1e Approve Amendment to Park & Trail Capital Improvement Program
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.2271100
Fax 952.227 1110
Building Inspections
Phone 952.2271180
Fax 952.2271190
Engineering
Phone 952.227 1160
Fax 952.227 1170
Finance
Phone 952.227 1140
Fax 952.2271110
Park & Recreation
Phone 952.227 1120
Fax 952.2271110
Recreation Center
2310 Coulter Boulevard
Phone 952.2271400
Fax 952.2271404
Planning &
Natural Resources
Phone 952.2271130
Fax 952.2271110
Public Works
1591 Park Road
Phone 952.227 1300
Fax 952.2271310
Senior Center
Phone 952.2271125
Fax 952.2271110
Web Site
www.ci.chanhassen.mn.us
.1.f-
"-
MEMORANDUM
TO:
Todd Gerhardt, City Manager
Todd Hoffman, Park & Recreation Director -111
FROM:
DA TE:
June 30, 2006
SUBJ:
Recommendation from Park and Recreation Commission to
Modify 2006 Park and Trail Capital Improvement Program (CIP)
This past spring, two new traIl projects were identIfied as priorities withIn the
community. The first is a final segment of the "internal" trail located at Lake
Ann Park. Construction of this 780 ft. trail will satisfy a number of needs.
Primary among these is the provision of a pedestrian access into the park from
West 78th Street, an accessIble route from the south parking lots to the ballfields,
and a secondary access into the park during emergency and special event
situatIOns.
The second project grew out of an ongoing Improvement project at Curry Farms
Park. Last year's playground project has resulted in the entire park beIng
disturbed by construction activity. The trail proposed for improvement and
extension is located at the far end of the park. It is in the city's best interests to
complete the needed trail work prior to the extensive restoration work required
to finalize the project.
Staff has sohcIted two quotes for the work included in these two projects.
Plehal Blacktopping, Inc. submitted the low quote of $46,295. Midwest Asphalt
Corporation submitted a quote of $115,891.
To cover the cost of these newly identified projects, staff is recommending that
three projects currently in the 2006 Park and Trail CIP be modified or deleted.
We propose that the off-leash dog area allocation be modified from $50,000 to
$30,000 to reflect the actual amount pledged to Carver County. In addition, it is
recommended that the Rice Marsh Lake Park and South Lotus Lake Park Trails
be deleted from the CIP. These two projects, estimated to cost $15,000 each,
have been found to be unbuildable. The planned route for the Rice Marsh Lake
TraIl cannot be drained effectively and, if constructed, would turn the park Into a
pond during heavy rains. The planned route for the South Lotus Lake trail
terminates at a private street. Terminating a public trail at a private street is not
fair to eIther the public trail users or the homeowners residmg on the pnvate
street. These modificatIOns would result in $50,000 being made available to
accomplish the proposed Lake Ann Park and Curry Farms Park TraIl
improvements.
The City of Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play
Mr. Todd Gerhardt
June 30, 2006
Page 2
On Tuesday evening, June 27, the Park and Recreation Commission toured all of
the proposed project sites. The Commission was excited about the newly
identified projects and concurred that construction should move forward. I did
sense some disappointment that the previously identified projects could not be
completed; however, again there was concurrence that it was not in the city's
best interests to construct the other two trails segments.
At the conclUSIOn of their discussion, Commissioner Scharfenberg moved and
Commissioner Murphy seconded that the CIty Council modIfy the 2006 Park
and Trail Capital Improvement Program by adding the Lake Ann Park and Curry
Farms Park Trail Improvements at a not to exceed amount of $49,999. To cover
the costs of these new projects, the Rice Marsh Lake Park TraIl, the South Lotus
Lake Park Trail, and a portion of the funding designated for an off-leash dog
area would be deleted from the CIP.
