Loading...
A Infiltration-Inflow Improvements CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227,1100 Fax: 952,227,1110 Building Inspections Phone: 952,227,1180 Fax: 952,227,1190 Engineering Phone: 952,227,1160 Fax: 952,227,1170 Finance Phone: 952,227,1140 Fax: 952,227.1110 Park & Recreation Phone: 952,227,1120 Fax: 952,227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227,1400 Fax: 952,227.1404 Planning & Natural Resources Phone: 952.227,1130 Fax: 952,227.1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952,227.1310 Senior Center Phone: 952,227.1125 Fax: 952,227,1110 Web Site www.ci.chanhassen.mn.us A ~ ~ MEMORANDUM TO: Paul Oehme, City Engineer/Dir. of Public Works ?c9. FROM: Alyson Fauske, Assistant City Engineer DATE: June 12, 2006 SUBJ: Infiltration/Inflow Improvements, PW254: Discuss Draft Feasibility Report REQUESTED ACTION Discussion on draft report - no action required. BACKGROUND The Metropolitan Council Environmental Services {MCES}has implemented an Inflow/Infiltration (III) Surcharge Program which will fine municipalities for III to the MCES facilities. The MCES surcharge for the City ofChanhassen is approximately $1,559,600.00, to be paid $311 ,920.00/yearforfiveyear.s. Each year, monies paid by the City to reduce III problems can be credited towards the MCES surcharge. WSB & Associates has been hired by the City to provide a Feasibility Report outlining the III issues, recommended remedial measures and proposed budgets. Staff will present the content and findings of the Draft Feasibility Rep()rta.tthe June 12,2006 Work Session. Also included in the background is a preliminary sewer rate study if the proposed 1&1 improvements were to be implemented and another rate study if no 1&1 improvements are implemented and the City accepts the MCES surcharge. Attachment: 1. Draft Executive Summary Report 2. 6- Year CIP 3.. Sewer Rate study Cc: Todd Hubmer- WSB & Associates, Inc. The City ot Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks, A great place to live, work, and play, G:\ENGIPUBLICIPW254 I&Ilbkgd ws 061206 draft report,doc 1. EXECUTIVE SUMMARY Infiltration and inflow (III) is an increasing problem for the entire Metropolitan Council Environmental Service (MCES) sanitary service area. Infiltration is clear water (either storm water or groundwater) which enters the sanitary sewer through cracked sanitary sewer pipes or damaged manholes, and inflow is clear water from direct connections to the sanitary sewer such as sump pumps and foundation drains. In response to this problem, MCES has adopted an III Surcharge program in which municipalities will be charged for excess clear water flow to the Metropolitan Disposal System. The MCES Surcharge program will also provide rebates and credits of the surcharges as incentives for cities to initiate municipal programs to reduce local clear water flow. The City of Chanhassen has initiated programs to reduce III to the sanitary sewer system. These programs include sanitary sewer televising, sewer rehabilitation, home inspection projects, and beginning in 2007, a Street Reconstruction Program incorporating sanitary sewer repair and replacement. The City completed home inspections in 1999 to identify direct sump pump and foundation drain connections to the sanitary sewer. Despite the programs in place to reduce III, the City of Chanhassen is currently exceeding MCES limits during peak flow events. The major contributing sources of III into the sanitary sewer system in Chanhassen appears to be infiltration into manholes and separated joints in the City's trunk system and MCES interceptor. Other contributing sources of III are reconnecting sump pumps to the sanitary system and possible leaking joints in service laterals. Therefore, to achieve MCES wastewater flow goals, the City must continue efforts to reduce the clear water flow into the sanitary sewer system. These efforts include manhole inspections, sanitary sewer televising, rehabilitation and replacement projects to repair known points of infiltration and inflow, and home inspections at point-of-sale and issuance of building permits to verify continued private residence