB/ANSI 117.1 - 1992 must also be provided. The ramp may be at the access aisle, but may not encroach into the required aisle space. An accessible route must be provided to all accessible entrances on multi-tenant buildings. The site plan should be revised to reflect these requirements. LANDSCAPING Mature trees flank the north and south sides of the property. Most of the trees to the north are covered by a 20' conservation easement. Those that aren't are scheduled to be removed for the Waytek Inc. March 9, 1998 Page 6 warehouse addition. Of the trees on the south side along Quattro Drive, six of them will be removed for driveway and parking lot additions. The easterly portion of the site, along the proposed parking lot is lacking in landscape materials. Staff recommends 7 trees be added to the landscape plan. Four shall be planted on the east side of the new parking lot and three shall be planted at the southeast comer of the property. The trees shall be a mix of oak and sugar maple to compensate for the native trees being removed. Along the northern boundary there is an easement within which the applicant is not allowed to remove trees. According to the grading plan, this restriction is being followed. Staff recommends the 20 foot wide easement be measured and fenced off with tree protection fencing before any grading commences. The same recommendation for fencing applies to the entire site; all areas of preserved trees must be fenced before grading can begin. LIGHTING Lighting locations and plans are illustrated on the plan and meet the requirements of the ordinance. Only shielded fixtures are allowed and the applicant has demonstrate that there is no more than 0.5 foot candles of light at the property line. SIGNAGE The applicant has not submitted a signage plan. There is an existing ground low profile business sign, which is permitted by ordinance. Any changes to the signage on site will require a permit. Building Height Building Setback Parking stalls Parking Setback Hard surface Coverage Lot Area COMPLIANCE TABLE - lOP DISTRICT Ordinance Waytek, Inc. 4 stories 1 story N-lO' E-lO' N-30' E-15.6' S-30' W-lO' S-72' W-155' 62 stalls 71 stalls N-O' E-O'* N-27' E-5' S-25' W-O' S-35 W-15' 70% 57% 1 acre 3.88 acres Waytek Inc. March 9, 1998 Page 7 GRADING/DRAINAGE AND EROSION CONTROL The existing site generally drains to the south onto Quattro Drive. A storm sewer line is proposed to be extended into the site to convey storm water runoff from the roof and parking lot areas. Upon initial review of the storm drainage plan, staff recommends an additional catch basin be located in the southeasterly comer of the parking lot to collect runoff prior to discharging into Quattro Drive. The City's storm sewer will carry the stormwater to a regional storm water pond for pretreatment prior to discharging downstream. Detailed storm drainage calculations for a 10-year, 24-hour storm event shall be submitted to the City's Engineering Department for review and approval prior to issuance of a building permit. The plans propose on utilizing a retaining wall along the southwesterly comer of the new addition to minimize grading and preserve existing trees. Along the north side of the proposed warehouse the building will actually be buried up to 8 feet in an effort to protect the adjacent trees. The City does have a 20- foot wide conservation easement along the northerly portion of the property. The proposed construction does not propose to encroach the conservation easement. Along the southwesterly corner of the building addition the parking lot expansion necessitates construction of a retaining wall due to the steep slopes. Staff has reviewed the proposed driveway and parking lot expansion in the southwest comer of the new addition and suggests that the driveway aisle be reduced to 22 feet in an effort to minimize grading and retaining wall height. The plans currently propose 24 feet. Staffhas reviewed the overall grading plan with regards to driveway access and parking lots. Staff believes that there are no other feasible options available to gain access and minimize tree loss. Currently, the parking lot drive aisle grades range from 6% to 8%. By shifting the drive aisle westerly in an effort to preserve the significant oaks will only increase driveway grades and lose parking sites. Site grading for the easterly portion of the site will require encroachment into the adjacent property to the east. Appropriate temporary construction easements should be obtained from the adjacent property owner. UTILITIES It appears based on the plans no additional sewer and water service will be needed from Quattro Drive. There currently exists a water service which falls in the proposed easterly drive entrance. This water service (curb box) will need to be adjusted to final grade upon completion of the driveway. The applicant and/or contractor applying for the building permit will be responsible for sanitary sewer and water hookup charges. The 1998 hookup charges for sanitary