ATTACHMENTS
1. Report to Park and Recreation Commission dated June 15,2006
2. Price Quotes
3. Project maps
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administrallon
Phone: 952.2271100
Fax: 952.2271110
Building Inspections
Phone: 952.227.1180
Fax: 952.2271190
Engineering
Phone: 952.227.1160
Fax: 952.2271170
Finance
Phone: 952.227.1140
Fax: 952.2271110
Park & Recreallon
Phone: 952.2271120
Fax: 952.2271110
Recreation Center
2310 Coulter Boulevard
Phone: 952.2271400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.2271130
Fax: 952.2271110
Public Works
1591 Park Road
Phone: 952.2271300
Fax: 952.2271310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
'-f
MEMORANDUM
TO:
Park and Recreation Commission
FROM:
Todd Hoffman, Park & Recreation Director
DA TE:
June 15,2006
SUBJ:
Recommendation to modify 2006 park and Trail Capital Improvement
Program to accomplish Trail Construction, at Lake Ann and Curry
Farms Parks
LAKE ANN PARK
Staff is proposing to extend an existing internal park trail from its terminus near ball
fields #1 and #6 south to the West 78th Street frontage ad for a total distance of
approximately 780 feet. We are also recommending , approximately 370 feet of
existing trail receive an overlay.
Staff is prop
trail, overlay
an additional
. internal park
d complete
ne.
QUOTES
.L, -.c.
Sub-Total
Grand Total
The City of Chanhassen · A growing community with clean lakes, quality schools, a channing downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Park & Recreation Commission
June 15, 2006
Page 2
PROPOSED FUNDING SOURCE
Neither of these two projects are currently identified in the 2006 Park and Trail
Acquisition and Development Capital Improvement Program.
The new trail for Lake Ann Park is being proposed as a safety improvement to
separate pedestrians and other non-vehicular travelers from the current entrance at the
park which is designed for vehicles only. The Miracles for Mitch race committee is
also looking forward to this new trail to alleviate conflict between their bike riders
and vehicles using the park entrance.
The Curry Farms trail project is an extension of last year's playground improvement
project. Upon mobilizing heavy equipment at the park, it became evident that
expanding the scope of the playground project to include this trail work was justified.
Staff is proposing that the Park and Recreation Commission recommend that the City
Council modify the 2006 Park and Trail Capital Improvement program to accomplish
these important trail projects. We propose that the off-leash dog area allocation be
modified from $50,000 to $30,000 to reflect the actual amount pledged to Carver
County. In addition, it is recommended that the Rice Marsh Lake Park Trail and
South Lotus Lake Park Trails be deleted from the CIP. These two projects, both
estimated to cost $15,000 each, have been found to be unbuildable. The planned
route for the Rice Marsh Lake Trail cannot be drained effectively and, if constructed,
would literally turn the park into a pond. The planned route for the South Lotus Lake
trail terminates at a private street. Terminating a public trail at a private street is not
fair to both the public trail users and the homeowners residing on the private street.
These modifications would result in $50,000 being made available to accomplish the
proposed Lake Ann Park and Curry Farms Park Trail improvements.
RECOMMENDATION
It is recommended that the Park and Recreation Commission recommend the City
Council modify the 2006 Park and Trail Capital Improvement Program by adding the
Lake Ann Park and Curry Farms Park Trail Improvements at a not t<;> exceed amount':.:.,~'
of $49,999, and deleting the Rice Marsh Lake Park Trail and South Lotus Lake Park
Trail, and a portion of the funding designated for an off-leash dog area to cover the
costs of these new projects.
ATTACHMENTS
1. Plehal Blacktopping Quotation.
2. Midwest Asphalt Corporation Quotation.
3. Project Maps.
g:\park\th\trail cip amendment.doc
. 05/11/06 THlT 15:05 FAX 9524457682
PLEHAL BLACKTOPPING INC.
~002
PAOPOSAL SUBMITTED TO
CITY OF CHANHASSEN
ATTENTION
PHONE #
952-227-1304
FAX #
952-227-1310
JOB NAME
STREET
1591 PARK ROAD
CITY. STATE. AND ZIP CODE
CHANHASSEN, MN. 55317
MAP LOCATION
JOB LOCATION
We hereby submit speCifications and estimCltes for:
LAKE ANN PARK:
NEW ASPHALT PATH: 9l WIDE 6" LIMESTONE BASE 8-1/2 FT. WIDE 3" ASPHALT SURFACE.
