Loading...
1d Approve Feasibility Report, Project 98-1 CITY OF CHANHASSEN ,90 City Center Drive, PO Box 141 Chanhassen, Minnesota 55317 Phone 612.937.1900 General Fax 612.937.5139 Engineering Fax 612.937.9152 Public Safety Fax 612.934.2524 \l1eb /i'Il'Ii'. ci. chillzhaSJeJI. Inn. us -1cC - MEMORANDUM . TO: Don Ashworth, City Manager Anita L. Benson, City Engineer ~ FROM: DATE: April 2, 1998 SUBJ: Approve Feastbility Report; Authorize Preparation of Plans and Specifications for Lake Lucy Road Project No. 98-1 The feasibility ~eport for this project was received by the City Council at their regular meeting on March 23, 1998. A public hearing was also held at that time. At the public hearing there were no relevant questions or concerns which required further investigation at that time; however, since a four-fifths vote of the City Council is required, no action was taken at the March 23 meeting. Staff recommends that the City Council formally approve the feasibility report dated March 15, 1998 for the Lake Lucy Road Improvement Project No. 98-1 and authorize the project consultant engineer, RCM Associates, Inc., to prepare the project plans and specifications. Attachments: 1. 2. Staff report dated March 12, 1998. Letter from Gestach & Paulson Construction dated March 6, 1998. City Council Meeting Minutes - March 23, 1998. 3. c: Dave Hempel, Assistant City Engineer Phillip Elkin, Water Resources Coordinator g:\cng\public\98-I\approve fcas I.doc .t Ie City of Chauhassm. A growing community with clean lakes, quality schools, a chmming downtown, thriving businesses, and beautiful parks. A great place to liue, work, and play CITY OF CHANHASSEN 690 City Center Dri/le, PO Box 147 Chanhassen, Minl2esota55317 Phone 612.937.1900 General Fax 612.937.5739 Engineering Fax 612.937.9152 Public Safety Fax 612.934.2524 \rIb Wll'w.ci. challhassen. mn.us 3 MEMORANDUM TO: Don Ashworth, City Manager Anita L. Benson, Project Engineer ~ March 12, 1998 FROM: DATE: SUBJ: Receive Feasibility Report for Lake Lucy Road Improvements; Authorize Preparation of Plans and Specifications - Project No. 98-1 This is the public hearing on"l:he feasibility study for the Lake Lucy Road Improvement Project No. 98-1. This proposed improvement project is being initiated by the City in an effort to complete the Municipal State Aid route. With this improvement project, the existing 350-foot uncompleted segment of Lake Lucy Road between the Woodridge Heights and Brenden Pond developments will be construct,cd. The primary project elements consist of roadway, trail and .storm sewer construction. Also included are street lighting and landscaping improvements which will match the established patterns in the Woodridge Heights and Brenden Pond developments. The feasibility report includes a detailed cost estimate, proposed preliminary assessment schedule, and construction schedule. The total project cost is estimated to be $119,000. TIns project is proposed to be financed by a combination of special assessments to the benefiting property, Brenden Pond 31'11 Addition, Municipal State Aid street funding, and storm water management (SWMP) funding. TIns project is considered feasible from botl1 an engineering and financial standpoint. As required by law, notification was made to tl1e property owner proposed for special assessments and publication has been made in tl1e Villager newspaper. The sole property owner proposed to be assessed for tl1is project is tl1e developer of Brenden Pond 31'11 Addition, Gestach-Paulson Construction. A copy of tl1e draft feasibility study has been provided to Mr. Gestach and Mr. Paulson for comment. The project engineer, Mr. Michael Foertsch of RCM (Rieke, Carroll, Muller Associates, Inc.), will be present at tl1e public hearing to provide a presentation of t11is feasibility report and respond to any pertinent questions which may arise. At tl1e close of the public hearing if there are no relevant questions or concerns which would require furtl1er investigation, it is recommended that the City Council formally approve the feasibility report dated March 16, 1998 for the Lake Lucy Road Improvement Project No. 98-1 and authorize tl1e project consultant engineer, RCM Associates, Inc., to prepare tl1e project plans and specifications. ktm Attachments: 1. 