6. Jacob's Tavern
CITY OF
CHANHASSEN
7700 Markel Boulevard
PO Box 147
Chanhassen, MN55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
RecrealionCenler
2310 Couller Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
WebSile
www.ci.chanhassen.mn.us
h
MEMORANDUM
TO:
Todd Gerhardt, City Manager
FROM:
Bob Generous, Senior Planner dt:
January 23, 2006 ~
DATE:
SUBJ:
Jacob's Tavern - Planning Case 05-40
EXECUTIVE SUMMARY
The applicant is proposing a 6,808 square-foot restaurant.
ACTION REQUIRED
City Council approval requires a majority of City Council present.
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on January 3,2006, to review the
proposed development. The Planning Commission voted 6 to 0 to approve the
proposed project. The Planning Commission deleted condition 4 recommending a
change in the roof structure. The staff report has been amended (struck-through) to
show this change. Planning Commission minutes for January 3, 2006 are item la of
the January 23, 2006 City Council agenda.
As part of presentation to the Planning Commission, the applicant stated that the silo
roof was proposed with canvas. However, staff was concerned about the durability
and quality of the material in this use. After discussion with staff, the applicant has
agreed to use standing seam metal roofing as the silo and cupolas roofing material.
RECOMMENDATION
Staff recommends adoption of the motion as specified on pages 9 through 12 in
the staffreport dated January 3, 2006.
ATTACHMENT
Planning Commission Staff Report dated January 3, 2006.
g:\plan\2005 planning cases\0540 jacob's tavem\executive summary.doc
The Cily 01 Chanhassen . A growing communily wilh clean lakes, qualily schools, a charming downlown, Ihrivlng businesses, winding lrails, and beaulilul parks. A 9"al place 10 live, work, and play.
E-l
Z
-<
U
l-I
~
~
~
-<
-<
E-l
-<
~
~
E-l
l-I
rJ),
PC DATE: January 3, 2005
[I]
CC DATE: January 23,2005
CITY OF CHANHASSEN
REVIEW DEADLINE: January 31, 2005
CASE #: 05-40
BY: RG, AF, LH, ML, JS, ST
STAFF REPORT
PROPOSAL:
Request for site plan approval for a 6,808 square-foot restaurant building -
JACOB'S TAVERN.
LOCATION:
7845 Century Boulevard (southeast corner of Highway 5 and Century
Boulevard)
APPLICANT:
Truman Howell Architects
17815 Hutchins Drive
Minnetonka, MN 55345
(952) 401-7889
Food for the Journey
1385 Wildflower Lane
Chaska, MN 55318
PRESENT ZONING: Planned Unit Development (PUD) -light industriaIloffice park
2020 LAND USE PLAN: OfficelIndustrial
ACREAGE: 2.03 acres (88,513 sq. ft.)
DENSITY: FAR. 0.08
SUMMARY OF REQUEST: Request for site plan approval for a 6,808 restaurant.
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The City's discretion in approving or denying a site plan is limited to whether or not the
proposed project complies with Zoning Ordinance requirements. If it meets these standards, the
City must then approve the site plan. This is a quasi-judicial decision.
Location Map
Jacob's Tavern
Planning Case No. 05-40
7845 Century Boulevard
City of Chanhassen
W 78TH
State Hwy 5 Arboretum Boulevard
"0
>
co
~
:J
-
c::
Q)
()
Subject
Property
Coulter Boulevard
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 2
PROPOSAL/SUMMARY
The applicant is proposing a 6,808 square-foot restaurant next to the Holiday Inn Express in the
Arboretum Business Park development. The building architecture includes a rural vernacular
incorporating a steel girder, open silo and a steeply pitched (l7-feet vertical to l2-feet
horizontal), 29-foot high, asphalt shingled roof with three shed dormer-type windows projected
from the roof and wire cupolas on the top. Staff is reeommendinf; tHat tHe a]9]9lieant ineor]9orate
tHe l1se of gooled dormer strnetmes as ]9art of tHese ",tindo';/s to eontiooe tHe ]9iteHed roof
treatment estoolisHed tHrOl1gHom tHe rest of tHe strnetl1re. The height of the roof is 37 feet.
However, the building height is calculated as 29 feet since, by code, only half of the roof height
is included in the building height calculation. The silo and cupolas have blue metal roofs. The
roof over the veranda is red corrugated metal. The primary building material is board and batten
siding made of cement material. A field stone finish is proposed at the base on the west and
south sides of the building.
East of the site is Holiday Inn Express. To the south of the site is a wetland complex which is
part ofChanhassen Nature Preserve, an approximately 100-acre open space and trail system. To
the west of the site are Century Boulevard and u.s. Bank, KinderCare Learning Center and the
Helsene Building. North of the site is Highway 5 and Arboretum Shopping Center (Century
Plaza). Access to the site is via Century Boulevard. Water and sewer services have been
stubbed to the property as part of the Arboretum Business Park development. The site has been
previously rough graded to facilitate development. A berm is located to the north, within the
right-of-way of Highway 5.
The full access driveway onto Century Boulevard was allowed as part of the Arboretum Business
Park 4th and 6th Additions. However, such approval was conditional and should the driveway
cease to operate in a safe manner in the opinion of the abutting property owners or if it fails
specific capacity criteria, then the median opening may be closed or restricted.
The Lifetime Fitness building, located southwest of this site, is two stories with a height to the
top of the parapet of 3 8 feet 8 inches. This height does not include the glass pyramidal roof
structure which is considered an architectural tower. The two, three-story office buildings
proposed to the north of the Lifetime Fitness building are 40 feet in height. The Holiday Inn
Express building is three stories and 42 feet to the top of the roof. It was anticipated that
structures along Highway 5 would be larger buildings than within the interior of the project with
specifications that those at the corner of Highways 5 and 41 be multi-storied.
Staff is recommending approval of the site plan subj ect to the conditions of the staff report.
BACKGROUND
On October 13,2003, the Chanhassen City Council approved PUD #92-6 granting final plat
approval for Arboretum Business Park 6th Addition creating two lots.
On September 22,2003, the Chanhassen City Council approved the following:
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 3
. The preliminary plat for Arboretum Business Park 6th Addition.
. Site Plan #2003-8, with a 15 percent variance from the 50 percent fenestration
requirement to permit 35 percent fenestration on the northern building elevation on Lot 2,
Block 1, Arboretum Business Park 6th Addition, for Holiday Inn Express.
. A sign variance to permit signage on the western building elevation of the Holiday Inn
Express
On April 14, 2003, the Chanhassen City Council approved an ordinance amending the Planned
Unit Development for Arboretum Business Park adding Personal Services as a permitted
commercial use and as the Third Amendment to the Arboretum Business Park Development
Contract/PUD Agreement.
On December 10, 2001, the City approved an amendment to the Planned Unit Development
(PUD #92-6) Development Contract/PUD Agreement for Arboretum Business Park
incorporating printing as a light industrial use; permitting indoor recreation/health clubs and
recording studios in the existing office-industrial buildings in the project; and prohibiting
vocational schools, public buildings (except in Outlots A and B), screened outdoor storage, and
food processing.
On September 24,2001, the Chanhassen City Council approved Interim Use Permit (IUP)
#2001-1 to grade a portion of the Arboretum Business Park development and Conditional Use
Permit (CUP) #2001-8 to permit development within the Bluff Creek Overlay District. The IUP
and CUP included this property.
On July 28, 1997, the City Council approved the following: the ordinance for PUD #92-6
rezoning approximately 154 acres from Agricultural Estate, A2, to Planned Unit Development,
PUD, and the PUD #92-6 granting final plat approval for Arboretum Business Park.
On June 23, 1997, the City Council approved a Resolution that the AUAR be revised to
incorporate the summary of issues and mitigation plan contained in the staff report, that the
revisions to the Traffic Study prepared by SRF outlined in the staff report be incorporated into
the study, and that the revised AUAR be adopted by the City.
On May 27, 1997, the City Council approved the following:
. Approved the first reading for rezoning the property from Agricultural Estate, A2, to
Planned Unit Development, PUD.
. Approved the preliminary PUD #92-6 for an office/industrial business park and
preliminary plat approval for 12 lots, two outlots and associated right-of-way subject to
the plans dated April 4, 1997, revised May 23, 1997, with conditions.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 4
. The City Council approved a Wetland Alteration Permit for Gateway Business Park
subject to the conditions of preliminary PUD #92-6 approval.
. The City Council approved Interim Use Permit #97-1 for Gateway West Planned Unit
Development site subject to conditions.
APPLICABLE REGULATIONS
. Arboretum Business Park Development Standards
. Site Plan Review, Chapter 20, Article II, Division 6
. Design Standards for Commercial, Industrial and Office-Institutional Development,
Chapter 20, Article XXIII, Division 7
GENERAL SITE PLAN/ARCHITECTURE
ARCHITECTURAL COMPLIANCE
Size Portion Placement
The primary building entry faces Century Boulevard. The building entry is highly defined with a
gabled roof projected out from the veranda and a projected vestibule entered through multi-pane
windowed double doors. The veranda surrounding the western and southern faces of the
building provides a comfortable seating area and adds to the articulation of the building. The use
of columns and the wooden railings with the stone veneer behind add visual interest to the
building. In order to break up the roof expanse, the developer has incorporated wire cupolas at
the peak of the roof. In addition, a set of three windows are proposed to add light to the building.
Staff s only eomment regarding tHese T;,'indo',T/S is tHat tHe a]9]9lieant sHmdd ineor]9orate tHe l1se of
goole dormers in tHis area to maintain tHe goole ]9ro]9osed on tHe east and west ele','ations as TNell
as ]9ro','iding additional artiel1lation and symmetry to tHe roof.
Based on staff s concerns regarding the size of the roof, the applicant has prepared a massing
schematic to show how the building relates to the Holiday Inn building to the east. As can be
seen by the plans, the building's mass is complementary to the hotel.
An indoor/outdoor fireplace is proposed in the northwest corner of the building. In addition, an
outdoor fire pit and patio is provided in the northwest corner of the building.
Material and Detail
Building material consists of hardiplank cement board and batten siding with a concrete cap,
wood columns, stone veneer, metal roofing on the veranda, cupolas and silo and asphalt shingles
for the main roof.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 5
Color
The main building color is light yellow, with accents of light blue and red. The main roof is a
weathered wood blend (black with flecks of browns and grays). The veranda's metal roof is red.
A faux field stone of split face willow blend (brown) is proposed on the western elevation below
the windows.
Height and Roof Design
The building height is one story and 29 feet. Height is limited to 3 stories or 40 feet in the PUD
District.
Pitched roofs shall have a minimum roof pitch of 1 foot of rise to every 4 feet of run. The main
roofhas a pitch of 17 feet of rise to 12 feet of run. The building has multiple pitched roof
elements. Mechanical equipment must be screened. No wooded fences are permitted on the
roof. The applicant has shown a mechanical room within the roof structure to accommodate
screening of rooftop equipment.
Staff is reeommenaing tHat tHe a]9]9lieam: in','estigate tHe l1se of gaBlea, aormer ';{inao';{ strnetl1res
in tHe roof to re]geat tHe gooles on tHe east ana ';{est enas of tHe Bl1ilaing ana to mateH tHe ]geak of
tHe el1]9olas, ratHer tHan tHe roof strnetl1re emrem:ly ]9ro]9osea.
Facade Transparency
Due to the use of a wraparound veranda, almost 100 percent of the western building elevation
has visual transparency as viewed by the public. All other areas include landscaping material
and architectural detailing and articulation.
Site Furnishing
Staff assumes that the developer is proposing seating on the veranda of the building. Benches
are appropriate along the south side of the building to enjoy the views over the city park.
Additional benches or tables would be appropriate within the fire pit area at the northwest corner
of the building. The developer shall install site furnishing including benches, bicycle racks, and
tables.
Loading Areas, Refuse Area, etc.
Screening of service yards, refuse and waste removal, other unsightly areas and truck
parking/loading areas is provided within an enclosure in the southeast corner of the building.
Landscaping
Minimum requirements for landscaping on Lot 1 of the Holiday Inn Express development
include 2,876 square feet oflandscaped area around the parking lot, 12 trees for the parking lot,
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 6
and bufferyard plantings along the north and west property lines. The applicant's proposed
landscaping as compared to the requirements for landscape area and parking lot trees is shown in
the following table.
Required Proposed
Vehicular use landscape area 2,876 sq. ft. 38,166 sq. ft.
Trees/vehicular use area:
Overstory trees 12 canopy trees 12 canopy trees, 10 understory
Islands/peninsulas 6 islands/peninsulas 6 islands/peninsulas
Highway. 5 2 canopy trees 3 canopy
bufferyard B - 170' 3 understory trees 3 understory
30' width 3 shrubs 9 shrubs
Century Blvd. 3 canopy trees 4 canopy trees
Bufferyard B - 150' 5 understory trees 5 understory trees
20' width 8 shrubs 10 shrubs
The applicant meets minimum requirements for all required plantings.
The area to the south of the parking lot adjoins park property that is undeveloped. Staff
recommends that the applicant seed the south slope with a native grass mix and eliminate the sod
as proposed.
Lot Frontage and Parking location
The property fronts on both Highway 5 and Century Boulevard. Parking for the project is
distributed around the building.
COMPLIANCE TABLE
PUD Standards
Jacob's Tavern
Building Height
3 stories, 40 feet
1 story, 29 feet
Building Setback
N - 70' E - 0'
W - 50' S - 0'
N - 134' E - 13'
W - 86' S - 150'
Parking stalls
113 stalls
104 stalls #
Parking Setback
N - 50' E - 0'
W - 0' S - 0'
N - 50' E - 74'
W - 0' S - 73'
Hard surface
coverage
70%*
57%
Lot Area
1 acre
2.03 acres
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 7
* The development may average 70% impervious surface over the entire project. Individual lots
may exceed the 70% coverage.
# A parking easement to use nine stalls on the Holiday Inn Express site will be required as part
of the site plan.
STREETS/ACCESS
No public streets are proposed as part of this project. The applicant is proposing full access to
the site from the shared private street with Holiday Inn off Century Boulevard. Since the private
street serves multiple lots, cross-access easements will need to be obtained and recorded against
the lots. An internal sidewalk system shall be developed to bring pedestrians from the public
trails on the west and south sides into and across the site. Pedestrian ramps shall be provided
where the sidewalk ends at a curb.
The full access driveway onto Century Boulevard was allowed as part of the Arboretum Business
Park 6th Addition. However, such approval was conditional and should the driveway cease to
operate in a safe manner in the opinion of the property owners of Lots 1 or 2, Block 1,
Arboretum Business Park 6th Addition, or Lots 1,2 or 3, Block 1, Arboretum Business Park 4th
Addition, or if any of the following conditions are met, the property owners of Lots 1 and 2,
Block 1, Arboretum Business Park 6th Addition and Lots 1,2 and 3, Block 1, Arboretum
Business Park 4th Addition shall be assessed 100% of the costs incurred to correct the conditions
in a fashion acceptable to the City of Chanhassen:
a. Level of service "P" at the intersection during peak AM and PM times.
b. Level of service "D" or below at the intersection during non-peak times.
c. Significant accidents that are attributed to the configuration of the intersection occur
that indicate a mutually recognized safety concern at the intersection.
GRADING/DRAINAGE
The site was previously rough graded in 2004 under the Holiday Inn Express project. The
applicant is now proposing to fine grade the site west of the Holiday Inn building to an
approximate elevation of 971.00 for the proposed building pad and parking on Lot 1. At this
elevation, stormwater from the building and parking lot will drain toward the proposed and
existing catch basins and be conveyed via storm sewer to the existing Century Boulevard storm
sewer. Storm sewer design data for a 10-year, 24-hour storm event will need to be submitted for
staff review prior to building permit issuance.
The plans show a two-foot high retaining wall along the north side of the north parking lot. The
applicant should be aware that any off-site grading will require an easement from the appropriate
property owner.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 8
Storm Water Management
Storm water calculations must be submitted to ensure the existing downstream storm water
infrastructure is sized adequately for the proposed development.
Erosion and Sediment Control
Two details for silt fence are included on the detail sheet. The old detail for silt fence (Detail
5300 last revised January of2003) should be removed from the detail sheet. The plans should be
revised to show inlet protection around all storm sewer inlets.
The detail showing the catch basin filter barrier is an adequate control; however, it may not be
the most appropriate best management practice given the locations of catch basins 3 and 4.
