Loading...
1c Authorize Preparation of Plans and specs/Coulter Blvd Rd, #97-1-4 CITY OF CHANHASSEN 90 City Center Drive, PO Box 147 Chanhassen, Minnesota 55317 Phone 612.937.1900 General Fax 612.937.5739 Engineering Fax 612.937.9152 ?ublic Safety Fax 612.934.2524 U:tb www.ci.chanhassen.mn.us 1~ MEMORANDUM TO: Don Ashworth, City Manager ~ FROM: Anita L. Benson, City Engineer DATE: April 20, 1998 SUBJ: Authorize Preparation of Plans and Specifications for Coulter Boulevard Street and Utility Improvements West of Century Boulevard Project No. 97-1-4 The City Council approved the feasibility study for the Arboretum Business Park public improvements on June 23, 1997. The feasibility study outlined five potential phases for the proposed public improvements to be constructed over four to five years depending on development demand on the property. The Phase I portion of the work consisted of the extension of trunk sanitary sewer and watermain west from the Autumn Ridge development to future Century Boulevard and then south to 820d Street. These trunk utility improvements were constructed in the fall of 1997. Also included in the Phase I work is the construction of Century Boulevard from 82nd Street to Coulter Boulevard which is scheduled to be completed by mid-summer, 1998. Phase II of the public improvements was predicted in the feasibility study to be constructed in 1998 and consist of the construction of Coulter Boulevard from its current terminus at the west end of the Autumn Ridge development west to the intersection with future Century Boulevard, a water storage tower, and the installation of a Traffic Signal System at 820d Street and Trunk Highway 41. The Phase II work planned for construction during the summer of 1998 includes the street construction of Coulter Boulevard from the Autumn Ridge development to Century Boulevard, and construction of a 1.5 MG water tower. The traffic signal at 820d Street and Trunk Highway 41 will not be completed in 1998 as identified in the feasibility study due to a change in phasing of the development. The Arboretum Business Park developer has submitted a letter requesting that the work identified in Phase IV of the feasibility study be constructed in the summer of 1998. These improvements are being requested to support the anticipated building construction on Lot 1, Block 2 and Lots 1 and 3, Block 1 and the water tower on Outlot A. Although the Phase IV improvements were originally identified in the feasibility report to be constructed after 1999, it is recommended that these improvements be constructed in 1998 to accommodate the revised development schedule. These improvements will consist of the extension of Coulter Boulevard west of Century Boulevard which will end in a temporary cul-de-sac until Trunk Highway 41 is reconstructed. The watermain will also be constructed in conjunction ';ity of Chanhassen. A Yfowiny, community with clean lakes, quality schools, a charminJ!. downtown, thrivin'l businesses. and beautiful harP, A rTrP/lt ''//IN tn I;,," wn.h n~ A A' n.. Don Ashworth April 20, 1998 Page 2 with this phase connecting to the new water tower. These improvements were identified in the feasibility report to cost approximately $423,000. The capacity of the water tower has been reduced from 2.0 MG to 1.5 MG since the feasibility study. The anticipated cost savings due to the reduced tower capacity and the schedule change of the traffic signal at 82nd Street and Trunk Highway 41 will create a capital cost funding balance for 1998. The anticipated public improvement investment for 1998 will be $3.3 Million. It is therefore recommended that the City Council authorize preparation of plans and specifications for Coulter Boulevard Road and Utility Improvement Project No. 97-1-4. ktm Attachments: 1. 2. Letter from Steiner Development, Inc. dated April 13, 1998. Feasibility Report excerpt (pages 5 and 11). c: . Charles Fo1ch, Director of Public Works Operations Dave Hempel, Assistant City Engineer Fred Richter, Steiner Development, Inc. Phil Gravel, Bonestroo g:\eng'public\97-1-4\auth p&s.doc S . ~l telner - ~ Development, Inc. 3610 County Road 101 Wayzata, MN 55391 (612) 473-5650 Fax 473-7058 April 13, 1998 Charles Folch Director of Public Works City of Chanhassen 690 Coulter Drive P.O. Box 147 Chanhassen, Minnesota 55317 RE: Arboretum Business Park Road Construction Dear Charles: In conjunction with the final plat application for Lots 1,2, 3 - Block 2, Outlots A and B - Block 2, and Lots 1,2,3,4 - Block 1 Arboretum Business Park 2nd Addition Steiner Development is requesting the City of Chanhassen build a portion of Coulter Boulevard west of Century Boulevard. Coulter would not connect to Highway 41 at this time, ending