95-21 CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: February 13. 19~i RESOLUTION NO: 95-21
MOTION BY: Senll
SECONDED BY:
Docken~lorf
A RESOLUTION APPROVING CHANGE ORDER NO. 2 FOR
TRUNK HIGHWAY 101 NORTH LEG, PROJECT NO. 88-22B
WHEREAS, on December 4, 1992, the City Council awarded the bid for the above
mentioned project with Change Order No. I being approved on February 14, 1994; and
WHEREAS, Change Order No. 2 involves the following:
Item A -
Item B-
Item C-
Item D-
Item E-
Item F-
Item G-
Item H-
Item I-
Item J-
the installation of 20-inch DIP watermain.
the construction of paved turnaround at the east end
of Chan View.
the repair of a portion of the existing bituminous pathway east
of Market Boulevard/TH 101 south of TH 5 and repair of
drainage problem.
the painting of the railroad crossing and signal light cabinets.
additional landscaping to provide more aesthetic screening of
the railroad and signal control cabinets and to address
concerns of adjacent property owners.
installation of vinyl-coated chain link fencing along the
sidewalk.
seeding of the area between West 78th Street and TH 5.
the installation of a timer to control the lighting for tennis
courts.
additional soil correction work.
correction of existing drainage problem which involved the
reconstruction of existing bituminous walkway.
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
approves Change Order No. 2 to the Trunk Highway 101 North Leg Improvement Project
No. 88-22B in the amount of $99,315.93.
Passed and adopted by the Chanhassen City Council this 13th day of February,
1995.
A TTES T:
Don Ashworth, City Clerk/Manager
YES
Chmiel
Berquist
Mason
Dockendorf
Senn
NO
None
Donald J. yor
None