Loading...
3c 2005 MUSA Improvement, Phase I, Project 04-05, Approve Const. Insp. Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax 952.227.1110 Building Inspections Phone 952.227.1180 Fax 952.227.1190 Engineering Phone 952.227.1160 Fax 952.227.1170 Finance Phone: 952.227.1140 Fax 952.227.1110 Park & Recreation Phone 952.227.1120 Fax 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone 952.227.1400 Fax 952.227.1404 Planning & Natural Resources Phone 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.ci.chanhassen.mn.us "..~...~ ~.." ...JC- ~. MEMORANDUM TO: Todd Gerhardt, City Manager 0- Paul Oehme, Dir. of Public Works/City Engineer~" ~. FROM: DATE: November 14,2005 SUBJ: Approve Construction Inspection Contract 2005 MUSA Improvements, Phase 1 Project No. 04-05 REQUESTED ACTION The City Council is requested to approve a Consultant Work Order with Kimley- Horn and Associates in the amount of $187,000 for construction phase services for Phase 1 of the 2005 MUSA Improvements. BACKGROUND On February 28, 2005, the City Council ordered the portion of the 2005 MUSA Improvements that will not be constructed as a part of the TH 212 project. These improvements include various street and utility improvements within the 2005 MUSA as detailed in the August, 2004 Feasibility Report prepared by Kimley- Horn and Associates. On March 28, 2005, the City Council approved a Consultant Work Order with Kimley-Horn and Associates for preliminary design services for the 2005 MUSA Improvements. This included efforts to further develop plans for the infrastructure required to support development in the 2005 MUSA. These improvements include various roadway, watermain, sanitary sewer, and storm sewer improvements as described below. 1. Roadway Improvements · East-West Collector Roadway between Audubon Road and Powers Boulevard. · East-West Collector Roadway/Audubon Road Turn Lanes and Traffic Signal. 2. Watermain Improvements · Extension of existing trunk watermain in Lyman Boulevard to the proposed location of the East-West Collector Roadway. · Trunk watermain along the East-West Collector Roadway between Audubon Road and Powers Boulevard. The City 01 Chanhassen · A growing &1nM~AftYWrlfrB~a'lT ~~~,~HarttV sc~~\or~,g~ cR\lrn11n~S&oWn1I\Wnt,i1H(WiHg'iJuJslnesses, winding trails, and beautiful parks A great place to live, work, and play. Todd Gerhardt November 14, 2005 Page 2 3. Sanitary Sewer Improvements . Extension of trunk sanitary sewer from an existing lift station along the south side of Lyman Boulevard east of Audubon Boulevard. . Trunk Sanitary Sewer along the East-West Collector Roadway between Audubon Road and Powers Boulevard. 4. Storm Drainage Improvements . Storm sewer and ponding improvements along the East - West Collector Roadway between Audubon Road and Powers Boulevard. On August 22,2005, the City Council approved a Consultant Work Order with Kimley-Horn and Associates for final design services for the 2005 MUSA Improvements. This included the design of two separate phases of the project, with the understanding that some of the project construction could occur in 2005. The following is a description of the improvements included as a part of the first phase of the project: Bid Package #1 - Bluff Creek Bridge and Trunk Watermain and Sanitary Sewer Improvements . Installation of trunk watermain along the east side of Bluff Creek between Lyman Boulevard and the East-West Collector Roadway. . Installation of trunk sanitary sewer along the east side of Bluff Creek between Lyman Boulevard and the East-West Collector Roadway. . Construction of a Bebo bridge across Bluff Creek including the realignment of a portion of the creek channel. These improvements are proposed to be constructed during the late fall/early winter months of 2005 to take advantage of frozen ground conditions and low flows in Bluff Creek. A preliminary schedule for the Bid Package #1 improvements is provided below: Approve Plans & Specs and Authorize Ad for Bids Accept Prelim. Assessment Role & Call Assessment Hearing Bid Opening Assessment Hearing Award Contract Start Construction Construction Complete Sept. 12,2005 Sept. 26, 2005 Oct. 14,2005 Oct. 24, 2005 Nov. 14,2005 Nov. 21,2005 June 3, 2006 G:\ENGIPUBLICI04-05 2005 MUSAIl 1 1405 bkgd 2005 MUSA construction services.doc Todd Gerhardt November 14, 2005 Page 3 Staff has solicited a proposal from Kimley-Hom and Associates for construction phase services for the Bid Package #1 improvements. These services include construction administration, inspection, staking, and quality control testing. It is staff's opinion that the construction phase services should be performed by Kimley-Hom and Associates due to the following: . The quality of their previous services for the 2005 MUSA. . Their knowledge and background of the project area. . Their knowledge of the property owners in the project area. . The tight schedule required to allow these improvements to proceed to meet the needs of the area property owners. . They are already working in the project area providing construction phase services for the TH 212 project. Kimley-Hom's estimated cost for the Bid Package #1 construction phase services is as follows: Work Task 1. Construction Administration and Inspection 2. Construction Staking 3. Quality Control Testing Subtotal Reimbursable Expenses Total Estimated Cost Estimated Fee $ 120,000 $ 40,000 $ 20,000 $ 180,000 $ 7,000 $ 187,000 These services will be performed on a time and materials basis not to exceed $187,000. The hourly rates Kimley-Hom and Associates are proposing are the same as for the previous preliminary and final design work tasks and are very competitive with other consulting firms. They will be required to submit time sheets verifying the hours worked on the project. Staff will review these time sheets for accuracy. Funding for these construction phase services will be provided primarily by assessments to the benefiting property owners as identified in the 2005 MUSA Feasibility Study. c: Jon Horn, Kimley-Hom & Associates Kate Aanenson, Community Development Director G:\ENG\PUBLlC\04.05 2005 MUSA\111405 bkgd 2005 MUSA (;ollstructioll services.uor.: