Loading...
1d East Water Treatment Plant Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us LJ- MEMORANDUM TO: Todd Gerhardt, City Manager FROM: \/,0 Paul Oehme, Dir. of Public Works/City Engineer \ o~. December 12, 2005 DATE: SUBJ: East Water Treatment Plant: Approve Change Order No.1 Project No. 04-08 REQUESTED ACTION Approve Change Order #1. BACKGROUND Staff has been working on cost-saving items for the East Water Treatment Plant project. Below are the items that staff has identified as cost savings items: 1. Delete aluminum tube framing over Kallwall panels: -$18,596.00 This item was an architectural feature that went over the windows in the pump room and the filter room. 2. Use aluminum picket style railing vs. specialized galvanized railing: -$24,870.00 These are the railings that go in front of the treatment plant and on top of the retaining wall by the backwash tank 3. Use regular masonry blocks with sand vs. sound blocks with sand: -$10,090.00 This was a noise attenuation improvement to mitigate the sound in the control room and the meeting room. 4. Use less expensive Standard R value Kallwall panels vs. High R value Kallwall panels: $25,511.00. The Kallwall panels will be installed in the pump room and the filter room. 5. Use standard Kallwall face sheet vs. high impact face sheet: -$4,249.00 The standard Kallwall face sheet has been used on other water treatment plants successfully. 6. Delete 4" CMU's and provide 7" masonry anchors on upper walls as applicable: -$1,850.00. Design change filler brick deleted. The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding traits, and beautiful parks. A great place to live, work, and play. Todd Gerhardt December 12, 2005 Page 2 7. Delete Lintels L2 and L13: -$850.00. Lintels for generator room not needed. Total Deduct: $86,016.00 Adds to the Contract: The soils correction has been completed. Poor soils were removed from the site where 79th Street is going to be extended and where the raw watermain from the wells will be installed. The removal of poor material and backfilling took approximately three days to complete. Approximately 340 cubic yards of contaminated soils with diesel fuel were also removed and properly landfilled. Also, two concrete truck drums were removed from the site. One was filled with tar material which was removed from the drum and properly disposed of. The drums were then cut up for scrap metal. Total Adds: $22,624.75 Total Change Order - Net Deduct: ($63,391.25) Staff and the consultant engineer have reviewed the costs and find them acceptable. c: Jay Whitaker - S.E.H. G;\ENGIPUBLICI04-08 WTPlbkgd 121205 CO #l.doc