compliance with the City's ordinances. Currently, the MCES surcharge amount for the City of Chanhassen is approximately $1,559,600, to be paid at $311,920 per year for a period of five years. The recommended minimum City budget for the 6-year III Reduction Program is approximately $2,304,000 and consists of $1,100,000 from the existing street reconstruction CIP; $1,010,000 from new III Reduction CIP; a general operating budget of $134,000; and MCES Interceptor televising of $60,000 (plus improvement costs to be determined). The costs accrued by the City through the III Reduction Program will be eligible for a MCES surcharge rebate upon approval by the MCES. In addition, costs spent on rehabilitation or reconstruction of the MCES interceptor may be directly reimbursed by the MCES. The MCES is currently proposing to impose a demand charge for communities not meeting III limits by the year 2013. These demand charges are anticipated to be up to 5 times the surcharge fees, and these charges may not be available to the City to correct III, but will be used by MCES to improve system capacity. Sanitary Sewer Infiltration and Inflow Redm:tion Plan City of Chanhassen, MN WSB Project No. 1694-00 Page 2 City of Chanhassen Table 2 Infiltration and Inflow Reduction Plan WSB Project No. 1694-00 Cost Opinion 6.Year Capital Improvement Program (CIP) Funding Sources General Totat Year Task Existing CtP New CtP Operating MCES Budget Expenditures Sanitary Sewer 1&1 Rehabilitation and Reconstruction Program 1. Construct sewer rehabilitation and reconstruction $120,000.00 2. Televise Sanitary Sewer $30,000,00 3. Inspect manholes in low areas and adjacent to lakes and wetlands $30,000.00 2006 4. Develop Sewer Rehabilitation Plan for 2007 $17,000.00 5. Inspection of sump pump connections $2,500.00 5. Public education $2,000.00 Televise MCES Interceptor Through Chanhassen $60,000.00 Subtotat $150,000.00 $0.00 $51,500.00 $60,000.00 $261,500.00 Street Reconstruciton Program (sanitary rehab portion) $200,000.00 Sanitary Sewer 1&1 Rehabilitation and Reconstruction Program 1. Construct sewer rehabilitation and reconstruction $130,000.00 2. Televise Sanitary Sewer $50,000.00 3. Develop Sewer Rehabilitation Pian for 2008 $12,000.00 2007 4. Inspection of sump pump connections $2,500.00 5. Public education $2,000.00 Review and adjust City sewer and water utility charges $25,000.00 Construct Phase I of MCES Sewer Rehabilitation To Be Determined Evaluate improvements and prepare annual report to MCES $5,000,00 Subtotat $200,000.00 $210,000.00 $16,500.00 $0.00 $426500.00 Street Reconstruciton Program (sanitary rehab portion) $250,000,00 Sanitary Sewer 1&1 Rehabilitation and Reconstruction Program 1. Construct sewer rehabilitation and reconstruction $130,000.00 2. Televise Sanitary Sewer $50,000.00 3. Deveiop Sewer Rehabilitation Plan for 2009 $12.000.00 2008 4. Inspection of sump pump connections $2,500.00 5. Public education ' $2,000.00 Implement adjustments to City sewer and water utility charges $15,000.00 Construct Phase II of MCES Sewer Rehabilitation To Be Determined Evaluate improvements and prepare annual report to MCES $5,000.00 Subtotal $250,000.00 $200,000.00 $16,500.00 $0.00 $466500.00 Street Reconstruciton Program (sanitary rehab portion) $0.00 Sanitary Sewer 1&1 Rehabilitation and Reconstruction Program 1. Construct sewer rehabilitation and reconstruction $155,000.00 2. Televise Sanitary Sewer $30,000.00 2009 3, Develop Sewer Rehabilitation Plan for 2010 $12,000,00 4. Inspection of sump pump connections $2,500.00 5. Public education $2,000.00 Construct Phase III of MCES Sewer Rehabilitation To Be Determined Evaluate improvements and prepare annual report to MCES $5,000.00 Subtotal $0.00 $200,000.00 $16,500.00 $0.00 $216,500.00 Street Reconstruciton Program (sanitary rehab portion) $250,000.00 Sanitary Sewer 1&1 Rehabilitation and Reconstruction Program 1. Construct sewer rehabilitation and reconstruction $165,000.00 2. Televise Sanitary Sewer $30,000.00 2010 3, Develop Sewer Rehabilitation Pian for 2011 $12,000.00 4. Inspection of sump pump connections $2,500,00 5. Public education $2,000.00 Evaluate improvements and prepare