sewer and water are $ 1,2 I 6 and $ I ,584, respectively per unit. The number of hookup units shall be based on the number of sewer availability charges (SAC units) which is determined by the Metropolitan Council Environmental Services upon plan review of the building. Waytek Inc. March 9, 1998 Page 8 STREETS The plan proposes to construct a new access point from Quattro Drive and eliminating one of the existing access points. The drive aisles are proposed at 24 feet wide. City Code requires the drive aisles to he a minimum of26 feet wide (Section 20-1101). Driveway grade to the parking lot is fairly steep (8%). Driveway grades for industrial sites are typically kept below 7% due to truck traffic concerns. However, given the topographic change of the site and proposed use, staff is comfortable with the driveway grade at 8%. The plans do propose to install an industrial driveway apron in accordance with City ofChanhassen Detail Plates. Staffhas recently revised the detail plates to reduce the amount of concrete needed in the apron area. Staff recommends that the new detail be incorpotated in the plan set. The existing driveway entrance is proposed to be eliminated and will need to be restored with B-618 concrete curb and gutter. All construction within City right-of-way for Quattro Drive will need to be inspected by the City's Engineering Department. The applicant and/or contractor sball contact the City's Engineering Department for inspections 24 hours in advance. MISCELLANEOUS Commercial permit requirements. The developers and/or desiguers should meet with a representative of the Inspections Division as early as possible to discuss commercial building permit requirements. Principals should be aware of many of these requirements before the project is bid. PLANNING COMMISSION UPDATE On February 18, 1998, the Planning Commission reviewed and recommended approval of this application with conditions. Issues that were raised included the following: . The trash enclosure was not shown on the plans. The planning commission directed staff to require this item shown as part of the regular submittal. Staff explained that the applicant intends to store the trash indoors. . The Planning Commission wanted to ensure that the type of lighting fixtures used in the new parking lot match the existing fixtures and meet the ordinance requirement. . The Planning Commission questioned the fact that the north elevation of the building, facing the residents of Eden Prairie, lacks any architectural detail. Staff explained that the 20 foot conservation easement is occupied by mature trees, followed by the railroad tracks, and additional trees. There is also a substantial difference in grade which makes it extremely difficult to see through. Staff visited the site in the month ofF ebruary while trees had no leaves and the building was screened from the homes. Waytek Inc. March 9, 1998 Page 9 RECOMMENDA nON Site Plan Review The Planning Commission recommends the City Council approve Site Plan Request #88-2 for a 24,683 square foot addition (Waytek, Inc.) as shown on the plans dated received January 16, 1998, subject to the following conditions: 1. The existing catch basin on Quattro Drive shall be protected with rock filter dikes until all disturbed areas on the site have been restored. 2. Storm sewer calculations for a 10-year, 24-hour storm event shall be submitted to the City Engineering Department for review and approval prior to issuance of a building permit. 3. The haul routes for exporting material from the site shall be approved by the City Engineer prior to issuance of a building permit. 4. The grading plans shall be revised to include an erosion control fence detail, revised Chanhassen Standard Detail Plate for a industrial driveway (No. 5207) and rock construction entrance detail No. 5301. In addition, erosion control fence shall be installed adjacent to Quattro Drive once the existing driveway is abandoned. 5. Sanitary sewer and water hookup charges shall be applied to the building permit. The charges shall be based upon the number of SAC units determined by the Metropolitan Council Environmental Services. 6. The applicant shall obtain the necessary construction access easement to perform grading on the adjacent property prior to any issuance of a building permit. 7. The applicant and/or contractor shall be responsible for adjusting the existing water service proposed in the easterly driveway access. 8. The contractor and/or developer shall contact the City's Engineering Department for inspection of the driveway apron an curb/street restoration prior to pouring the concrete. A 24-hour notice is required to schedule an inspection. 9. Plans for trash enclosure and rooftop screening shall be submitted to staff for approval. All roof top equipment shall be screened from views. 10. The applicant shall enter into a Site Plan Agreement. Financial guarantees for landscaping shall be submitted to the City at the time of building permit application. Waytek Inc. March 9, 1998 Page 10 11. The applicant must install tree protection fencing prior to construction. Fencing must be inspected by city staff before work is allowed to begin. 