Wimco-type inlet controls may be a better inlet control option. Additional existing catch basins
immediately adjacent to the project must be protected as well. During installation of the
proposed storm sewer infrastructure to the existing storm sewer, temporary caps or plugs may be
needed until the installation of the pipes and inlets are complete.
A temporary cover of mulch and seed is needed within 14 days of final grade for any exposed
soils or if any exposed soils are not actively worked within a l4-day time period.
Any sediment tracked upon paved surfaces must be scraped and swept within 24 hours.
Other Agencies
The applicant should apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES
Phase II Construction Site Permit), Minnesota Department of Natural Resources (for
dewatering), Minnesota Department of Transportation, Minnesota Department of Health) and
comply with their conditions of approval.
UTILITIES
Municipal sewer and water service is available to the site from stubs on the south and northeast
side of the lot. The watermain and municipal sewer lines will be considered private utility lines
since they will serve only one lot.
The underlying property has been previously assessed for sewer and water improvements and
those assessments have been paid. According to the City's Finance Department records, there is
no remaining assessment on the parcel. However, the sanitary sewer and water hookup charges
will still be applicable for the parcel. The 2006 trunk hookup charge is $1,575 for sanitary sewer
and $4,078 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed
against the parcel at the time of building permit issuance.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 9
All of the utility improvements are required to be constructed in accordance with the City's latest
edition of Standard Specifications and Detail Plates. Permits from the appropriate regulatory
agencies will have to be obtained, including but not limited to the MPCA, Department of Health,
Watershed District, MnDOT, etc.
LIGHTING/SIGNAGE
Site lighting for the interior of the business center should be consistent throughout the development.
A decorative, shoe box fixture (high pressure sodium vapor lamps or metal halide lights) with a
square ornamental pole shall be used throughout the development area for area lighting. All
fixtures must be shielded with a total cutoff angle equal to or less than 90 degrees. Fixture
height shall not exceed 30 feet. The applicant is proposing 28-foot tall fixtures. Additionally,
the applicant is proposing decorative, pedestrian scale, l5-foot tall lighting fixtures along the
sidewalk around the building. All wall-mounted light fixtures shall be shielded with a total
cutoff angle equal to or less than 90 degrees.
The applicant is proposing wall signs on the northern and western building elevations. Signage
is permitted in these locations. However, the applicant has not provided sufficient information to
determine if the signs comply with code. Separate sign permits must be applied for prior to the
installation of the wall signs.
Each property shall be allowed one monument sign per street frontage. The sign shall not exceed
eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. It appears
that there are two monument signs located within the right-of-way for Century Boulevard.
Monument signs must be located on the lot for which the sign is intended, outside of any
drainage and utility easement and a minimum of 10 feet from the property line (note that the
monument sign shown on the site plan is located within the public right-of-way and may not be
located there). All signs shall require a separate sign permit.
RECOMMENDA TION
Staff and the Planning Commission recommends that the Planning Commission City Council
adopt the following motion:
"The Chanhassen City Council approves Planning reeommenas a)9)9ro','al of Site Plan Planning
Case #05-40, plans prepared by Schoell & Madsen, Inc., dated November 10, 2005, for a 6,808
square-foot restaurant on Lot 1, Block 1, Arboretum Business Park 6th Addition, subject to the
following conditions:
1. The applicant shall enter into a site plan agreement with the City and provide the necessary
security to guarantee erosion control, site restoration and landscaping.
2. A recorded parking easement for the benefit of Lot 1, Block 1, Arboretum Business Park 6th
Addition for the use of nine stalls on the Holiday Inn Express site (Lot 2, Block 1, Arboretum
Business Park 6th Addition) is required as part of the site plan.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 10
3. The developer shall install site furnishings including benches, bicycle racks, and tables.
40 THe a]9]9lieam: sHall ineor]9orate tHe l;lse of goolea, aormer ';{inao';.' strnetmes in tHe roof.
5. All signs shall require a separate sign permit.
6. Mechanical equipment, either roof-mounted or at grade, must be screened.
7. The building must be protected with an automatic fire sprinkler system.
8. The building plans must be prepared and signed by design professionals licensed in the State
of Minnesota.
9. The building owner and or their representatives shall meet with the Inspections Division to
discuss plan review and permit procedures.
10. Pedestrian ramps shall be provided in all locations where the sidewalk ends at a curb.
11. The full access driveway onto Century Boulevard is allowed. However, should the driveway
cease to operate in a safe manner in the opinion of the property owners of Lots 1 or 2, Block
1, Arboretum Business Park 6th Addition, or Lots 1,2 or 3, Block 1, Arboretum Business
Park 4th Addition, or if any of the following conditions are met, the property owners of Lots 1
and 2, Block 1, Arboretum Business Park 6th Addition and Lots 1,2 and 3, Block 1,
Arboretum Business Park 4th Addition shall be assessed 100% of the costs incurred to correct
the conditions in a fashion acceptable to the City of Chanhassen:
a. Level of service "P" at the intersection during peak AM and PM times.
b. Level of service "D" or below at the intersection during non-peak times.
c. Significant accidents that are attributed to the configuration of the intersection occur that
indicate a mutually recognized safety concern at the intersection.
12. The slope located along the southern property line shall be seeded with a native grass mix
and left natural. The applicant will be allowed to mow along the parking lot and trail if
necessary.
13. Storm water calculations shall be submitted to ensure the existing downstream storm water
infrastructure is sized adequately for the proposed development.
14. Two details for silt fence are included on the detail sheet. The old detail for silt fence (Detail
5300 last revised January of2003) should be removed from the detail sheet. The plans
should be revised to show inlet protection around all storm sewer inlets.
15. Wimco-type inlet controls should be specified for inlet protection. Inlet protection shall be
provided for existing catch basins immediately adjacent to the project.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 11
16. During installation of the proposed storm sewer infrastructure to the existing storm sewer,
temporary caps or plugs should be provided until the installation of the pipes and inlets are
complete.
17. A temporary cover of mulch and seed is needed within 14 days of final grade for any
exposed soils or if any exposed soils are not actively worked within a l4-day time period.
18. Any sediment tracked upon paved surfaces must be scraped and swept within 24 hours.
19. The applicant shall apply for and obtain permits from the appropriate regulatory agencies
(e.g., Riley-Purgatory-BluffCreek Watershed District, Minnesota Pollution Control Agency
(NPDES Phase II Construction Site Permit), Minnesota Department of Natural Resources
(for dewatering), Minnesota Department of Transportation, Minnesota Department of
Health) and comply with their conditions of approval.
20. A professional civil engineer registered in the State of Minnesota must sign all plans.
21. The applicant will be required to submit storm sewer sizing design data for a 10-year, 24-
hour storm event with storm sewer drainage map prior to building permit issuance.
22. The applicant should be aware that any off-site grading will require an easement from the
appropriate property owner.
23. Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
24. Add the latest City Detail Plate Nos. 1004, 5214, 5300 and 5302.
25. The site will be subject to City sanitary sewer and water hookup charges at the time of
building permit issuance. The 2006 trunk utility hookup charges are $1,575.00 per unit for
sanitary sewer and $4,078.00 per unit for water.
26. Permits from the appropriate regulatory agencies must be obtained, including but not limited
to the MPCA, Department of Health, Watershed District, MnDOT, etc.
27. On the utility plan show all the existing utility sewer type, size, slope and class.
28. Cross-access easements for the shared driveway access must be obtained and recorded
against the lots.
29. A 10-foot clear space must be maintained around fire hydrants, i.e., street lamps, trees,
shrubs, bushes, Xce1 Energy, Qwest, cable TV and transformer boxes. This is to ensure that
fire hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance #9-1.
Planning Commission
Jacob's Tavern - Planning Case 05-40
January 3, 2006
Page 12
30. Yellow curbing and "No Parking Fire Lane" signs will be required. Contact Chanhassen Fire
Marshal for exact location of yellow curbing and location of signs to be installed.
31. Builder must comply with the following Chanhassen Fire Department/Fire Prevention
Division Policies.
a. # 1-1990 regarding fire alarm systems,
b. #4-1991 regarding notes to be included on all site plans,
c. #7-1991 regarding pre-fire drawings,
d. #29-1992 regarding premise identification,
e. #34-1993 regarding water service installation,
f. #36-1994 regarding proper water line sizing,
g. #40-1995 regarding fire protection systems."
ATTACHMENTS
1. Findings of Fact and Recommendation.
2. Development Review Application.
3. Reduced Copy Preliminary Site Plan.
4. Reduced Copy Preliminary Grading Plan.
5. Reduced Copy Preliminary Utility Plan.
6. Reduced Copy Preliminary Landscape Plan.
7. Reduced Copy Preliminary Lighting Plan.
8. Reduced Copy First Floor Plan.
9. Reduced Copy Exterior Elevations.
10. Reduced Copy Building Sections.
11. Reduced Copy Roof Plan.
12. Jacob's Tavern Massing Study from West.
13. Jacob's Tavern Massing Study from South.
14. Letter from Aaron Mlynek (SWCD) to Robert Generous dated December 13, 2005.
15. Memo from Mark Littfin to Robert Generous dated December 22,2005.
16. Arboretum Business Park - Development Design Standards.
17. Public Hearing Notice Affidavit of Mailing.
g:lplanl2005 planning casesl05-40 jacob's tavernlstaffreportjacob's tavern. doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
INRE:
Application of Truman Howell Architects and Associates, Inc. for Site Plan
Review for a 6,808 square foot restaurant building on 2.03 acres of land -
Planning Case No. 05-40.
On January 3, 2006, the Chanhassen Planning Commission met at its regularly scheduled
meeting to consider the application of Truman Howell Architects and Associates, Inc. for a site
plan review for the property located at 7845 Century Boulevard for Jacob's Tavern. The
Planning Commission conducted a public hearing on the proposed site plan which was preceded
by published and mailed notice. The Planning Commission heard testimony from all interested
persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development (PUD) light industrial/office
park.
2. The property is guided by the Land Use Plan for OfficelIndustrial uses.
3. The legal description of the property is: Lot 1, Block 1, Arboretum Business Park 6th
Addition.
4. In evaluating a site and building plan, the Planning Commission and City Council shall
consider its compliance with the following:
(a) The proposed development is consistent with the elements and objectives of the
city's development guides, including the comprehensive plan, official road
mapping, and other plans that may be adopted;
(b) The proposed development is consistent with the site plan review requirements;
(c) The proposed development preserves the site in its natural state to the extent
practicable by minimizing tree and soil removal and designing grade changes to
be in keeping with the general appearance of the neighboring developed or
developing or developing areas;
(d) The proposed development creates a harmonious relationship of building and
open space with natural site features and with existing and future buildings having
a visual relationship to the development;
1
(e) The proposed development is creates a functional and harmonious design for
structures and site features, with special attention to the following:
1) An internal sense of order for the buildings and use on the site and provision of
a desirable environment for occupants, visitors and general community;
2) The amount and location of open space and landscaping;
3) Materials, textures, colors and details of construction as an expression of the
design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
4) Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms of location and number of access points to the public streets,
width of interior drives and access points, general interior circulation,
separation of pedestrian and vehicular traffic and arrangement and amount of
parking.
(f) The proposed development protects adjacent and neighboring properties through
reasonable provision for surface water drainage, sound and sight buffers,
preservation of views, light and air and those aspects of design not adequately
covered by other regulations which may have substantial effects on neighboring
land uses.
5. The planning report #05-40 dated January 3,2005, prepared by Robert Generous, et ai, is
incorporated herein.
RECOMMENDA TION
The Planning Commission recommends that the City Council approve the site
plan review.
ADOPTED by the Chanhassen Planning Commission this 3rd day of January, 2005.
CHANHASSEN PLANNING COMMISSION
BY:
Its Chairman
2
Planning Case No. 0 5 -40
CITY OF CHANHASSEN
7700 Market Boulevard - P.O. Box 147
Chanhassen, MN 55317 - (952) 227-1100
CITY OF CH,G.i'JHASSEN
RECEIVED
DEVELOPMENT REVIEW APPLICATION
DEe 0 2 2005
PLEASE PRINT
Applicant Name and Address:
1RLi--fMj 1-\a..V~ L~
J 1fPj~ HuTatt~~ D~'
Htf\-J ~ 1i~ SSQ46
Contact: 1f2D-;;;:J t-krwELL
Phone~~-1~ FaX:~-4d -lQr/?'J
Email: -tVV ct"r1Y1 -b11-a . CCnVl
CHANHASSEN PUNNING DEPT
Owner Name and Address:
R:tO fOt2- 7BB ~
1~f5 WILDr<.atJEP.l-J..J...JE
~/H~ ~?:>ltJ
Contact: \~ ~ ~1-J f'OU.J0
Phone~.'3l'O~etlec, Fax:
Email:
Comprehensive Plan Amendment
Temporary Sales Permit
Conditional Use Permit
Vacation of Right-of-Way/Easements
Interim Use Permit
Variance
Non-conforming Use Permit
Wetland Alteration Permit
Planned Unit Development*
Zoning Appeal
Rezoning
Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
~
* Site Plan Review* ('EI.cO~)
x
Notification Sign** - $75 + $100 Damage Deposit
I1CS~
Escrow for Filing Fees/Attorney Cost***
V- $50 CUP/SPRNACNARlWAP/Metes & Bounds
- $450 Minor SUB
Subdivision*
TOTAL FEE $
7tf5 Otl
cH~Ic::Da-'-f
CA(j-\eP $>'i C1~
~A~
An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to
the public hearing.
. Twenty-six (26) full-size folded copies of the plans must be submitted, inclJding an 8%" X 11" reduced copy for each plan sheet
along with a diqita' copy in TIFF-Group 4 ('.tif) format.
.. Applicant to obtain notification sign from City of Chanhassen Public Works at 1591 Park Road and install upon submittal of
completed application. $100 damage deposit to be refunded to applicant when sign is returned following City Council approval.
... Escrow will be required for other applications through the development contract.
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application.
SCAtlllED
PROJECT NAME: ,,)(Cf)fJ' ~ ~\J6l2+4
LOCATION: ~~ /HD
LEGAL DESCRIPTION: Wi 1 ) ~1, ~P'./O~l5TlJH e001~~ -p~tl\ ADombN
TOTAL ACREAGE:
WETLANDS PRESENT:
PRESENT ZONING:
1.2 .l9~
YES
*
NO
REQUESTED ZONING:
HC-~
1+t:-1.
PRESENT LAND USE DESIGNATION: 1?Ee:Jr.AJ,. ~
REQUESTED LAND USE DESIGNATION: 1<F"~A-OAA-t\.rf
REASON FOR REQUEST: rmel12l.arl'1J. f'F- ~V~
This application must be completed in full and be typewritten or dearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
orization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my ledge.
JILIl/8O
~ate
Jll/, /f)f5
Date
G:\plan\forms\Development Review Application. DOC
Rev. 4/05
SCAN lIED
n
.+,
h
,
- -
I-
Z 0-
W
llJ Lr.l 0
en = (!l
en = -,
<CO ~-
II!J C'-l Z
2;> <."2 z
.....:
""-- --J
TW 0 0-
uO Z
LLW U LU
oU: W
W en
>- ~
!:: a :r:
z
0 '"'(
:r:
<.)
WARNING
THE COi'lTRloCTOR SHALL CONTACT AlL PUBUC lJ11UT1ES
FOR lOCATIONS OF ALL UNDERGROUNO WIRES. CABLES,
CONllurrs, PIPES, I.W<lHOlES, VAlVES, OR Oll-iER BURIED
STRUCTURES BEFORE DIGGING. HE SHALL REP....R OR
REPl...oIoCE 1l-IE ABOVE WHEN OAw.GED DURING
CONSTRUCTION AT NO COST TO OWNER.
BENCHMA.RK
Top nut of lIydrunt OS Ihow...
Elevation _ 972.37 n. (H.G.V.D. 1929)
~
DOM' o..,,"~',,"'
;~S-T-A~rE- .H-I---G H WAY
N O.
5
CHD BRG~88'12'O,
-----.. ------~~,--
:'1' - ---~"'i""..
i I~__..__
i i
,"
II
i I:
li:o
",
i Ii
I "D:
ii,
-----------------,
,
:10
,
,
I
r
I
I
I
r----------------.