2. 3. Feasibility report. Public hearing notice. Letter to Gestach Paulson Construction dated March 3, 1998. .f c: Dave Hempel, Assistant City Engineer Charles Folch, Director of Public Works Operations g:'eng\public\98-I\1ppro\'c reas.doc The City ojChanhasse1l. A growing community with clean lakes, qualily schools, a chlllming downtown, thriving businesses, and beautifid parks. A great place to live, work, and CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA NOTICE OF PUBLIC HEARING FOR LAKE LUCY ROAD IMPROVEMENT PROJECT NO. 98-1 NOTICE IS HEREBY GIVEN that the Chanhassen City Council will meet in the City Hall Council Chambers located at 690 City Center Drive on Monday, March 23, 1998 at 6:30 p.m. for a public hearing on the Lake Lucy Road Improvement Project No. 98-1. This project deals with the construction of the final segment of Lake Lucy Road (between the Woodridge Heights and Brenden Pond developments) to an urban roadway section with concrete curb and gutter, storm drainage facilities, and trails. Said improvements are proposed to take place within Section 3 of the city and are proposed to be financed by a combination of municipal state aid street funds, stormwater management funds, and special assessments. The total project cost of said improvements is estimated to be approximately $119,000.00. All interested persons may appear and be heard at said time and place. Anita L. Benson, City Engineer 937-1900, extension 156 (Publish in the Chanhassen Villager on 3/12/98 and 3/19/98) \'dsl\vol2\eng\hearing\98-1 ph notice.doc CITY OF CHANHASSEN 690 City Center Drive, PO Box 147 Chanhassen. Minnesota 55317 Phone 612.937.1900 General Fax 612.937.5739 Engineering Fax 612.9379152 Public Safety Fax 612.934.2524 W'eb www.ci.chanhassen.mn.us March 3, 1998 Messrs. Gestach and Paulson Gestach Paulson Construction 200 N. Chestnut Street Chaska,MN 55318 Re: Draft Feasibility Report for Lake Lucy Road Improvements Project No. 98-1 Dear Messrs. Gestach and Paulson: Enclosed please find a copy of the draft feasibility report for the Lake Lucy Road Improvement project for your review. Presentation of the feasibility study to the Chanhassen City Council is scheduled for Monday, March 23, 1998. Therefore, we need to receive any final comments by Monday, March 16, 1998 in order to incorporate them into the final feasibility report. Please feel free to contact me at 937-1900, ext 156 to express any concerns or have any questions you may have addressed. Thank you for your time in reviewing this feasibility study. Sincerely, CITY OF CHANHASSEN ~cl6~ Anita L. Benson, P .E. City Engineer ALB:jms c: Dave Hempel, Assistant City Engineer Michael Foertsch, RCM Associates, Inc. \'cfs 1 \vo12'eng'i>ublic\98-1\draft feasibility .doc The City of Chanhassen. A growing community with clean lakes, quality 5C/;00/s, a cham/ing downtown, thriving businesses, and beautiful parks. A great place to live, work, and p ~. .~ Feasibility Report Lake Lucy Road Improvements "~-,~ ~.~~~=s.:~;}-- . . ,,!t-.' j " 10001 red circle drive · box 130 · minnelonka. mn 55343 · (612)_1 · fax (612)935-8814 1.C. .........'e,..... '- - - " ~ :'<'. -'" - ~-- ...