12. The applicant shall add 7 trees to the landscape plan. Four shall be planted on the east side of the new parking lot and three shall be planted at the southeast comer of the property. The trees shall be a mix of oak and sugar maple 13. The light fixtures may not exceed 0.5 foot candles oflight from fixtures at the property line. All new fixtures shall match those that are currently used on the site. . 14. The applicant shall install tree protection fencing around all preserved trees (within construction limits) before site grading can commence. 15. The applicant shall comply with the conditions of the conservation easement located on the northerly 20 feet of the property. No trees will be allowed to be removed within the easement. 16. Fire Marshal Recommendation: a. Regarding the new access off of Quattro Drive submit grade dimensions to the City Engineer and Fire Marshal for approval. Pursuant to 1991 Uniform Fire Code Section 10.204 (t). b. "No parking fire lane" signs shall be installed. Contact Chanhassen Fire Marshal for exact location. Pursuant to Chanhassen Fire Department/Fire Prevention Policy #06-1991. c. Submit utility plans to the City Engineer and Fire Marshal for approval. 17. Park and trail fees shall be paid at the time of building permit. 18. Approval of this site plan is contingent upon consolidation of Lots 3 and 4, Block 1, Park One 3rd Addition (provide proof of single Parcel Identification Number). 19. Building Official Recommendation: a. The developers and/or designers should meet with a representative of the Inspections Division as early as possible to discuss commercial building permit requirements. Principals should be aware of many ofthese requirements before the project is bid. 20. The parking lot drive aisles shall meet City Code Section 20-1101. Waytek Inc. March 9, 1998 Page 11 21. Depending on storm sewer calculations, an additional catch basin may be required in the easterly parking lot to intercept runoff prior to draining onto Quattro Drive." A TT ACHMENTS 1. Memo from Steve Kirchman dated February 10, 1998. 2. Memo from Dave Hempel dated February 5, 1998. 3. Memo from Mark Littfin dated January 28, 1998. 4. Application and public notice. 5. Conservation Easement. 6. Planning Commission minutes dated February 18, 1998. 7. Plans dated January 16, 1998. t"J "'-,\ ~ m ~ -..... --- "' '" ~ .. ~ CITY OF CHANHASSEN 7 City Center Drive, PO Box 147 JJanhassen, Minnesota 55317 Phone 612.9311900 General Fax 612.937.5739 ngineering Fax 612.937.9152 tblic Safety Fax 612.934.2524 tYeb /l!lUW ci. chanhassen. mn.lts MEMORANDUM TO: Sharmin AI-Jaff, Planner II Steve A. Kirchman, Building Official 4. cr. k- February 10, 1998 FROM: DATE: SUBJECT: 88-8 SPR (file 2) I was asked to review the site plan proposal stamped "CITY OF CHANHASSEN, RECEIVED, JAN 16 1998, CHANHASSEN PLANNING DEPT." for the above referenced project. Analvsis: The building code provides for protection of buildings based on setbacks from property lines. This building is proposed to be built on two separate lots. As an alternate to replatting the property into one lot, it will be acceptable to combine the properties by providing only one Property Identification Number (PIN) for both lots. Multiple PIN numbers will not be permitted in the future unless the building is altered to meet the building code requirements pertaining to wall and opening protection based on location on property. Documentation of a single PIN should be provided to the plan reviewer prior to building permit issuance. I would like to request that you relay to the developers and designers my desire to meet with them as early as possible to discuss commercial building permit requirements. Recommendations: 1. Provide documentation showing one PIN for both lots to the Inspections Division plan reviewer prior to building permit issuance. 2. Meet with the Inspections Division plan reviewer for a Commercial Building Permit Requirements Checklist as soon as possible after site plan approval. g:lsafetylsaklmemoslplanlwaytek I Ie Ci~y of ClJanhassen. A growing community with clean lakes, quality schools, a channing downtown, thriving businesses, and beautiful parks. A great place to live, work, and play. CITY OF CHANHASSEN 690 City Center Drive, PO Box 147 Chanhassen, Minnesota 55317 Phone 612.937.1900 General Fax 612.937.5739 Engineering Fax 612.937.9152 Public Safety Fax 612.934.2524 'Xfeb www.d.chanhassen.mn.lIS MEMORANDUM TO: Sharmin Al-Jaff, Planner II / Dave Hempel, Assistant City Engineer ;f:Jr / I ./ ^-b'fr February 5, 1998 FROM: DATE: SUBJ: Site Plan Review for Office/Warehouse Addition to Waytek 7660 Quattro Drive - File No. 98-2 LUR Upon review of the plans prepared by Bernard Herman Architects, Inc. dated January 16, 1998, I offer the following comments and recommendations: GRADING & DRAINAGE The existing site