15" DIA CULVERT WITH ENDS
REMOVE 50 L.F. OF EXISTING ASPHALT PATH
EXCAVATE TO NECESSARY GRADE (EXCESS DIRT TO BE USED ON SITE)
N ALL 6 INCHES eLA 0 CRUSHED BAsE
INSTALL 15" METAL CULVERT WITH ENDS UNDER BASE
GRADE AND
INSTALL 3 INCHES MN.DOT #2341A BITUMINOUS WEARING COURSE. ROLL AND COMPACT.
COST: 19 785.00
ALTERNATE BID: OVERLAY EXISTING PATH 8-1 2 FT. X 363 FT.
MILL END JOINT
SWEEP AREA CLEAN
TACK COAT
INSTALL 1- CHES MN.DOT BITUMINOUS WEARING COURSE
ROLL AND COMPACT. COST: $3,450.00 (IF DONE WITH
ABOVE
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of:
AS LISTED ABOVE
Payment to be made as fOllows;
NET ON COMPLETION
dOflars($
).
.<.
Any peraon or company Wpj)ly l;lbOr or materials for this improvement to y<>vr ProPerty may
flle a lien agaInst your property it IMt J)Cr$l>T1 or company is not paIcJ lor lI1e coolril)utkms. All
depths are average and mea~urements <:Ire ilPProximate. All matsrlalls guarllrllC\.'d to be as
specified. All work Is to be completed in a ~'nlike mann9r according to speeifietrlionr,
submitt9d per standard pracllooe. All agreemenl$ eonlirlgen! upon stn'kes. accidents. or delllyS
beyond our control. Owner to carry tire. lomaCfO ~nrJ ol/'lcr MC9ssary inaurance. Our WO(k\~"J
arc fvlly covered by WOrkman's Compensatlon lru:ursncf,). Sell AMllional Contract Term~
On The BaCk.
No I=INANCE CHARGE made on accounts paicJ willlin 30 di1Ys. Past due Involcee INiIl be
charged 1112% per month RNANCE CHARGE (H\% annuel percenl~9C rule).
RICH PELTIER
A_I~, ~ ~dzVu
Signature .
Note; This pro may be withdrawn
by us if not accepted withIn FTFT'R'RN ( t ~)
days.
Acceptance of Proposal- ll,eabove prices, speclflcalions
and COn<!IUons are ~alislactory and are hereby acceptw. The general provisions 011
the back of thIS contract are mede a pan 01 thl$ contract and incorporated hereln by
this reference. You are authorized 10 do the work as specJtled. Payment WIll be made
as outlined above.
Signature
Date of Acceptance;
.a;:
Signature
White Copy (Retum to Office). Yellow Copy (Customer). Pink Copy (File)
04/10/06 MON 12:51 FAX 9524457682 PLEBAL BLACKTOPPING INC. ~001
pLEHAL
~~G
.... PLEHAL BLACKTOPPING, INC.
P.O. BOX 317 TELEPHONE (952) 445-7676
13060 DEM CON DRIVE FAX (952) 445-7682
SHAKO PEE, MN 55379"()317
FAX TRANSMITTAL COVER PAGE
NAMEOFREClPENT: pnie- ~~
CO:MPANY: ~t7y ~r- dll1fJJ1#f!;;5eN
NAME OF SENDER: ~ ~
DATE: c./-&-CJ~
IN REFERENCE TO: 1At--;k WC)~ t! tt:qf'"' ~_S
COM:MENTS: f.? I ~t:s
t"/-x '1"7(/ / '/JfhL ;70/- ~I rhfd P'...~ 4',4- P/?Z'..../~
~P6- &U,~. MtI A7.Jp (1tJ/tl~. c?~ ...$:r;O.~
/
('.:r~ p~ WI;7d PeJ<j wi)
'uM-re;;iL c:. I )' ~a / ~ ~He5 (7~ 5" /~tJ% e'/-Ir?/l4' V4~ P~.