I
10 :
I
,
,
r
I
] :1---': -'f, f:TT
:, ;1(;-"/10'1'
I ",,_~.;,;i r~:'i
---
r
r
I
r
I
I
I
,
I
I
r
,
I
I
,
I
r
,
I
i 1:c:C
i Ii
::1>
I! Ii
1111
:I!W
i i:....I
<i II
10
,II;
I'
::0
11m
"
i I.
i I
i I
ill
! !I
,: II
I1II
::>
i! !I
/l~Q:
~
L,
I
I
I
__I
/L
2 PM/KING
'''''''''
I-
Z
W
q~~
:IT ~i," - ~l~ ~
:'. 'Fi - - -, I' ~I L' 'II rf,:.~'~~.,P~p":'lS"''- .
,: 'ii, ~iJ_ !rJJL,l1 -'J~u _LL :1 j ~LLlJjjJ _)~1~,
I! I OIWNAGE ole UTi I
;'i Lx _~,J~=~~~i;;~~~~~:~::~~~~:~~~-----------------------l i
Ii ~ ;:;7{%,J;;o~~~"'~.;;;;;::t:C.--;~_;:~~__;..:~::=_::O:2:..:.~':::":'::':"c'.:'22:':';": '='~Cv _ i i
I 'I I I--~~..- - -~ --.-- ~<~~ -'- r
I .. L~_m_~}_=__=_= -- ~-~'~="'==~~: J~:::::
-~~
~~
ST
S B,,"T34" E
@
DeBignedBy:
1......"....,.,_lNIpIM_~..:lll1........-
Irry-...----,.....~-
~_ilecl.....,..\IIe_d..SIu"'_
~.k'.....:-~l:w__ __
IUw\T_ .1
O':~AIIlI.No.~
_ Schoell & Madson, Inc.
-W'- Eng~ng. Plllnnlng
IVlllQW.yUIll~8o.kl _n.ll8l'..r""'.8lIle1OO
~_S&lOI5-I525 a_._6/l.'):')l)._
(95~)~7l5Ol-Iu~2)~ [7M)24l-01l11-fa:J'(952)SoI6--iOE5
TRUMAN HOWELL ARCHITECTS & ASSOC.. IHe
1711'. HUTCHINS DRIV.
"1~:~T~o':'TAel~
m~~~;o'
Drawn By'
ChededBy:
. PROJECT INFORMAnON
_ ZONING
PROPOS(O ZONING; PUC
EJ(ISTING ZONING, PUO
- SITE INFORMATION
TOTN.. SfTE AREA: 66.5\J SF / 2.0J AI;
TOTAl.. Il.lPERVIOUS AREA.: SO.347 /1.1& N;
56.9~ OF SrTE
PARKING AREA: J5,955 Sf" / 0.88 AC
4O.6Jl:OFSJTE
aUILDING AREA: 6.808 SF / 0.16 AC
7.69l11: Of SITE
TOTAL CREENSP....C(: 36,166 SF / 0.88 N:.
4J.1:11: OF SITE
- PARKING REQUIREMENTS
EST,lBUSHUENT WITH ruu UQUOR LICENSE
REOUIREIolENT:ISP,l,CEPEREVERY5QSQUAAEFEETOF
GROSS FLOOR ....RE,l OR 1 SP"'CE FOR lVERY 2. SOoTS,
WHICHEVER IS GRE,lTER
CROSSF1.OOR",RE,l_S,6J6SF
(5,6.36 SF/50 SPN:.E5)- llJ SP,l,CES
-DR-
167 SE"'-TS. 167/2 - 84 SP1.CES
REOUIREDSP,l,C[S:11J
PROVlOroSPACES:l08{51ol.C.)
. SrrE NOTES
AlL WORK SfW.!. BE PERfORMEO IN ACCORDANCE WITH TI-lE CIT1' OF CtW'OHo\SSEN
ST,lNDAAD PL,lTES, SPECIFlC,lTKlNS, ,lNO BUILDING PERIolJT REOUIR(lolEN'TS.
REFER TO GR..oDING P1.Al'l FOR EXISTING N'lD PROPOSED GFWJES
REFER TO LANDSClPE Pu.N FOR PROPOSED PLANT W.TERII<L
AU. OIUEHSIONS SHOWN loRE TO F1.CE OF CURB UNLESS NOTED OTHERWISE.
CONTAACTOR SH"'U FlELD VERIFY niE LOC....ll0NS "'NO ELEVATIONS OF [)(ISTlNG UT1UTIES
,lNO TOPOGRWHIC F[..t,TURES, SUCH ....S EXISTING GIJTT(R GR....OES "'T TI-lE PROFOSEO
ORI\IEWAVS, PRIOR TO THE S1""T OF SITE GRADING. THE CONTIl....CTOR SKotJ.l. Iloll.lEDI.I\TELY
NOTIFY Tl-IE ENGINEER OF ANY OISCREPANCIES OR VAAI,lTlONS FROM THE Pl.ANS.
AU. CURB,lND GltTTER TO BE CONCRETE PER CIT'( OF CI-i,lNHASSEN ST,lNDAROS.
TYPICAl. F\JU SIZE 90" P.o.RKINC STALl IS g'X!!!' UNLESS NOTED OTHERWISE.
LIGHT POLES. fIXT\!I1ES....NOBJISES SKotJ.l. BE PER CrTY OF G.....NH...SSEN ST....NQilftOS. SE[
LIGHTING Pu.N FOR AODmOl'lAl. INFORW.T10N.
CONTRACTOR TO COORDINATE FlRE: ,lPP.o.R....TlJS ""CESS RONlS <Ii: SUf'PUES WllW ThE CITY
OF CH,lNI1ASSEH PRIOR TO AND DURING CONSTRUCTION. PURSU,lHT TO UINNESOT.... flRECODE
SECTION so:p.J.
""
P....YEREDGING
. CONCRETE BRrCK PAVER DETAJL
10"d/e"
STEEL Sf'I~E
I' LEVELING SAND BA3E
I I I I ~ ~:S~'l/DOT n ~ W;P[(;/IIE
~ I F11r= 11r= II=' ~ COIolPACI[O SUIlGRADE
~ Proj..ctNB.....lLocetion:
JACOI" TAVERN
CttANHASSEH, Ail".
I r=-:I
L:::J
I ~s~ro, 6[
SMI Project Numbor. 64-401.001
~s_"'.
~CAlllIED
GRADING NOTES:
1. CO~CTOR sw.u. CONTACT 'GOPHER STATE ONE CAlL' WITHIN TWO WORKING
DAYS PRIOR TO (1(CAVATION/ CONSTRUCTION. FOR lfTlUTY LOCATIONS. TWIN
cmES loIElllO AREA; 1l:)1-4:)4-OOO2 OR TOll.-FREE: 1-1I00-2:)2-11511.
2. CONTllACTOR SH.W. FIELD ~IFY niE LOCATIONS AND E1..EVATIO~S OF
EXISTING lfTlUTlES AND TOPOGRAPHIC FEATURES PRIOR TO START OF SITE
GRADl~G. THE CO~TRACTOR SHAlt. IMUEDlA.TELY NOTIFY Tl-lE PROJECT
ENGINEER OF Am 04SCREPANCIES OR VARlA.TIONS.
J. SUIT.o.aLE GRADING loIAITRIAl SHAll. CO~SIST OF ALl. SOIL ENCOUNfEREO ON
Tl-lE SrT[ WITH (XCEPTIO~ OF TOPSOIl., DEBRIS, ORG.ANIC loIATERlAl AND
OTHER UNSTABLE IoIATERlAl. STOCKPILE TOPSOIL AND GRANULAR FIll. AT
LOCATIO~S DIRECTED BY CONTRACTOR.
4 SUEMORAOE EXCAYATlON Si'iAU. BE BACKFlL...L.EU IIolMEDlAITLY AFTER EXCAYATlON
TO HnP OFFSET /lHf STi\BIUTY PROBLEIolS DUE TO WATER SEEP,l,GE OR
STEEP SLOPES. WHEN PLACING NEW SURfACE loIATERIAl ICJACENT TO
EXISTING PA'VEt.l(~T, niE EXCAVATION Si'iAU. BE BACKFILLED PROUPT\..Y TO
AYOID UNDERIolINING Of THE EXISTING PAVDoIENT.
5. CONTRACTOR SHAll BE RESPOtlSIBLE fOR AU. HORIZONTAL AND vtRTK:AL
COKTROL
II. CONTRACTOR SHAll El<CAVATE ~~AGE TRENCHES TO fOll.OW PROPOSED
STORl.I SEWER AI..JGNt,IENTS.
7. GRADES SIiOWN ARE FINISHED GRADES. CONTRACTOR SHALl ROUGH GRAD( TO
SUBGRADE ELEVATIOtl,!.EAYE STREET READY FOR SUBIlASE.
II. ALL EXCESS IoIATERIAl. BITlJIolINOUS SURFACING. CONCRETE ITEMS, Hff
ABANDO~m lfTlUTY ITEloiS, A><O OTHER UNSTABLE IoIATERIAlS SHALl BECOIolE
THE PROPERTY OF THE CONTRACTOR AND SI-W..L BE DISPOSED OFF THE
CONSTRUCTION SITE.
II. COIolPLLTlON OF SITE GRADING OPERATIONS SHAlL RESULT IN AU. AREAS BEING
GRADEDTD 'PlAN SUBGRADE El.!VATIO~'. BUILDING pm AREAS sw.u. BE
Orn;RIoIINED BY REfERRING TO 1l1E ARCHrrtCTVRAL. DRAWINGS. THE PARKING
LOT AND DRIY(WAYAREAS SHAU.8EOETERIolINED 8Y REfERRING TO THE SITE
PlNl NOD PAYEMENT SECTION DETAiLS fOR LOCATION AND UIIlITS Of
BrTUl,;INOUS PAYEMENT SECTlOtlS.
10. REFER TO THE ARCHITECTS SITE PLAN fOR 1oI0ST CURRENT HORIZONTAL
DIIolENSIONS AND SITE LAYOUT.
11. REFER TO lfTlUTY I'tAH fOR SANITARY SEWER ......IN. WATER IoIAiN SEIMeE
LAYOUT AND ELEVATIONSANO CASTlNGAND STRUCTURE SCHEDULE.
12. ~~E llo1t~. GRADED SLOPE FROM EDGE OF BUILDING Si'W.L BE 6 INCHES
lJ. FINISHED GROUND AND SOD ELrvATlON ADJACENT TO BUILDING SHAlL BE 6"
BElDW F\.DOA ELEVATION. SLOPE GROUND AWAY FROM BUILDING A IoIINIf.lUM
Of' 6" IN 10 Ft:ET BEYOND 10 fEET REFER TO Pl>>l GRAOES.
14. CO~CTOR IS RESPONSIBLE FORGRADINGAHO SLOPlNGTHEFlNISHED
GROUND SURFACE TO PROVIDE SIolOOTH a: UNIFORM SLOPES, WHICH PROVIDE
POSITfIIE ORAlNAGE AWAY fROloI BUIlDINGS AND PRE'JDfT PONDING IN LOWER
AREAS. CONTACT ARCHITLCT IF FIELD AOJUSTIoIENTS TO CRADING PlANS ARE
REOUIRED.
15. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION, PA\I[M(NTS AND CURB
AND GUTTER WITH SIIlOOTH UNIFORM SLOPES WHICH PROVIDE POSITl\IE
DRAINAGE. CONTACT ARCHITLCT IF FlElO AOJUSTMENlS ARE REOUIRED.
16. INSTALl A IolINIUUl.I Of 4 INCHES CLASS 5 AGGREGATE BASE UNDER CURB
AND GUTTER.
EROSION CONTROL NOTES:
1. ALL PERIIoIETER SILT f(NCE AND ROCK CONSTRUCTION ENTRANCES
SHALl. BE INSTALllD PRIOfi TO CONSTRUCTKlN.
2'~C:~ORSHAl..lCONSTRUCTDR.'JNAGE8.ASINSPRIORTDSITF;
J. THE CONTRACTOR Sf.W..lINSTALl CATCH BASIN EROSION COmllOl
IoIEASURES.
.t. WffilIN TWO WEEKS OF SITE GRADING, AU. DISTURBED AREAS SHALl BE
STABIUZED WIDl SEED, SOD OR ROCK BASE. REFER TO lAI'DSCAPE
PLANS FOR tMTE:RlAlS.
5. ALl EROSION COmllOL IoIEASUR[S SHAll. BE INSTALLED AND
~~~ED IN ACCORDANCE WITH CITY, AND WATERSHED DISTRICT
6 THE CONTRACTOR SHALl t.lAlNTAJN AU. EROSION CONTROL IoIEASURES,
INCLU04NG TH( REIllOVAL OF ACCUlllJL.ATED SILT IN FRONT Of' SILT
FENCES DURING niE DURATION Of THE CONSTRUCTlON.
7. NN E~CESS SEDIMENT IN PROPOSED BASINS SHALl BE REl.lOVED BY
THE CONTRACTOR.
II. REt.lov( ALl EROSION CONTROL MEASURES AFTER \/EGETATION IS
ESTABUSHED.
9. THE CONTRACTOR SHAlt. REI.IO\IE AlL SOllS AND SEDIM[Nf TRACKED
ONTO EXISTING STJlEETS AND PAllED AREAS.
10. IF BLOWING DUST BECOIllES A NUlSN<CE, THE CONTRACTOR SHALl.
APPLY WATER FROll A TANK lRUCl< TO ALL CONSTRUCTlON AREAS
BENCHMA.RK
Top nul of tI)'drantol Iho..n.
EI.~otion _ 972.J7 FL (N.G.V.D. \929)
Ruvifoiofll
Date: DltSCrt ion'
11-10-05 C Comments
e,
"'
f~ 1! -;,g;;-~;- --- ----'~-_
II ~ t"'^ __----- -::;:;:~,--,'"",
_~j _ _~2'?- _~g~~- /' ---
"I: i ~ : ;.7C:' //~--~
Ii I i\,''J~:./ //
SCN~ /
Ii.' ,! / ./
\ / /,,"\?'
.co II! . ! ~-~./
/E! I/J/
++ ':r~~ SO I
I 10,1/
. I <,
j i d
/11,,11 )
~ i '-......\i /C81
~L Rl....9611.71
i ~l:.:-./
:i
ii
I!
"
"
,~
:1
"
,/ j Ii
I "
l,,,,-_ _ I':;;.::-::/lf~;:~~-----.;_~_:..-_-:~i'C__-~~5--
~.~."~~=-~~=-=-
-----
1.'.~I1\~;'~'-rrr.".'j; ;
,,"'F'<;'~-""";1')'~.
r,
l~l
:t-.:l
,
/
/
;
1......-.,,'...
:~
--~
--~._._--
\ \.
,\ ~
. \ I
_-------->l....~--
---
.__-------_w.
Iherwby.......-_pIBn_~..............
"'I'---__I....~-
~......,.,......of...~oI""""-011
[)oqigned By;
~ Schoell & Madson, Inc.
_._ Eng~"lII.p"nntng
IIl5elIWoyabl~_l ~Thhl_NW,_1llO
~_~ ac_,_5/i:I3O-WOlI
(9'j21~7fi01-Iu(9!521~ ('7MJ241-c<J1-1u1952)~5
TRUMAN HOWELL ARCHITECTS . ASSOC., INC
17." HUTC14N. DRIY.
~~::'T:o~:aa':"
Drawn By:
0..
"~~
FI_IlY'~D_~
cnedulKlBy;
n
.+,
~
o
!""'"""""'"
'''"'
LEGEND
-!?<:"-OENOTESEXISTlNGCONTOUR
-----996----- DOlOTES PROPOSED CONTOUR
----.--.- DENOTES DRAlN.AGE/lITUTY EA$EMENT
'~-OENOTESEXISTlNGSTORIolSEWER
-<<- DENOTES PROPOSED STORIIl SEWER
. ..............." DDlOTES PROPOSED CURB TIPPED OUT
-OOOOOO[JOOOO[J. DDlOTES EROSION COtlTROL SILT FENCE
,....r.-.~ DENOTES PROPOsro ROCK CONSTRUCTlOtl ENTRANCE
DENOTES PERCENT OF GRADE
c::::::J DENOTES PllOPOSED BUILDING
DENOTES EXISTING STORM ......NHOLE/CB
.. DENOTES PROPOSED STORt.l MANI"IOLE/CB
if.:-~'.~.~::"i;:': DENOTES EXISTING CONCRETE
EROSION '" SEDrUENT CONTROL t.IAlNTENANCEo
I. INSPECT SILT FENCES AFTER EACH RAiNFAll. AND AT LEAST [WLY DURING
PROLONGED RAlNF"l1.. IIIlMEDlATUY REPAIR FAILED OR FAlU~G FENCES.