generally drains to the south onto Quattro Drive. A storm sewer line is proposed to be extended into the site to convey stormwater runoff from the roof and parking lot areas. Upon initial review of the storm drainage plan, staff recommends an additional catch basin be located in the southeasterly corner of the parking lot to collect runoff prior to discharging into Quattro Drive. The City's storm sewer will carry the stormwater to a regional stormwater pond for pretreatment prior to discharging downstream. Detailed storm drainage calculations for a 10-year, 24-hour storm event shall be submitted to the City's Engineering Department for review and approval prior to issuance of a building permit. The plans propose on utilizing a retaining wall along the southwesterly corner of the new addition to minimize grading and preserve existing trees. Along the north side of the proposed warehouse the building will actually be buried up to 8 feet in an effort to protect the adjacent trees. The City does have a 20-foot wide conservation easement along the northerly portion of the property. The proposed construction does not propose to encroach the conservation easement. Along the southwesterly corner of the building addition the parking lot expansion necessitates construction of a retaining wall due to the steep slopes. Staff has reviewed the proposed driveway and parking lot expansion in the southwest corner of the new addition and suggests that the driveway aisle be reduced to 22 feet in an effort to minimize grading and retaining wall height. The plans currently propose 24 feet. . Staff has reviewed the overall grading plan with regards to driveway access and parking lots. Staff believes that there are no other feasible options available to gain access and minimize tree loss. Currently, the parking lot drive aisle grades range from 6% to 8%. By shifting the drive aisle westerly in an effort to preserve the significant oaks will only increase driveway grades and lose parking sites. Site grading for the easterly portion of the site will require encroachment into the adjacent property to the east. Appropriate temporary construction easements should be obtained from the adjacent property owner. Th, Gry 'f C""d,,",," A growi'g "'mm"iry wjth "" .10. q,,1i ry "''',,Ii. , ,,,,,,,,j'g '!'w"'''', th,i,j 'g "mi,.''', "d b""jfi<1 P'"j" A K"" p." m Ii". ,,,,I. '" Sharmin AI-Jaff Waytek Addition Site Plan Review February 5, 1998 Page 2 UTILITIES It appears based on the plans no additional sewer and water service will be needed from Quattro Drive. There currently exists a water service which falls in the proposed easterly drive entrance. This water service (curb box) will need to be adjusted to final grade upon completion of the driveway. The applicant and/or contractor applying for the building permit will be responsible for sanitary sewer and water hookup charges. The 1998 hookup charges for sanitary sewer and water $1,216 and $1,584, respectively per unit. The number of hookup units shall be based on the number of sewer availability charges (SAC units) which is determined by the Metropolitan Council Environmental Services upon plan review of the building. STREETS The plan proposes to construct a new access point from Quattro Drive and eliminating one of the existing access points. The drive aisles are proposed at 24 feet wide. City Code requires the drive aisles to be a minimum of 26 feet wide (Section 20-1101). Driveway grade to the parking lot is fairly steep (8%). Driveway grades for industrial sites are typically kept below 7% due to truck traffic concerns. However, given the topographic change of the site and proposed use, staff is comfortable with the driveway grade at 8%. The plans do propose to install an industrial driveway apron in accordance with City of Chanhassen Detail Plates. Staff has recently revised the detail plates to reduce the amount of concrete needed in the apron area. Staff recommends that the new detail be incorporated in the plan set. The existing driveway entrance is proposed to be eliminated and will need to be restored with B-618 concrete curb and gutter. All construction within City right-of-way for Quattro Drive will need to be inspected by the City's Engineering Department. The applicant and/or contractor shall contact the City's Engineering Department for inspections 24 hours in advance. RECOMMENDED CONDITIONS OF APPROVAL 1. The existing catch basin on Quattro Drive shall be protected with rock filter dikes until all disturbed areas on the site have been restored. 2. Storm sewer calculations for a lO-year, 24-hour storm event shall be submitted to the City Engineering Department for review and approval prior to issuance of a building permit. 3. The haul routes for exporting material from the site shall be approved by the City Engineer prior to issuance of a building permit. Sharmin AI-Jaff Waytek Addition Site Plan Review February 5, 1998 Page 3 4. The grading plans shall be revised to include an erosion control fence detail, revised Chanhassen Standard Detail Plate for a industrial driveway (No. 5207) and rock construction entrance detail No. 5301. In addition, erosion control fence shall be installed adjacent to Quattro Drive once the existing driveway is abandoned. 