~ A7Jfl ~#(k ~- 3-::ZV~ .;tI-v.A?r up/ 7fr 4//1
1:?tiTl7A1//CJtlVS ~)? a.e~ ( ~tf/ t1?<Jp t>>KI.#;u-; . -Ie::..:
.."
sit'
[107"' 5f:::r!) ~
/ ~
/4d.~
THERE ARE I P AGESIDOCUMENTS INCLUDING TRIS COVERP AGE. IF YOU DO NOT
RECEIVE TffiS TRANSMITTAL IN ITS ENTIRETY, PLEASE CALL 952-445-7676.
.. -~ - - . - "- ,
- - .~_..~ ~ -,.,-....._~._.....'....,
04/08/06 SAT 10: 49 FAX 9524457682 PLEHAL BLACKTOPPING INC. ~ 002
/ PLEHAL
,. \'J~.G
...... PLEHAL BLACKTOPPING, INC.
P.O. BOX 317 TELEPHONE (952) 445-7676
13060 DEM CON DR1VE FAX (952) 445-7682
SHAKOPEE, MN 55379-0317
FAX TRANSMITTAL COVER PAGE
NAME OF RECIPENT: ~ ~j!...y
COMPANY: {l ~/ tf'~ t!,/f?/ltJ lI/?$eJ
/
,lZtr1H~
DATE: t/-S<:Pb
NAME OF SENDER~
IN REFERENCE TO: /<:PtJ,6 lItiL. 7llA-T L ?O (1u ~/'Y' AP4 ~~,
COMMENTS; ? I X 3'h /
d~ I'hUC (bwA ~5 A7Vp :.7lVkfJS 7Z> A ~/P771 ~r /CJ/
I
to/7#htJ ;;l:9 I (/0/ ~flI&/'7; ~-t A7VP .##~ t:7,Rr A5 ~,
~p( ~ ~(~;;;:. [1~7..5 /a?% (?p/~~b.4l'~~ ~~..
~ ftA;p ~~;KZ alU#i""7?~~ ,
ft.'~ %J;M~ /W;.,.I..P~Z$ff/ 7J:fJer #,4 . l5/7"//,d/"uv;:. 14:i1I:Q..c.er a~e::
~ /Wp tbp/~
IM~
f/I ~
t!~ I~I .ffC1~-
..t-_. ~'4;
THERE ARE / PAGES/DOCUMENTS INCLUDING THIS COVER PAGE. IF YOU DO NOT
RECEIVE THIS TRAt~SMITTAL IN ITS ENTIRETY PLEASE CALL 952-445-7676.
Midwest Asphalt - 9522590279 No.0979 P, 1
P.O. BOX 5477 · HOPKINS. MlNNESOT A. 55S43
PHONE: (952) 937...a033. FAX: (962) S37-691Q
May,30, 2006 6:52PM
SPHAI-T
ORPORA110ft
Attn.: Dale Gregory @ Citx of Chanhassen
Project: Chanhassen Trail Construction
City: Chanhassen
Engineer:
Date: Ma 30 2006
Estimator: Keith Sticha
All Taxes Included
Bond Included, up to.5%
0%
No. Item Description Quantity, Unit Unit Cost
Lake Ann
385' of 8' Trail Overlay 385.00 LF $ 22.20 $ 8,547.00
780' of 8' New Trail (Complete) * 780.00 LF $ 41.45 $ 32,331.00
CUl'ry Farm I
4701 of 61 Trail Overlay 470.00 LF $ 24.40 $ 11,468.00
250' of 61 New Trail (Agg Base & Mix Only) 250.00 LF $ 57.50 $ 14,375.00
330' of New 6' Trail (Complete)*'" 330.00 LF $ 149.00 $ 49,170,00
,
Total Bid; $ 115,891.00
Inclusions/Exclusions
No Traffic Control
No Removals
No Sawcutting
No Gate Valve or Manhole Adjustments
No Restoration
Mobilization
1 - Lake Ann Overlay
3 - Lake Ann New Trail
1 - Curry Farm Overlay
2 - Curry Farm New Trail (250')
3 - Curry Farm New trail (330')
Any Additnonal Mobs @ $925.00 Each
..L_ .~'
Project Notes:
Midwest Asphalt Corporation will honor this proposal for a period of,25 days
Retainage withheld same as owner
"'Includes Grading, Prep, Agg Base, Bit and Culvert Installation (City'to Supply Culvert)
*"'Includes Clearing and Grubbing, Grading, Prep, Agg Base & Bit. .