-',_J--~~t: . --~~~4k2~~,;: CITY OF CHANHASSEN City Project No. 98-1 Chanhassen, MN RCM File No. 10445.01 March 1998 '. '~:F- FEASIBILITY REPORT FOR LAKE LUCY ROAD IMPROVEMENTS OTY OF CHANHASSEN PROJECf NO. 98-1 MARCH 1998 Rieke Carroll Muller Associates, Inc. RCM File No. 10445.01 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the ws of the State of Minnesota. Date: MIf~K /1, /Cfc;e> TABLE OF CONTENTS Section fm Introduction 1 Figure 1 - Project Location 2 Existing Conditions 3 Proposed Improvements 3 Alternate Alignments 4 Potential Work Scope Addition 4 Figure 2 - Typical Street Section 5 Figure 3 - Proposed Alignment 6 Project Costs and Financing 7 Project Schedule 8 Conclusions and Recommendations 8 Appendix RCM 10445.01 INTRODUcnON The Feasibility Report has been prepared and is submitted in accordance with an agreement between the City of Chanhassen and Rieke Carroll Muller Associates, Inc. (RCM). The report was authorized by the Chanhassen City Council at its regular meeting February 2, 1998. The report outlines the project scope for completing street, storm sewer and trail improvements in Lake Lucy Road between the Brenden Pond and Woodridge Heights subdivisions (see Figure 1). An estimate of project costs has also been included in this report. 1 rPRO.JECT J LOCATION ....... " ci 2: cl Q: ci u o '0111 rieke corroll Muller ossocio tes inc. J REVISIONS D engineers - orchitects _ loncl St;rv€'yor-s ( FIGURE 1 LOCATION MAP PROPOSED IMPROVE,tylENTS LAKE LUCY ROAD CITY OF CHANHASSEN, MINNESOTA DATE MAR.199B FILE NO. 10445.01 RCM 10445.01 EXISTING CONDITIONS Lake Lucy Road between Trunk Highway 41 and Galpin Boulevard is part of the Municipal State Aid Street system (MSA) in the City of Chanhassen. The majority of this roadway has already been constructed. A portion of the roadway was completed in 1996 as part of the Brenden Pond, Phase I development. Another segment was completed in 1997 with the Woodridge Heights development. Storm sewer improvements and a bituminous trail were installed in conjunction with the roadway improvements for each development. At present, a 350-foot gap exists between the two segments of roadway (see Figure 1). With development pending for another phase of Brenden Pond, construction of this missing segment of roadway is imperative. The City's Surface Water Management Plan, dated November 1994, identified the need for storm sewer piping and water quality ponding in this area. While most of the ponding requirements have been met by development of the Woodridge Heights subdivision, additional ponding is necessary to protect mitigated wetlands created by the same subdivision. As part of the same subdivision, a short segment of storm sewer pipe was installed to convey stormwater runoff across the proposed alignment of Lake Lucy Road. Sanitary sewer and watermain facilities have already been constructed through this uncompleted roadway segment. PROPOSED IMPROVEMENTS Proposed improvements for this uncompleted segment of Lake Lucy Road include placement of roadway materials at widths and thiclmesses which match those of the adjacent segments (see Figure 2). An 8-foot wide bituminous trail is proposed for the north side of the street and will also match the trail locations of adjacent segments. The proposed .roadway alignment meets State Aid design criteria and it effectively connects the segments already constructed (see Figure 3). Stonn sewer improvements will be constructed to meet State Aid requirements for a IO-year frequency rainfall event. An existing culvert near the common boundary of the Brenden Pond and Woodridge Heights developments will be extended to meet piping requirements indicated in the City's Surface Water Management Plan. A small water quality pond will be constructed to treat stormwater runoff and to protect nearby wetlands. 