2, REPLACEIoIENT - FABRIC SHoOJ.J. BE: REPLACED PROf.lPTl.'l' WHEN IT
DECOUPOSES OR BECOMES lNUFtCTWE 6EFORE TIlE BARRIER IS NO
LONGER NECESSARY.
3. SEOIIoIE~T RDolOVAL - SEOIIolENT DEPOSITS SHAU.. BE REIoIO\IED AFTER EACH
STORIoI[\I[NT.
.t. ANY SE04MENT REllAlNING IN PlACE Af'll:R THE SILT FENCE OR FlLTER
FABRIC IS NO LONGER REQUIRED SHAll BE GRADED TO CONf'ORll WITH THE
~1~~~d~B~ :iP~~.ANO SUDED WITH THE APPROPRIATE SEED UIX
WARNING
THE CONTRACTOR SHAlL CONTACT.-oJ. PUBLIC UTlUTlES
f"OR LOCATIONS OF .-oJ. UNDERGROUND WIRES. CABLES.
CONDUITS. PIPES. WlNHOLES. VALVES. OR OTHER BURIED
STRUCTURES BEFORE DIGGING. HE SHAll. REPAIR OR
REPlACE THE i\BOVE WHEN DAMAGED DURING
CONSTRIJCT\ON AT NO COST TO OWNER.
PAVlNG PLAN LEGEND
DENOTES LIGHT DUTY BITUlllNOUS PAVEIoIENT.
1-1/2" llnjDOT 2JJ1 WEARING COURSE
1-1/2" Un/DOT 2JJ1 BASE COURSE
7- CL 5 GRAVEL (10011 CRUSHED QUARRY STONE)
COf.lPACTED SUBGAADE
DENOTES HEA\IEY DUTY BITlJUINOUS PA\!EllENT.
2- lln/OCT 2JJl WEARING COURSE
2- Un/OCT 2JJ 1 BASE COURSE
9- CL 5 GRAVEL (l00lC CRUSHED QUARRY STONE)
COMPACTED SUBGRADE
~ Project NameJLocation:
~ ~~~.r::'E::
~ Sheal Tille: PRalMlMAflY GRADlNQ Pl......
I~
L:::J
11]'2"m 61
SMI Project Number. &4401.()01
SCAfWED
CONSTRUCTION NOTES:
1. REFER TO ARCHlTEcrS SITE PlAN FOR BUILDING AHD PARKiNG LAYOUT
DII.IENSIONSANOLOCATIONS.
2. PRIOR TO CONSTRUCTION, THE CONTR.o\CTO~ SHALl FlElD VERIFY ALl [)llsnNG
UTllJTY LOCATIONS AND ItNERTS. SHOWN OR NOT 5l'OWN, ANY OISCREPANCV
BETWEEN PlANS AND fiElD CONDmONS SHAU.. BE REPORTED TO THE OWNER
IIolMED....mY.
J. THE UTlUTY CONll!.O.CTOR StW..L vrRIN THE LOCATIONS AND ELEVATlONS OF THE
BUIlDING PIPE sYSTO.l PRIOf! TO CONSTRUCTlNG SERVICE CONNECTlOOS.
4. ALl UTlUTY WORK SHALl BE PE~FORillED IN ACCORDANCE ~ THE CITY OF
C~HA.SSEHSPECIFH:ATlONSANOBUIlDINGP(RMITREQUlROlEtlTS.
5. &' WATEIlIAAIN SHAlL BE ClASS 52 DIP CONFORilllNG TO THE REQUIREMENTS OF
AHSl//>._" CL51//>.21.51 AND CI04/A21.4 OR ~ C-900. flm~s Sl-Wl.
BE Cu.sS 250 CONFORMING TO THE REaUIRE...Etmi Of' NolSI//>._A
Cl10//>.21.10 OR ANSI/A_A CI5J/A21.5J. H'I'tIR/>.NTS SIW..L BE THE P/>.CEll
/>.S w.NUF/>.CfURED 6'1' w/>.TEIlOUS CO. OR .o\PPROVEI) EOU/>.L COillPLYlNG WITH
THE CITY Of' CHAN...-.sSEN. GA~ V/>.LVES SHAll BE SINGLE OISC TYPE WIT1-I
RESiLIENT SfAT illEETlNGTHE REOUIREMENTS OF A_A C509. AU PLUGS, TEES,
BENDS AND OTHER THRUST POINTS SHALL BE PROVlO€D WITH CONCRETE
REoIlCTION BACKING OR MEGA. LUG. AU. W/>.TEIlIoWN SH/>.LL BE INST/>.UEO WIT1-I
/>. "'INU,",UIol OF 7.5' COVER AND IN />.CCORDANCE WlTH />._/>.C6OO AND
CONOUCTMTY PRCMSIONS CONFOR...ING TO ANSI/A_A Cl11/"21.11.
BEFORE BEING PlACED IN SERVICE, THE COMPLETED WAT'ERIAAIN SfiALl BE
DISINFECTEO AND FW~EO IN ACCORDANCE WITH />._A C651 AND Tl1E
REOUIREMENTS OF THE ...INNESOTA OEPART"'ENT OF HEAJ..Tl-l.
II. 5ANrT/>.RV SEWER SH/>.LL BE &" PVC-SDR-26 UNLESS NOTUl
OIFFEREmLY. IoI/>.NHOLESSHAU.BE48"OW.lETERPRECASTREINFORCED
CONCRETE IN />.CCOOONlCE WITH />.STW C478. CASTING SH/>.LL BE NEEtw-l R-
11142 WITH TYPE "6" COVER. IoI/>.NHOLES SfW.l HAVE A I.IINIMUloI OF TWO AND A
t.lAX1...UloI 01' FOUR ADJUSTI.lENT RINGS. JrU PIPE COONECTlONS TO [)lISTING
UTllJTY STRUCTURES SHAll BE "KOR-N-SE/>.L" OR CITY />.PPRQ'.UI EOUAL FOR
CONCRETE BLOCK OR BRICK STRUCTURES, CONSTRUCT AN OPENING EDUAL TO
Tl1E PIPE SIZE. GROUT />.ROUND PIPE TO CLOSE OPENING, AND REPIIJR STRUCT\JRE
TO CITY REOOIFlElAENT'S. THE CONTIl/>.CTOR SHALL VERIFY TYPE Of' CONNECOON
WITH CITY ENCINEERING DEPARTMENT AND COOROINA~ Nrr REOUIRED CITY
INSPECTIONS NEEDED FOR CITY />.CCEPTANCE.
7. STOR'" SEWER SfW..1. BE REINFORCED CONCRETE PIPE OR APf'RO\IEO EQU/>.L
CATCH Il/>.SINS Si'W..L BE PRECAST REINFORCED CONCRETE. CASTING SH/>.LL BE
NEEN/>.H R-3290 L WITH CURB 80le OR NEEN/>.H R-173J CASTlNG "C' CR/>.~ IN
THE MIDDLE OF PAAKINC LOT$_ 1oI/>.NH0LES SH/>.LL BE FOUR FT. OWolETEIl
PRECAST REINFORCED CONCRETE iN />.CCORCMNCE WITH.ISTIol C478. CASTING
SH/>.LL fiE NEEN,A,H R-173J. MANHOLES SHALL H/>.V( A lAINllAU,,", or 2 AND A
l,I.AJ(l~U'" OF 4 ADJUSTMENT RINGS.
8. unUTY TRENCHES SHALL BE CO,,",P/>.CTED TO ilSll: STANDARO PROCTOR
MA.l:IMU'" DRY DENSITY (AST\l D698,78 OR MSHTO T-99) FROlA THE PIPE
20NE TO WITI1IN THREE FEET or THE GROUNO SURFACE />.NO 100::1: ST/>.NONlO
PROCTORINTl1EUPPERTHREEFEET.
9. CONNECTION TO THE [)llsnNG SANITARY SEWER AND WATER REQUIRrs
INSPECTION BY THE CITY OF CHANHASSEH.
10. FlELD ADJUST AU. CASnNCS TO W.TCH Fl"",,- GR.>.OES.
11. CONTRACTOfl SI-W.l. CONTACT 'GOPH(R ST"lt ONE C/>.LL' WITHIN TWO
WORKING D"YS PRIOR TO EXCAV/>.TlON/CONSTRUCTlON FOR UTlUTY
LOCATlONS, TWIN cmrs I.IORO ARu.: 651-4~-OOO2 OA TOll-FREE:
1-800-252-1166.
12. CONTRACTOR SI-W.l. NOTIFY THE CITY OF' CHANHASSEN 48 HOURS IN
1>l1VANCE OF WORK-.G WITHIN "&E RIGHT OF WAY. CITY INSPECTORS lAUST
OBSERVE AU. WORK CO"'PlETEO ON CITY STREETS INCLUDING REMOV-'L OF
EXlsnNG BITI.J"'INOUS PAvrIolENT, [)lCAYATlON OF TRENCHES, PLACEIolENT or
W/>.TEIl w"IN AND SANITAAY SEWER, UTIUTY CONNECTIONS TO EXISTING UNES,
B1lCKFLUNC />.NO PlACEloIENT OF BITUIolINOOS PAVEl.lENT.
13. CONTRACTOR SHALL INSTALl, INSPECT,IoWNTAlNANO RE"'OVETHE
NECESS/>.RV SIGN/>.G.E FOR lANE CLOSURES. ALl TRI.FFlC CONTf!OL OCVIcrs
ANO SIGNING SH/>.U. CONFORM TO THE WN-"'UTCO, INCLUOING fiElD Ww'lU/>.L FOR
TEIolPORAR'f TIWTlC CONTROL ZONE LAYOUTS, JANUAAY 1998. ONE ELEVEN FOOT
lAINllAUIol WIDTH lANE IN [/>.CH [ljRECTlON SHAlL BE PROVIDED />.T AU TI...rs,
14. TME EXISTING BIT\JIolINOUS P/>.VEMENT SH/>.Ll BE S/>.WCUT IN ACCORDANCE
WITH "'n/OOT SPECIFlCATlONS,
15. CONTRACTOR Will BE RESPONSIBLE FOR OBTAJNING Tl1E APPROPR....TE
SEWER, WA.TU1 />.NO PlU",BING PER...fTS FROM THE CITY'S BUILDING
DEPARTlolEKT_ 16. GENERA.L CONTIU.CTOR Sl-W.L COORDINATE WORK WITH />.LL
UTIUTV CO...PANIES.
WARNING
THE CONTIU.CTOR Sl-W.l CONT/>.CT />.LL pueuc UTlUTlES
fOR LOCATIONS 01' ALL UNDERGROUND WlRES. COBLES,
CONDUITS, PIPES, IoI/>.NHOLES, v/>.(.vrs, OR OTHER BURIED
STRUCTURES BEFORE DIGGING. HE SHALl REP.lJR OR
REPUtoCE THE ~ WHEN OAI.lA.GEO DUIllNG
CONSTRUCTlOO "1 NO COST TO OWNEll.
BENCHMARK
TopnutofhydrontO"h-own
Elevotion - 972.J7 Ft. (N.G.V.O. 1929)
Revision.
Dote: D..=ri .on
11,10.05 Ci Commltntl
.
....
'>1
[:"~;y .1C1~:f~r~l. =-
----",'c---- -r - f--L:~Q=,"g------ --- - ---
-- Ii ~II: 19~~c",:,
I I r:"y
MONUMENT S;[t;N I
i II I
!!i I
I :i~ I
l:Oil
i ~;;l i
i LP I !
1::-:::,:jl5.9\1
I I
I i
r----------------,
I
I
I
r
,
,
I
,
,
,
I
r
,
~Move: 8" PLUG
CNNECTTO[)(ISTINGB"
C C-900 W/>.TERI.lAJN WIlH-~
8r6' REDUCER t....:~;:._-~
~~~~~ J;l
I", 1--1:
~ r;~n-=o=-.--':,~
III !V::<>-::;'~'""';f':-I I
i ~ I ft::::>:j:(:<-;":q I
i .l r~~~~r?f~ J'
I . 4--LLLJ I~I~
' "<J I
: J r-
"~CUT BITUIolINOUS i I _
~ REillOVE 6" ~ '
e IolINOUS CURB I I
r ..}
, ?
r .'
't,
I J / I
I /I /
: ; "
l'i
i i L___ --- ____I
II -1~E"'Ol.r JSTI~ II" UG ; r r~-"~:~':~'TT:l_, i L-
'u __:j[1o~IlTO~~~I;.- .: 1.#(~.~:.8~:,:~::'Y~::~ l__
I__Lh' .'~ I di:LDC.A.TIONPRIORTOCONSTRUC'liON .' B8'-l~'R'C r "'~ ~- L.,.I l\~_
~~~NG: 1\- RC-;-n -~~~-';(;moH 'QF-rPIPE. ,)-,. lI'N_!056.8$______ - Y I --. 0.50J; ~o,' . : -- _~:;~-
STDml SEWER INSTAU. 8",,8" REDUCER i $AWCUT BlnJ"'IHOUS j--j....--t........ '; ~.~ ~HH:;I~"t.
RIIol-967,00 \ I . 6"-9CJ' BEND I />.NO REMOVE 6" /Y'",' -' I ,~"LtFS
~~6~tiiRt PFlOfl: TO,: _, i. BITUIolINQUS CURB ._-i~_V/ _ <_M~-:~:.. I /
""I ""rJ"I' I I I ! i l_l_E:C~--n' "TT-/I Ii" 1~fTt-~~~~:~,,~~~1'~~ i I
II I I U 1 -I--ri- I j I I 'I ~,--<J} I SAAlE:iSECTI />.!..r.EI.lOVEO:~ '~'lu'"'~:l
F~~]~;1~~~~::~~;~:;~=;~~-"_~~~~~ ~[ - ~-,~.=
/11 !; - ~ -+ - ~ .- - - -- =-~"-''''_c~~~:~::::ccc~"
i !! L_______________I -------____________________________________ _ J l____ -~'''~".,-~
I
f....--,
- I" It
I d
I :1
i II
i ,I
i II
I ,~
I Ii
i :1
I,
oj
'r
'I
n
.+,
~
LEGEND
OENOTES BOUNDARY UN':
.. - OENO~S DRAli'Io'.CE/ UTIUTV WEIolENT
--c-:- DENOTES (XISTINGSTORW SEWER
-<<- DENOTES PROPOSED STOR'" SEWER
_1_DENOTESPROPOSEQWATERItIAIN
-<- DENOTES EXISTING SA.NITARY SEWER
-<- OENOTES PROPOSED S/>.NITARY SEWER
DENOTES EXISTING BUILDING
c::::::J
DENOTES PROPOSED BUILDING
DENOTES [)llsnNG STORlA t.lANHOLEj CB
DEHOTES PROPOSED STORIol IolANHOLE/ CB
DENOTES PROPOSEO ITS / FrS W/RIP!tAP
. .
..
o
.
...
DENOTES PROPOSED mQRANT
OENOTES PROPOSED GATE V/>.LVE
OENOTES EXISTING HYORNfT
.,*,,*,,~llwIll""pIIon___by....._
1nJ_____I.....~_
Enu_..-IM_al..Sl-.oI","",-.
De,igned By:
~ Schoell & Madson. Inc.
_~_ Eng~lrtlll . Surwylng . PI.nn~
W -
'lI5eOw'~b ~:~NW=-~
TRUMAN HOWELL ARCHITECTS 6; ASSOC., IHe
171111 HUTCHlN8 Dill'.
"1~::'T:or::1"\.8-:"
~ ProJ&C'lNBrn&/1.ocBtion:
~ ~~~::s~:~l!::
~She"ITilie: ,IIEl_AIIYUTLJTYI'LAII
I~
l:::J
Ir3'o,61
SMI Project Number. 64401-001
Crown By:
"-
A_Ill' ---'-------- 0..., ~
Checked By:
::>CAllllED
_ PLANT LEGEND
0"""""0"'''0"''"''
00 <Do
SHRUBS/ PER(NNw.$
o
o EVERGREENTRE(
W
D
SOD-AU. DISTURBED AREAS NOT RECEMNG ROCK
IolULCH
ROCK MULCH IN SHRUB BEDS- DRESSER TRAPP
ROCK l!ll1, }I" "'OOIFIEO. GREY/BLACK IN COLOR
BY DRESSER TRM' ROCK ltole., DRESSER, WI$CONSlN.
715.4BJ.3216 OR OWNER APPROVED SUBSTITUTE.
