Loading...
1f1 Chanhassen East Business Center, Phase III, Final Plat Approval - "? - t ) - J L.. L- 2: ( - ~ J - - ) P.c DATE: li-1 '- CITY 0 F CHANHASSEN CC. DATE: 6-8-98 CASE: 95-18 SUB, 95-4 VAC BY: Al-Jaff:v STAFF REPORT PROPOSAL: Final Plat to Subdivide 3.46 acres into 2 Lots, Chanhassen East Business Center Third Addition LOCATION: South of Highway 5, West of Dell Road, and North of Lake Drive East APPLICANT: CSM Investors, Inc. 2575 University Ave. W, Suite 150 Sc Paul, MN 55114-1024 646-1 71 7 PRESENT ZONING: lOP, Industrial Office Park ACREAGE: 3.46 acres ADJACENT ZONING AND LAND USE: N - Highway 5 S - Lake Drive East and DataServ E - CSM Phase II W - AbralHighway Business SEWER AND WATER: Services are available to the site. SITE CHARACTERISTICS: The site is an old farmstead. The majority of the site has been disturbed by grading activities relating to CSM Phase I andll. 2000 LAND USE: Offi celIndustrial Chanhassen East Business Center Third Addition May 26, 1998 Page 2 PROPOSAL/SUMMARY On May 26, 1998, the City Council approved the preliminary plat for Subdivision #95-18 for Chanhassen East Business Center Third Addition as shown on the plat received April 20, 1998, with the following conditions: I. Park and trail dedication fees to be collected per city ordinance. This condition still applies. 2. The name of the subdivision shall be changed to Chanhassen East Business Center Third Addition, and the lots shall be described as Lots I and 2, Block I. This condition has been met. 3. The applicant shall dedicate a cross-access/parking easements over the two lots. The applicant shall enter into a site plan agreement with the City and provide the necessary financial security to guarantee compliance with the permit. This condition still applies. 4. The installation of traffic signals at the intersection of Lake Drive East and Dell Road is expected in the future. The developer shall be responsible for a share of the local cost participation of this signal on a percentage basis based upon traffic generation from full development of this site in relation to the total traffic volume on Dell Road. The developer and/or property owner shall waive any and all procedural and substantive objections to the special assessment, including, but not limited to, hearing requirements or any claim that the assessment exceeds the benefit to the property. This condition still applies. 5. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood- fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. All catch basins shall be protected with silt fence or hay bales until the parking lot is paved. This condition still applies. 6. The appropriate front, rear and side yard drainage and utility easements shall be dedicated on the final plat. Chanhassen East Business Center Third Addition May 26, 1998 Page 3 This condition has been met. 7. The applicant shall escrow with the city $4,000.00 to guarantee boulevard restoration and/or repairs to existing City utilities or street improvements damaged as a result of construction. This condition still applies. 8. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Watershed District, Metropolitan Council Waste Water Services, Minnesota Health Department, Minnesota Pollution Control Agency and Minnesota Department of Transportation and comply with their conditions of approval. This condition still applies. 9. No berming or landscaping will be allowed within street right-of-way. This condition still applies. 10. The final construction plans and specifications for the site utility improvements shall be designed and constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates and/or state plumbing codes. This condition still applies. 11. A cross access and maintenance agreement shall be executed over the easterly lot to permit utility extension and street access to the westerly lot. This condition still applies. 12. All driveway access points along Lake Drive East shall be constructed in accordance with the City's Industrial Driveway Detail Plate No. 5207. This condition still applies. 13. The applicant shall enter into an addendum to the development contract with the city and provide financial security in the form of a letter of credit to guarantee site improvements and pay administration fees for review and recording the final plat. Chanhassen East Business Center Third Addition May 26, 1998 Page 4 This condition has been deleted. Since no public improvements are being installed, it is not necessary to amend the Development Contract. Individual Site Plan Agreements will be prepared for each lot. The applicant is requesting final plat approval to subdivide 3.46 acres into 2 lots. This subdivision is consistent with the preliminary plat and staff is recommending approval. SUBDIVISION The final plat proposes replatting 3.46 acres (Lot 2, Block 1, Chanhassen East Business Center Second Addition) into two lots referred to as Lots 1 and 2, Block 1, Chanhassen East Business Center Third Addition. The ordinance requires a minimum area of 1 acre for industrial lots. These lots will have areas of 1.82 acres and 1.64 acres, which exceeds ordinance requirements. The subdivision request is a relatively straightforward action. Standard drainage and utility easements around the perimeter of all lots are illustrated on the plat. WETLANDS A wetland delineation report was prepared by John Anderson with wetlands data as part of the first phase of this project. The applicant has indicated on the plan sheet that no wetlands exist on this site. These findings have been reviewed and confirmed by both city staff and a Technical Evaluation Panel. GRADING AND DRAINAGE Overall, the site has been rough graded. The city approved a grading permit last year. The grading plan proposes minimal grading in order to prepare the site for the building and parking lot facilities. Landscaped berms are proposed along Trunk Highway 5 and Lake Drive East. The site is designed to drain via storm sewer to the southeast where the storm water will discharge into the existing storm drainage system in Lake Drive East. As a part of Phase I, the applicant constructed a regional storm water pond on the southwest comer of Lake Drive East and Dell Road. The storm water from this development will be conveyed via storm water pipes in Lake Drive East to the regional pond for pretreatment prior to discharging into Eden Prairie. Storm drainage calculations for the storm sewer have already been submitted to the city with the