3 ReM 10445.01 · A portion of the roadway will incorporate a 4-inch diameter drain tile on each side of the street beneath the curb and gutter. The drain tile will convey subsurface water which accumulates in the granular subbase into proposed storm sewer improvements. Street lighting and landscaping improvements which match established patterns will be incorporated into the project. A portion of the road right-of-way bas been dedicated with the platting ofWoodridge Heights. The remainder of the road right-of-way and necessary drainage easements will be dedicated through platting of Brenden Pond, 3rd Addition. ALTERNATE ALIGNMENTS Alternate alignments were not considered for this report, as the proposed alignment is fixed by existing improvements on both ends of the project. POTENTIAL WORK SCOPE ADDITION Depending on fmal platting of Brenden Pond 3rd Addition, an additional sanitary sewer and water service may need to be added to this project. The cost associated with this work would be 100% assessable. 4 P./W C/L 1w LI\; 40' I 40' ~ . 8' I 5' -II ' 18' 18' 1'81T. TRAIL I' .. ; .. C/L PROFILE B618 GRADE C.& G. 0.02' 1FT. ... iL 4" PERFORATED P .E. PIP!:: (TYP) .3" BIT. WEAR 6" CL 5 AGGREGATE (1007. CRUSHED) 2" 9IT.(WEAR COURSE MnDOT 2.331, TYPE41 A) BITUMINOUS TACK COAT MnDOT 2357 3- 1/2" BIT. BASE (MnDOT 23.31 TYPE 31B.) 12" CL. 5 AGGREGATE ( 1007. CRUSHED) 18" GRANULAR BORROW TYPICAL STREET SECTION NO SCALE rDATe: MAR.199B ~CIII rieke CQrrol1 Muller QssociQ tes inc. FIGURE 2 PROPOSED IMPROVEMENTS LAKE LUCY ROAD CITY OF CHANHASSEN ) REVISIONS engineers. architects . land s....rveyors \I \ ~ \'\1 \" \ ~\" ~~ \ elL PROPOSED AUGNMENT ~\\\ '1,\\ '\ ~ \" ~" ~\" \~~, , ~\" ,~" , ,/ / '\ \" \" ' ----- .... '" \\'\ ,,\-........- /'" ",'" \\~ \ \ ~.... ..../ "....)) ~ \ ~ X - .... .... ........,<~ \...."\c ~ /..../:~~O~ ~~ ....-- / / /' /~ ..(.... ~ /0'. ,,0/ ~ - / /# ~'t-~> #.,:Y /"" .... - END OF EXISTING 17' '" # P' /"'" IMPROVEMENTS / ~ .- / .... / '" / PROPOSED STORM SEWER ------ ---- -=======~ ---- .::;:::~ LAk--=~ _ - - _ E: LUcy --. '= '= - ~D '="", ======== ------- ~ ==~ :::::::::::.-:::::::. ----------- END OF EXISTING IMPROVEMENTS r---. I I I I PROPOSED STORM SEWER 'w'OODRIDGEI HE GHTS SUB IVISI ." '", ~R END E N ',p 0 N D SUB D"~ V I SID N OUTLOT B o Sco.le 1 H = lOa' 10111 rieke ca.rroll Muller o.ssocio. tes inc. ] REVISIONS rHm NO. ] .;)ineers - orchitects _ lo.nd surveyors l FIGURE 3 PROPOSED IMPROVEMENTS LAKE LUCY ROAD CITY OF CHANHASSEN, MINNESOTA ;;;~-.(:,..'~; -..,o:-~" ~i.._. '_. ;;~_;.'.'''';'_,_'" DATE MAR.1998 rILE NO. 10445.01 ReM 10445.01 PROJEcr COSTS AND FINANQNG The following table summarizes the estimated construction costs by the significant elements of the project. Construction cost estimates are based on quantities identified for the recommended alignment and on unit prices typically bid for this type of project Estimated Proiect Costs Street Construction Stonn Sewer Construction and Pond Excavation Bituminous Trail Construction 15% Contingencies 25% Engineering & Administration Total Estimated Project Costs $48,500 31,000 3,000 12,500 24 000 $119,000 A portion of the project costs are considered to be of benefit and assessable to the developer of Brenden Pond, 3rd Addition. The proposed assessments are based upon a front footage cost consistent with the previous Lake Lucy Road (phase I) project 92-12 with a construction cost index (CCI) factor added. Municipal State Aid Street funds and Surface Water Management funds will be used to finance the remaining project costs. The following table summarizes the project cost participation: Estimated Proiect Financing Estimated Assessable Frontage = Assessment Rate Per Foot = Assessable Share Municipal State Aid Street Funds Surface Water Management Funds Total Estimated Project Cost 500 LF $87.18 $43,590 $53,130 $22 280 $119,000 7 RCM 10445.01 PROJECT SCHEDULE The following schedule is proposed for the Lake Lucy Road improvements. The schedule may be revised to reflect any unforeseen changes or to allow for coordination with other construction activities. City Council receives feasibility report City Council approves project/authorize preparation of plans & specs City Council approves plans & specs/authorize ad for bids Receive bids City Council awards contract Begin construction Substantial completion of construction Hold public hearing for project assessments Final completion of construction and landscaping March 23,1998 March 23,1998 April 27, 1998 May 22,1998 May 26, 1998 June 1998 August 1998 October 1998 June 1999 CONCLUSIONS AND RECOMMENDATIONS 1. The project is feasible from an engineering and a financial standpoint. 