Loading...
1m. Approve Change Order for Turn Lane on Powers Blvd. CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227 1100 Fax 952.2271110 Building Inspections Phone 952,227 1180 Fax 952,2271190 Engineering Phone 952.2271160 Fax 952.227 1170 Finance Phone 952,227 1140 Fax 952,227 1110 Park & Recreation Phone 952.2271120 Fax 952,227 1110 Recreation Center 2310 Coulter Boulevard Phone 952.2271400 Fax 952,2271404 Planning & Natural Resources Phone 952.227 1130 Fax 952,227 1110 Public Works 1591 Park Road Phone: 952.227 1300 Fax 952.2271310 Senior Center Phone 952.2271125 Fax 952.227 1110 Web Site www.ci.chanhassen.mn.us ifY) MEMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme, P.E., Dir. of Public Works/City Engineer V, 0, FROM: DATE: August 14,2006 ~. SUBJ: Approve Change Order for Turn Lane on Powers Boulevard Project No. 03-09 REQUESTED ACTION Approve change order for turn lane on Powers Boulevard. BACKGROUND On February 28, 2005, Council approved a cooperative agreement with MnDOT for improvements in junction with the TH 212 project. On April 19, 2005, Council approved a loan agreement with the State of Minnesota for funding the TH 212 project. On November 14, 2005, Council approved assessments for TH 212. DISCUSSION This change order is for the addition of a curb cut and turn lane on Powers Boulevard for future access to a property on the east side of the county road. These improvements were not in the cooperative agreement, but were requested by the property owner to plan for future development. The turn lane was assessed 100% to the benefitmg property owner on November 14, 2005. The City just recently received the change order for this work. The change order number is the TH 212 project change order number. Approval of the change order is recommended. Attachments G:\ENG\TH 312\CoWICil item\bkgd081406 appr ell order tumlane.doc The City 01 Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks, A great place to live, work, and play STATE (lJ: MINNESOTA DEPARTMENT OF TRANSPORTATION Supp To Contract No S05063 DESIGN/BUILD CHANGE ORDER NO.9 DESIGN/BUILD PROJECT: Zumbro River Constructors Page 1 of 3 STATE PROJECT NO. 1017-12 LOCATION OF WORK: New alignment for TH 212 in Hennepin and Carver County from 850 feet east of CSAH 4/TH 312 interchange to approximately 6,050 feet west of the existing intersection of CR 147 and existing TH 212. CONTRACTOR NAME AND ADDRESS: 312 Lake Hazeltine Drive Suite 100 Chaska, Minnesota 55318 FEDERAL PROJECT NO. NH 0212 (308) CHANGE ORDER TOTAL $82,326.27 APPROV AL LEVEL REQUIRED D Level 1 r8J Level 2 This Contract is between the State of Minnesota, acting through its Commissioner of Transportation, and Contractor as follows: I. SCOPE OF WORK WHEREAS. This Project encompasses new design and construction for the realignment of TH 212, creating a controlled access highway from existing TH 312 termination to approximately 0 75 miles west of the intersection of Carver County Road 147 and TH 212, and WHEREAS The project consists of the design and construction of four-lane controlled access highway, and WHEREAS' The Project generally consists of grading, surfacing, noise berms, noise walls, ponds, signals, lighting, and signing and bridge construction, and WHEREAS. Additional major responsibilities include but are not limited to environmental coordination, public relations, utility coordination, and warranties, and WHEREAS' The new TH 212 will be part of the National Highway System, and WHEREAS The original project contract documents and plans do not indicate a right turn lane or a left turn lane on Powers Blvd at Station 88+00, and WHEREAS The City of Chanhassen has requested that a left turn lane on southbound Powers Boulevard and a right turn lane on northbound Powers Boulevard and a curb cut out at approximate Station 88+00, and WHEREAS The Engineer has determined that constructing these turn lanes under this Contract is in the best interest of the traveling public and constitutes Extra Work as Per Directive Letter 12. NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1) The Contractor is directed to design and construct a left turn lane on southbound Powers Boulevard and design and construct a right turn lane on northbound Powers Boulevard at approximate Station 88+00. 2) All design and construction for this change will be made as per the Contract documents for this project. 3) Payment will be as per the negotiated lump sum for all labor, equipment and materials associated with the design and construction of the right turn lane and the left turn lane as listed below in the 'Estimate of Cost' A payment for Contractor's Allowance In the amount of 10% for the first $50,000 of subcontractor work and 2% of the the remaining subcontractor cost, and a Contractor's risk payment as provided in Book 1, 13 6 3 will also be made 4) The Contractor shall not make claim of any kind or character whatsoever for any other costs or expenses which they may have incurred or which they may hereafter incur, in performing the work and furnishing the materials required by this Agreement. STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp To Contract No S05063 DESIGN/BUILD CHANGE ORDER NO.9 Page 2 of 3 II. COST ESTIMATE Estimate of Cost New Contract Items, Prime Contractor Work: Item No. Item Construct Turn Lanes Unit Unit Quantitv Price Amount LUMP SUM 1 $ 43,262 44 $ 43,262 44 Unit Unit Quantity Price Amount LUMP SUM 1 $ 21,632.71 $ 21,632 71 LUMP SUM 1 $ 2,170.00 $ 2,17000 LUMP SUM 1 $ 6,166.00 $ 6,16600 Subtotal $ 29,968 71 Prime Contractor's Allowance 10% $ 2.996,87 Total Subcontracted Work $ 32,965 58 Risk $ 6,098.24 Total All Work/Net Increase $ 82,326.27 Subcontracted Work: Item No. Item Bituminous Paving Pavement Markings Design and Survey Group 54 100% Costs are City of Chanhassen III. IMPACT DELAY ANALYSIS The Contractor agrees that there are no additional time impacts for this work. IV. ATTACHMENTS Other Documents D Plans D Specifications D Other V. DISCLAIMER This Change Order represents a complete and equitable adjustment to the contract price and time; and includes all costs, both direct and indirect, associated with delays, impacts, and time extensions. ...--. STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract NO.S05063 DESIGN/BUILD CHANGE ORDER NO.9 Page 3 of 3 VI. SIGNATURES level 1 & 2 APPROVALS level 2 APPROVALS Onl CONTRACTOR Zumbro River Constructors COMMISSIONER OF TRANSPORTATION By' By' Date Date. Mn/DOT COMMISSIONER OF ADMINISTRATION By' By: Date. Date MnlDOT ASSISTANT DISTRICT ENGINEER (ADE) MUNICIPAL APPROVAL (IF REQUIRED) By' By' Date Date. VII. FUND ENCUMBERANCE GROUP NO APPR. AMOUNT GROUP NO APPR. AMOUNT GROUP NO APPR, AMOUNT DATE ENCUMBERED ORIGNINAL ENCMUBRANCE, CHANGE ORDER TOTAL $ BY $ ENCUMBERED TO DATE. Individual signing certifies that funds have been encumbered as required bv Minn. Stat. !l16A.15 A.ltlll. 212 Audubon Road (County Road 15) to ^ Powers Blvd. (County Road 17) ~ ci ~ aJr:- (f)..... 0::0:: ~g o Cl. HOMESTEAD LN. r 'I North L.J 200 SCAle IN FEET BASED ON PREliMINARY DESIGN. DETAilS MAY CHANGE WITHOUT NOTICE. ~1:'1'" -\ ''i.\ -t .1. J