5. Sanitary sewer and water hookup charges shall be applied to the building permit. The charges shall be based upon the number of SAC units determined by the Metropolitan Council Environmental Services. 6. The applicant shall obtain the necessary construction access easement to perform grading on the adjacent property prior to any issuance of a building permit. 7. The applicant and/or contractor shall be responsible for adjusting the existing water service proposed in the easterly driveway access. 8. The contractor and/or developer shall contact the City's Engineering Department for inspection of the driveway apron an curb/street restoration prior to pouring the concrete. A 24-hour notice is required to schedule an inspection. c: Anita Benson, City Engineer g:'cng\davc'1>c\waytck,spr.doc C ITV OF ellANHASSEN 690 COULTER DRIVE · P.O. BOX 147. CHANHASSEN, MINNESOTA 55317 (612) 937-1900 . FAX (612) 937-5739 MEMORANDUM TO: Sharmin AI-Jaff, Planner II FROM: Mark Littfin, Fire Marshal DATE: January 28, 1998 SUBJ: Request for site plan review for a 24,638 square foot office/warehouse addition to Waytek, Inc. located south of the Twin Cities Railroad and west of Dell Road, 7660 Quattro Drive, Sweden borg/Shaw Construction, Inc. Planning Case 88-8 Site Plan Review (File 2). I have reviewed the site plan for the above project. In order to comply with the Chanhassen Fire DepartmentlFire Prevention Division, I have the following fire code or city ordinance/policy requirements. The site plan is based on the available information submitted at this time. If additional plans or changes are submitted, the appropriate code or policy items will be addressed. I. Regarding the new access off of Quattro Drive submit grade dimensions to the City Engineer and Fire Marshal for approval. Pursuant to 1991 Uniform Fire Code Section 10.204 (t). 2. "No parking fire lane" signs shall be installed. Contact Chanhassen Fire Marshal for exact location. Pursuant to Chanhassen Fire DepartmentlFire Prevention Policy #06-1991. 3. Submit utility plans to the City Engineer and Fire Marshal for approval. SWEDENBORG SHAW CONSTRUCTION December 22, 1997 Waytek, Inc. 7660 Quattro Drive P.O. Box 690 Chanhassen, MN 55317 RECEIVED DEe 24 1997 CITY OF CHANH^SSth Attn: Norman Larson Wayne Larson Bob Lamoreaux Re: Proposed Addition Gentlemen: As a recap from our meeting with Ms. Sharmin AI-Jaff, the City Planner, we have committed to the following schedule as it relates to the Site Plan approval process for the proposed building addition. 1. Site Plan Application deadline: January 16, 1998. 2. Planning Commission meeting: February 18, 1998, 7:00 PM. 3. City Council meeting: March 9,1998,6:30 PM. The Planning Commission and City Council meetings are held in the Council Chambers at City Hall, lower level. As we approach these meeting dates, I will be in contact with you to communicate where our project falls on the agenda for Planning Commission and City Council meetings respectively. John . Shaw (Jack) Vice President mla c: Bernard Herman, Bernard Herman Architects Jeff Lindgren, Hedlund Engineering Sharmin AI-Jaff, City of Chanhassen Design Phase Services & Consrruction Management 7685 COl1lorate Way Eden Prairie. MN 55344-2021 (612) 937-8214 (612) 934-9433 FAX CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN, MN 55317 (612) 937-1900 DEVELOPMENT REVIEW APPLICATION APPUCANT: SWf2dQ.Y\b:r~- Shaw Ccncst . we. ADDRESS::J fo~5 CorDt.W:~ Wc3~ EdenPrdlr\e. MN 55314- TElEPHONE (DaytimelCdZJ g~1- 8111 OWNER: Wc30~k :me... ADDRESS: .J(o~ ~U~~ DriL>~ C~V\a~~ ~JJ TElEPHONE{ loll L q -49 - 61bS - Comprehensive Plan Amendment - Temporary Sales Permit - Conditional Use Permit _ Vacation of ROW/Easements - Interim Use Permit _ Variance - Non-conforming Use Permit - Wetland Alteration Permit _ Planned Unit Development. _ Zoning Appeal _ Rezoning _ Zoning Ordinance Amendment _ Sign Permits I I L Notification Sign I _ Sign Plan Review I -2l Site Plan Review. -A... Escrow for Filing Fees/Attorney Cost.. ($50 CUP/SPAN ACN ARIW AP/Metes and Bounds, $400 Minor SUB) _ Subdivision. I l:I, ~~ TOTAL FEE $ 10 1\1. . A list of all property owners within 500 feet of the boundaries of the property must be Included with the application. Building material samples must be submitted with site plan reviews. "Twenty-six full size folded copies of the plans must be submitted, Including an 8W' X 11" reduced copy of transparency for each plan sheet. - Escrow will be required for other applications through the development contract NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application. PROJECT NAME ~T.nc.. l.ClCATION~!<>~ ~~rCl Dr. lEGAl DESCRIPTION lcl;:-~ ~~ ~ Blrl l,J)c;lrk 6ng.,1vlI rei Mdi\~ Ci{~ of' __\'1.3~"'~ I tlrmniprn ~vtt'PM\nn~..:dd TOTAl..ACREAGEJloo.l'l~q ~ WETlANDS PRESENT YES X pRESENT ZONING I.O.P. Tndu~ MIc.2.. Eark D.