....lIeoccAll)u~.............""","-.,
.!
iiliZi
~
=O~_
..,.
. 1IIIl"l7j,l;I--
KS6~41 Chanhassen Trail (Cu~ry Farm & Lake Ann) Qt.xls
I
LAKE ANN PARK
0'.
_ ,. l ~.
"'::'"",,
.,..
:!V.', ,~'Iti~...;,~ ~,;:,':'"~.:~~.,."..c ,
........
Add Trail Overlay
Add Trail
RICE MARSH LAKE PARK
Delete Trail ($15,000)
SOUTHLOTUSLAKEPARK
Delete Trail ($15,000)
CURRY FARMS PARK
........
Add Trail Overlay
Add New Trail
Add Trail Reconstruction
.........
~
Capitol Improvement Program
City of Chonhossen, MN
1006 thru 1010
Contact Unassigned
Department Park & Trail bnprovements
Type Improvement
Useful Life 30 Years
Category Park
Priority nJa
.
Project #
PK&T -050
II
Project Name Off-Leash Dog Areas
Account # 1 410-0000-4706
Account # 3
Account #2
Total Project Cost $50,000
II
Description ,
The development or a contribution towards the development of an off leash dog area.
JI
JIll
Justifictitioll .,
An offleashdog area does not exist in town.
II
JI
Expenditures
Construction
2006
50,000
50,000
2007
2008
2009
2010
Total
50,000
50,000
II
Total
~
~
Funding Sources
Park Dedication Fund
2006
50,000
50,000
2007
2008
2009
2010
Total
50,000
50,000
~
Total
,
,
"0" if we contribute towards a county off leash dog area. Significant maintenance impact if we create our own.
Operational ImptlCt/Other
I
.,J ~
I
I
~
w
80
~
I
I
I
Capital Improvement Program
City ofChanhossen, MN
2006 thru 2010
Contact
Account # 1 410-0000-4701
Account # 3
Department Park & Trail Improvements
Type Improvement
Useful Life 30 Years
Category Park
Priority nla
Project #
PK&T -062
I
Project Name South Lotus Lake Park Trail
I
Account #2
Total Project Cost $15,000
Description I
Construction of an 8-foot wide pedestrian trail walkway to connect the two different sections of the park.
I
I
JustiJicotion I
These intema1 walkways are extremely popular with residents and are a relatively inexpensive means of increasing the usage of our parks.
I
I
I
Expenditures
Construction
2006
15,000
15,000
2007
2008
2009
2010
Total
15,000
15,000
Total
I
I
I
Funding Sources
Park Dedication Fund
2006
15,000
15,000
2007
2008
2009
2010
Total
15,000
15,000
Total
I
I
Operatio1llll ImplICt/Other
I
I
I
I
I
II
I
91
Capital Improvement Program
City of Clumhassen, MN
2006 thru 2010
Contact
Department Park & Trail hnprovements
Project #
PK&T -061
Type hnprovement
Useful Life 30 Years
Category Park
Priority n/a
Project Name Rice Marsh Lake Park Trail
Account # 1 410-0000-4701
Account # 3
Account #2
Total Project Cost $15,000
Description I
Construction of an 8-foot wide pedestrian trail walkway around the perimeter of Rice Marsh Lake Park.
Justification I
These internal walkways are extremely popular with residents and are a relatively inexpensive means of increasing the usage of our parks.
Expenditures
Construction
2006
15,000
15,000
2007
2008
2009
2010
Total
15,000
15,000
Total
Funding Sources
Park Dedication Fund
2006
15,000
15,000
2007
2008
2009
2010
Total
15,000
15,000
Total
OpertlJional Impact/Other
90
.
--
.
II
II