STRAIGl-ITLEADER
AND fULL CROYrtll
FlJLL fORM
rOGRADE
QUANTITIES $HO\l>tl IN THE PLANTING SCHEDULE ARE FOR THE CONffiAC10R'S CONVENIENCE.
CONTRACTOR TO VERIFY QlJANTlTIES SHO'M'l ON THE PLAN
_ LANDSCAPE NOTES
I. LANDSCAPE CONTllACTOR TO vtRIFY AU. UTIUTY LOCATIONS ON PROPERTY WITH THE GENEfU.L CONTRACTOR -'NO BY CALLING GOI"HER STATE ONE
CAlL (651-.f54-0002) PRIOA TO STAKING PlANT UX:ATIONS.
2. VERIFY ALL lANDSCIJ>e: IIoIPRO\IOdENTS WITH REIolOV.o.LS AND SITE WQf'lI<. CONTRA.CTOR TO DISPOSE or ALL REMOVALS OFF-SITE.
J. PROVIDE A l.IlNll.lUIll Of 4" TOPSOIL IN LAWN AREAS Ai'lO 12" TOPSOIL IN lANDSC,IJ'[ BEDS. ADD SOIL AAI(NDIolENTS FOR OPTl,"U," PlN'<T GROWTH.
4. ALL DISTURBED lANDSCAPED AREAS, NOT INOICATtO TO HAVE ROCK ,"ULCH TO BE SODDED, UNLESS NOTED OTHERWISE.
5. ROCK UIIlr.1-I AR'A~, ROCK ,"ULCH TO BE PRIl.lARLV IN SHRUB BED LOCATIONS, AS INOICATEO ON DRAWINGS. l.lULCH SHALL BE DRESSER TRAPP
ROCK 11117. ~- 1Il0DIFIED. GREY/SLACK IN COLOR BY DRESSER ll<AP ROCK INC.. DRESSER. WISCONSIN. 715,41:13,3216. ROCK UULCH SHALL BE A
"'INIUU," OF 3" DEPTH OVER flLTER FABRIC, mEE OF ALL DELTERIOUS W.TERIAL OWNER TO APPROVE ROCK r.lULCH, PRIOR TO CONSTRucnON.
8.~SOOISTOBEPRIUARILVkENTlJCKVBLUEGRASS,FREEOFl.AWNGR.A.SSWEEDS,lAATCH INTO EXISTlNG,ASAPPLlCABlE. ANCHOR
SOD ON SlOPED OR POTENTIAL EROSION AREAS, OR AS REOUIRED. UATCH SOD EDGE f"LUSH WITH EXlsnNG FINISH GRADE. ROLL SOD TO PROIIIDE
SuOOTH GIWlE. STAKE ALL SODDED SLOPES 4:1 OR GRATER. PROVIDE EROSION CONTROl DE\IICES AS NECESSARY UNTil SOD IS ESTAllLISHEO.
7. CONTRACTOR TO VERIN PlANTS REQUIRED AS REFLECTED 00 PlAN, NOTlN lANDSCAPE ARCHITECT IF PLAN AND SCHEDULE DO NOT ,"ATCH. ALl.
PlANT ,"ATERIAL TO COMPLY WITH TI-IE LATEST EDITION OF TI-IE AUERICAN STANDARD FOR NURSERV STOCK. NolERICAN ASSOCIATlON OF NURSEYUAN. ADO
FERTlUZER, HERBK:'DE:, AND PESTICIDE AS NECESSARV FOR OPTl"'UIoI GROWTH.
B. ALL PI.>>ITING BEDS TO BE EDGED wrrH r.l[fAL EDGING, 3jI6-INCH THICk BV "-INCH HIGH BY 10-f1:ET LONG, BV COL-lAET, OR APPROVED EQUAL
ANCHORED WITH uETAI. SPIKES PER lAANUFACTUIlER'S RECOlAUOIOATlONS
9. SINGLE TREE PlANTlNGS SHAL.l. HAVE A ... DEPTH SHREOOED HARDWOOD WULCH RING AROUND u,cH BAS~ DECIDUOUS PI.ANT MATERIAL SHAU
HAVE A lAlNliIlUU 3' DWoIETER RING. EVERGREEN PLANT MATERIAl. SHAU.. HAVE A RING TO THE DRIP UN~
10. SHREDDED HARDWOOD WULCH SHALL BE COLORED, RED C"NYON BY mv", OR APPROVED EQUAL AND AT A WINIt..lUW 4- DEPTH. FREE OF ALl.
DELETERIOUS WATERIAl... OW~ER TO N'PROVE OF r.lULCH. PRIOR TO CONSTRUCTION.
11. CONllW:TOR TO WAlNTAlN ANO WATER PL.J\,NT W.TERIAL DURING INST"lU.TlON "NO FOR A 60 EST....BUSHIIlENT PERIOD. VOLUWE Of WATER TO BE
PER PlANT REQUIREMENT fOR ESTABUSHMENT AND NORIIlAl. GROWTH. CONTRACTOR SHAU.. PROVIDE A WRITIEN REQUEST FOR THE OWNER ACCEPTANCE
INSPECTlON
12. CONTR,l,(;TOR TO W"RR.A.NTY NEW SOD fOR 00 D"VS UPON SUBSTANTIAL PROJECT COIolPLETJON.
13, COl-lTRACTOR SHoI.LL WAAFwffY NEW PlAN MATfRI....L roR TWO YEAR UPON PROJECT COI.lPLETlON AND OWNER'S ACCEPTANCE. ALL REPL.J\,CEW[NTS
TO a~ PRQ\I1DED BY THE CONTRACTOR AT NO ADDITIONAl COST TO THE OWN~R.
1... ALL PLANT MATERIALS SHALL BE INSPECTED ON SITE PRIOR TO PLANTING BV LANOSCAPE ARCHITECT DR OWNER'S REPRESENTATIVE.
15. EXISTING TREES AND SHRUBS, THROUGHOLfT THE PROf'ERTY. SHALL BE PRUNED TO REUOIIE DEAD OR UNDESIRABLE Ur.lBS AND TO SHAPE PLANT
FOR DESIRABLE APPEARANCE AND COMPLETED BV A OUAUflED INOMDui\L. CONTRACTOR TO ClEAR AND GRUB EXISTlNG VEGETATION A~O DISPOSE OF
ALLREr.lOV~ OFF-SITE PER PROJECT IIIjPROVEMENTS.
16. PROPERTY SHALL HAVE ALfTOMATlC UNDERGROUND IRRIGATION SY5TEW. CONTRACTOR TO PROIllDE SHOP DRAWINGS fOR LANDSCAPE ARCHITECT
APPROV-'L- SVSTEU SHALL BE WINTERIZED(BLOwN-O\JT} AfTER ThE FIRST OPERATIONAL SEASON AND SKI\LL PROVIDE STARTUP ThE FOLLOWING SPRING
IRRIGATION SHALl HAIlE TWO-YEAR WARRANTY (Jt<l PARTS AND lABOR fOLLOWING INSTALLATION APPRQl/Al BY OWNER, PIlOIllDE 6A.CKfLOW DEVICE, WATER
~ETER. BOOSTER PUr.lP, BLOW-OUT VAL\fES. CONTROLLER, RAIN SENSOR. WIRES. VAlVE BOXES. SLEEVlNG. VAL\fES. ROTORS. SPRAYS, AND OTHER
ACCESSORIES FOR A COMPlLTE SYSTEU,
n
.+,
~
WARNING
THE CONTRACTOR SKAlL CO~TACT ALL PUBUC UTlLmES
FOR Loo.TIONS OF .o.u UNDERGROUND WIRES, CABLES,
CONDUITS, PIPES. t..lANHOLES, VALVES. OR OTHER BURIED
STRUCTURES BEFORE ~GGlNG. ME SHALL REPAIR OR
REPlACE THE ABOVE WHEN DAIIj.o.GEO DURING
CONSTRUCTION ....T NO COST TO OWNER.
o .
~ ,
"ACE
ClleC:lr.edBy:
~ so.... n,,,
~ PIl~y u.~CAf1! PL.AIlI
I r=-:I
~
Irs",61
SMI Project Number: 64401-001
DrltWr'lBy:
==== Schoell & Madson. Inc.
.,_ ~.PI8nnk1g
11Dl!IIlW.,---.:LlUlool ilI54,"*,,_'flIl'.lUlootlO
~_&5:JOO..152:!I 9.,,"-,_.5!'J300-_
~__~-""('JI.'lzJ~ C7<<!)1+<rn-Iurlt52}5oIHOlI5
TRUMAN HOWELL ARCHITECTS It ASSOC., IMC
17.1. HUTC"IlI. DRIVI
.......YONKA. WI
.811ti .0107...
~ PrtljectN..meILoclItion:
JACOII'. TAVI!RIlI
QWIIHA"lIlI, Mill
RoMsOO.
D..te. 0esttI Ion'
11.11.05 CITY COMMENTS
,
"
1........,.<*Ify_.........._~II'J'..."'undIr
"'1l1lrw::1~__I.....~_
~~_.........IJI...s-. ._
~ -{ ~:-1: :2-._
=~ll.Ho.~
De.i!l""d8y;
GCAfWED
! !i
i \1
! 11
ill
I Ii
ill
i!i~
Ill!~
ill!
i '<[
ill
!.:l>
III
jl i;
'iliw
lili~
Ii II
:i Ii=:)
ii ii
111'0
1'1'
,! I'r:q
1111
illl
ii It
ii ii
II il
: Itr-
n
p !'
'II~
! !!
""':=J
I-
z
w
U
'!
II
Ii
, "
~
SOOt:
~
D.~ ~~rlml~
S T A T E H I G H 'vi A Y N 0, S
00 0,0 00 0.0 0.0 00 0.0 0.0 0.0
0.0 0.1 '0.1 0.1 ).L_u1!~1 0.0 0.1 O. )-~ 0.0 0.0 0.0 '0.0
,5 ,,'r~
0.7 2.2 1.9 0 08 0.3 '0.2
h -~5 i 114/
J"" I I
I
0.6 0.6 2.1
.I~'~~""._""'"
;: :,l' I
'II
I.
'IV
"
II
n il
"
Ii C. G
~ I
I
el
i
/:,
0.0
'0.0
01 ~.
"
01
0,1
~5
-"1~ ii' ii, I I .1 . j I r I ',I ,I'"' r I ','
1:05' 2.11' '6.S . a.7 I 091 1101' 13j 5'7' 18 I 07 '12 I. jl~ '.'
[: I., , I I I ! i Ii I: I i I I' :
....~-,.."..---E1---...o.....-..J--..!-.....:..~-...../~-=-f71- "'!-=--b~~: I
~~~'c, -h._ iA3 2.2 /OP-._..2,~ 26 A20 11 /05., 'O~~
--...:
2.3
l.1
1.4
2.7
2.8
2.0
11
1.4
1.8
2.6
~_ ~-~-~O~~~~~-j.;;.~~~~'2
- 0~---~-":~':':-~3____.~~ 01
._~..._-,
0.2
'01
._~_._-
WARNING
THE COtflRACTOR Stw..l CONTACT AlL PUBlIC lfflUTIES
FOR lOCATIONS ~ ALL UNDERGROUND WIRES, CABLES.
CONOUITS. PIPES, IolANHOltS. 'iAL'<t:S. OR OTHER BURIED
STRUCTURES BEFORE DIGGING. HE SHAU. REPAIR OR
REPlACE THE AlIOVE WHEN OAUACED OURING
CONSTRUCTION AT NO COST TO OWNER.
AlD,Inr::.
ARCHITECTURAL LIGHTING DESTGN$,!NC
2920 ANTHONY LANE
ST, ANTHONY, MN ~5418
612-2~2-4100, 612 252 4141 fo"
CONTACT, $CDTl HARMES
@@ D.'~m~
~
Checked By:
o..iljfledBy:
IhIor8brllMify_.....pIM___....II'_
"'>>'dirwctl~_....I....~Pn:lIeaIan8I
~M::hIIct....o.........oI...SlIIleDl~
1.8 1.3 ~;<'!.:_~~~
i~-:-.
~ I
(9'~ 07 11-- i
~ .~t.J..{.':;:~(.~:l.:...~r- ~
I W;"{("r(;"\ ~.
ll~:~gi:i
"!3 II If
rr"
j')
30 ...R.;;,I LOT 2
.1' /
/ "
:l~// 4,8
(; ~___~3
: ["'1T7, 1'''1',
, ~." I ! ~,4,O 1'1.,;[
:~___l v', :........,.j i c;:..~ 'L
"vi L.I L-i .~_, .
07
10
h
.5
1.6
2.3
31
21
1.6
1,9
21'-"'1 i if i 15 I 1'371 I04T
..J , Ll:.J--L1.LI..L.,~
3.2 10 0.6 0.9 35 i::J 28
E
t.3
0.3
0.2
15<- h '0.6
0.4
FIXTUi<:'ES MUST 1<['1'*
Pro 'E'ct: All Proects
Qt Lobel S Ml?ol
6 A
1 ,
4 E
7 ',/ c:J
6 C
0.3
J\lcob's Tavern
~tointainer;l Light levels using \Jidl?\ite Al3 fixtures (new)
Existing fixtul"~s Ql"e unknown.
It9.a32
12/21/2005
/;;'~.-.-........'.....
(~-::,.L~~;'::'~
;.:;~ ' ,~
) - .1
~
DlSCLAIMEP
rlois l'ght,n'Ol plun SIJO'clfi... l",..,inuir'.s ~",ppll..oI by ALD, Any <I..vi"tio;", f..o"
tNs plM' or "'". Of l'-'r.lnn..~,. otn.r tn<l'" ALD prOdL.ct,. IIrKI r.Q\..... f...ll "u.."it'tnl
Of f,"t...r. "n"'p1.. <I..<lwlngs, "1'101 Ilgnti"9 pIn,., to city, .ngln~..r MId lar\d"cnp..
on;:hitcct for p..iO'" approvn(
Tn..~~ <::o.l<::....("tiO"S fire NOT vnlid for Ow,.,..... or city <lpproval "$1"9 a,.,y '"o,,-ALD
r..pr..",,,,,,t..,, p..od",ct' or fi"t"'''''li ,.,ot :of,ow,., on thl.. pi"'.... rillt",r.... ...",..t b.. p,'ovided by ALP
C"I<:...I"tion.. I,o.v.. be..,., pe..fo.."'<'" witn o....r ""lit i"tw-pr..to.tion of the
"et"lI..glven10...... $O...l/diffl/r..ncl/ibe'twe..,.,.....o.........oIa,.,ciC"IClAot..d
re5'-,lt$ ''''y occ"'.. du" to i"tol"",,"'ees In calc...(o.tion ,.,..tnod". testing
p..oc.-"w'es. COMpO"..,.,t p....fo"..,unr.... ..,.."s.......""nt t..c...nlq......s an" netd
conditions s...cn 1\$ ,"alto.ge. t.....p{>ro.tu.... va..io.tions, IOI"lfl ...o.n".nct....er
voriotions. ond oth.... vorlo.k:>l{>s_ Co.IC",latio"'$ dO no't to.l<. "'to cons!d..rati"n
obJ..cts s...en o.s. b...t not \i"'it"d ta, t,'{'{'S, b,~I"I"g5, pnv.."'ent, Sid('walk,
Of'" c:nr,., C<ltClAntl"'" val......,. r.pr....~nt norlzontal n... Ilgnt .....t.... foldn9 st..Dlg...t ....p)
"(",,,,inance rc lev..l:!\' (unl.."s otr.....wi".. ,.,etedl. If tr,.. r..o.l e"'vi..on",..nt <=onolitk>"" do
not ..."ten tn.. Inp",t dnta. ct;ff..'-..ne"" will occ...r uctw..",., "'"""........<1 v"l",es tl"d culc"l"t..,J v,,'-.....s
AlD is '-'ot resp.~nsibl.. for nCt:!uirlng 0... ir'ltl'rpretln9 any lOCal lighting code"
Tn.... liQntl"!;l Co.lc",lot,o".. 0."1' lIot 1\ S",b..titute fo.. l"oIepl'''dl'"t ,,,gl,,~..ring o.nCly"'s
nY<lprof.,.,.I",.,<lI..,.,gl"..er.
