Loading...
1f East Water Treatment Plant Fiber Optic Quote CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.2271100 Fax 952.227 1110 Building Inspections Phone 952.2271180 Fax 952.2271190 Engineering Phone 952.2271160 Fax 952.227 1170 Finance Phone 952.2271140 Fax 952.227 1110 Park & Recreation Phone 952.227 1120 Fax 952.227 1110 Recreation Center 2310 Coulter Boulevard Phone 952.227 1400 Fax 952.227 1404 Planning & Natural Resources Phone 952.227 1130 Fax 952.227 1110 Public Works 1591 Park Road Phone 952.227 1300 Fax 952.2271310 Senior Center Phone 952.227 1125 Fax 952.2271110 Web Site WlVW. ci. chan hassen. m n. us 44 MEMORANDUM TO: Todd Gerhardt, CIty Manager Paul Oehme, Dir. of PublIc Works/CIty EngineerYc?f ()M~ Apnl10,2006 . '~~ FROM: DATE: SUBJ: East Water Treatment Plant, Project No. 04-08-4: Approve Quote with CenturyTel for Fiber Optic Installation REQUESTED ACTION Approve quote wIth CenturyTel for fiber optIc installation. BACKGROUND The East Water Treatment plant is currently scheduled for substantial completion at the end of the year. The treatment plant will need to be run remotely and at other CIty facilities. The new water treatment facility will require connectivIty to the city network for both voice and data communication. The fiber connection wIll enable appropriate staff the abilIty to both monitor and control water treatment functions through a secure connection from City Hall and the PublIc Works facilitIes. To facilitate thIS connection, a fiber optIc connection will need to be made to the plant. The fiber optic line is located on the south side of TH 5. The work wIll mclude directIOnal boring the fiber optic cable under TH 5 to the water treatment plant and extending the fiber optic to the building. The City IT department wIll then connect the fiber optic cable to the control room equipment and the City network. CenturyTel is the only provider for fiber optic cable the City can use. The quote for the work from Century Tel is $28,433.00. Funding for this work was programmed in the 2006 CIP #EQ-072. The original proposal was to extend the fiber from Great Plains Boulevard to the water treatment plant. It was determined more economical to directional bore the fiber across TH 5. Attachments G:\ENGIPUBLICI04-08-4 WTP Fiberlhkgd upp tiber "OIltru"!.dm:G:\ENGIPUBLICI04-08-4 WTP Fiberlhkgd upp tiber mIltru"!.do" The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks A great place to live, work, and play. 2/22/2006 ------=::--, CEN:rU~YTEL CenturyTel Solutions ICB Pricing Reference #: 20050500 Customer: Date: Account Manager: Sales Manager: Market: CI tv of Chanhassen February 21, 2006 Al Grotewold Thomas Lvnch Eden PraIre The following represents approved ICB pricing for the City of Chanhassen. Upon acceptance of the proposal, please notify me to begin implementation into the billing system. Failure of notification of customer acceptance may result in delayed or inaccurate billing. This form must be included in the final vrovisioninf! vackaf!e. If you have any questIOns, please let me know. ICB Pricin2; ar2e arge Fiber Lateral Build [CTL Network to $28,433 00 $0.00 NA 1 Chanhassen Water Treatment Plant (952- 974)] One- Time Ch Monthly Ch Usage Charge Volume Other Terms . One time charge only. . PromotIOns Available: None . This IS in accordance to the existmg contract with the city of Chanhassen. . ICB pricing quote is valid for 90 days from the date of this approval. Brian Srmth Pricing Manager cc: Rick Osburne Chad Winkle Gary Carver Larry Miller Prepared by Doug Goldsby Page 1 of 1 CenturyTel Confidential ,! ',I !i I: Capital Improvement Progtam City of Clumhossen, MN EQ-072 2006 thru 2010 Project # Contact Unassigned Department Major Equipment Type hnprovement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost $50,000 Project Name Network Fiber Ext - East Water Treatment Facility Account # 1 700-7003-4705 Account # 3 Account #2 Description This project funds the construction costs for extending the City's fiber network to the new water treatment facility. Justification The new water treatment facility will require connectivity to the city network for both voice and data communication. The fiber connection will enable appropriate staff the ability to both monitor and control water treatment functions through a secure connection from City Hall and Public Works facilities. Voice ~~\!nication will be provided throughtthe C.ity'~ phon" .)'Stem usmg the samt' VOIP techno1o~ currently in p.1acc-feHhe-Recreati=-Centcund Public W~ .flcilitier. , i , Expenditures Construction 2006 50,000 50,000 2008 2009 2010 Total 50,000 50,000 2007 Totlll Funding Sources Water Utility Fund 2006 50,000 50,000 2008 2010 Total 50,000 50,000 2007 2009 Totlll Operationlll Impact/Other I 54