2. The project is necessary to complete a vital link in the overall transportation plan for the City of Chanhassen. It also addresses the need for storm sewer and ponding improvements identified in the City's Surface Water Management Plan. 3. The City of Chanhassen is obligated to complete the roadway in order to comply with Municipal State Aid requirements. 4. Construction of recommended improvements in 1998 will closely coincide with housing construction in the area, resulting in minimal disruption to the neighborhood. 5. Sanitary sewer and watermain improvements are not needed for the project, as these improvements have already been installed. 8 Lake Lucy Road March 5, 1998 Preliminary Cost Estimate RCM File No. 10445.01 Description Quantity Unit Unit Cost Cost Mobilization 1 LS $4,000.00 $4,000 Unclassified Excavation 1000 CY $2.50 $2,500 Clear and Grub 30 TREE $250.00 $7,500 Bituminous Wear (incl. Trail) 200 TON $30.00 $6,000 Bituminous Base 250 TON $28.00 $7,000 Bituminous Tack Coat 20 GAL $2.00 $40 Class 5 Aqqreqate 1090 TON $9.00 $9,810 Select Granular Borrow 1500 TON $6.50 $9,750 6" Concrete Driveway Apron 20 SY $40.00 $800 B618 Curb & Gutter 700 LF $7.00 $4,900 Sod with 4" Topsoil 450 SY $2.00 $900 Seedinq with Mulch 0.1 AC $2,000.00 $200 Landscape Tree 15 EA $300.00 $4,500 Erosion Control Silt Fence 1200 LF $2.00 $2,400 Check Bale 20 EA $5.00 $100 Street Lighting 1 LS $1,500.00 $1,500 15" RCP, CI. V 60 LF $25.00 $1,500 30" RCP, CI. III 260 LF $40.00 $10,400 Salvage 30" RCP Apron 2 EA $1,000.00 $2,000 Catch Basin 2 EA $1,250.00 $2,500 Storm Sewer Manhole 2 EA $1,200.00 $2,400 . CI. III Riprap with Filter 15 CY $80.00 $1,200 4" PE Drain Tile 100 LF $6.00 $600 $82,500 Plus 15% Contingencies $12,500 Plus 25% Engineering & Administration $24,000 Total Preliminary Cost Estimate $119,000 Rieke Carroll Muller Assoc., Inc. 03/17/98 200 Chestnut Street North Chaska, Minnesota 55318 March 6, 1998 Anita L. Bensoi Charles Folch 690 City Center Drive Chanhassen, MN 55317 Dear Anita & Charles, This letter is to summarize what was discussed in our confrence call late Thursday afternoon, March 5, 1998. Both Leland Paulson & myself do not want either the Lake Lucy Road ex1ension or the Brenden Pond 3rd Addition to proceed without first resolving the important issue of wetland borders on our property as delineated by Svoboda Ecological Resources. We contracted with Frank Svoboda because he & his firm are recognized as experienced, knowledgable & respected professionals in their field, also very capable of delineating wetland borders as per regulations govern. We submitted Svoboda's report dated June 20, 1997 and received a response from Phillip A. Elkin, Water Resources Coordinator dated March 3, 1998 rejecting the same Svoboda Ecological Research report on their testing. We have contacted Frank regarding the situation and faxed a copy of Philip's letter to him, so he can persue this difference of opinion and resolve it in a timely matter. As you know, there are severe financial concequences on the use of the land in which it can be used and as I have stated (as a horse person) we want to put "the horse in front of the cart". on this issue. We regret any inconveniences that this delay may cause your work in this area, and hope that the problem can be resolved soon, as we hate to waste anybody's valuable time. David estach Gestach Paulson Construction c: Dave Hempel, Assistant City Engineer Sharmin AI-Jaff, Planner 1/ CITY OF CHANHASSEN rnrn@rnmwrnoo MAH 0 'J 1998 EMGI"EERI"~ OEPT,