't9
MOlm't Heiqht
!,.!:'~j~~_t: All _~..:::.2jp.cts
SEqNo lab.;>l Z
I A 28
2 A 28
3 A 28
4 A 28
5 A 28
6 A 213
7 B 29
8 C 15
'3 C 15
It) C IS
11 C 15
12 C 15
13 C l5
14 E 28
15 E 23
16 E 28
17 E 28
18 \J 2
I':; \J 2
20 \J 2
21 \J
22 ',/
23 ',/
24 ;J
NUMeric SUMrlar
Pro 'ect: All Pro 'eocts
lebeol ColcT pe
Jo.Cor,'S PUr'k.n lllul"1inu neE'
Halide lnn Exp lllul"1inonce
[lescrip-tion
Videlite AL3M 401) 4H::;/25' pole, 3' base
Existin (IJni-<nown) AL:iM-401)-4HS-Twin Heod/25' OlE'
Exh:th' (unknown) 4iJOMH-Sin Ie. 25' pol
Existing ......all MOl)nt (I,An!.-nown) 250MH, 23
LurH~C l60/l61-15lJMH-PCFC SE3/14' l~'Me': pole
Or.wnBy:
_==_ Schoel! & Madson, Inc.
,., Eng~ng. panning
to5lJOW.rzUl9cdNrd,abl $54'llW1:lsn.4twt.,.,..oo
~_ MlO!FI~25 9;Fhw.~ M:3:lO-lotOll
(lI!\2l M&-7ecJll-tu~ S4&-9Oe6 0I!l3)2~ -t...lIli'i21S4ll--90S5
TRUMAN HOWELL ARCHITECTS &; ASSOC., IHC
178111 HUTCHINS DRIY.
MINNIETONK.... MN
IlitIl21401-711811
~TlIpp8I'I
o-~Reg.NO.~
LU..C=<:::'':...~ '-=:--PRESENTATION
rLl1
tJ .-
t
,..-. q~
Units A, Mo, Min A, /Min Max/Mi"
Fe 143 6.5 O,[) 0.0(1 D,Oi)
Fe 102 36.4 00 0.00 0.00
LUMen~ LLF Fileno Me
32000 Q.70D ALM404HS,ppf
36000 Q,70[) ALM404Hppf
32000 0,701l tlLM404HS,ppt'
22000 0,701) ALM404HS,ppf
120;.00 0,701l ll)2G0162,ies
ArrClrlHE'nE'"t
SINGLE
BACr'-BACY.
SINGLE
SINGLE
SINGLE
C:::L~""
. .....coe-. T"'YI!RM
CK...NItA..,iN, 11M
I
,
'E
U 1,1,,1
J
o
....
'""
\
I ~T~?~~7\-~--::;r:;c~~".
I p...........
~cSb" ~ __._'~_: :"
I
a'I.~..
0,_-,: '".' U (J II U :1
o
o
~,-
""
I ~.'
"'"
""
@ FIRST FLOOIi! PLAN
AI
-------1
-=~--]
w".r-o'
I TOT.... ~ 1'OaTAM!. !""!It Sea. I"f.,
TOT.... ~aw. ..1
[i
~~
~g
~~
WI-
lE2
ZZ
a:~
~:Z
<(W
I-~
g:l<(
lD::r:
Oz
()<(
<(::r:
,()
~ E ;,
i!!i
~~~;
illl! j]
5:J
TRUMAN
HOWELL
ARCHITECTS
& ASSOC.,INC.
'JII'Ill~_
_1lJI<.\..l/lJoIIl
~_flll:~"
1V~/05
"'"
3/16'.r-<r
FreT
R.OOR
PLAN
G
neAlH/ED
~ ~~~~
~~o~~
~1'!Dm.....1tOOI'
~ ~~~~~~l~
~~~~,.~.
~olO'l'~
~:aAmtlKlN
m........
~'~~_.~
a.fVolOO'-o"
m........
~'~~_....
a.fV,lOO'-o'
~-
M_~
~ ELEVATION
@ ELEVATION
~=~
T~.=~
~~:~~ ~
Mn'::::; ~
m..........
T{#'a~l:lO~~
TaP"a~~;~
@ ELEVATION
@ ELEVATION
~'.r-o"
~'.r-o"
i
~~I
~
<(
z
~~
WI-
lE2
ZZ
a::::!:
!!;!Z
<(W
I-~
9><(
alI
Oz
0<(
<(I
-'0
!iii
"".
ilih
{P~o
~ ;l}~
5:J
TRUMAN
HOWELL
ARCHITECTS
& ASSOC.,INC.
I~~-
-~-
~-_I"'~'"
tV~/05
"'"
3/32'''-{),
EXTERIOR
a.EVATIONS
~
GCAWIED
~~~~'-O'
8
~
DECK
@ BUILDING SECTION
~
-----.-....----..----..
I
[ R ::r p
- I-----------
-- I ~ E(
~ .. ~
I ~~~: ~
~ if"
DINING KITCI4EN
DECK
I
__n__n__n___n__n______ ______________________n_ m _ _nnununu___nu nuunu_nunu__nn_ uuuun_uuuuu_
________nnnn_ --- nuu
@ BUILDING SECTION
~
~IS
~
<l:
z
~!2
WI-
8:2
ZZ
a::::!;
~Z
<l:W
I-~
~<l:
CDI
Oz
U<l:
<l:I
-'U
!ili
]:~!
UBI
f!i}i
fi:]
TRUMAN
HOWELL
ARCHITECTS
& ASSOC.,INC.
'JN~_
_1lJO(,I,1IIW'i11
~_f.~JIII
W~/05
AS NOTED
DfI"'_C
Ell.UlfoIQ
SECTIONS
8
~
CCAWIEO
ROOF PLAN
G)
'-"20.r-o'
i
3CAfWED
JACOB'S TAVERN
CHANHASSEN,MN
Jl:]
UMAN
OWELL
w:JIlTEcrs
. j8S()C.,lMc.
---
---
--
WQs1-
110101011
.JACOIl'll TAYEftl ~
CHMHAIll:EN, ~ ~
jo '^- +l
~\ng c~~
~~ '$
0) 1946 ""
~ CJ~
O"lJfy S\~
219 East Frontage Road
VVaconia,~ 55387
Phone: 952-442-5101
Fax: 952-442-5497
CONSERVATION DISTRICT
http://www.co.carver.mn.us/SWCD/SWCDmain.html
Mission Statement: To provide leadership in conservation and teach stewardship of the soil, water, and related
resources throuf!h a balanced, cooperative prOf!ram that protects, restores, and improves those resources.
December 13, 2005
Robert Generous, Senior Planner
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
Re: Jacob's Tavern
Mr. Generous:
The SWCD has taken the opportunity to review the Jacob's Tavern plan. The plan reviewed is
dated 11/09/05 with a City stamp of December 02,2005. Please review and consider the
following comments and suggestions regarding erosion and sediment controls and NPDES
compliance.
Erosion Control
- A temporary cover of mulch and temporary seed is needed within 14 days of final grade for any
exposed soils or if any exposed soils are not actively worked within a 14 day time period.
Sediment Control
- The detail showing the CB filter barrier is an adequate control; however it may not be the best
BMP given the locations of the CB's #3 and #4. Wimco-type inlet controls may be a better inlet
control option. Additional existing CB's immediately adjacent to the project must be protected
as well.
- During installation of the proposed storm sewer infrastructure to the existing storm sewer,
temporary caps or plugs may be needed until the installation of the pipes and inlets are complete.
- Any sediment tracked upon paved surfaces must be scraped and swept within 24 hours.
SWPPP
- A NPDES permit is required for the development and be applied for and received from the
MPCA by the Owner and operator of the site.
- A completed SWPPP meeting NPDES conditions is needed for the development prior to
application ofthe NPDES permit.
If there are any questions or if I can be of further assistance please contact the SWCD office.
Sincerely,
Aaron Mlynek, CPESC
Urban Conservation Technician
c. Lori Haak, City of Chanhassen (email)
AN EQUAL OPPORTUNITY EMPLOYER
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO:
Robert Generous, Senior Planner
FROM:
Mark Littfin, Fire Marshal
DATE:
December 22, 2005
SUBJ:
Jacob's Tavern. Request for site plan approval for a 6,808
square foot restaurant building on 2.2 acres located at the
southeast comer of Highway 5 and Century Boulevard.
Planning Case: 05-40
I have reviewed the site plan request for the above project. In order to comply with the
Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or
city ordinance/policy requirements. The site plan is based on the available information
submitted at this time. If additional plans or changes are submitted, the appropriate
code or policy items will be addressed.
1. A lO-foot clear space must be maintained around fire hydrants, i.e., street lamps,
trees, shrubs, bushes, Xcel Energy, Qwest, cable TV and transformer boxes.
This is to ensure that fire hydrants can be quickly located and safely operated by
firefighters. Pursuant to Chanhassen City Ordinance #9-1.
2. Yellow curbing and "No Parking Fire Lane" signs will be required. Contact
Chanhassen Fire Marshal for exact location of yellow curbing and location of
signs to be installed.
3. Builder must comply with the following Chanhassen Fire Department/Fire
Prevention Division Policies. Copies enclosed.
a. # 1-1990 regarding fire alarm systems,
b. #4-1991 regarding notes to be included on all site plans,
c. #7-1991 regarding pre-fire drawings,
d. #29-1992 regarding premise identification,
e. #34-1993 regarding water service installation,
f. #36-1994 regarding proper water line sizing,
g. #40-1995 regarding fire protection systems,
g: \safety\ml\p Irev05-40
The City 01 Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. P.O. BOX 147
CHANHASSEN, MN 55317
(952) 227-1150
FAX: (952) 227-1190
CHANHASSEN FIRE DEPARTMENT POLICY
FIRE SPRINKLER SYSTEMS
1. Extinguishing systems for kitchen hoods, spray booths and similar locations require a separate
permit.
2. A minimum of two sets of plans is required. Send, or drop off plans and specifications and
calculations to:
Fire Inspections
Attn: Mark Littfin, Fire Marshal
City of Chanhassen
7700 Market Boulevard
POBox 147
Chanhassen, MN 55317
3. Post indicators are required and must have tamper protection.
4. All control valves must be provided with tamper protection.
5. All system tests must be witnessed by the Chanhassen Fire Marshal. Appointments can be
made by calling the Fire Marshal at (952)-227-1150 between 8:00 AM and 4:00 PM, Monday
through Friday. Please try to arrange tests at least 24 hours in advance.
6. Main drains and inspector test connections must be piped to the outside atmosphere.
7. Water may not be introduced into sprinkler piping from the City main until the Fire Marshal
witnesses a flush test per NFP A 2002 10.10.2.1.
8. The City ofChanhassen has adopted Chapter 1306 including item El of the Minnesota State
Building Code.
9. The entire sprinkler system must be designed and installed per current applicable standards,
i.e. 13, 13D, 13R and current Minnesota State Building Code, Chapter 9.
Fire Sprinkler Systems 40-1995
Page 1 of3
10. All equipment installed in a fire protection system shall be UL listed or factory mutual
approved for fire protection service.
11. Fire protection systems that are hydraulically calculated shall have a 5 psi safety factor at
maximum system flow.
12. Include spec sheets for fire sprinkler heads-dry pipe/pre-action valving.
13. The definition of inspection is contained in MN Rule 7512.0100 Subpart 10, and states that
inspection means:
. Conducting a final acceptance test.
. Trip test of dry pipe, deluge or pre-action valves.
. A test that an authority having jurisdiction requires to be conducted under the
supervision of a contractor. Only licensed fire protection contractors are permitted to
conduct these tests.
. All other inspections including the inspector's test, main drain and other valves are
permitted under MN Rule 7512.0400 Subpart-2G, as maintenance activities and do not
require a license as a fire protection contractor.
. Rough-in inspection required if piping or hangers will be concealed.
. 2 hour 200# wet pressure test including the fire department connection.
. 24 hour air pressure test (for dry systems only)
. System must be 100% tested prior to calling for inspection.
. 2 hour 200 # wet pressure test of dry pipe systems.
14. A UL 72 certificate is required for sprinkler monitoring.
15. A zone map will be required for all multi-riser systems. The map must be permanently
mounted adjacent to the sprinkler riser.
16. On Spec Warehouse projects:
. Ordinary group 2 designs will be accepted for the shell building.
. Upon tenant finish, a review for storage height and commodity class will need to be
reviewed for proper sprinkler protection.
17. Back flow prevention devices must be one of the following per Minnesota State Plumbing
Code Sec. 4715.2110:
RPZ (reduced pressure zone)
DCV A (double check valve assembly)
18. Sprinkler contractor is responsible for choosing the appropriate density and for the accuracy
of hydraulic calculations.
Fire Sprinkler Systems 40-1995
Page 2 of3
19. Sprinkler systems with specialized design criteria (i.e. high pile storage, flammable liquids)
must include a code analysis of the proposed design including specific code references.
20. Exterior combustible decks on R-1 apartment buildings shall have sprinkler protection above.
21. Dry valve trip test-water to flow from inspector's test within 60 seconds on systems
containing more than 750 gallons. Accelerators and/or exhausters will be required ifthe 60
second requirement is not met.
Revisions
6/1 0/02
3/22/05
Fire Sprinkler Systems 40-1995
Page 3 of3
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227-1150
FAX: (952) 227-1190
MAXIMUM ALLOWED SIZE OF DOMESTIC WATER SERVICE ON A
COMBINATION DOMESTIC/FIRE SPRINKLER SUPPLY LINE
1. Domestic water line shall not be greater than Jf4 pipe size of the
combination service water supply line.
2. 1 W' domestic off 6" line.
3. 2" domestic off 8" line.
4. 2 ~ domestic off 10" line.
Option 1:
Domestic sizes may be increased if it can be calculated hydraulically that
the demand by all domestic fixtures will not drop the fire sprinkler water
below its minimum gallonage required.
Option 2:
Combination domestic and fire line service shall have an electric
solenoid valve installed on the domestic side of the service. This
valve shall be normally powered open and close on loss of electric
power or signal from the system water flow indicator.
Must be approved by the Chanhassen Fire Marshal and Chanhassen
Mechanical Inspector.
Revisions
6/10/02
3/22/05
Combination Water Service Lines 36-1994
Page 1 of 1
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227-1150
FAX: (952) 227-1190
CHANHASSEN FIRE DEPARTMENT POLICY
PREMISES IDENTIFICATION
General
Numbers or addresses shall be placed on all new and existing buildings in such a position
as to be plainly visible and legible from the street or road fronting the property. Said
numbers shall contrast with their background. Size and location of numbers shall be
approved by one of the following - Fire Marshal, Fire Inspector, Building Official,
Building Inspector.
Requirements are for new construction and existing buildings where no address numbers
are posted.
Other Requirements - General
1. Numbers shall be a contrasting color from the background.
2. Numbers shall not be in script.
3. If a structure is not visible from the street, additional numbers are
required at the driveway entrance. Size and location must be
approved.
4. Numbers on mail box at driveway entrance may be a minimum of 4".
However, requirement #3 must still be met.
5. Administrative authority may require additional numbers if deemed
necessary.
Residential Requirements (2 or less dwellinl! unit)
1. Minimum height shall be 5 inches.
2. Building permits will not be tinaled unless numbers are posted and
approved by the Building Department.
Premises Identification 29-1991
Page 1 0 f 2
Commercial Requirements
1.
Minimum height shall be 12".
2.
Multi-Tenant Buildings
a. Building address range, minimum height of 12 inches.
b. Address numbers required on all tenant doors. Minimum height of
6 inches.
3.
If address numbers are located on a directory entry sign, additional
numbers will be required on the
buildings main entrance.
4.
Signage on overhead! delivery doors will also be required.
Revisions
6/10/02
3/22/05
Premises Identification 29-1991
Page 2 0 f 2
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227-1150
FAX: (952) 227-1190
CHANHASSEN FIRE DEPARTMENT
POLICY REGARDING PRE-PLAN
Prior to issuing the Certificate of Occupancy, a pre-plan, site plan shall be submitted to the Fire Department for
approval. The following items shall be shown on the plan.
1) Building footprint and building dimensions
2) Fire lanes and width offrre lanes
3) Water mains and their sizes, indicate looped or dead end
4) Fire hydrant locations
5) P.LV. - Fire Department connection
6) Gas meter (shut-oft), NSP (shut oft)
7) Lock box location(s)
8) Fire walls, if applicable
9) Roof smoke vents, if applicable
10) Interior frre walls
11) Exterior doors (garage doors also)
12) Location offrre alarm panel
13) Sprinkler riser location
14) Exterior L.P. storage, if applicable
15) Haz. Mat. storage, if applicable
16) Underground storage tanks locations, if applicable
17) Type of construction walls/roof
18) Standpipes
19) Fire Department make up exhaust controls for parking garages
20) Smoke evacuation system controls
21) Elevator shafts
22) Special Fire Suppression System Room
23) Interior Roof Access
24) Attic Access Hatch
25) Outside emergency generators
SIZE: llxl7, 81/2 xll or larger plans will be accepted. A digital version in group 4 TIFF format may be
required to be submitted with the paper version of the plan.
