Loading...
Variance 06-04 CITY OF CHANHASSEN PLANNING DEPARTMENT 7700 Market Boulevard P.O. Box 147 CHANHASSEN, MN 55317 (952) 227-1100 FAX (952) 227-1110 LETTER OF TRANSMITTAL DATE 4/4/06 ATTENTION Sue Nelson RE: Document Recordin JOB NO. 2006-04 Variance TO: Campbell Knutson, PA 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 WE ARE SENDING YOU ~ Attached D Under separate cover via the following items: D Shop drawings D Copy of letter D Prints D Change Order D Plans D Samples D Specifications D Pay Request D _ COPIES DATE NO. DESCRIPTION 1 3/13/06 Variance 06-04 (Lot 16, Block 4 & Lot 1, Block 4, Red Cedar Point) THESE ARE TRANSMITTED as checked below: D For approval D For your use D As requested D Approved as submitted D Approved as noted D Resubmit copies for approval D Submit copies for distribution D Returned for corrections D Return corrected prints D For review and comment ~ For Recording D FOR BIDS DUE D PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO: SIGNED: If enclosures are not as noted, kindly notify us at once. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA V ARIANCE06-04 1. Permit. Subject to the terms and conditions set forth herein, the City of Chanhassen hereby grants the following variance: The City Council approves Variance #06-04 for a 22.5-foot front yard setback variance, a 15.8-foot front yard setback variance and a 2.39% hard surface coverage variance for the construction of a modified three-stall garage on a lot zoned Single Family Residential (RSF). 2. Propertv. The variance is for property situated in the City of Chanhassen, Carver County, Minnesota, and legally described as follows: . Lot 16, Block 4 and Lot 1, Block 5, Red Cedar Point 3. Conditions. The variance approval is subject to the following conditions: 1. Tree protection fencing must be properly installed at the edge of construction and extended completely around the tree at the greatest distance possible. This must be done prior to any construction activities and remain installed until all construction is completed. 2. To retain soil moisture in the remaining root area, wood chip mulch must be applied to a depth of 4 - 6 inches, but no deeper, over all the root area. 3. Roots closest to the tree should be cut by hand or a vibratory plow to avoid ripping or tearing the roots. 4. The elevation of the garage wall closest to the tree must be at grade. This means the opposing wall will either need a retaining wall or a foundation wall due to the cut into the slope necessary to create a level floor. 5. No equipment or materials may be stored within the protected root area. 1 .' 6. The tree will need to be watered during dry periods. 7. Any pruning cuts necessary must be done before April 1 or after July to avoid any possible exposure to the oak wilt fungus, a fatal disease for red oaks. 8. The applicant must obtain a building permit prior to construction of the garage. 9. The applicant must submit a proposed grading plan with the building permit to demonstrate how the site will drain. 10. Lot 1, Block 5 and Lot 16, Block 4, Red Cedar Point must be combined under the same Parcel Identification Number. 11. An affidavit of lot combination must be recorded. 4. Lapse. .If within one (1) year of the issuance of this variance the allowed construction has not been substantially completed, this variance shall lapse. Dated: March 13,2006 CITY OF CHANHASSEN \ (SEAL) AND: STATE OF MINNESOTA ) ( ss COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this.!:L ~ay of ~ ' 2006 by Thomas A. Furlong, Mayor and Todd Gerhardt, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted by its City Council. ~~~ DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 1."~"!l1~r- KAREN J. ENGELHARDT I Notary Public~Minnesota My Commission expires Jan 31, 2010 2