in a temporary cul-de-sac as indicated on the grading plan. These improvements are requested to support anticipated building construction on Lot 1, Block 2; Lot 1 and Lot 3, Block 1; and the water tower on Outlot A, Block 2. The improvements are identified in the Report for City Project No. 97 - 1. Our proposed schedule anticipates having the rough grading completed from May 15 through July 15. The construction of Coulter could follow and be completed with a first lift of black top by October 15, 1998. We look forward to discussing the details of this request with the City. Sincerely, GATEWAY PARTNERS CITY OF CHANHASSEN rnrn@~flWrn[ID APR 15 1998 ENGINEERINC DEPT. p:\sdi\projects\chan5&41 \misc\folch3.doc I I I I I I I I I [ This report examines the feasibility of completing street and utility improvements in the project area. Sewer and water service will be provided by extending utilities installed under previous projects. A summary of the proposed improvements with this project includes: 1. Extension of trunk sanitary sewer from the Autumn Ridge Development westward within the Coulter Boulevard right-of-way. 2. Installation of major trunk water mains and an elevated water storage facility. 3. The construction of Coulter Boulevard between the existing west termini of the road at. the Autumn Ridge development to the proposed north-south collector road. 4. The construction of the proposed north-south collector road from 82nd Street to Highway 5. 5. The eventual completion of intersection improvements on Highway 5 at the intersection with the new north-south street and on Highway 41 at the intersection with 82nd Street. The project will be completed in several phases. The phases are dictated by timing constraints related to the development and the improvements on Highway 5 and Highway 41. The proposed phasing is as described below: II Phase I: The Phase I work consists of the work necessary to allow for development in the southwest corner of the site. This work consists of the following elements: - Trunk Sanitary Sewer in Coulter Boulevard -- Trunk Water Main in Coulter Boulevard -- North-South Street and utilities between Coulter Blvd. and 82nd St. Phase II: The Phase II work will be completed in 1998 and consist of the following: -- Street construction on Coulter Boulevard -- Water tower construction -- Traffic signal @ 82nd Street and Highway 41 Phase ill: The timing of the Phase ill work depends on the improvement of Highway 5 and the needs of the development. The Phase ill work will likely be compl~ted in 1999 and will consist of the following: - Sanitary sewer and water main in North-South Street between Coulter Blvd. and Highway 5 - Street construction of North-South St. between Coulter Blvd. and Hwy 5 -- Turn lane improvements and traffic signal on Highway 5 Phase IV: The timing of the Phase IV work depends on the improvement of Highway 41. This work could be done privately or under public contract (to be determined by the City at a later date). This work will likely be done after 1999 and will consist of the following: - Sewer and water in East-West Road. ~ Street construction of East-West Road between North-South Road and Highway 41 - Turn lane improvements on Highway 41 i:\393\39J52\report Page 5 Table 4A Project 97-1 Revenue Summary (with Coulter Blvd.) Item Estimated Cost Assessments 1. Phase I . Sanitary Sewer - Trunk Sanitary Sewer - Lateral Water Main - Trunk Water Main-Lateral Ben. from Trunk Water Main - Lateral Street - N-S South End Subtotal Phase I IT. Phase IT Water Main & Tower-Trunk Water Main-Lateral Ben. from Trunk Street- Coulter Boulevard Street - Traffic Signal @ 82nd St Subtotal Phase IT ill. Phase ill Sanitary Sewer - Lateral Water Main - Trunk Water Main-Lateral Ben. from Trunk Street - N-S North End Street - Traffic Signal on Hwy 5 Subtotal Phase ill IV. Phase IV Sanitary Sewer - Lateral Water Main - Lateral Street - E- W Street Subtotal Phase IV V. Total All Phases i:\393\3935Z\report $104,000.00 61,000.00 245,000.00 0.00 74,000.00 509.000.00 $ 993,000.00 $2,480,000.00 0.00 791,000.00 50.000.00 $3,321,000.00 $69,000.00 112,000.00 0.00 336,000.00 170.000.00 $687,000.00 $38,000.00 37,000.00 386.000.00 $461.000.00 $5,462,000.00 $287,980.00. 61,000.00 375,100.00 6,000.00 74,000.00 509.000.00 $ 1,313,080.00 ~ Net Revenue $183,980.00 0.00 130,100.00 6,000.00 0.00 0.00 $ 320,080.00 (I ~l "' il ;1 t. 0.00 ($2,480,000.00) $12,000.00 12,000.00 , 0.00 (791,000.00) 50.000.00 0.00 $ 62,{)()().00 ($3,259,000.00) $69,000.00 0.00 23,000.00 336,000.00 170.000.00 $ 598,000.00 $38,000.00 37,000.00 386.000.00 . $461.000.00 $2,434,000.000 0.00 ($112,000.00) 23,000.00 0.00 0.00) ($89,000.00) 0.00 0.00 0.00 0.00 ($3,027,920.00) Page 11