\"irlct l)ndeu~.~.a 'S~ PRESENT lAND USE DESIGNATION ~{ltt l}iar&tro~ AdditlOV1 REQUESTED LAND USE DESIGNATION ~V\ Rvu\~w AOphu;}hM REASON FOR THIS REQUEST NO REQUESTED ZONING This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. 1\ determination of completeness of the application shall be made within ten business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within ten business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owne(s Duplicate Certificate of Title. Abstract of nle or purchase agreement). or I am the authorized person to make this application and the fee owner has also signed this application. 1 will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies. etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing requirements and agency review. Therefore. the city Is notifying the applicant that the city requires an automatic 60 day extension for lopment re . w. Development review shall be completed within 120 days unless additional review extensions app ved by t e ap Iicant. ~, l-1c:r-QS Date Signature of plicant _~ --P_A1..,....e.-r~__ ,~ Signature of Fee Owner Application Received on {-Ib -q& Fee Paid ~f" 38 t - I" - ?B Date Receipt No.l(.,~ 2- j The appncant should contact staff for a copy of the staff report whIch will be available on Friday prior to the meeting. If not contacted. a copy of the report will be mailed to the applicant's address. - ..- . - ~ " CONSERVATION EASEMENT THIS INSTRUMENT, Made this day of July, 1988, by and between FRANK BEDDOR, JR. and MARILYN A. BEDDOR, husband and wife, County of Carver, State of Minnesota, Grantors, and the CITY OF CHANHASSEN, a municipal corporation under the laws of the State. of Minnesota, County of Carver, State of Minnesota, Grantee: WITNESSETH: That Grantors, in consideration of the sum of One Dollar ($1. 00) and other good and valuable consideration to them. in hand paid by Grantee, the receipt in sufficiency of which is, hereby acknowledged, do hereby grant, bargain, sell, and convey to Grantee, its successors and assigns, a perpetual easement for , conservation purposes and environmental protection over, on and across the following described premises located in the County of Carver, State of Minnesota, viz: ' The rear 20 feet of Lots 2 through 7, inclusive, Block 1, PARK ONE THIRD ADDITION, according to the plat thereof on file and of record in the Office of the County Recorder, Carver County, Minn~sota. The following activities shall be prohibited within the conservation easement area described above. a. The placement and erection of buildings, structures, and private docks. b. The alteration of vegetation in any manner or form except for removal of dead or diseased vegetation. c. The excavation or filling of the easement area. d. The application of fertilizers, whether natural or chemical. e. The application of chemicals for the destruction or retardation of vegetation. f. The deposit of waste or debris. g. Construction of paths, trails, walkways, and service roads, except as constructed by the City. h. T~e application insecticides. of herbicides, ~esticides \, and #5 ~ ~ ~ . , i. The storage of watercraft, boat trailers, ice fishing houses, snowmobiles, and any type of motorized and non- motorized vehicles. Continuous screening shall be. maintained . within the easement area by the Grantors, their heirs, successors and assigns should dead or diseased vegetation need to be removed. Grantors covenant that they are the owners and are in the possession of the above described premises and have the lawful right. and authority to convey and grant the conservation easement described herein. IN WITNESS WHEREOF, said Grantors have caused this easement to be executed as of the day and year first above written. Frank. Beddor, Jr. Marilyn A. Beddor STATE OF MINN~SOTA ss COUNTY OF CARVER The foregoing instrument was acknow1edge~ before me this day of ' 1988, by FRANK BEDDOR, JR. and MARILYN A. BEDDOR, husband and wife. Notary Public THIS INSTRUMENT WAS DRAFTED BY: Julius C. Smith 252 Southdale Office Centre 6750 France Avenue South Edina, MN 55435 (612) 920-1521 CHANHASSEN PLANNING COMMISSION REGULAR MEETING FEBRUARY 18, 1998 Chairman Peterson called the meeting to order at 7:05 p.m. MEMBERS PRESENT: LuAnn Sidney, Craig Peterson, Matt Burton, Allyson Brooks, Alison Blackowiak, and Kevin Joyce. Ladd Conrad arrived during item 3, after the public hearings. STAFF PRESENT: Kate Aanenson, Planning Director; Bob Generous, Senior Planner; Sharmin AI-Jaff, Planner II; Dave Hempel, Asst. City Engineer; and Todd Hoffman, Park and Recreation Director . PUBLIC HEARING: SITE PLAN REVIEW FOR A 24.638 SQ. FT. OFFICE/W AREHOUSE ADDITION TO W A YTEK. INC.. LOCATED SOUTH OF THE TWIN CITIES RAILROAD AND WEST OF DELL ROAD. 7660 QUA TTRO DRIVE. SWEDENBORG-SHA W CONSTRUCTION. INC. Sharmin AI-Jaff presented the staff report on this item. Peterson: Questions of staff? Sidney: Now you gave us a sheet with additional