95-23 CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: February 13. 1995 RESOLUTION NO: 95-23
_
MOTION BY: Ma~on SECONDED BY: Bero_ui~
A RESOLUTION ACCEPTING SUPPLEMENTAL REPORT TO FEASIBILITY STUDY
FOR GALPIN BOULEVARD RECONSTRUCTION (FROM TH 5 SOUTH TO
TIMBERWOOD DRIVE AND CONSTRUCTION OF MC GL YNN DRIVE FROM GALPIN
BOULEVARD TO 1600 FEET EAST); APPROVING PLANS AND SPECIFICATIONS AND
AUTHORIZE ADVERTISING FOR BIDS FOR PHASE 1; PROJECT NO 93-26A
WHEREAS, on September 13, 1993, the City Council authorized preparation of a
feasibility study for the above mentioned project; and
WHEREAS, the overall project was to begin construction during the summer of
1994, however some external factors delayed the start of this project which made it
impossible to start this project during the 1994 calendar year; and
WHEREAS, as a result, this project has been divided into two phases with Phase
I to be completed the summer of 1995, and Phase II to be a future improvement project.
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
receives the supplemental report to the feasibility study prepared by Barton-Aschman &
Associates for the Galpin Boulevard reconstruction from Trunk Highway 5 south to
Timberwood Drive and construction of McGlynn Drive from Galpin Boulevard to 1600 feet
east; approves plans and specifications for Phase I and authorize advertisement for bids.
Passed and adopted by the Chanhassen City Council this 13th day of February,
1995.
ATTEST:
Don Ashworth, ~"~y Clerk/Manager
YES NO ABSENT
Chmiel
Dockendorf
Senn
Berquist
Mason
None None