3 Feasibility Study, TH 101 N C ITV OF CHANHASSEN :3 690 COULTER DRIVE. P.O: BOX 147. CHANHASSEN, MINNESOTA 55317 (612) 937-1900. FAX (612) 937-5739 MEMORANDUM TO: Mayor and City Council -;1/ FROM: Todd Hoffman, Park & Recreat-ion Director DATE: January 8, 1998 SUBJ: Proposals for the Completion of a Feasibility Study; TH 101 North "Temporary" , Trail During a December 1997 city council work session, staff was directed to solicit proposals for the preparation of a feasibility study for a trail along Highway 1 0 1 north. Attached please find two proposals, one from BRW, Inc. and one from Howard R. Green Company. BRW, Inc. completed a similar scoping study and feasibility report in 1993. Howard R. Green Company is currently working on the referendum trail projects. The proposals differ in format and scope allowing an opportunity to select the product which best fits the council's desires. The BRW proposal at $12,580 is priced purely as a "feasibility" study. Howard R. Green Company's estimate for "pre-letting" services at $22,000 involves the preparation of plans and specifications. Assistant City Manager Gerhardt has attached a summary of the tax increment financing which could be utilized for this project. Staff awaits direction from the city council in this regard. c: Don Ashworth, City Manager Todd Gerhardt, Assistant City Manager Ilcts I Ivo12lparklth\th I 01 feasibility.doc .~ ~ M l.L f= ... M '0 1: C;; i5 u. i= DIKIII January 5, 1998 R W INC. Mr. Todd Hoffman Director of Parks and Recreation City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 Re: TH 101 Trail Project Proposal for Feasibility Study Update Services Dear Mr. Hoffman: 'fanning 'ransportation ngineering Jrban Design The following proposal is submitted for your consideration for services to prepare a feasibility study update for the TH 101 Trail Project. The proposed trail project extends along TH 101 from South Shore Drive to Pleasant View Road. The total length of the proposed trail construction is approximately 9,200 lineal feet. hresher Square 30 Thi rd Street So. BR W has previously completed a scoping study and a feasibility report for the TH 101 Trail Project in 1993. The project did not proceed to final design and construction at that time due to the high estimated construction costs and the anticipated reconstruction of TH 101 in the near future. 1inneapolis, IN 554]5 12/370-0700 ox 612/370-]378 It is our understanding that proposed reconstruction of TH 101 has been delayed due to funding issues and that the City would like to reconsider the construction of the TH 101 Trail. The trail would be constructed with the understanding that it would be temporary. It is likely that most of the trail would have to be removed and reconstructed when the roadway is reconstructed. ICllver lilwaukee linneapoIis 'ewark r1ando The City is requesting that the 1993 feasibility report be updated considering the temporary nature of the trail in an attempt to determine ways to reduce the cost of the project. This proposal details our proposed scope of work, estimated cost and schedule to update the original feasibility report. hoenix Jrtland lJ1 Diego "'ttle SCOPE OF WORK . The following is a summary of the work tasks to be completed as a part of our proposed scope of work for the feasibility study update: I . Review Existing Study The 1993 feasibility report will be reviewed with respect to content and scope for 1998 construction including the following: ,) (~-I! ~ \.: I I Mr. Todd Hoffman January 5, 1998 Page 2 . A field review will be performed to determine the extent of changes which may have occurred within the project area. Changed conditions will be noted and considered for 1998 construction. . The proposed trail alignment and other specifics of construction will be reviewed to determine if the alignment or construction methods can be modified considering the temporary nature of the trail. . Project costs will be updated to reflect 1998 construction. . Agency review and permit requirements will be reviewed to determine impacts that any recent revisions to State and local rules and guidelines would have on the project. 2. Agency Meeting We anticipate that one meeting with representatives of Mn/DOT and/or Hennepin County will be required to review the proposed trail construction and coordinate it with the future reconstruction of TH 101. 3. Neighborhood Meeting We anticipate that one neighborhood meeting will be required during the course of updating the feasibility study. Two neighborhood meetings were previously held in 1993 for the project and some strong opposition was expressed by property owners along TH 101. We recommend that another neighborhood meeting be held as a part of the feasibility study update to review revisions in the trail design and to reinitiate communications with the residents of the project area. 4. Staff Meetings and City Council Presentation Two meetings with City staff are anticipated for the project. The initial meeting will be held to determine the exact extent of the feasibility study review/update and to conduct a field review. A second meeting will be held to discuss our initial findings with City staff prior to preparation of the revised feasibility report. One meeting with the City Council is anticipated to present the updated feasibility report. 5. Feasibility Report Preparation An updated feasibility report will be prepared detailing the proposed trail design, the necessary permits\approvals and the associated estimated costs for the trail construction. Twenty copies of the updated feasibility report will be prepared and delivered to the City. ESTIMATED COST The following is a summary of our estimated costs based upon the Scope of Work detailed above. Mr. Todd Hoffman January 5, 1998 Page 3 1. Review Existing Study Personnel Project Manager Project Engineer Technician Hours Rate Total $ 1,000.00 $ 1,920.00 $ 400.00 Task 1 Total.......................................................................$ 3,320.00 8.0 24.0 8.0 $ 125.00 $ 80.00 $ 50.00 2. Agency Meeting (One Total) Personnel Project Manager Project Engineer Hours Rate Total $ 500.00 $ 640.00 Task 2 Total.......................................................................