Loading...
1b Approve Quote for Upgrade to Lift Station No. 15 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227 1100 Fax 952.227 1110 Building Inspections Phone 952.2271180 Fax 952.227 1190 Engineering Phone 952.227 1160 Fax 952.2271170 Finance Phone 952.227 1140 Fax 952.2271110 Park & Recreation Phone 952.2271120 Fax 952.2271110 Recreation Center 2310 Coulter Boulevard Phone 952.2271400 Fax 952.2271404 Planning & Natural Resources Phone 952.2271130 Fax 952.227 1110 Public Works 1591 Park Road Phone 952.2271300 Fax 952.2271310 Senior Center Phone 952.227 1125 Fax 952.2271110 Web Site www.ci.chanhassen.mn.us 1b MEMORANDUM TO: Todd Gerhardt, City Manager ~ B. Paul Oehme, P.E. Dir. of Public Works/City Engmeer (. (J~. FROM: DATE: May 22, 2006 SUBJ: Lift Station No. 15: Consider Approving Quote for Improvements PW0550 REQUESTED ACTION Approve quote for Lift Station 15 Improvements in the amount of $37,357.84 to Quality Flow Systems, Inc. BACKGROUND Annually, the City has considered improvements for lift station maintenance and upkeep. These improvements are designed to make the sanitary lift station network more reliable and reduce emergency calls and sanitary sewer backups. Currently, the City maintains 30 lift stations in the system. DISCUSSION This year staff is requesting Lift Station 15 be improved. Lift Station 15 is located on the north side of Lotus Lake off of Horseshoe Curve. Over the last six months, this station has had several emergency calls. The main problem with the station can be associated with the electrical panel that is over 30 years old. The panel can no longer be maintained effectively and needs be replaced. Along with the panel, the pumps and piping in the panel should be replaced. One of the pumps in the station has broken down because of electrical problems. The other pump is also recommended for replacement which is over 15 years old. Staff has also looked at the pumping requirements for the lift station and it is recommended to increase the horse power of the pumps from 7 hp to 10 hp. Staff has received quotes for the lift station improvements as follows: Quality Flow Braun Pump & US Filter Systems, Inc. Controls Lift Station Panel $25,110.34 N/A $26,446.08 Replace Pumps (2 $ 9585.00 $11,076.00 N/A Each) Replace LS piping $2,662.50 $3,397.35 N/A Total includes tax $37,357.84 The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks A great place to live, work, and play Todd Gerhardt May 22, 2006 Page 2 The City has now standardized the lift station panels with a Quality Flow Systems panel. This is the same panel the City has standardized at the recently rehabilitated lift stations 2 and 27. This is the same panel the City has in our standard plates for new lift station installations. Standardization of panels is critical for ease of maintenance and to reduce the replacement parts inventory. The quote staff has received for lift station 15 is consistent with the other panels the City has replaced recently. Quality Flow submitted the lowest quotes for all the necessary components in the amount of $37,357.84. At this time, staff recommends approving the quote with Quality Flow Systems. Attachment: SS-017 G:\ENGIPUBLICIPW055- Liti Stations (general)\Bkg 052206 LS 15 rehab. doc Capitol Improvement Program City ofClumhassen, MN S8-017 2006 thru 2010 Contact Unassigned Department Sanitary Sewer Improvements Type hnprovement Useful Life Unassigned Category Utilities Priority nla I Project # Project Name Sanitary Lift Station Rehabilitation Program Account # 1 Account #2 Account # 3 Total Project Cost $225,000 I Description I The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The City currently I maintains 30 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service or replace pumps, pipe gallery, and electrical components as needed. I Justification I Reduce emergency calls and potential sewer backups. I I Expenditures Maintenance 2006 45,000 45,000 2007 45,000 45,000 2008 45,000 45,000 2009 45,000 45,000 2010 45,000 45,000 Total 225,000 225,000 I Total I I Funding Sources Sewer Utility Fund 2006 45,000 45,000 2007 45,000 45,000 2008 45,000 45,000 2009 45,000 45,000 2010 45,000 45,000 Total 225,000 225,000 I Total I Operational ImpacVOther I I I I I I 110 I