MEMORANDUM
TO:
Don Ashworth, City Manager
Todd Hoffman, Park & Recreation Director ~'
January 21, 1998
FROM:
DATE:
SUBJ:
Contract Amendment, 1998 Trail Project, Howard R. Green
Company
~:-.....
On October 20, 1997, the city council entered into a contract with H.R. Green
Company to perform professional services associated with the 1998 trail project.
A copy of this contract is attached. On December 17, 1997, Dave Nyberg, Project
Manager addressed the attached letter to me regarding a budget update and request
for an amendment to their contract with the city. Mr. Nyberg discussed this
amendment with the council on January 12, 1998. The contract changes presented
in this letter would result ina revised scope of work for hourly services of
$116,400. The design phase of the project remains at $73,800 for a total revised
fee of$190,200. The original estimated fee was $129,700.
RECOMMENDATION
Approval of the amended contract in the amount of $190,200 is recommended.
g: \park \referen \tra i I cont ractamend. doc
-f
'i(J' ofClJilllllilSsl'll. A grOll'ing commlmi(y with clean lakes, qUi/lity sel'ools, II chal7ning dOll'lIto/lln, thril'ing b/lSinesses, and bea/ltiful parks. A great place to lil'e, /1'01'/.:. ail!l pll):
Howard R. Green Company
CONSULTING ENGINEERS .
W
I I
l1JSllmc E.\GlllDS
Formerly MSA
Consulting Engi
December 17, 1997
File: 801380j
Mr. Todd Hoffman
Park and Recreation Director
City of Chanhassen
P. O. Box 147
Chanhassen, MN 55317
.;:--
RE: BUDGET UPDATE AND AMENDMENT TO CONTRACT
1998 TRAIL PROJECT
Dear Mr. Hoffman:
,-
We would like to take this opportunity to update you on the engineering budget of the above
referenced project. We have invoiced the City the following amounts through the end of
November:
Design Phase (Hourly not-to-exceed, $73,800)
Final Design
Wetland Delineation and Permitting
$47,742.13
$6,657.50
$54,399.63
Sub-Total Design Phase through 11/30
Property Acquisition and Public Process (hourly basis, $22,400)
Public Involvement
Easements
$3,456.86
$12,898.90
$16,355.76
Sub-Total
The $22,400 original budget for property acquisition and public process is part of a total hourly
budget of $55,900 that also includes construction staking, inspection, and administration.
Based on the current project design, anticipated clear zone requirements, and prescriptive rights
issues of Carver County and Mn/DOT we anticipate a much greater effort on our part then
originally estimated for preparation of easements for this project. We originally estimated a fee
of approximately ~(14,000 for the preparation of easements. This was based on preparing 20
easements at a cost of $500 per easement, with another $4,000 for plat research and
coordination.
At this stage in the project, we are anticipating preparation of approximately 95 easements,
according to the table below. Based on the above estimate of $500 per easement, we
anticipate costs for preparation of the easements alone to be $47,500. Below is a total estimate
of our anticipated costs for easement preparation:
1326 Energy Park Drive. St. Paul, MN 55108 . 612/644-4389 fax 612/644-9446 toll free 888/368-4389
December 17,1997
Mr. Todd Hoffman
Page Two
Powers Boulevard
Lake Riley
Galpin Boulevard
Highway 7
Bluff Creek
Connection Trail
Total Easements
45
6
15
5
5
.19
95
Prepare Easements
Survey Staking Control (Easements)
Plat Research and Review
$47,500
$7500
$10.000
$65,000
Sub-total
We also anticipate additional labor and expense efforts for the public involvement portion of this
project. This task includes public correspondence, follow-up, and individual and neighborhood
meetings. We originally budgeted $8,400 for this task, including public meetings and providing
information to the City for mailings to property owners. We anticipate that we will require an
additional $9500 to complete this task for a revised estimated budget of $17,900. These
expenses are due to the large volume of individual responses to residents along the proposed
segments. To date, we have sent out over 50 memos of information to residents. We continue
to receive regular phone calls from residents that require a response and documentation. We
anticipate that this effort will continue throughout the duration of this project.
The above changes would result in a revised scope of work for hourly services of $116,400.
The design phase of the project remains at $73,800, for a total revised fee of $190,200.
We would like to talk to you about this proposed revision to the contract. Please give us a call
after you have had time to review the above information.
Sincerely
Howard R. Green Company
n
.j)1k{/ It ~
David E. Nyberg, P.E.
Project Manager
DEN/et
O\proj\801380\380-1707.dec
Howard R, Green Company
CONSULTING ENGINEERS
(--r'1" ~j u iQq7
J...J../. i~, ./ ! _. ,I
HOWARD R. GREEN COMPANY
PURCHASE ORDER
THIS AGREEMENT, made this 20th day of October, 1997 by and between, the CITY OF
CHANHASSEN (herafter "CLIENT', and HOWARD R. GREEN COMPANY (hereafter "HRG"), for
professional services concerning the 1998 Bike Trail Improvements Project.
HRG Project Number 801380P
The CLIENT agrees to employ HRG to perform the following services:
· Preliminary Surveying: As required to complete plans and specifications. The preliminary
survey will encompass areas that are not sufficiently covered with aerial topography
sufficient to develop a plan and profile for bike trail construction. Areas with sufficient aerial
topography coverage will not be surveyed in an effort to reduce costs on behalf of the
CLIENT.
· Project Design: Design will include the preparation of plans and specifications for the
construction of six segments of bike trail. Plans will be prepared in stages to allow at least
two reviews by the public prior to final approval of the plans by the City of Chanhassen.
· Property Acquisition: HRG will prepare easement descriptions and exhibits on the City's
behalf for property required to complete the project. This shall include both permanent and
temporary easements as required for the project construction.
· Project Management: HRG will assist in the coordination of public information meetings to
facilitate the project design. It is anticipated that these meetings will be held in November of
1997 and January of 1998. Additional project management responsibilities will include
coordination of the surveying, inspection, construction staking, wetland delineation,
permitting, and bidding.
· Construction Staking: HRG will provide construction staking as required on the project.
Staking will be completed on an as needed basis in areas where construction from the plans
is not feasible as determined by the Engineer. Staking will include the establishment of line
and grade in such areas.
· Project Inspection: HRG will provide a project inspector to the City of Chanhassen for the
coordination of field activities during construction. The inspector will be available to address
contractor inquiries, City staff inquiries, and public concerns related to the project.
In consideration for these services, the CLIENT AGREES to pay HRG on the following
basis: (Indicate Payment Method)
[ ] Lump sum in the amount of
[ ] Per current Rate Schedule with an estimated fee not to exceed
02113/95
O:\proj\801380p\Purchase Order
Paae 1 of 4
[ ] Other as stated here:
· Per current Rate Schedule for the design phase with an estimated fee not to exceed
$78,600.
· Per current Rate Schedule on an hourly basis for the property acquisition portion,
and for the construction staking and inspection phases, with an estimated fee of
$51,100.
The Schedule of Fees and Conditions of HOWARD R. GREEN COMPANY (attached
hereto) are incorporated into this AGREEMENT and made a part of it.