$ 1,140.00 4.0 8.0 $ 125.00 $ 80.00 3. Neighborhood Meeting (One Total) Personnel Hours Rate Total Project Manager 4.0 $ 125.00 $ 500.00 Project Engineer 8.0 $ 80.00 $ 640.00 Technician 8.0 $ 50.00 $ 400.00 Task 3 Total.......................................................................$ 1,540.00 4. Staff Meetings and City Council Presentation Personnel Project Manager Project Engineer Hours Rate Total $ 1,000.00 $ 960.00 Task 4 Total.......................................................................$ 1,960.00 8.0 12.0 $ 125.00 $ 80.00 5. Feasibility Report Preparation Project Manager Project Engineer Technician 8.0 24.0 24.0 $ 125.00 $ 80.00 $ 50.00 $ 1,000.00 $ 1,920.00 $ 1,200.00 Task 5 Total.......................................................................$ 4,120.00 Mr. Todd Hoffman January 5, 1998 Page 4 Reimbursable Expenses Reimbursable expenses would be billed directly to the City with no BRW markup. Reimbursable expenses may include items such as mileage, reproduction costs, delivery charges and photography. The total estimated amount for the reimbursable expenses required for the project is $500.00. Summary 1. Review Existing Study 2. Agency Meeting 3. Neighborhood Meeting 4. Staff Meetings and Council Presentation 5. Feasibility Report Preparation Reimbursable Expenses Total Estimated Costs $ 3,320.00 $ 1,140.00 $ 1,540.00 $ 1,960.00 $ 4,120.00 $ 500.00 $12,580.00 We propose to provide the services detailed above on an hourly basis. The total cost for our services would depend upon the level of effort requested by City staff. Assuming that we would provide all of the services detailed above, the total estimated not-to-exceed amount for our services and expenses would be $ 12,580.00. We would propose that any additional services requested by City staff also be performed on an hourly basis. We would be happy to provide City staff with a not-to-exceed amount for any additional services as they are requested. PROJECT SCHEDULE We anticipate that all services identified in the Scope of Work can be completed within a period of 60 days from the time that we are notified to proceed. We understand that the study is to be completed in the winter\spring of 1998. We would be happy to further discuss schedule requirements with City staff to meet your needs. Thank you for the opportunity to submit this proposal. Please let me know if you have any questions or we can provide any additional information. Sincerely, BRW, INC. Howard R. Green Company CONSULTING ENGINEERS r~ rO.\SILTI.\G E.\GI.\EOO Formerly MSA Consulting Engineers January 5, 1998 File: 802790P Mr. Todd Hoffman Park and Recreation Director City of Chanhassen 590 Coulter Drive P.O. Box 147 Chanhassen, :MN 55317 RE: PROPOSAL FOR ENGINEERING SERVICES HIGHWAY 101 TRAIL Dear Mr. Hoffman: We are pleased to present our proposal for completing design and construction services for a proposed trail along Highway 101 in Chanhassen. We have enjoyed our experience working with you on the trail projects currently underway, and are very interested in continuing our working relationship with the Park and Recreation Department by completing this project. We have reviewed the information provided to us on the proposed trail segment. We understand that the trail wilJ be constructed completely on the west side of Highway 101 within the City of Chanhassen. We propose to complete this project in a manner similar to the trail projects we are currently working on. The outline below provides a cost breakdown by task similar to the current projects. DESIGN SERVICES (PRE-LETTING) Plans and Specifications Public Involvement Design Services Subtotal $12,000 10.000 $22,000 CONSTRUCTION SERVICES Construction Administration Construction Staking Construction Inspection Construction Services Subtotal 5,000 12,500 15.000 $32,500 TOTAL $54,500 I, \ i 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 Mr. Todd Hoffman January 5, 1998 Page Two Based on the information provided to us for review, it appears a significant work effort has already been completed on the proposed trail project. The above cost estimate for design and construction services assumes that we can utilize the existing topographic survey and all the wetland delineations that have been completed. If for whatever reason this is not possible, our estimate to complete these tasks is $5,500 for the topographical survey and $3,500 for the wetland delineations and permits. The feasibility report prepared in 1993 indicates that the' trail was proposed to be constructed entirely within MnDOT right-of-way, as close as five feet off the bituminous roadway surface. Only temporary easements would be required to construct the trail under this option. In our discussion with MnDOT for the current projects, they have indicated that a trail separation of 10 feet off the bituminous road may be a minimum separation allowable. Ifthis is true, the proposed trail alignment along Highway 101 shown in the 1993 report would need to be modified and thus would require more easements to construct. Based on this information, we estimate preparing approximately 30 easements for this project at an estimated cost of $19,000. As with the current trail projects, we propose to complete the topographical survey (if needed), plans and specifications, and wetland permitting tasks (if needed) on an hourly not-to-exceed basis. Public involvement, easements, and construction services will be completed on an hourly basis, with the above numbers as our estimate. Please let us know if you have any questions about the above estimate for engineering services. We are confident that we can provide you the best service possible on this project, given our involvement in your current trail projects. Thank you for the opportunity to provide our scope of services on this project. We look forward to continuing working with you on your future trail projects. Sincerely, Howard R. Green Company j)(!ML ~ David E. Nyberg, P.E. Project Manager DEN:tw 0:\proj\802790p\ 790-050 Ijan Howard R. Green Company CONSULTING ENGINEERS