PLEASE NOTE: Plans with topographical information, contour lines, easement lines, property lines,
setbacks, right-of-way lines, headings, and other related lines or markings, are !l!!!. acceptable, and will be
rejected.
Revisions 6/10/02, 3/22/05
Pre-Plans 07-1991
Page 1 of 1
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227-1150
FAX: (952) 227-1190
CHANHASSEN FIRE DEPARTMENT NOTES TO BE
INCLUDED ON ALL SITE PLANS
1. Fire Marshal must witness the flushing of underground sprinkler service line, per NFP A 13 2002
10.1 0.2.1
2. A fmal inspection by the Fire Marshal before a Certificate of Occupancy is issued.
3. Fire Department access roads shall be provided on site during all phases of construction. The
construction of these temporary roads will conform with the Chanhassen Fire Department
requirements for temporary access roads at construction sites. Details are available.
4. Onsite fire hydrants shall be provided and in operating condition during all phases of construction.
5. The use of liquefied petroleum gas shall be in conformance with NFPA Standard 58 and the
Minnesota Uniform Fire Code. A list of these requirements is available. (See policy #33-1993)
6. All fire detection and fire suppression systems shall be monitored by an approved UL central station
with a UL 72 Certificate issued on these systems before fmal occupancy is issued.
7. An 11" x 14" As Built shall be provided to the Fire Department. The As Built shall be reproducible
and acceptable to the Fire Marshal. (See policy #07-1991).
8. An approved lock box shall be provided on the building for fire department use. The lock box
should be located by the Fire Department connection or as located by the Fire Marshal.
9. High-piled combustible storage shall comply with the requirements of Article #23 of the Minnesota
International Fire Code. High-piled combustible storage is combustible materials on closely packed
piles more than 15' in height or combustible materials on pallets or in racks more than 12' in height.
For certain special-hazard commodities such as rubber tires, plastics, some flammable liquids, idle
pallets, etc. the critical pile height may be as low as 6 feet.
10. Fire lane signage shall be provided as required by the Fire Marshal. (See policy #06-1991).
11. Maximum allowed size of domestic water service on a combination domestic/fire sprinkler supply line
policy must be followed. (See policy #36-1994).
Revisions, 5/15/03, 3/22/05
Notes For Site Plan 04-1991
Page 1 of 1
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227- 1150
FAX: (952) 227-1190
FIRE ALARM SYSTEMS #01-1990
1. Fire alarm system shall meet the requirements of 2000 IFC and the current standard ofNFP A 72.
2. Two (2) sets of plans shall be submitted to the Fire Department for approval. Plans shall include:
a. Connection diagrams.
b. Specification data sheets.
c. Schedules, for each device, including: location, function, and zoning.
d. Complete diagrams indicating: devices, components, interconnecting wiring, indicate
labeling and descriptions on equipment.
e. Floor plans indicating device and component locations, conduit, raceway and cable routes.
t: Power connections, including source and branch circuit data.
g. Plan layout and details of: fire alarm control panel, fire alarm
subpanels/transponders, annunciator.
3. Wiring may be either a Class A or Class B Wiring System. (Exception: When a fire alarm system is used to actuate
an extinguishing system that protects a special hazard with high value, Class A circuitry will be required.
4. All components of the system must be u.L. listed for their application, compatible and installed per current
applicable NFP A 72, (99) National Electric Code and manufacturer's requirements.
5. Alarm verification is required for all systems using smoke detectors.
6. When Central Station notification is required or otherwise provided, it must be through a V.L. listed communicator,
or NFP A Listed Control Panel. All Central Stations must be V.L. listed.
7. Alarm horn must meet audibility requirement of NFP A 72, which would normally require an alarm horn in each
unit.
8. The system shall be zoned per Chanhassen Fire Department requirements.
9. A u.L. 72 Certificate is required on the system. The V.L. 72 Certificate shall be current and required for the life of
the alarm system and the life of the building. A copy of the V.L. 72 application OR certificate must be provided
prior to the fmal of the building.
10. A fully-function annunciator must be provided per Fire Marshal approved location if the control panel is remotely
located.
11. All systems using standard horns or speakers must be set for temporal time.
1
Fire Alarm Policy 01-1990
Page 1 of 2
12. The Chanhassen Fire Marshal must be contacted for final inspection of the completed job. The inspection will
include the following. Approved and acceptance must comply with NFP A 72.
a. Test for proper operation of each device.
b. Random testing for system trouble.
c. Random testing for ground fault trouble.
d. Correct operation on battery or standby power.
13. Remote alarm indicating devices are required at locations when duct detectors are not visible from floor.
14. All pull stations will need approved covers to prevent accidental activation.
15. A permit application signed by the low voltage contractor or electrical engineer.
16. Water flow alarm must be monitored as a distinct signal.
17. Low air pressure on sprinkler systems containing air pressure shall be monitored.
18. Devices designed to initiate a specific function or action i.e. duct smoke detection, elevator recall, and
door hold open detectors shall be monitored only for supervision.
19. Power supply for alarm systems must be on a dedicated circuit. Breakers for all alarm system
components, including exterior sprinkler alarms must have approved locking devices to prevent
the accidental disconnecting of power.
20. Monitoring systems must comply with NFP A 72 including panel requirement for audible trouble
signals and must have two means of signal transmission.
21. A zone map is required on all multiple sprinkler riser or zoned systems. The map must be
permanently mounted adjacent to sprinkler riser, alarm panel and annunciator panel.
22. Completion ofNFP A 72, installation/testing forms.
Revisions
5/15/03
3/22/05
2
Fire Alarm Policy 01-1990
Page 2 0 f 2
..
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 MARKET BLVD. PO BOX 147
CHANHASSEN, MN 55317
(952) 227- 1150
FAX: (952) 227-1190
DATE:
PROJECT:
ADDRESS:
OCCUPANCY TYPE:
OCCUPANCY:
CONTACT NAME:
ADDRESS:
PHONE:
FAX:
E-MAIL:
New Construction/Remodel for Commercial Plan
Review Submittal Criteria FP 52-2005
Page 1 of3
FIRE DEPARTMENT POLICY
NEW/EXISTING CONSTRUCTION/REMODEL AND PLAN SUBMITTAL CRITERIA
FOR COMMERCIAL BUILDING
1. Submittals for building permits must include detailed information relating to the proposed use and
occupancy classification of the building.
2. Complete and submit a Hazardous Materials Inventory Statement documenting the quantities and
classifications of hazardous materials to be used or stored inside or outside of the facility. Hazardous
materials must be classified according to the Minnesota Fire Code. Yes _ No _ N/ A _
3. Provide a storage arrangement plan describing materials to be stored, the quantities and heights of storage.
Storage of combustible materials exceeding 12' in height and storage of high hazard commodities
exceeding 6' in height must meet the requirements of the Minnesota Fire Code. A completed high-piled
storage worksheet is required. Yes _ No _ N/ A _
4. Provide a list of special operations such as welding, cutting and other hot-work, battery charging stations,
application of combustible or flammable finishes, dip-tank operations, laser use, medical gas use and
storage, etc. Yes _ No _ N/ A_
5. Provide floor plans indicating locations and specifications of equipment such as spray booths, industrial
ovens, commercial cooking equipment, exhaust hoods, dust collectors, parts cleaning equipment, forklift
and industrial battery charging stations, etc. Yes _ No _ N/ A _
6. Provide floor plans showing locations of roof and attic access, electrical and mechanical rooms, sprinkler
riser rooms, fire alarm control panels, annunciator panels and portable fire extinguishers.
Yes No N/A
7. Provide signage for doors opening to rooms containing roof and attic access, electrical and mechanical
equipment, sprinkler control assemblies, fire alarm control panels and annunciator panels shall be clearly
labeled. This may require interior and/or exterior doors to be labeled. Yes _ No _ N/ A_
8. Install a Knox or Dama brand fire department key box on the building in an approved location no higher
than 6 feet above grade. For single tenant buildings, the box should be mounted near the main entrance.
For multi-tenant buildings, the box should be mounted near the fire department connection. Contact Fire
Marshal for exact location. Yes No N/ A
9. Post approved signage for fire lanes as required by fire inspection staff. Yes _ No _ N/ A _
10. Comply with Chanhassen Fire Department/Fire Prevention Policy 29-1991 regarding Premise
Identification. Yes No N/A
11. Provide furniture flammability and smoke development information for Group A and I occupancies.
Yes No N/A
12. A separate permit is required for all above ground or below ground tanks. Submit manufacturer's
information and detailed plans. All equipment must be UL listed. Yes _ No _ N/ A _
New Construction/Remodel for Commercial Plan
Review Submittal Criteria FP 52-2005
Page 2 of3
..
13. Provide fire extinguishers as required by the Minnesota Fire Code. Multi-purpose extinguishers require a
minimum rating of 4A60BC and must be spaced with maximum travel distance of75 feet from any point
to a fire extinguisher. K-c1ass portable fire extinguishers are required in commercial kitchens. D-c1ass
portable fire extinguishers shall be installed in machine shops. Yes _ No _ N/A_
14. Provide fire sprinkler plans and hydraulic calculations. A separate Fire Department permit is required.
See the Automatic Fire Sprinkler Handout for additional requirements. Yes _ No _ N/ A_
15. Provide fire alarm plans and specifications. A separate Fire Department permit is required. All equipment
must be UL listed. Systems must be NFP A 72 compliant and have two means of signal transmission. See
the fire alarm system handout for additional requirements. Yes _ No _ N/ A _
16. Fire alarm system must be centrally monitored, and the monitoring company must be able to differentiate
between a sprinkler waterflow alarm and other fire alarms, such as manual pull stations and smoke
detectors. Yes No N/A
17. Fire alarm control panels shall be protected with a smoke detector near the panel.
Yes No N/A
18. Upon installation, all fire protection systems shall be pre-tested before calling for an inspection. If during
the inspection any fire protection equipment fails to function properly, the inspection will need to be
rescheduled and a re-inspection fee may be charged. Yes _ No _ N/ A _
19. See attached requirements or additional items listed below:
20. The following contact information must be provided with all plans:
Phone
Phone
Phone
Phone
Phone
Contractor
Building Owner
Business Owner
Architect
Fire Protection Engineer
4/01/2005
New Construction/Remodel for Commercial Plan
Review Submittal Criteria FP 52-2005
Page 3 of3
Adopted 7/28/98
Amended 7/26/99
Amended 8/13/01
Amended 12/10/01
Amended 4/14/03
EXHIBIT C
ARBORETUM BUSINESS PARK
DEVELOPMENT DESIGN STANDARDS
Development Standards
a. Intent
)
The purpose of this zone is to create a PUD light industrial/office park. The use of the PUD zone is
to allow for more flexible design standards while creating a higher quality and more sensitive
proposal. All utilities are required to be placed underground. Each lot proposed for development
shall proceed through site plan review based on the development standards outlined below. Photo-
composite images of proposed development adjacent to Highways 5 and 41 shall be submitted as
part of the review process. The PUD requires that the development demonstrate a higher quality
of architectural standards and site design. Ancillary uses may be permitted as listed below if they
are ancillary to a principal use on the individual lot. Commercial/retail uses are prohibited
except those uses specifically noted below.
b. Permitted Uses
The permitted uses in this zone should be limited to light industrial, warehousing, office and other
uses as defined below. The uses shall be limited to those as defined herein. If there is a question as
to whether or not a use meets the definition, the City Council shall make that interpretation.
Permitted uses shall be allowed on the different Blocks and Lots for which they are specified
below. The Blocks and Lots specified below are those designated on the attached PUD plan. The
Block and Lot designations in final plats approved for phases of development may differ from those
specified below. However, the permitted uses shall continue to be those specified below for the
Lots identified in the PUD plan.
Light Industrial - The manufacturing, compounding, processing, assembling, packaging, printing,
or testing of goods or equipment or research activities entirely within an enclosed structure, with no
outside storage. There shall be negligible impact upon the surrounding environment by noise,
vibration, smoke, dust or pollutants. (Lots 3,4, and 5, Block 1; Lot 1, Block 2; Lots 1,2,3, and 5,
Block 4; and the Wrase property) (Amended 12/10/01)
Warehousing - Means the commercial storage of merchandise and personal property. (Lots 3, 4,
and 5, Block 1; and Lots 1,2,3, and 5, Block 4)
1
)
Office - Professional and business office. (Lots 1,2,3,4, and 5, Blockl; Lot I, Block 2; Lot I,
Block 3; Lotsl, 2, 3,4 , and 5 , Block 4; and the Wrase property)
Health Services- establishments primarily engaged in furnishing medical, surgical and other
health services to persons. (Lots 1 and 2, Block 1; Lot I, Block 3; and Lot 4, Block 4)
Conferences/Convention Center - establishments designed to accommodate people in assembly,
providing conference and meeting services to individuals, groups, and organizations. (Lot 5 ,
Block 4)
lndoor Recreation/Health Club - establishments engaged in operating reducing and other health
clubs, spas, and similar facilities featuring exercise and other physical fitness conditioning. (Lots
3,4 and 5, Block 1; Lot 1, Block 3; and Lots 2, 3 and 4 , Block 4) (Amended 12/10/01)
Hotel/Motel-establishments engaged in furnishing lodging, or lodging and meals, to the general
public. (Lot 1, Block 3; and Lot 4, Block 4)
Utility Services - Water towers and reservoir. (Lots 3, 4, and 5, Block 1; Lots 1,2, and 3, Block
4; and the Wrase property)
)
Recording Studio - Lots 3, 4 and 5, Block 1; Lots 2 and 3, Block 4. (Amended 12/10/01)
Commercial uses (permitted on lots specified as commercial in development standards
tabulation box)
1. Restaurant, permitted on Lot 1, Block 3 or Lot 4, Block 4. (One stand alone restaurant.)
2. Convenience store with or without gas pumps, not to exceed 12,000 square feet, on Lot 1 or
2, Block 1, only. (One convenience store.)
3. Banks, with or without drive up windows (Lots 1 and 2, Block 1; Lot I, Block 3; and Lot 4,
Block 4)
4. Day Care - establishments providing for the care and supervision of infants and children on a
daily basis. (Lots 1 and 2, Block I;Lot I, Block 3; and Lot 4, Block 4)
5. Auto service center, auto body repair is prohibited (Wrase) (amended 8/13/01)
6. Personal Services (amended 4/14/03)
Ancillary Uses (in conjunction with and integral to a primary use)
1. Fast Food (no drive-through and only in conjunction with and integral to a convenience
store).
2. Restaurant (only in conjunction with hotel/motel or convention/conference center).
3. Showroom - showroom type display area for products stored or manufactured on-site provided
that no more than 20 percent of the floor space is used for such display and sales. [for entire
development]. (Amended 8/25/97)
2
:'\
i.)
)
4. Telecommunication Towers and Antennas by conditional use permit only.
5. Car wash, in conjunction with convenience store.
6. Day Care
Interim Uses (Amended 7/26/99)
Church facilities, Le., assembly or worship halls and associated office, meeting, and other
required spaces, subject to the following criteria:
1. The church shall not occupy more than six percent (6%) of the one building on Lots 3
and 4, Block 2, Arboretum Business Park 2nd Addition.
2. The church congregation may not exceed 200 adult members.
3. Shall be reviewed and approved in accordance with the same procedures specified in
the city code for conditional use permits.
Prohibited uses (Amended 12110/01)
. Contractors Yard
. Lumber Yard
. Home Improvement/Building Supply
. Garden Center
· Auto related including sales and repair, except on the Wrase property (amended 8/13/01)
. Home furnishings and equipment stores
. General Merchandise Store
. Vocational School
· Public buildings, except on Outlots A and B, which are public park land
. Screened outdoor storage
. Food processing
c. Setbacks
The development is regulated by the Highway 5 and the PUD Standards. There are no minimum
requirements for setbacks on interior lot lines in the PUD zone. The following setbacks shall apply:
Street Frontage
Minimum Setback
Buildin arkin
70/50
50120
Maximum Setback
Buildin arkin
150 *
100
Hwys. 5 &41
Coulter & Century
Boulevards
3
I 82nd & West Local I 30/20 I NA
) *Lot 5 , Block4, must only meet the maximum setback on one Highway frontage.