conditions. AI-Jaff: Yes, and I read those conditions off. Sidney: Okay. Peterson: A couple questions Sharmin. As it relates to the traffic proposal, it seems as though we get these a lot with trash enclosures kind of coming in as an after thought and anytime we are given the detail about color and the tone and feel of the building and yet we're not seeing what can really be a negative to the building. How come the trash is always kind of secondary and in many cases we're not even seeing it because it's going through with the condition of approval anyway? AI-Jaff: In this case we did speak to the applicant. The trash enclosure is going to be inside the building. Typically if it's a site plan, let's say it's in a central business district or a visible area, we do require the applicant to show where that's going. Peterson: More importantly I think Kate, as a future reference. I've seen, well we see a lot of them without it and it's I think having a pre-requisite. Important as they seemingly are, and we're making big issues of a lot of other things. That can be a truly a sight sore that... Aanenson: That's point noted. Planning Commission Meeting - February 18, 1998 Peterson: Going to condition number 13. Talk about the light fixtures and we don't really talk about whether or not they're going to be the same as the existing or not. We should obviously make an effort to make them as close to the same as possible. Just a matter of, that can be rather unsightly also. Other questions of staff? With that, would the applicant or their designee wish to address the Planning Commission? If so, please come forward and state your name and address. Jack Shaw: Jack Shaw. I'm with Swendenborg-Shaw Construction. We're excited about the project and I'm here this evening with Bob Lamaroo, a principle ofWaytek and open to any questions you may have. Peterson: A quick one for you. On the side towards the railroad tracks, and towards the houses in Eden Prairie. Quite often we may forget that those are residents that look at that, basically from the back of their house, on a regular basis. We didn't seem to put much, pay much attention to dealing in the tone of the back.. . all of that Fabcon stuff I would. Is there anything that we can do to maybe mitigate the coldness of that so that when you wake up in the morning you go... Jack Shaw: I worked with staff on that and we have discussed that. The grade is rather high in the back of the lot there so the wall's about 20 feet tall. Approximately, and we have a grade differential of about 8 feet. So a lot of that is taken up in the grade itself. It's also heavily, heavily screened with some very mature oaks and maples in the back of the building there. Peterson: I really couldn't get a sense in driving by how far back are the trees from the building? AI-Jaff: There is a 20 foot easement and that is currently occupied by.. .and then you have the railroad tracks. And on the residential side there's another probably 10 feet of mature trees and then you have the houses. Joyce: It's.. . seeing the homes now without vegetation, you know. Certainly six months a year there's no... Peterson: Other questions...? Thanks. This is a public hearing. May I have a motion... to open the public hearing. Joyce moved, Sidney seconded to open the public hearing. The public hearing was opened. Peterson: This is a public hearing. Anyone wishing to address the commission, please come forward please. Seeing none, may I have a motion to close the public hearing and a second. Joyce moved, Sidney seconded to close the public hearing. The public hearing was closed. Peterson: Any comments Matt, on this project? 2 Planning Commission Meeting - February 18, 1998 Burton: Not really. It seems to have met all the criteria that are laid out in the staff report and it seems to make sense. So I don't have any problems with this project. Peterson: Alison. Blackowiak: My only question today, I talked to Sharmin about the drive aisle width and that's been addressed so I have no other comments. Brooks: I have no comments. Peterson: LuAnn. Sidney: I have no problems with the development as proposed. I guess I did have some concerns about the mature trees, where that would be affected by a proposed driveway. However, I guess looking at the site I can't really see any other choice and I guess I would encourage the applicant to really try their darnedest to preserve the trees on the north side, because I think those are significant trees. So I'd vote... Joyce: No problems. Peterson: I concur with, the only additional things would be the comments I said earlier. With that may I have a motion please. Joyce: I'll make a motion the staff recommends the Planning Commission recommend approval of Site Plan Request #88-2 for a 24,683 square foot addition as shown on plans dated received January 16, 1998 and subject to conditions 1 through 21. Adding to that condition 13, to make an attempt to have similar lighting as the existing development. Condition 20 to read, all parking lot drive aisles shall meet City Code Section 20-1101. And condition 21, depending on storm sewer calculation, additional catch basins may be required in the easterly parking lot to intercept runoff prior to draining onto Quattro Drive. Peterson: Second please. Burton: Second. Peterson: Any discussion? Joyce moved, Burton seconded that the Planning Commission recommend approval of Site Plan #88-2 for a 24,683 square foot addition (Waytek, Inc.) as shown on the plans dated received January 16, 1998, subject to the following conditions: 1. The existing catch basin on Quattro Drive shall be protected with rock filter dikes until all disturbed areas on the site have been restored. 