Loading...
1b Approval Plans and Specs for Well #8, #97-4 CITY OF CHANHASSEN ,90 City Center Drive, PO Box 147 Chal/hassen, Minnesota 55317 Phone 612.937.1900 General Fax 612.937.5739 Engineering Fax 612.937.9152 Public Saftty Fax 612.934.2524 \Veb /IllUllI.ci.chanhassen.mn./Is 1b - MEMORANDUM TO: Don Ashworth, City Manager Charles Folch, Director of Public Works Operations Qk Anita L. Benson, City Engineer WJ March 12, 1998 FROM: DATE: SUBJ: Approve Plans and Specifications for Well No.8 Drilling Contract and Authorize Advertising for Bids - Project No. 97-4 Attached are the specifications for the installation of Well No.8. This improvement was identified in the approved comprehensive water policy plan and is imperative to meet the service demands and fire protection requirements associated with the City's rapid growth in population and industry. These specifications specifically relate to the drilling and casing of the new well into the Jordan aquifer at an estimated depth of 500 feet. The location for this new well has been established within the Highover subdivision and is in the high pressure zone region. At the January 26, 1998 City Council meeting acquisition of the land for Water Supply Well No.8 was approved. Well No.8 is the second of two wells ultimately needed to meet the future supply demands in the high-pressure zone; the other well being Well No.7 which was constructed in 1996. The costs for the drilling and casing of the well is estimated to be $220,000 and was included in the approved 1998 budget. This project was also included in the approved Comprehensive Water Policy Plan (February, 1993) which derived unit trunk utility assessment charges for predicting overall system revenues in comparison to the overall ultimate infrastructure costs. Plans for the well house facility will be prepared for City Council approval in the late summer. It is therefore recommended that the City Council approve the specifications for the Well No.8 drilling contract and authorize advertising for bids, Project No. 97- 4. A copy of the specifications is available in the Engineering Department for review. ktm Attachment: 1. Letter dated March 16, 1998 from Bonestroo & Associates c: Dave Hempel, Assistant City Engineer Jerry Boucher, Utility Superintendent Phil Gravel, Bonestroo Dick Foster, Bonestroo \'dsl\voI2'englpublic\97-4'plans & specs.doc T!Je City of ClJallhassen. A growing community with cleall lakes, quality schools, a charming downtowll, thriving businesses, and bealltifit! parks. A great place to live, work, find play. ~ fI ~ Bonestroo ~ Rosene -- ~ Anderlil< & 1 \J 1 Associates Engineers & Architects March 16, 1998 Bonestroo. Rosene,/lnderlik and /lssociates. Inc. is an /lffirmative /lceion/Equal Opportunity Emplo'ler Principals: Otto G. Bonestroo. PE. . Joseph C. Anderlik. PE. . Marvin L Sorvala, PE. . Richard E. Turner. P:;. . Glenn R. Cook. PE. . Robert G. Schunicht, P.E. . Jerry A. Bourdon, P.E. . Robert W. Rosene. PE. and Susan M. Eberlin. C.PA.. Senior Consultants /lssociate Principals: Howard A. SanFord. PE. . Keith A. Gordon. PE. . Robert R. Pfefferle, PE. . Richard W. Foster. PE. . David O. Loskota. PE. . Robert C. Russel', A.I.A. . Mark A. Hanson, PE. . Michael T. Rautmann, PE. . Ted K.Fieid. PE. . Kenneth P Anderson. PE. . Mark R. Rolls. PE. . Sidney P Williamson. PE.. L.S. . Robert F. Kotsmith Offices: St. Daul. Rochester, Willmar and St. Cloud. MN . Milwaukee. WI Ms. Anita Benson, P.E. City of Chanhassen 690 City Center Drive, PO Box 147 Chanhassen, MN 55317 Re: Municipal Well #8 City Project 97-4 Our File 39348 Dear Anita: Attached for your approval are plans and specifications for the well construction portion of Well #8. A separate contract for the pumphouse construction will be prepared and bid this summer. This contract includes drilling, developing, and testing the well. Also included is much of the site work including relocating the existing driveway entrance to the south. Landscaping is not included in this contract. The anticipated capacity for this well is between 1,000 and 1,600 gpm. The Engineer's Estimate for this contract is $217,410.00. This is in line with our previous estimates. The current project schedule is as follows: Council Approve Plans and Specifications Receive Bids Council A ward Bids Begin Construction Complete Construction March 23, 1998 April 21, 1998 (11 :00 AM) April 27, 1998 May 6, 1998 October 23, 1998 Permits from the Minnesota Department of Health and the Minnesota Department of Transportation have been applied for. The site acquisition process is nearly complete. We recommend that you approve the plans and specifications and authorize advertisement for bids. Feel free to contact Dick Foster, Mark Rolfs, or me if you have any questions or require any further assistance. Sincerely, BONESTROO ROSENE ANDERLIK AND ASSOCIATES D"A ~~o-".C\ ~~l Gravel, P.E. PG:cmi 2335 West Highway 36 · St. Paul, MN 55113 · 612-636-4600 · Fax: 612-636-1311