The average hard surface coverage does not include Outlots A and B. The PUD standard for
hard surface coverage is 70% for office and industrial uses. Anyone site/lot can exceed the 70
percent requirement but in no case can the entire finished development exceed 70 percent.
d. Development Standards Tabulation Box
1. Building Area
LOTIUSE
Building Size/FAR
(s uare feet)
Lot 3, Block 1 10.02 131,006 262
Lot 4, Block 1 5.45 71,218 142
Lot 5, Block 1 4.41 57,688 115
Lot 1, Block 4 4.38 57,199 114
Lot 2, Block 4 5.40 70,597 141
Lot 3, Block 4 8.98 117,371 235
Lot 1, Block 2 12.23 159,822 320
Lot 5, Block 4 , 23.20 (.4 FAR) 404,279 (311000) 1,213
Lot 1, Block 1 1.80 11,746/23,520 (511000) 59
Lot 2, Block1 2.32 15,180/30,320 (411000) 61
Lot 4, Block 4 , 4.06 26,536/ 53,060 (511000) 133
OfficelHotel
LotI, Block 3 6.41 (.1OFAR) 27937 / (16/1000) 447
Restaurant/Office 83,770
4
)
Commercial sites may develop as office-industrial uses. Square footage for individual lots
may be reallocated within the development, by type, provided the maximum square footage
is not exceeded.
Building Square Footage Breakdown
Office
31% 368,000 I (432,000)
31% 368,000 I (432,000)
31% 368,000 I (432,000)
7% 81,000 1(0)
100% 1,186,000 1(1,295,000)
Light Industrial
Warehouse
Commercial
Total
*includes the Wrase property. () represents conversion of commercial uses to office-
industrial uses
2. More than one (1) principal structure may be placed on one (1) platted lot.
3. Building height shall be limited to 3 stories or 40 feet.
/
4.
Lot 5, Block 4, , is intended to accommodate a major corporate headquarters or office,
research, high end manufacturing with limited warehousing type user. While the majority
of the development is based on 30 percent office space, Lot 5 must have a minimum of 40
percent office use and include multi-story building(s).
e. Building Materials and Design
1. The PUD requires that the development demonstrate a higher quality of architectural
standards and site design. All mechanical equipment shall be screened with material
compatible to the building.
\
2. All materials shall be of high quality and durable. Masonry material shall be used. Color
shall be introduced through colored block or panels and not painted cinder block.
3. Brick may be used and must be approved to assure uniformity.
4. Block shall have a weathered face or be polished, fluted, or broken face.
5. Concrete may be poured in place, tilt-up or pre-cast, and shall be finished in stone, textured,
coated, or painted.
\
.l
5
6.
Metal siding will not be approved except as support material to one of the above materials
or curtain wall on office components or, as trim or as HV AC screen.
)
7. All accessory structures shall be designed to be compatible with the primary structure.
8. All roof mounted equipment shall be screened by walls of compatible appearing material or
camouflaged to blend into the building or background. Wood screen fences are prohibited.
All exterior process machinery, tanks, etc., are to be fully screened by compatible materials.
9. The use of large unadorned, pre-stressed concrete panels and concrete block shall be
prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate
and/or other patterning. All walls shall be given added architectural interest through
building design or appropriate landscaping. The buildings shall have varied and interesting
detailing. The use of large unadorned, concrete panels and concrete block, or a solid wall
unrelieved by architectural detailing, such as change in materials, change in color,
fenestrations, or other significant visual relief provided in a manner or at intervals in
keeping with the size, mass, and scale of the wall and its views from public ways shall be
prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate
and/or other patterning. All walls shall be given added architectural interest through
building design or appropriate landscaping.
10. Space for recycling shall be provided in the interior of all principal structures or within an
enclosure for each lot developed in the Business Center.
j
11 Each buildings shall contain one or more pitched roof elements depending on scale and
type of building, or other architectural treatments such as towers, arches, vaults, entryway
projections, canopies and detailing to add additional interest and articulation to structures.
12. There shall be no underdeveloped sides of buildings visible from public right-of-ways.
All elevations visible from the street shall receive nearly equal treatment and visual
qualities.
f. Site Landscaping and Screening
1. Landscaping along Highways 41 and 5 shall comply with Buffer yard standard C. Coulter
Boulevard, Century Boulevard, and West 82nd Street shall comply with Buffer yard standard
B. The master landscape plan for the Arboretum Business Park (formerly Gateway) PUD
shall be the design guide for all of the specific site landscape developments. Each lot must
present a landscape plan for approval with the site plan review process.
2. Storage of material outdoors is prohibited unless it has been approved under site plan
review. All approved outdoor storage must be screened with masonry fences and/or
landscaping.
)
6
3.
Undulating or angular berms or elevation changes of 3' in height shall be placed along
Coulter Boulevard, and Century Boulevard. The berms shall be sodded or seeded at the
conclusion of each project Phase grading and utility construction. The required buffer
landscaping may be installed incrementally, but it shall be required where it is deemed
necessary to screen any proposed development. All required boulevard landscaping shall be
sodded.
, . ')
. 4. Loading areas shall be screened 100 percent year round from public right-of-ways. Wing
walls may be required where deemed appropriate.
g. Signage
1. All freestanding signs be limited to monument signs. The sign shall not exceed eighty (80)
square feet in sign display area nor be greater than eight (8) feet in height. The sign
treatment is an element of the architecture and thus should reflect the quality of the
development. The signs should be consistent in color, size, and material throughout the
development. The applicant should submit a sign package for staff review.
2. Each property shall be allowed one monument sign per street frontage.
3. The signage will have consistency throughout the development. A common theme will be
introduced at the development's entrance monument and will be used throughout.
)
4.
Consistency in signage shall relate to color, size, materials, and heights.
5. The Arboretum Business Park PUD shall be permitted two Arboretum Business Park
identification signs. One sign per project entrance, at West 82nd and Century Boulevard
and at Highway 41 and the westerly roadway, shall be permitted. Said sign shall not
exceed 80 square feet in sign area nor be greater than eight feet in height.
,
6. Wall sign shall be permitted per city ordinance for industrial office park site.
7. All ,signs shall require a separate sign permit.
8. In addition to the two signs identified in g. 5. above, signage for the main entrance on
Highway 5 and Century Boulevard shall be reviewed and approved by the Planning
Commission and City Council.
h~ Lighting
1. Lighting for the interior of the business center should be consistent throughout the
development. The street lights should be designed consistent with the existing lighting
along the existing Coulter Boulevard.
7
)
. \
I
2.
A decorative, shoe box fixture (high pressure sodium vapor lamps or metal halide lights)
with a square ornamental pole shall be used throughout the development area for area
lighting.
3 Lighting equipment similar to what is mounted in the public street right-of-ways shall be
used in the private areas.
4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2
candle at the property line. This does not apply to street lighting.
i. Alternative Access
1. Each site shall accommodate transit service within the individual development whenever
possible.
2. Pedestrian access shall be provided from each site to the public sidewalk and trail system.
3. The developer and site users shall promote and encourage Traffic Demand Management
Strategies.
4. Each site shall provide areas for bicycle parking and storage.
8
.........;
LOTS 1-3
LOTS 3-5
INDUSTRIAL
WAREHOUSE
LOTS = 88.65
PARK = 48.36
ROW = 14.72
,~
BANK
OFFICES
CLINICS
HEALTH CLUB
TOTAL = 151.73 ACRES
LEGEND
~ iii Entry Monuments
- Elevated Signs
i) Ground Signs
* Street Lights
.oe Street Trees
., Ponds
..~ Wetlands
ev""
- - PedlBike Trails
pun PLAN
ARBORETUM BUSINESS PA
CHANHASSEN, MN
. "'-,
LOT 1
,INDUSTRIAL OFFICE .~.
I~J
Al<I>UIlAN
~~;;:::'r::r
a
NORIll
~ . - 300' 60~
27 MAY 1997
FIGURE 4
CITY OF CHANHASSEN
AFFIDA VIT OF MAILING NOTICE
ST ATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Todd Gerhardt, being first duly sworn, on oath deposes that he is and was on December
22, 2005, the duly qualified and acting Clerk of the City of Chanhassen, Minnesota; that on said
date he caused to be mailed a copy of the attached notice of Public Hearing for Jacob's Tavern
- Planning Case No. 05-40 to the persons named on attached Exhibit "A", by enclosing a copy
of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to
all such owners in the United States mail with postage fully prepaid thereon; that the names and
addresses of such owners were those appearing as such by the records of the County Treasurer,
Carver County, Minnesota, and by other appropriate records.
?r4/\.~
Todd Gerhardt, City Clerk
Subscribed and sworn to before me
thi~NJday of~~rY\I~ r ,2005.
Jv~/T.~
~ N~
>.~ KIM T. MEUWISSEN I
.$ Notary Public-Minnesota
. My Commission Expires Jan 31, 2010
CCAlllll;O
Date & Time:
Location:
Property
Location:
What Happens
at the Meeting:
Questions &
Comments:
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Tuesda , Januar 3, 2006 at 7:00 .m.
Cit Hall Council Chambers, 7700 Market Blvd.
Request for Site Plan Approval for a 6,808 square-foot
restaurant buildin on 2.02 acres - Jacob's Tavern
05-40
Truman Howell Architects
Southeast corner of Highway 5 and Century Boulevard (7845
Century Boulevard)
A location ma is on the reverse side of this notice.
The purpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the ro'ect.
If you want to see the plans before the meeting, please stop
by City Hall during office hours, 8:00 a.m. to 4:30 p.m.,
Monday through Friday. If you wish to talk to someone about
this project, please contact Robert Generous at 952-227-1131
or e-mail baenerous@cLchanhassen.mn.us. If you choose to
submit written comments, it is helpful to have one copy to the
department in advance of the meeting. Staff will provide
copies to the Commission. The staff report for this item will
be available online at http://206.10.76.6/weblink7 the
Thursda rior to the Plannin Commission meetin .
City Review Procedure:
. Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations,
Rezonings, Comprehensive Plan Amendments and Code Amendments require a public hearing before the
Planning Commission. City ordinances require all property within 500 feet of the subject site to be notified of the
application in writing. Any interested party is invited to attend the meeting.
. Staff prepares a report on the subject application that includes all pertinent information and a recommendation.
These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of
the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of
the hearing process. The Commission will close the public hearing and discuss the item and make a
recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning
Commission's recommendation. Rezonings, land use and code amendments take a simple majority vote of the
City Council except rezonings and land use amendments from residential to commercial/industrial.
. Minnesota State Statute 519.99 requires all applications to be processed within 60 days unless the applicant
waives this standard. Some applications due to their complexity may take several months to complete. Any
person wishing to follow an item through the process should check with the Planning Department regarding its
status and scheduling for the City Council meeting.
. A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often developers
are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the
project with any interested person(s).
. Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and
any correspondence regarding the application will be included in the report to the City Council. If you wish to have
somethin to be included in the re ort, lease contact the Plannin Staff erson named on the notification.
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Date & Time: Tuesday, January 3, 2006 at 7:00 p.m.
Location: City Hall Council Chambers, 7700 Market Blvd.
Proposal: Request for Site Plan Approval for a 6,808 square-foot
restaurant building on 2.02 acres - Jacob's Tavern
Plannina File: 05-40
Applicant: Truman Howell Architects
Property Southeast corner of Highway 5 and Century Boulevard (7845
Location: Century Boulevard)
A location map is on the reverse side of this notice.
The purpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
public hearing through the following steps:
What Happens
at the Meeting: 1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the project.
If you want to see the plans before the meeting, please stop
by City Hall during office hours, 8:00 a.m. to 4:30 p.m.,
Monday through Friday. If you wish to talk to someone about
this project, please contact Robert Generous at 952-227-1131
Questions & or e-mail baenerous@cLchanhassen.mn.us. If you choose to
Comments: submit written comments, it is helpful to have one copy to the
department in advance of the meeting. Staff will provide
copies to the Commission. The staff report for this item will
be available online at http://206.1 O.76.6/weblink7 the
Thursday prior to the Planning Commission meetina.
City Review Procedure:
. Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations,
Rezonings, Comprehensive Plan Amendments and Code Amendments require a publiC hearing before the
Planning Commission. City ordinances require all property within 500 feet of the subject site to be notified of the
application in writing. Any interested party is invited to attend the meeting.
. Staff prepares a report on the subject application that includes all pertinent information and a recommendation.
These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of
the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of
the hearing process. The Commission will close the public hearing and discuss the item and make a
recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning
Commission's recommendation. Rezonings, land use and code amendments take a simple majority vote of the
City Council except rezonings and land use amendments from residential to commercial/industrial.
. Minnesota State Statute 519.99 requires all applications to be processed within 60 days unless the applicant
waives this standard. Some applications due to their complexity may take several months to complete. Any
person wishing to follow an item through the process should check with the Planning Department regarding its
status and scheduling for the City Council meeting.
. A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often developers
are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the
project with any interested person(s).
. Because the Planning Commission holds the publiC hearing, the City Council does not. Minutes are taken and
any correspondence regarding the application will be included in the report to the City Council. If you wish to have
somethina to be included in the reoort, Dlease contact the Plannina Staff Derson named on the notification.
/
--
--
i
J
!
Subject
Property
i
C-... ~..------
(----===gouiier-B~ul~~~~--
. ./e~~
.......--c6i;\\~.~.. \
...---=~--=--./ \
-~ ,
Disclaimer
This map is neither a tegally recorded map nor a survey and is not intended to be used as one. This
map is a compilation of records, information and data located in various city, county, state and federal
offices and other sources regarding the area shown. and is to be used for reference purposes only.
The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational,
tracking or any other purpose requiring exacting measurement of distance or direction or precision in
the depiction 01 geographic features. If errors or discrepancies are found please contact 952-227-1107.
The preceding disclaimer is provided pursuant to Minnesota Statutes 9466.03, Subd. 21 (2000), and
the user of this map aCknowledges that the City shall not be liable for any damages, and expressly
waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims
brought by User, its employees or agents, or third parties which arise out of the use(s access or use of
data provided.
u
>
a;
~
"
c:
(')r-
i
!
!
i
Subject
Property
I
'~ ----
ir-----=-~Oulter B_~Ut~-------
/~~
Cou\\et..-. \
----~ \
---- '
Disclaimer
This map is neither a legally recorded map nor a survey and is not intended to be used as one. This
map is a compilation of records, inlormation and data located in various city, county, state and federal
offices and other sources regarding the area shown, and is to be used for reference purposes only.
The City does not warrant that the Geographic Information System (GIS) Data used to prepare this
map are error free, and the City does not represent that the GIS Data can be used for navigational,
tracking or any other purpose requiring exacting measurement of distance or direction or precision in
the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107.
The preceding disclaimer is provided pursuant to Minnesota Statutes 9466.03, Subd. 21 (2000), and
the user 01 this map acknowledges that the City shall not be liable for any damages, and expressly
waives all claims, and agrees to defend, indemnity, and hold harmless the City from any and all claims
brought by User, its employees or agents. or third parties which arise out of the use(s access or use of
data provided.
Public Hearing Notification Area (500 feet)
Jacob's Tavern
Planning Case No. 05-40
7845 Century Boulevard
City of Chanhassen
vv 78TH
State Hwy 5 Arboretum Boulevard
"0
>
co
~
:J
-
c::
Q)
()
Subject
Property
Coulter Boulevard
NORTH COAST PARTNERS LLP
7500 78TH ST W
EDINA, MN 55439 -2517
ALSHOUSE PROPERTIES LLC
1300 WILLOWBROOK DR
WAYZATA, MN 55391 -9583
CENTURY GAS LLC
13540 80TH ST S
HASTINGS. MN 55033 -8530
WYLS, LLC
PO BOX 1080
YANKTON. SD 57078 -1080
KC PROPCO LLC
C/O KNOWLEDGE LEARNING CORP
650 NE HOLLADAY ST
SUITE 1400
PORTLAND, OR 97232 -4301
US BANK NA
ATTN: AMY HERNESMAN
2800 LAKE ST E
MINNEAPOLIS, MN 55406 -1930
HELSENE PARTNERS LLC
5685 GRANT LORENZ RD
EXCELSIOR, MN 55331 -8363
CENTURY 2000 PARTNERS LLP
C/O STEINER DEVELOPMENT
3610HWY101 S
WAYZATA, MN 55391 .3424