3 Planning Commission Meeting - February 18, 1998 2. Storm sewer calculations for a 10 year, 24 hour storm event shall be submitted to the City Engineering Department for review and approval prior to issuance of a building permit. 3. The haul routes for exporting material from the site shall be approved by the City Engineer prior to issuance of a building permit. 4. The grading plans shall be revised to include an erosion control fence detail, revised Chanhassen Standard Detail Plate for an industrial driveway (No. 5207) and rock construction entrance detail No. 5301. In addition, erosion control fence shall be installed adjacent to Quattro Drive once the existing driveway is abandoned. 5. Sanitary sewer and water hookup charges shall be applied to the building permit. The: charges shall be based upon the number of SAC units determined by the Metropolitan Council Environmental Services. 6. The applicant shall obtain the necessary construction access easement to perform grading on the adjacent property prior to any issuance of a building permit. 7. The applicant and/or contractor shall be responsible for adjusting the existing water service proposed in the easterly driveway access. 8. The contractor and/or developer shall contact the City's Engineering Department for inspection of the driveway apron and curb/street restoration prior to pouring the concrete. A 24 hour notice is required to schedule an inspection. 9. Plans for trash enclosure and rooftop screening shall be submitted to staff for approval. All roof top equipment shall be screened from views. 10. The applicant shall enter into a Site Plan Agreement. Financial guarantees for landscaping shall be submitted to the City at the time of building permit application. 11. The applicant must install tree protection fencing prior to construction. Fencing must be inspected by city staff before work is allowed to begin. 12. The applicant shall add 7 trees to the landscape plan. Four shall be planted on the east side of the new parking lot and three shall be planted at the southeast comer of the property. The trees shall be a mix of oak and sugar maple. 13. The light fixtures may not exceed 0.5 foot candles oflight from fixtures at the property and attempt to have similar lighting to the remaining existing development. 14. The applicant shall install tree protection fencing around all preserved trees (within construction limits) before site grading can commence. 4 Planning Commission Meeting - February 18, 1998 15. The applicant shall comply with the conditions of the conservation easement located on the northerly 20 feet of the property. No trees will be allowed to be removed within the easement. 16. Fire Marshal recommendations: a. Regarding the new access off of Quattro Drive, submit grade dimensions to the City Engineer and Fire Marshal for approval. Pursuant to 1991 Uniform Fire Code Section 10.204(f). b. "No Parking Fire Lane" signs shall be installed. Contact Chanhassen Fire Marshal for exact location. Pursuant to Chanhassen Fire Department/Fire Prevention Policy #0'6- 1991. c. Submit utility plans to the City Engineer and Fire Marshal for approval. 17. Park and trail fees shall be paid at the time of building permit. 18. Approval of this site plan is contingent upon consolidation of Lots 3 and 4, Block 1, Park One 3rd Addition (provide proof of single Parcel Identification Number). 19. Building Official recommendations: a. The developers and/or designers should meet with a representative of the Inspections Division as early as possible to discuss commercial building permit requirements. Principals should be aware of many of these requirements before the project is bid. 20. The parking lot drive aisles shall meet City Code Section 20-1101. 21. Depending on storm sewer calculations, an additional catch basin may be required in the easterly parking lot to intercept runoff prior to draining onto Quattro Drive. All voted in favor and the motion carried. PUBLIC HEARING: REQUEST FOR A LOT SPLIT ON LOT 2. BLOCK 4. HIGHOVER ADDITION. FOR DEVELOPMENT OF A WELL SITE. THE PROPERTY IS LOCATED NORTH OF LONGACRES DRIVE ON THE EAST SIDE OF HWY. 41 (HAZEL TINE BLVD.). WEST OF HIGHOVER DRIVE AND SOUTH OF LAKE LUCY ROAD. CITY OF CHANHASSEN. Sharmin AI-Jaff presented the staff report on this item. Peterson: Questions of staff? 5