previous plat. Chanhassen East Business Center Third Addition May 26, 1998 Page 5 EROSION CONTROL Erosion control measures and site restoration are proposed in accordance with the City's Best Management Practice Handbook (BMPH). The grading plan incorporates erosion control fence (Type I) around the perimeter of the grading limits. Most of the erosion control fence has already been installed. Rock construction entrances are proposed at the access points. Erosion control measures shall be maintained until the parking lot areas have been paved with a bituminous surface and the site restored with sod, seed and landscaping. Hay bales and/or rock dikes are proposed to be installed around all catch basins and shall be maintained until the parking lots have been paved. UTILITIES Individual sewer and water services will be extended through the lots from Lake Drive East. A cross access agreement will need to be prepared to extend utility service to the west lot from the east lot. All utilities installed outside the city's drainage and utility easements or right-of-way shall be considered private and not maintained by the city. These utilities will be inspected by the City's Building Department. The applicant and/or contractor shall be responsible for obtaining the appropriate permits from the City's Building Department. The final construction plans shall be prepared in accordance with the City of Chanhassen' s latest edition of Standard Specifications and Detail Plates and/or state plumbing codes. In conjunction with Phase I, a development contract was prepared and recorded against this parcel. Since this development is not installing any public improvements it is not necessary for the applicant to enter into a new development contract with the city; however, staff does recommend the applicant enter into individual site plan agreements. STREETS/P ARKING/INTERIOR CIRCULATION The site is proposed to be accessed from two driveway access points off Lake Drive East. The easterly access drive is proposed to be shared with the site to the east (Phase I). A cross-access and maintenance agreement will need to be recorded against the parcel. In conjunction with Phase I of this development, a traffic study was prepared for the intersection of Lake Drive East and Dell Road. The traffic study revealed acceptable levels of service through Phase I of the development and eventually a level of service "B" for the forecast year 2005, assuming a signalized intersection. Based on the traffic study, it appears a traffic signal may be required in the future at Lake Drive East and Dell Road. The developer shall be responsible for a share of the local cost participation of this traffic signal on a percentage basis based upon traffic generation from full development of this site in relation to the total traffic volume of Dell Road. A condition will be placed in the site plan permit accordingly. Chanhassen East Business Center Third Addition May 26, 1998 Page 6 A 6-foot wide concrete sidewalk exists along the north side of Lake Drive East. In conjunction with the proposed driveway curb cuts, pedestrian ramps will need to be constructed at all access points. The driveway access points along Lake Drive East shall be constructed in accordance with the City's Industrial Driveway Detail Plate No. 5207. MISCELLANEOUS There is an existing site plan agreement that needs to be amended to relate to this proposal. COMPLIANCE TABLE - lOP DISTRICT Ordinance Lot 1 Lot 2 Lot Area 1 acre 1.82 acres 1.64 acres PARK AND TRAIL DEDICATION FEES The city is requiring that park and trails fees be submitted in lieu of park land. Fees are to be paid in accordance to city ordinance. One-third of the fees will be required at the time of final plat recording. RECOMMENDATION SUBDIVISION "The City Council approves the final plat for Subdivision #95-18 for Chanhassen East Business Center Third Addition as shown on the plat received June 1, 1998, with the following conditions: 1. Park and trail dedication fees to be collected per city ordinance. 2. The applicant shall dedicate a cross-access/parking easements over the two lots. The applicant shall enter into a site plan agreement with the City and provide the necessary financial security to guarantee compliance with the permit. 3. The installation of traffic signals at the intersection of Lake Drive East and Dell Road is expected in the future. The developer shall be responsible for a share of the local cost participation of this signal on a percentage basis based upon traffic generation from full development of this site in relation to the total traffic volume on Dell Road. The developer and/or property owner shall waive any and all procedural and substantive Chanhassen East Business Center Third Addition May 26, 1998 Page 7 objections to the special assessment, including, but not limited to, hearing requirements or any claim that the assessment exceeds the benefit to the property. 4. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood-fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. All catch basins shall be protected with silt fence or hay bales until the parking lot is paved. 5. The applicant shall escrow with the city $4,000.00 to guarantee boulevard restoration and/or repairs to existing city utilities or street improvements damaged as a result of construction. 6. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Watershed District, Metropolitan Council Waste Water Services, Minnesota Health Department, Minnesota Pollution Control Agency and Minnesota Department of Transportation and comply with their conditions of approval. 7. No berming or landscaping will be allowed within street right-of-way. 8. The final construction plans and specifications for the site utility improvements shall be designed and constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates and/or state plumbing codes. 9. A cross access and maintenance agreement shall be executed over the easterly lot to permit utility extension and street access to the westerly lot. 10. All driveway access points along Lake Drive East shall be constructed in accordance with the City's Industrial Driveway Detail Plate No. 5207. 11. The applicant shall enter into a Site Plan Agreement and post financial guarantees to guarantee all site improvements (attorney fees for review and recording, plat filing, cross access easement, GIS fees, landscaping, etc.)." ATTACHMENTS 1. Final Plat received June 1, 1998. g: \p Ian \sa \csmfp. i i i .doc