annual report to MCES $5,000.00 Subtotal $250,000.00 $200,000.00 $16,500.00 $0.00 $466,500.00 Street Reconstruciton Program (sanitary rehab portion) $250,000.00 Sanitary Sewer 1&1 Rehabilitation and Reconstruction Program 1. Construct sewer rehabilitation and reconstruction $165,000.00 2. Televise Sanitary Sewer $30,000.00 2011 3. Develop Sewer Rehabilitation Plan for 2012 $12,000.00 4. Inspection of sump pump connections $2,500.00 5. Public education $2,000.00 Evaluate Improvements and prepare annual report to MCES $5,000.00 Subtotal $250,000.00 $200,000.00 .. $16,500.00 $0.00 $466,500.00 Total CtP Expenditures 2006-2011 $1,100,000.00 $1,010,000.00 $134,000.00 To be Determined $2,304,000.00 Note: Table is based' on available information to date and should be revised annually as new information becomes availabie. Additionai years of Improvements shouid be determined in future revisions City ofChanhassen, MN Infiltration and Inflow Reduction Plan WSB Project No. 1694.00 K:\OI694-00\Admin\Docs\Table 2 . 6yrCIP.x1s . EHLERS & ASSOCIATES INC o :!E w :!E To: Greg Sticha From: Jessica Cook and Mark Ruff Subject: Effects of Infilatration and Inflow on Sewer Rates Date: June 7,2006 The City has requested that Ehlers & Associates evaluate the impact on sewer rates of two different scenarios for working with the Metropolitan Council on Infiltration and Inflow ("I & I") concerns. To address this problem, the City has already budgeted $75,000 per year from the hook- up fund to pay for I & I improvements. In addition to being a concern for the met Council, I & I has increased costs for City residents and businesses. Last year we estimated that the City pays the Met Council to dispose of 40% more flow than the usage measured at residents' meters. The difference was attributed to I & I, and the cost gets passed along to users in the form of higher rates. Scenario 1: The first scenario is a negotiated improvement plan whereby the City agrees to make improvements to its system to reduce the amount of! & 1. The costs of the improvements that exceed the budgeted $75,000 per year have been assigned to the operating fund, to be paid by users. The improvements should result in a reduction of the amount of metered flow for which the Met Council charges the City. However,for purposes of this evaluation, no reduction in the Met Council disposal fees has been assumed. In theory, the improvements should reduce the outflow, reducing the need to increase rates. Scenario 2: The second scenario is that the City pays a $311,000 penalty to the Met Council each year for five years. The penalty is paid by existing and future users through fee increases. The connection fund will continue to make budgeted 1&1 improvements, but not reduction in the Met Council disposal fees has been assumed. The chart on the next page shows the fee impact for these two scenarios. 3060 Centre Pointe Drive Rosevi11e, MN 55113-1105 (651) 697-8546 Fax: (651) 697-8555 jcook@ehlers-inc.com http://www.ehlers-inc.com Scenario One: Scenario Two: N e20tiated Improvements Penalty New 1&1 Costs Year New Improvement Cost $311,000 penalty each year from (in operating 2006 $75,000 2006-2010. fund) 2007 $135,000 2008-2011 $ 125,000/year 2005 Study 1&1 Impvts. 2005 Study 1&1 Penalty Year % Increase % Increase* Year % Increase % Increase Projected 2005 5.0% 5.0% 2005 5.0% 5.0% User Rates 2006 8.0% 8.0% 2006 8.0% 8.0% 2007 5.5% 12.5% 2007 5.5% 19.0% (for an average 2008 5.0% 5.0% 2008 5.0% 5.0% family that uses 2009 5.0% 4.0% 2009 5.0% 5.0% 9,000 gallons per month) 2010 5.0% 4.0% 2010 5.0% 5.0% 2011 5.0% 4.0% 2011 5.0% 3.0% 2012 5.0% 4.0% 2012 5.0% 3.0% 2013 5.0% 4.0% 2013 5.0% 3.0% *Reduced 1&1 may result in lower rates. Please note that the purpose of this study was to compare the impact of the two scenarios, while keeping the cash balance in the fund at the same level as the previous rate study. Whichever option the Council chooses, rate increases can be "flattened" to minimize the impact in 2007 and realize some of the benefit of reducing 1&1. 3060 Centre Pointe Drive Roseville, MN 55113-1105 (651) 697-8546 Fax: (651) 697-8555 jcook@ehlers-inc.com http://www.ehlers-inc.com